ML16201A223: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:*.' Andy T. Barbee Director,  
{{#Wiki_filter:*.' Andy T. Barbee Director, Nuclear Training 803.345.4034  
Nuclear Training  
803.345.4034  
A SCANA COMPANY U.S. Nuclear Regulatory  
A SCANA COMPANY U.S. Nuclear Regulatory  
Commission  
Commission  
ATTN: Document  
ATTN: Document Control Desk Washington, DC 20555-0001  
Control Desk Washington,  
Dear Sir I Madam: Subject: VIRGIL C. SUMMER NUCLEAR STATION, UNITS 1, 2 AND 3 DOCKET NO. 50-395 DOCKET NO. 52-027 AND 52-028 OPERATING  
DC 20555-0001  
LICENSE NO. NPF-12 COMBINED LICENSE NO. NPF-93 AND NPF-94 REGULA TORY ISSUE SUMMARY, RIS 2016-09 PREPARATION  
Dear Sir I Madam: Subject:  
VIRGIL C. SUMMER NUCLEAR STATION,  
UNITS 1, 2 AND 3 DOCKET NO. 50-395 DOCKET NO. 52-027 AND 52-028 OPERATING  
LICENSE NO. NPF-12 COMBINED  
LICENSE NO. NPF-93 AND NPF-94 REGULA TORY ISSUE SUMMARY,  
RIS 2016-09 PREPARATION  
AND SCHEDULING  
AND SCHEDULING  
OF OPERATOR  
OF OPERATOR LICENSING  
LICENSING  
EXAMINATIONS  
EXAMINATIONS  
July 15, 2016 Attached  
July 15, 2016 Attached please find South Carolina Electric & Gas Company's  
please find South Carolina  
Electric  
& Gas Company's  
anticipated  
anticipated  
schedule  
schedule for operator licensing  
for operator  
licensing  
examinations  
examinations  
for V. C. Summer Units 1, 2 and 3. As previously  
for V. C. Summer Units 1, 2 and 3. As previously  
discussed  
discussed  
with Region II, V. C. Summer Units 2 and 3 plan two examinations  
with Region II, V. C. Summer Units 2 and 3 plan two examinations  
for calendar  
for calendar year 2017. The proposed dates are 01/17/17 (alternate  
year 2017. The proposed  
dates are 01/17/17  
(alternate  
01/30/17)  
01/30/17)  
and 12/04/17  
and 12/04/17 (alternate  
(alternate  
12/11/17).  
12/11/17).  
Should you have any questions  
Should you have any questions  
Line 64: Line 46:
TS/ATB/wm  
TS/ATB/wm  
Attachments  
Attachments  
(2) c: K. B. Marsh S. A Byrne J.B. Archie N. S. Carns J. H. Hamilton  
(2) c: K. B. Marsh S. A Byrne J.B. Archie N. S. Carns J. H. Hamilton J. W. Williams W. M. Cherry C. Haney G. J. McCoy E. F. Guthrie S. A Williams N. E. Constance  
J. W. Williams  
P. A Mathena NRC Resident Inspector  
W. M. Cherry C. Haney G. J. McCoy E. F. Guthrie S. A Williams  
N. E. Constance  
P. A Mathena NRC Resident  
Inspector  
K. M. Sutton NSRC RTS (CR-16-03121)  
K. M. Sutton NSRC RTS (CR-16-03121)  
File (814. 04, RR 1150) PRSF (RC-16-0114)  
File (814. 04, RR 1150) PRSF (RC-16-0114)  
DCRM V. C. Summer Nuclear Station*  
DCRM V. C. Summer Nuclear Station* P. 0. Box 88 * Jenkinsville, SC* 29065 * F (803) 941-9776   
P. 0. Box 88 * Jenkinsville,  
SC* 29065 * F (803) 941-9776   
f.' NRC FORM536 U.S. NUCLEAR REGULATORY  
f.' NRC FORM536 U.S. NUCLEAR REGULATORY  
COMMISSION  
COMMISSION  
APPROVED  
APPROVED BY OMB: NO. 3150-0131  
BY OMB: NO. 3150-0131  
EXPIRES: 10/31/2017  
EXPIRES:  
10/31/2017  
(05-2016)  
(05-2016)  
rJP" R<G"<., Estimated  
rJP" R<G"<., Estimated  
burden per response  
burden per response to comply with this voluntary  
to comply with this voluntary  
information  
information  
collection  
collection  
request:  
request: 1 hour. This >'\ OPERA TOR LICENSING  
1 hour. This >'\ OPERA TOR LICENSING  
information  
information  
collection  
collection  
is used to plan budgets and resources  
