ML16201A223: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:*.' Andy T. Barbee Director, | {{#Wiki_filter:*.' Andy T. Barbee Director, Nuclear Training 803.345.4034 | ||
Nuclear Training | |||
803.345.4034 | |||
A SCANA COMPANY U.S. Nuclear Regulatory | A SCANA COMPANY U.S. Nuclear Regulatory | ||
Commission | Commission | ||
ATTN: Document | ATTN: Document Control Desk Washington, DC 20555-0001 | ||
Control Desk Washington, | Dear Sir I Madam: Subject: VIRGIL C. SUMMER NUCLEAR STATION, UNITS 1, 2 AND 3 DOCKET NO. 50-395 DOCKET NO. 52-027 AND 52-028 OPERATING | ||
DC 20555-0001 | LICENSE NO. NPF-12 COMBINED LICENSE NO. NPF-93 AND NPF-94 REGULA TORY ISSUE SUMMARY, RIS 2016-09 PREPARATION | ||
Dear Sir I Madam: Subject: | |||
VIRGIL C. SUMMER NUCLEAR STATION, | |||
UNITS 1, 2 AND 3 DOCKET NO. 50-395 DOCKET NO. 52-027 AND 52-028 OPERATING | |||
LICENSE NO. NPF-12 COMBINED | |||
LICENSE NO. NPF-93 AND NPF-94 REGULA TORY ISSUE SUMMARY, | |||
RIS 2016-09 PREPARATION | |||
AND SCHEDULING | AND SCHEDULING | ||
OF OPERATOR | OF OPERATOR LICENSING | ||
LICENSING | |||
EXAMINATIONS | EXAMINATIONS | ||
July 15, 2016 Attached | July 15, 2016 Attached please find South Carolina Electric & Gas Company's | ||
please find South Carolina | |||
Electric | |||
& Gas Company's | |||
anticipated | anticipated | ||
schedule | schedule for operator licensing | ||
for operator | |||
licensing | |||
examinations | examinations | ||
for V. C. Summer Units 1, 2 and 3. As previously | for V. C. Summer Units 1, 2 and 3. As previously | ||
discussed | discussed | ||
with Region II, V. C. Summer Units 2 and 3 plan two examinations | with Region II, V. C. Summer Units 2 and 3 plan two examinations | ||
for calendar | for calendar year 2017. The proposed dates are 01/17/17 (alternate | ||
year 2017. The proposed | |||
dates are 01/17/17 | |||
(alternate | |||
01/30/17) | 01/30/17) | ||
and 12/04/17 | and 12/04/17 (alternate | ||
(alternate | |||
12/11/17). | 12/11/17). | ||
Should you have any questions | Should you have any questions | ||
Line 64: | Line 46: | ||
TS/ATB/wm | TS/ATB/wm | ||
Attachments | Attachments | ||
(2) c: K. B. Marsh S. A Byrne J.B. Archie N. S. Carns J. H. Hamilton | (2) c: K. B. Marsh S. A Byrne J.B. Archie N. S. Carns J. H. Hamilton J. W. Williams W. M. Cherry C. Haney G. J. McCoy E. F. Guthrie S. A Williams N. E. Constance | ||
J. W. Williams | P. A Mathena NRC Resident Inspector | ||
W. M. Cherry C. Haney G. J. McCoy E. F. Guthrie S. A Williams | |||
N. E. Constance | |||
P. A Mathena NRC Resident | |||
Inspector | |||
K. M. Sutton NSRC RTS (CR-16-03121) | K. M. Sutton NSRC RTS (CR-16-03121) | ||
File (814. 04, RR 1150) PRSF (RC-16-0114) | File (814. 04, RR 1150) PRSF (RC-16-0114) | ||
DCRM V. C. Summer Nuclear Station* | DCRM V. C. Summer Nuclear Station* P. 0. Box 88 * Jenkinsville, SC* 29065 * F (803) 941-9776 | ||
P. 0. Box 88 * Jenkinsville, | |||
SC* 29065 * F (803) 941-9776 | |||
f.' NRC FORM536 U.S. NUCLEAR REGULATORY | f.' NRC FORM536 U.S. NUCLEAR REGULATORY | ||
COMMISSION | COMMISSION | ||
APPROVED | APPROVED BY OMB: NO. 3150-0131 | ||
BY OMB: NO. 3150-0131 | EXPIRES: 10/31/2017 | ||
EXPIRES: | |||
10/31/2017 | |||
(05-2016) | (05-2016) | ||
rJP" R<G"<., Estimated | rJP" R<G"<., Estimated | ||
