ML17037C259: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:t<<ASSI~p~'<oplltlUNITEDSTATESATOMICENERGYCOMMISSION WASMINGTON, D.C.2054Srr0y+~4)IS0IAugust22,1973UocketHo,5P22PNiagaramohawkPowerCorporation ATTN:Nr.PhilipD.Raymond,YicePresident-Engineering 300ErieBoulevard 1<estSyracuse, NewYork13202Gentlemen:
{{#Wiki_filter:t<<ASSI~p~'<op ll tl UNITED STATES ATOMIC ENERGY COMMISSION WASMINGTON, D.C.2054S rr 0 y+~4)IS 0I August 22, 1973 Uocket Ho, 5P 22P Niagara mohawk Power Corporation ATTN: Nr.Philip D.Raymond, Yice President-Engineering 300 Erie Boulevard 1<est Syracuse, New York 13202 Gentlemen:
4TheAtomicEnergyCommission hasamendeditsregulations torequireoperators whomanipulate thecontrolsofnuclearpowerreactorsandotherlicensedproduction andutilization facilities tocompletearequalification programorbeadmipistered areexamination beforeeachlicenserenewalandtorequirefacilitylicensees tocarryoutsrlansi~+e nneva+nvvenid~1ifir~tiOnnvnnv'>meAnamendment toPart55.oftheAEC'sregulations, whichwaspublished intheFederalRegisteronAugust17,1973establishes minimumre-'quirements forrequalificatipn programsincluding on-the-job trainingandlecturesonbasictheoriesandsafetysystemsofthespecificplant.Itappliestobothoperators andsenioroperators.
4 The Atomic Energy Commission has amended its regulations to require operators who manipulate the controls of nuclear power reactors and other licensed production and utilization facilities to complete a requalification program or be admipistered a reexamination before each license renewal and to require facility licensees to carry out srlansi~+e nnev a+nv v enid~1 i fir~tiOn nv nnv'>me An amendment to Part 55.of the AEC's regulations, which was published in the Federal Register on August 17, 1973 establishes minimum re-'quirements for requalificatipn programs including on-the-job training and lectures on basic theories and safety systems of the specific plant.It applies to both operators and senior operators.
.Anamendment toPart50published intheFederalRegisteronthesamedaterequiresthatanapplication for.alicensetooperateafacilityItIustincludeadescription andplansforimplementation ofanoperatorrequalification program.Also,eachfacilitylicenseemusthavesuchaprograminoper'ation withinthreemonthsafterissuanceofanoperating license.Holdersofoperating licensesineffectontheeffective dateoftheseamendments, September 17,'1973, mustsubmitanoperatorrequalification programforCommission approval'and con-.currently implement thatprogramwithinthreemonthsafterthe'ffective dateoftheamendments.  
.An amendment to Part 50 published in the Federal Register on the same date requires that an application for.a license to operate a facility ItIust include a description and plans for implementation of an operator requalification program.Also, each facility licensee must have such a program in oper'ation within three months after issuance of an operating license.Holders of operating licenses in effect on the effective date of these amendments, September 17,'1973, must submit an operator requalification program for Commission approval'and con-.currently implement that program within three months after the'ffective date of the amendments.  


NiagaraMohawkPowerCorp.Allpower,testandreprocessing facilitylicensees arerequested tosubmittherequiredinformation withonesignedoriginalandthirty-nineadditional copies.Ifasinglesubmittal coversmorethanoneunitat.astation,onesignedoriginalandfifty-nine additional copiesshouldbeprovided.
Niagara Mohawk Power Corp.All power, test and reprocessing facility licensees are requested to submit the required information with one signed original and thirty-nine additional copies.If a single submittal covers more than one unit at.a station, one signed original and fifty-nine additional copies should be provided.All other facility licensees are requested to sub-mit one signed original and twenty-one additional copies.Sincerely, D.J.Skovholt, Assistant Director for Operating Reactors Directorate of Licensing
Allotherfacilitylicensees arerequested tosub-mitonesignedoriginalandtwenty-one additional copies.Sincerely, D.J.Skovholt, Assistant DirectorforOperating ReactorsDirectorate ofLicensing


==Enclosure:==
==Enclosure:==


1.Amendment to10CFRPart50andPart55,cc:ArvinE.Upton,EsquireAttorneyLeBoeuf,Lamb,Leiby8HacRae1821Jefferson PlaceN.M.Washington, D.C.20036DISTRNUTION:PDRLocalPDRDocketRoomFacilityFileD.J.SkovholtD.L.,Ziemann 0~}}
1.Amendment to 10 CFR Part 50 and Part 55, cc: Arvin E.Upton, Esquire Attorney LeBoeuf, Lamb, Leiby 8 HacRae 1821 Jefferson Place N.M.Washington, D.C.20036 DISTR NUT ION: PDR Local PDR Docket Room Facility File D.J.Skovholt D.L., Ziemann 0~}}

Revision as of 01:47, 8 July 2018

Nine Mile Point Unit 1 - Letter Regarding Amendments to Part 55 of the Aec'S Regulations Establishing Minimum Requirements for Requalification Programs and Requesting That All Power, Test, and Reprocessing Facility Licenses Submit the Requi
ML17037C259
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/22/1973
From: Skovholt D J
US Atomic Energy Commission (AEC)
To: Raymond P D
Niagara Mohawk Power Corp
References
Download: ML17037C259 (4)


Text

t<<ASSI~p~'<op ll tl UNITED STATES ATOMIC ENERGY COMMISSION WASMINGTON, D.C.2054S rr 0 y+~4)IS 0I August 22, 1973 Uocket Ho, 5P 22P Niagara mohawk Power Corporation ATTN: Nr.Philip D.Raymond, Yice President-Engineering 300 Erie Boulevard 1<est Syracuse, New York 13202 Gentlemen:

4 The Atomic Energy Commission has amended its regulations to require operators who manipulate the controls of nuclear power reactors and other licensed production and utilization facilities to complete a requalification program or be admipistered a reexamination before each license renewal and to require facility licensees to carry out srlansi~+e nnev a+nv v enid~1 i fir~tiOn nv nnv'>me An amendment to Part 55.of the AEC's regulations, which was published in the Federal Register on August 17, 1973 establishes minimum re-'quirements for requalificatipn programs including on-the-job training and lectures on basic theories and safety systems of the specific plant.It applies to both operators and senior operators.

.An amendment to Part 50 published in the Federal Register on the same date requires that an application for.a license to operate a facility ItIust include a description and plans for implementation of an operator requalification program.Also, each facility licensee must have such a program in oper'ation within three months after issuance of an operating license.Holders of operating licenses in effect on the effective date of these amendments, September 17,'1973, must submit an operator requalification program for Commission approval'and con-.currently implement that program within three months after the'ffective date of the amendments.

Niagara Mohawk Power Corp.All power, test and reprocessing facility licensees are requested to submit the required information with one signed original and thirty-nine additional copies.If a single submittal covers more than one unit at.a station, one signed original and fifty-nine additional copies should be provided.All other facility licensees are requested to sub-mit one signed original and twenty-one additional copies.Sincerely, D.J.Skovholt, Assistant Director for Operating Reactors Directorate of Licensing

Enclosure:

1.Amendment to 10 CFR Part 50 and Part 55, cc: Arvin E.Upton, Esquire Attorney LeBoeuf, Lamb, Leiby 8 HacRae 1821 Jefferson Place N.M.Washington, D.C.20036 DISTR NUT ION: PDR Local PDR Docket Room Facility File D.J.Skovholt D.L., Ziemann 0~