is used to plan budgets and resources  
for operator  
for operator examinations.  
examinations.  
Send comments  
Send comments  
burden estimate  
burden estimate to the FOIA, Privacy, and Information  
to the FOIA, Privacy,  
and Information  
Collections  
Collections  
Branch (T-5 c F53), U.S. Nuclear Regulatory  
Branch (T-5 c F53), U.S. Nuclear Regulatory  
Commission,  
Commission, Washington, DC20555-0001, or by e-mail to t; " EXAMINATION  
Washington,  
DATA ,. . lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information  
DC20555-0001,  
or by e-mail to t; " EXAMINATION  
DATA ,. . lnfocollects.Resource@nrc.gov,  
and to the Desk Officer,  
Office of Information  
and Regulatory  
and Regulatory  
Affairs,  
Affairs, \, . 0# NEOB-10202, (3150-0131), Office of Management  
\, . 0# NEOB-10202,  
and Budget, Washington, DC 20503. If a means "1 ..... f.*"' used to impose an information  
(3150-0131),  
Office of Management  
and Budget, Washington,  
DC 20503. If a means "1 ..... f.*"' used to impose an information  
collection  
collection  
does not display a currently  
does not display a currently  
valid OMB control number, the NRC may not conduct or sponsor,  
valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information  
and a person is not required  
to respond to, the information  
collection.  
collection.  
FACILITY  
FACILITY NRC REGION Virgil C. Summer Nuclear Station, Unit 1 II A. PROPOSED EXAMINATION  
NRC REGION Virgil C. Summer Nuclear Station,  
Unit 1 II A. PROPOSED  
EXAMINATION  
PREPARATION  
PREPARATION  
SCHEDULE  
SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ----ESTIMATED  
PROPOSED  
NUMBER CY2018 CY2019 CY2020 CY2021 ----ESTIMATED  
NUMBER OF LICENSEE-PREPARED  
NUMBER OF LICENSEE-PREPARED  
l 1 .1 0 EXAMINATIONS  
l 1 .1 0 EXAMINATIONS  
Line 133: Line 86:
NUMBER OF NRG-PREPARED  
NUMBER OF NRG-PREPARED  
0 0 0 0 EXAMINATIONS  
0 0 0 0 EXAMINATIONS  
-B. INITIAL OPERATOR  
-B. INITIAL OPERATOR LICENSE EXAMINATIONS  
LICENSE EXAMINATIONS  
PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ------.. * NUMBER OF REACTOR 3 3 3 0 OPERATORS , NUMBER OF SENIOR REACTOR 3 3 3 0 OPERATORS  
PROPOSED  
-INSTANT NUMBER OF SENIOR REACTOR' 3 3 3 0 OPERATORS-UPGRADE  
NUMBER CY2018 CY2019 CY2020 CY2021 ------.. * NUMBER OF REACTOR 3 3 3 0 OPERATORS  
, NUMBER OF SENIOR REACTOR 3 3 3 0 OPERATORS  
-INSTANT NUMBER OF SENIOR REACTOR'  
3 3 3 0 OPERATORS-UPGRADE  
NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-
NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-
LIMITED c PROPOSED  
LIMITED c PROPOSED DATES PRIMARY DATE 05/28/2018  
DATES PRIMARY DATE 05/28/2018  
10/28/2019.  
10/28/2019.  
10/26/2020  
10/26/2020  
Line 149: Line 97:
11/04/2019  
11/04/2019  
11/02/2020  
11/02/2020  
c. PROPOSED  
c. PROPOSED GENERIC FUNDAMENTALS  
GENERIC FUNDAMENTALS  
EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 --* -NUMBER MARCH SEPTEMBER  
EXAMINATION  
(GFE) SCHEDULE  
PROPOSED  
CY 2017 CY 2018 --* -NUMBER MARCH SEPTEMBER  
MARCH SEPTEMBER  
MARCH SEPTEMBER  
ESTIMATED  
ESTIMATED  
Line 161: Line 105:
4 v * NRC FORM536 U.S. NUCLEAR REGULATORY  
4 v * NRC FORM536 U.S. NUCLEAR REGULATORY  
COMMISSION  
COMMISSION  
APPROVED  
APPROVED BY OMB: NO. 3150-0131  
BY OMB: NO. 3150-0131  
EXPIRES: 10/31/2017  
EXPIRES:  
10/31/2017  
(05-2016) ... ",. Estimated  