burden per response | burden per response to comply with this voluntary | ||
to comply with this voluntary | |||
information | information | ||
collection | collection | ||
request: | request: 1 hour. This >'\ OPERA TOR LICENSING | ||
1 hour. This >'\ OPERA TOR LICENSING | |||
information | information | ||
collection | collection | ||
is used to plan budgets and resources | is used to plan budgets and resources | ||
for operator | for operator examinations. | ||
examinations. | |||
Send comments | Send comments | ||
burden estimate | burden estimate to the FOIA, Privacy, and Information | ||
to the FOIA, Privacy, | |||
and Information | |||
Collections | Collections | ||
Branch (T-5 c F53), U.S. Nuclear Regulatory | Branch (T-5 c F53), U.S. Nuclear Regulatory | ||
Commission, | Commission, Washington, DC20555-0001, or by e-mail to t; " EXAMINATION | ||
Washington, | DATA ,. . lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information | ||
DC20555-0001, | |||
or by e-mail to t; " EXAMINATION | |||
DATA ,. . lnfocollects.Resource@nrc.gov, | |||
and to the Desk Officer, | |||
Office of Information | |||
and Regulatory | and Regulatory | ||
Affairs, | Affairs, \, . 0# NEOB-10202, (3150-0131), Office of Management | ||
\, . 0# NEOB-10202, | and Budget, Washington, DC 20503. If a means "1 ..... f.*"' used to impose an information | ||
(3150-0131), | |||
Office of Management | |||
and Budget, Washington, | |||
DC 20503. If a means "1 ..... f.*"' used to impose an information | |||
collection | collection | ||
does not display a currently | does not display a currently | ||
valid OMB control number, the NRC may not conduct or sponsor, | valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information | ||
and a person is not required | |||
to respond to, the information | |||
collection. | collection. | ||
FACILITY | FACILITY NRC REGION Virgil C. Summer Nuclear Station, Unit 1 II A. PROPOSED EXAMINATION | ||
NRC REGION Virgil C. Summer Nuclear Station, | |||
Unit 1 II A. PROPOSED | |||
EXAMINATION | |||
PREPARATION | PREPARATION | ||
SCHEDULE | SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ----ESTIMATED | ||
PROPOSED | |||
NUMBER CY2018 CY2019 CY2020 CY2021 ----ESTIMATED | |||
NUMBER OF LICENSEE-PREPARED | NUMBER OF LICENSEE-PREPARED | ||
l 1 .1 0 EXAMINATIONS | l 1 .1 0 EXAMINATIONS | ||
Line 133: | Line 86: | ||
NUMBER OF NRG-PREPARED | NUMBER OF NRG-PREPARED | ||
0 0 0 0 EXAMINATIONS | 0 0 0 0 EXAMINATIONS | ||
-B. INITIAL OPERATOR | -B. INITIAL OPERATOR LICENSE EXAMINATIONS | ||
LICENSE EXAMINATIONS | PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ------.. * NUMBER OF REACTOR 3 3 3 0 OPERATORS , NUMBER OF SENIOR REACTOR 3 3 3 0 OPERATORS | ||
PROPOSED | -INSTANT NUMBER OF SENIOR REACTOR' 3 3 3 0 OPERATORS-UPGRADE | ||
NUMBER CY2018 CY2019 CY2020 CY2021 ------.. * NUMBER OF REACTOR 3 3 3 0 OPERATORS | |||
, NUMBER OF SENIOR REACTOR 3 3 3 0 OPERATORS | |||
-INSTANT NUMBER OF SENIOR REACTOR' | |||
3 3 3 0 OPERATORS-UPGRADE | |||
NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS- | NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS- | ||
LIMITED c PROPOSED | LIMITED c PROPOSED DATES PRIMARY DATE 05/28/2018 | ||
DATES PRIMARY DATE 05/28/2018 | |||
10/28/2019. | 10/28/2019. | ||
