|
|
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:ES-201Examination Outline Quality Checklist Facility: | | {{#Wiki_filter:ES-201 Examination Outline Quality Checklist Facility: |
| Fermi 2Date of Examination: | | Fermi 2 Date of Examination: |
| 312012017 ItemTask Description lnitialsab*c#1.RITTENa.Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401 or ES'401N'Nç+9Wb. Assess whether the outline was systematically and randomly prepared n accordance withSection D.'1 of ES-401 or ES-401 N and whether all llA categories are appropriately sampled.n4pv{d,c. Assess whether the outlineevolutions or.\{toüqtd. Assesswhetherthe ns for deselected orK/A statements areriate,nút,f,ltw2.sIMULAToRa.Usng Form ES-301-5, verify that the proposed scenario sets cover the required number ofnorml evolutions, instrument and component | | 312012017 Item Task Description lnitials a b*c#1.R I T T E N a.Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401 or ES'401N'Nç+9 W b. Assess whether the outline was systematically and randomly prepared n accordance with Section D.'1 of ES-401 or ES-401 N and whether all llA categories are appropriately sampled.n4p v{d, c. Assess whether the outline evolutions or.\{toüqt d. Assesswhetherthe ns for deselected or K/A statements are riate,nút, f,ltw 2.s I M U L A T o R a.Usng Form ES-301-5, verify that the proposed scenario sets cover the required number of norml evolutions, instrument and component failures, technical specifications, and major transients |
| : failures, technical specifications, and majortransients
| | @ûqøb.Assess whether there are e nough scenario sets (a nd spa res)to test the p rojected num ber a nd mtx of appl icants n accordance with the expected crew compos ition nd rotation schedule wthout comp rom ising exam i significantly nteg rlty and en SU re that each appl icant can be tested us ing at least one new or modified scenano, that no scena nos are du p licated from the audit test(s), and that scenarios will not be onn*çf$.tb c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative and quantitative criteria specified on Form ES-301-4 and described in D te'{fnh 3, W A L K T H R o U G H Verify that the systems walk{hrough outline meets the criteria specified on Form ES-301'2: (t ) ifre outline(s) contain(s) the required number of control room and in-plant tasks distributed among the safety functions as specified on the form (2) task repetition from the last two NRC examinations is within ihe limits specified on the form (3) no tasks are duplicated from the applicants' audit test(s) )(4) the number of new or modified tasks meets or exceeds the minimums specified on the form (Sl the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.s\*\tfr4 b. Verify that the administrative outline meets the crteria specifed on Form ES-30'1-'1 (1) the tasks are distributed among the topics as specifed on the form at least one task is new or significa no more than one task is repeated ntly modified from the last two NRC licensing examinations S\P{$\op c. Determine if there are enough different outlnes to test the projected number and mix of and ensure that no items are du ons nt${ll\ctf)4.(t E N E R A L a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the riate exam sections.rPút$@b. Assess whether the 10 CFR 55.41143 and 55.45 ts tP'$rD$\@c. Ensure that KA ratin for at least 2.5.$\D 0J!?$f\qd. Check for duplication and exam sectionsn,taú>$.qf'e. Check the entire exam for balance of covens^ûtnøf. Assess whether the exam fits the a level orngncdb Printed re Date ill sltL ,, I t/ry.tU t //b?/e/r¿a. Author b. Facility Reviewer (-)c. NRC Chief Examiner (#)d. NRC Supervisor R 0 Note:# lndepe ndent NRC reviewer initial items in Column "c"; chief examiner concurrence required- Not applicable for N RC-prepa red examination outlines.* tÅ):ff r*rrie, c.*¿;+ tect ahen quai (c\blt 'nçq}} |
| @ûqøb.Assesswhetherthereareenoughscenariosets(andspares)totesttheprojectednumberandmtxofapplicantsnaccordance withtheexpectedcrewcompositionndrotationschedulewthoutcompromising exam isignificantly ntegrltyandenSUrethateachapplicantcanbetestedusingatleastonenewormodifiedscenano,thatnoscenanosareduplicatedfromtheaudit test(s), | |
| and that scenarios will not beonn*çf$.tbc. To the extent possible, assess whether the outline(s) conform(s) with the qualitative andquantitative criteria specified on Form ES-301-4 and described inDte'{fnh3,WALKTHRoUGHVerify that the systems walk{hrough outline meets the criteria specified on Form ES-301'2: | |
| (t ) ifre outline(s) contain(s) the required number of control room and in-plant tasks distributed among the safety functions as specified on the form(2) task repetition from the last two NRC examinations is within ihe limits specified on the form(3) no tasks are duplicated from the applicants' audit test(s) )(4) the number of new or modified tasks meets or exceeds the minimums specified on the form(Sl the number of alternate path, low-power, emergency, and RCA tasks meet the criteria onthe form.s\*\tfr4b. Verify that the administrative outline meets the crteria specifed on Form ES-30'1-'1 (1) the tasks are distributed among the topics as specifed on the format least one task is new or significa no more than one task is repeatedntly modifiedfrom the last two NRC licensing examinations S\P{$\opc. Determine if there are enough different outlnes to test the projected number and mix ofand ensure that no items are duonsnt${ll\ctf)4.(tENERALa. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in theriate exam sections. | |