(05-2016) ... ",. Estimated  
burden per response  
burden per response to comply with this voluntary  
to comply with this voluntary  
information  
information  
collection  
collection  
Line 174: Line 115:
collection  
collection  
is used to plan budgets and resources  
is used to plan budgets and resources  
for operator  
for operator examinations.  
examinations.  
Send ti comments regarding  
Send ti comments  
burden estimate to the FOIA, Privacy, and Information  
regarding  
burden estimate  
to the FOIA, Privacy,  
and Information  
Collections  
Collections  
Branch (T-5 :; ll F53), U.S. Nuclear Regulatory  
Branch (T-5 :; ll F53), U.S. Nuclear Regulatory  
Commission,  
Commission, Washington, DC20555-0001, or by e-mail to ; EXAMINATION  
Washington,  
DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information  
DC20555-0001,  
or by e-mail to ; EXAMINATION  
DATA lnfocollects.Resource@nrc.gov,  
and to the Desk Officer,  
Office of Information  
and Regulatory  
and Regulatory  
Affairs, ..  
Affairs, ..  
NEOB-10202,  
NEOB-10202, (3150-0131), Office of Management  
(3150-0131),  
and Budget, Washington, DC 20503. If a means '*"'**&deg;'.  
Office of Management  
and Budget, Washington,  
DC 20503. If a means '*"'**&deg;'.  
used to impose an information  
used to impose an information  
collection  
collection  
does not display a currenijy  
does not display a currenijy  
valid OMB control number, the NRG may not conduct or sponsor,  
valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information  
and a person is not required  
to respond to, the information  
collection.  
collection.  
FACILITY  
FACILITY NRCREGION  
NRCREGION  
Virgil C. Summer Nuclear Station, Units 2 and 3 II ' A. PROPOSED EXAMINATION  
Virgil C. Summer Nuclear Station,  
Units 2 and 3 II ' A. PROPOSED  
EXAMINATION  
PREPARATION  
PREPARATION  
SCHEDULE  
SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 -----ESTIMATED  
PROPOSED  
NUMBER CY2018 CY2019 CY2020 CY2021 -----ESTIMATED  
NUMBER OF LICENSEE-PREPARED  
NUMBER OF LICENSEE-PREPARED  
1 1 1 1 EXAMINATIONS  
1 1 1 1 EXAMINATIONS  
Line 218: Line 140:
NUMBER OF NRG-PREPARED  
NUMBER OF NRG-PREPARED  
0 0 0 0 EXAMINATIONS  
0 0 0 0 EXAMINATIONS  
B. INITIAL OPERATOR  
B. INITIAL OPERATOR LICENSE EXAMINATIONS  
LICENSE EXAMINATIONS  
PROPOSED NUMBER . CY2018 CY2019 CY2020 CY2021 --------NUMBER OF REACTOR 0 0 0 0 OPERATORS  
PROPOSED  
NUMBER . CY2018 CY2019 CY2020 CY2021 --------NUMBER OF REACTOR 0 0 0 0 OPERATORS  
NUMBER OF SENIOR REACTOR 24 24 24 24 OPERATORS  
NUMBER OF SENIOR REACTOR 24 24 24 24 OPERATORS  
-INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE  
-INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE  
NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-
NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-
LIMITED PROPOSED  
LIMITED PROPOSED DATES PRIMARY DATE 10/08/2018  
DATES PRIMARY DATE 10/08/2018  
09116/2019  
09116/2019  
09/14/2020  
09/14/2020  
Line 235: Line 154:
09/28/2020  
09/28/2020  
09/27/2021  
09/27/2021  
c. PROPOSED  
c. PROPOSED GENERIC FUNDAMENTALS  
GENERIC FUNDAMENTALS  
EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 ---NUMBER MARCH SEPTEMBER  
EXAMINATION  
(GFE) SCHEDULE  
PROPOSED  
CY 2017 CY 2018 ---NUMBER MARCH SEPTEMBER  
MARCH SEPTEMBER  
MARCH SEPTEMBER  
ESTIMATED  
ESTIMATED  