10/26/2020 | 10/26/2020 | ||
Line 149: | Line 97: | ||
11/04/2019 | 11/04/2019 | ||
11/02/2020 | 11/02/2020 | ||
c. PROPOSED | c. PROPOSED GENERIC FUNDAMENTALS | ||
GENERIC FUNDAMENTALS | EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 --* -NUMBER MARCH SEPTEMBER | ||
EXAMINATION | |||
(GFE) SCHEDULE | |||
PROPOSED | |||
CY 2017 CY 2018 --* -NUMBER MARCH SEPTEMBER | |||
MARCH SEPTEMBER | MARCH SEPTEMBER | ||
ESTIMATED | ESTIMATED | ||
Line 161: | Line 105: | ||
4 v * NRC FORM536 U.S. NUCLEAR REGULATORY | 4 v * NRC FORM536 U.S. NUCLEAR REGULATORY | ||
COMMISSION | COMMISSION | ||
APPROVED | APPROVED BY OMB: NO. 3150-0131 | ||
BY OMB: NO. 3150-0131 | EXPIRES: 10/31/2017 | ||
EXPIRES: | |||
10/31/2017 | |||
(05-2016) ... ",. Estimated | (05-2016) ... ",. Estimated | ||
burden per response | burden per response to comply with this voluntary | ||
to comply with this voluntary | |||
information | information | ||
collection | collection | ||
Line 174: | Line 115: | ||
collection | collection | ||
is used to plan budgets and resources | is used to plan budgets and resources | ||
for operator | for operator examinations. | ||
examinations. | Send ti comments regarding | ||
Send ti comments | burden estimate to the FOIA, Privacy, and Information | ||
regarding | |||
burden estimate | |||
to the FOIA, Privacy, | |||
and Information | |||
Collections | Collections | ||
Branch (T-5 :; ll F53), U.S. Nuclear Regulatory | Branch (T-5 :; ll F53), U.S. Nuclear Regulatory | ||
Commission, | Commission, Washington, DC20555-0001, or by e-mail to ; EXAMINATION | ||
Washington, | DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information | ||
DC20555-0001, | |||
or by e-mail to ; EXAMINATION | |||
DATA lnfocollects.Resource@nrc.gov, | |||
and to the Desk Officer, | |||
Office of Information | |||
and Regulatory | and Regulatory | ||
Affairs, .. | Affairs, .. | ||
NEOB-10202, | NEOB-10202, (3150-0131), Office of Management | ||
(3150-0131), | and Budget, Washington, DC 20503. If a means '*"'**°'. | ||
Office of Management | |||
and Budget, Washington, | |||
DC 20503. If a means '*"'**°'. | |||
used to impose an information | used to impose an information | ||
collection | collection | ||
does not display a currenijy | does not display a currenijy | ||
valid OMB control number, the NRG may not conduct or sponsor, | valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information | ||
and a person is not required | |||
to respond to, the information | |||
collection. | collection. | ||
FACILITY | FACILITY NRCREGION | ||
NRCREGION | Virgil C. Summer Nuclear Station, Units 2 and 3 II ' A. PROPOSED EXAMINATION | ||
Virgil C. Summer Nuclear Station, | |||
Units 2 and 3 II ' A. PROPOSED | |||
EXAMINATION | |||
PREPARATION | PREPARATION | ||
SCHEDULE | SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 -----ESTIMATED | ||
PROPOSED | |||
NUMBER CY2018 CY2019 CY2020 CY2021 -----ESTIMATED | |||
NUMBER OF LICENSEE-PREPARED | NUMBER OF LICENSEE-PREPARED | ||
1 1 1 1 EXAMINATIONS | 1 1 1 1 EXAMINATIONS | ||
Line 218: | Line 140: | ||
NUMBER OF NRG-PREPARED | NUMBER OF NRG-PREPARED | ||
0 0 0 0 EXAMINATIONS | 0 0 0 0 EXAMINATIONS | ||
B. INITIAL OPERATOR | B. INITIAL OPERATOR LICENSE EXAMINATIONS | ||