Revision as of 07:42, 8 July 2018

Virgil C. Summer Nuclear Station Units 1, 2, and 3 - Preparation and Scheduling of Operator Licensing Examinations
ML16201A223
Person / Time
Site: Summer  South Carolina Electric & Gas Company icon.png
Issue date: 07/15/2016
From: Barbee A T
SCANA Corp, South Carolina Electric & Gas Co
To:
Document Control Desk, Office of New Reactors, Office of Nuclear Reactor Regulation
References
RIS 2016-09
Download: ML16201A223 (3)


See also: RIS 2016-09

Text

  • .' Andy T. Barbee Director, Nuclear Training 803.345.4034

A SCANA COMPANY U.S. Nuclear Regulatory

Commission

ATTN: Document Control Desk Washington, DC 20555-0001

Dear Sir I Madam: Subject: VIRGIL C. SUMMER NUCLEAR STATION, UNITS 1, 2 AND 3 DOCKET NO. 50-395 DOCKET NO.52-027 AND 52-028 OPERATING

LICENSE NO. NPF-12 COMBINED LICENSE NO. NPF-93 AND NPF-94 REGULA TORY ISSUE SUMMARY, RIS 2016-09 PREPARATION

AND SCHEDULING

OF OPERATOR LICENSING

EXAMINATIONS

July 15, 2016 Attached please find South Carolina Electric & Gas Company's

anticipated

schedule for operator licensing

examinations

for V. C. Summer Units 1, 2 and 3. As previously

discussed

with Region II, V. C. Summer Units 2 and 3 plan two examinations

for calendar year 2017. The proposed dates are 01/17/17 (alternate

01/30/17)

and 12/04/17 (alternate

12/11/17).

Should you have any questions

concerning

Unit 1 exams, please call Mr. Neil E. Constance

at (803) 345-4028.

For questions

concerning

Units 2 and 3 exams, please call Mr. Paul A Mathena at (803) 345-4642.

TS/ATB/wm

Attachments

(2) c: K. B. Marsh S. A Byrne J.B. Archie N. S. Carns J. H. Hamilton J. W. Williams W. M. Cherry C. Haney G. J. McCoy E. F. Guthrie S. A Williams N. E. Constance

P. A Mathena NRC Resident Inspector

K. M. Sutton NSRC RTS (CR-16-03121)

File (814. 04, RR 1150) PRSF (RC-16-0114)

DCRM V. C. Summer Nuclear Station* P. 0. Box 88 * Jenkinsville, SC* 29065 * F (803) 941-9776

f.' NRC FORM536 U.S. NUCLEAR REGULATORY

COMMISSION

APPROVED BY OMB: NO. 3150-0131

EXPIRES: 10/31/2017

(05-2016)

rJP" R<G"<., Estimated

burden per response to comply with this voluntary

information

collection

request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This >'\ OPERA TOR LICENSING

information

collection

is used to plan budgets and resources

for operator examinations.

Send comments

burden estimate to the FOIA, Privacy, and Information

Collections

Branch (T-5 c F53), U.S. Nuclear Regulatory

Commission, Washington, DC20555-0001, or by e-mail to t; " EXAMINATION

DATA ,. . lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information

and Regulatory

Affairs, \, . 0# NEOB-10202, (3150-0131), Office of Management

and Budget, Washington, DC 20503. If a means "1 ..... f.*"' used to impose an information

collection

does not display a currently

valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information

collection.

FACILITY NRC REGION Virgil C. Summer Nuclear Station, Unit 1 II A. PROPOSED EXAMINATION

PREPARATION

SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ----ESTIMATED

NUMBER OF LICENSEE-PREPARED

l 1 .1 0 EXAMINATIONS

ESTIMATED

NUMBER OF NRG-PREPARED

0 0 0 0 EXAMINATIONS

-B. INITIAL OPERATOR LICENSE EXAMINATIONS

PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ------.. * NUMBER OF REACTOR 3 3 3 0 OPERATORS , NUMBER OF SENIOR REACTOR 3 3 3 0 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR' 3 3 3 0 OPERATORS-UPGRADE

NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-

LIMITED c PROPOSED DATES PRIMARY DATE 05/28/2018

10/28/2019.

10/26/2020

ALTERNATE

DATE 06/04/2018

11/04/2019

11/02/2020

c. PROPOSED GENERIC FUNDAMENTALS

EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 --* -NUMBER MARCH SEPTEMBER

MARCH SEPTEMBER

ESTIMATED

NUMBER OF 0 0 6 0 CANDIDATES

NRC FORM 536 (05-2016)

4 v * NRC FORM536 U.S. NUCLEAR REGULATORY

COMMISSION

APPROVED BY OMB: NO. 3150-0131

EXPIRES: 10/31/2017

(05-2016) ... ",. Estimated

burden per response to comply with this voluntary

information

collection

request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This OPERA TOR LICENSING

information

collection

is used to plan budgets and resources

for operator examinations.

Send ti comments regarding

burden estimate to the FOIA, Privacy, and Information

Collections

Branch (T-5 :; ll F53), U.S. Nuclear Regulatory

Commission, Washington, DC20555-0001, or by e-mail to ; EXAMINATION

DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information

and Regulatory

Affairs, ..

NEOB-10202, (3150-0131), Office of Management

and Budget, Washington, DC 20503. If a means '*"'**°'.

used to impose an information

collection

does not display a currenijy

valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information

collection.

FACILITY NRCREGION

Virgil C. Summer Nuclear Station, Units 2 and 3 II ' A. PROPOSED EXAMINATION

PREPARATION

SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 -----ESTIMATED

NUMBER OF LICENSEE-PREPARED

1 1 1 1 EXAMINATIONS

ESTIMATED

NUMBER OF NRG-PREPARED

0 0 0 0 EXAMINATIONS

B. INITIAL OPERATOR LICENSE EXAMINATIONS

PROPOSED NUMBER . CY2018 CY2019 CY2020 CY2021 --------NUMBER OF REACTOR 0 0 0 0 OPERATORS

NUMBER OF SENIOR REACTOR 24 24 24 24 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE

NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-

LIMITED PROPOSED DATES PRIMARY DATE 10/08/2018

09116/2019

09/14/2020

09/13/2021

ALTERNATE

DATE 10/22/2018

09/30/2019

09/28/2020

09/27/2021

c. PROPOSED GENERIC FUNDAMENTALS

EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 ---NUMBER MARCH SEPTEMBER

MARCH SEPTEMBER

ESTIMATED

NUMBER OF 0 24 0 24 CANDIDATES

NRG FORM 536 (05-2016)