LICENSE EXAMINATIONS | PROPOSED NUMBER . CY2018 CY2019 CY2020 CY2021 --------NUMBER OF REACTOR 0 0 0 0 OPERATORS | ||
PROPOSED | |||
NUMBER . CY2018 CY2019 CY2020 CY2021 --------NUMBER OF REACTOR 0 0 0 0 OPERATORS | |||
NUMBER OF SENIOR REACTOR 24 24 24 24 OPERATORS | NUMBER OF SENIOR REACTOR 24 24 24 24 OPERATORS | ||
-INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE | -INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE | ||
NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS- | NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS- | ||
LIMITED PROPOSED | LIMITED PROPOSED DATES PRIMARY DATE 10/08/2018 | ||
DATES PRIMARY DATE 10/08/2018 | |||
09116/2019 | 09116/2019 | ||
09/14/2020 | 09/14/2020 | ||
Line 235: | Line 154: | ||
09/28/2020 | 09/28/2020 | ||
09/27/2021 | 09/27/2021 | ||
c. PROPOSED | c. PROPOSED GENERIC FUNDAMENTALS | ||
GENERIC FUNDAMENTALS | EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 ---NUMBER MARCH SEPTEMBER | ||
EXAMINATION | |||
(GFE) SCHEDULE | |||
PROPOSED | |||
CY 2017 CY 2018 ---NUMBER MARCH SEPTEMBER | |||
MARCH SEPTEMBER | MARCH SEPTEMBER | ||
ESTIMATED | ESTIMATED |
Revision as of 07:42, 8 July 2018
ML16201A223 | |
Person / Time | |
---|---|
Site: | Summer |
Issue date: | 07/15/2016 |
From: | Barbee A T SCANA Corp, South Carolina Electric & Gas Co |
To: | Document Control Desk, Office of New Reactors, Office of Nuclear Reactor Regulation |
References | |
RIS 2016-09 | |
Download: ML16201A223 (3) | |
See also: RIS 2016-09
Text
- .' Andy T. Barbee Director, Nuclear Training 803.345.4034
A SCANA COMPANY U.S. Nuclear Regulatory
Commission
ATTN: Document Control Desk Washington, DC 20555-0001
Dear Sir I Madam: Subject: VIRGIL C. SUMMER NUCLEAR STATION, UNITS 1, 2 AND 3 DOCKET NO. 50-395 DOCKET NO.52-027 AND 52-028 OPERATING
LICENSE NO. NPF-12 COMBINED LICENSE NO. NPF-93 AND NPF-94 REGULA TORY ISSUE SUMMARY, RIS 2016-09 PREPARATION
AND SCHEDULING
OF OPERATOR LICENSING
EXAMINATIONS
July 15, 2016 Attached please find South Carolina Electric & Gas Company's
anticipated
schedule for operator licensing
examinations
for V. C. Summer Units 1, 2 and 3. As previously
discussed
with Region II, V. C. Summer Units 2 and 3 plan two examinations
for calendar year 2017. The proposed dates are 01/17/17 (alternate
01/30/17)
and 12/04/17 (alternate
12/11/17).
Should you have any questions
concerning
Unit 1 exams, please call Mr. Neil E. Constance
at (803) 345-4028.
For questions
concerning
Units 2 and 3 exams, please call Mr. Paul A Mathena at (803) 345-4642.
TS/ATB/wm
Attachments
(2) c: K. B. Marsh S. A Byrne J.B. Archie N. S. Carns J. H. Hamilton J. W. Williams W. M. Cherry C. Haney G. J. McCoy E. F. Guthrie S. A Williams N. E. Constance
P. A Mathena NRC Resident Inspector
K. M. Sutton NSRC RTS (CR-16-03121)
File (814. 04, RR 1150) PRSF (RC-16-0114)
DCRM V. C. Summer Nuclear Station* P. 0. Box 88 * Jenkinsville, SC* 29065 * F (803) 941-9776
f.' NRC FORM536 U.S. NUCLEAR REGULATORY
COMMISSION
APPROVED BY OMB: NO. 3150-0131
EXPIRES: 10/31/2017
(05-2016)
rJP" R<G"<., Estimated
burden per response to comply with this voluntary
information
collection
request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This >'\ OPERA TOR LICENSING
information
collection
is used to plan budgets and resources
for operator examinations.
Send comments
burden estimate to the FOIA, Privacy, and Information
Collections
Branch (T-5 c F53), U.S. Nuclear Regulatory
Commission, Washington, DC20555-0001, or by e-mail to t; " EXAMINATION
DATA ,. . lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information
and Regulatory
Affairs, \, . 0# NEOB-10202, (3150-0131), Office of Management
and Budget, Washington, DC 20503. If a means "1 ..... f.*"' used to impose an information
collection
does not display a currently
valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information
collection.
FACILITY NRC REGION Virgil C. Summer Nuclear Station, Unit 1 II A. PROPOSED EXAMINATION
PREPARATION
SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ----ESTIMATED
NUMBER OF LICENSEE-PREPARED
l 1 .1 0 EXAMINATIONS
ESTIMATED
NUMBER OF NRG-PREPARED
0 0 0 0 EXAMINATIONS
-B. INITIAL OPERATOR LICENSE EXAMINATIONS
PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ------.. * NUMBER OF REACTOR 3 3 3 0 OPERATORS , NUMBER OF SENIOR REACTOR 3 3 3 0 OPERATORS
-INSTANT NUMBER OF SENIOR REACTOR' 3 3 3 0 OPERATORS-UPGRADE
NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-
LIMITED c PROPOSED DATES PRIMARY DATE 05/28/2018
10/28/2019.
10/26/2020
ALTERNATE
DATE 06/04/2018
11/04/2019
11/02/2020
c. PROPOSED GENERIC FUNDAMENTALS
EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 --* -NUMBER MARCH SEPTEMBER
MARCH SEPTEMBER
ESTIMATED
NUMBER OF 0 0 6 0 CANDIDATES
NRC FORM 536 (05-2016)
4 v * NRC FORM536 U.S. NUCLEAR REGULATORY
COMMISSION
APPROVED BY OMB: NO. 3150-0131
EXPIRES: 10/31/2017
(05-2016) ... ",. Estimated
burden per response to comply with this voluntary
information
collection
request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This OPERA TOR LICENSING
information
collection
is used to plan budgets and resources
for operator examinations.
Send ti comments regarding
burden estimate to the FOIA, Privacy, and Information
Collections
Branch (T-5 :; ll F53), U.S. Nuclear Regulatory
Commission, Washington, DC20555-0001, or by e-mail to ; EXAMINATION
DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information
and Regulatory
Affairs, ..
NEOB-10202, (3150-0131), Office of Management
and Budget, Washington, DC 20503. If a means '*"'**°'.
used to impose an information
collection
does not display a currenijy
valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information
collection.
FACILITY NRCREGION
Virgil C. Summer Nuclear Station, Units 2 and 3 II ' A. PROPOSED EXAMINATION
PREPARATION
SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 -----ESTIMATED
NUMBER OF LICENSEE-PREPARED
1 1 1 1 EXAMINATIONS
ESTIMATED
NUMBER OF NRG-PREPARED
0 0 0 0 EXAMINATIONS
B. INITIAL OPERATOR LICENSE EXAMINATIONS
PROPOSED NUMBER . CY2018 CY2019 CY2020 CY2021 --------NUMBER OF REACTOR 0 0 0 0 OPERATORS
NUMBER OF SENIOR REACTOR 24 24 24 24 OPERATORS
-INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE
NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-
LIMITED PROPOSED DATES PRIMARY DATE 10/08/2018
09116/2019
09/14/2020
09/13/2021
ALTERNATE
DATE 10/22/2018
09/30/2019
09/28/2020
09/27/2021
c. PROPOSED GENERIC FUNDAMENTALS
EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 ---NUMBER MARCH SEPTEMBER
MARCH SEPTEMBER
ESTIMATED
NUMBER OF 0 24 0 24 CANDIDATES
NRG FORM 536 (05-2016)