| rPút$@b. Assess whether the 10 CFR 55.41143 and 55.45tstP'$rD$\@c. Ensure that KAratinforat least 2.5.$\D0J!?$f\qd. Check for duplication andexam sectionsn,taú>$.qf'e. Check the entire exam for balance of covens^ûtnøf. Assess whether the exam fits the alevelorngncdbPrintedreDateill sltL,, I t/ry.tU t //b?/e/r¿a. Authorb. Facility Reviewer | |
| (-)c. NRC Chief Examiner | |
| (#)d. NRC Supervisor R0Note:# lndependent NRC reviewer initial items in Column "c"; chief examiner concurrence required- Not applicable for NRC-prepared examination outlines. | |
| * tÅ):ff r*rrie, c.*¿;+ tect ahen quai (c\blt 'nçq}} | |
Similar Documents at Fermi |
---|
Category:License-Operator
MONTHYEARML24197A0622024-07-15015 July 2024 Retake Exam Form 5.1-1 Postexamination Check Sheet IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A0992024-06-14014 June 2024 Retake Exam Form 1.3-1 Examination Security Agreement ML24173A1002024-06-14014 June 2024 Retake Exam Form 2.1-1 Examination Preparation Checklist ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24173A0862024-06-0505 June 2024 Retake Exam Form 2.3-2 Operating Test Quality Checklist NRC-24-0038, Retake Exam Proposed Exam Submittal Letter2024-05-22022 May 2024 Retake Exam Proposed Exam Submittal Letter NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24149A1102024-03-13013 March 2024 Form 1.3-1, Examination Security ML24149A1152024-03-13013 March 2024 Form 5.1-1 Post Examination Check Sheet (Fermi 2024) ML24149A1132024-03-13013 March 2024 Form 2.1-1, Examination Preparation Checklist (Fermi 2024) ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 ML24149A0702024-02-14014 February 2024 Form 3.4-1 Events and Evolutions Checklist (Fermi 2024 Ile - Final) ML24149A0682024-02-14014 February 2024 NRC Form 2.3-1 Examination Outline Quality Checklist ML24149A0862024-01-0505 January 2024 Form 2.3-4, Written Exam Quality Checklist, Fermi 2024 Ile ML24149A0852024-01-0505 January 2024 Form 2.3-2, Operating Test Quality Checklist, Fermi 2024 Ile NRC-23-0078, Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day2023-12-13013 December 2023 Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day NRC-23-0067, NRC-23-0067 signed-150 Day Outline Submittal2023-09-29029 September 2023 NRC-23-0067 signed-150 Day Outline Submittal IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21326A1532021-06-16016 June 2021 ES-401-1 and ES-401-3_Initial ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A0922021-06-16016 June 2021 ES-301-6 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 2024-07-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24197A0622024-07-15015 July 2024 Retake Exam Form 5.1-1 Postexamination Check Sheet IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A0992024-06-14014 June 2024 Retake Exam Form 1.3-1 Examination Security Agreement ML24173A1002024-06-14014 June 2024 Retake Exam Form 2.1-1 Examination Preparation Checklist ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24173A0862024-06-0505 June 2024 Retake Exam Form 2.3-2 Operating Test Quality Checklist NRC-24-0038, Retake Exam Proposed Exam Submittal Letter2024-05-22022 May 2024 Retake Exam Proposed Exam Submittal Letter NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24149A1102024-03-13013 March 2024 Form 1.3-1, Examination Security ML24149A1152024-03-13013 March 2024 Form 5.1-1 Post Examination Check Sheet (Fermi 2024) ML24149A1132024-03-13013 March 2024 Form 2.1-1, Examination Preparation Checklist (Fermi 2024) ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 ML24149A0702024-02-14014 February 2024 Form 3.4-1 Events and Evolutions Checklist (Fermi 2024 Ile - Final) ML24149A0682024-02-14014 February 2024 NRC Form 2.3-1 Examination Outline Quality Checklist ML24149A0862024-01-0505 January 2024 Form 2.3-4, Written Exam Quality Checklist, Fermi 2024 Ile ML24149A0852024-01-0505 January 2024 Form 2.3-2, Operating Test Quality Checklist, Fermi 2024 Ile NRC-23-0078, Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day2023-12-13013 December 2023 Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day NRC-23-0067, NRC-23-0067 signed-150 Day Outline Submittal2023-09-29029 September 2023 NRC-23-0067 signed-150 Day Outline Submittal IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21326A1532021-06-16016 June 2021 ES-401-1 and ES-401-3_Initial ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A0922021-06-16016 June 2021 ES-301-6 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 2024-07-09
[Table view] |
Text
ES-201 Examination Outline Quality Checklist Facility:
Fermi 2 Date of Examination:
312012017 Item Task Description lnitials a b*c#1.R I T T E N a.Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401 or ES'401N'Nç+9 W b. Assess whether the outline was systematically and randomly prepared n accordance with Section D.'1 of ES-401 or ES-401 N and whether all llA categories are appropriately sampled.n4p v{d, c. Assess whether the outline evolutions or.\{toüqt d. Assesswhetherthe ns for deselected or K/A statements are riate,nút, f,ltw 2.s I M U L A T o R a.Usng Form ES-301-5, verify that the proposed scenario sets cover the required number of norml evolutions, instrument and component failures, technical specifications, and major transients
@ûqøb.Assess whether there are e nough scenario sets (a nd spa res)to test the p rojected num ber a nd mtx of appl icants n accordance with the expected crew compos ition nd rotation schedule wthout comp rom ising exam i significantly nteg rlty and en SU re that each appl icant can be tested us ing at least one new or modified scenano, that no scena nos are du p licated from the audit test(s), and that scenarios will not be onn*çf$.tb c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative and quantitative criteria specified on Form ES-301-4 and described in D te'{fnh 3, W A L K T H R o U G H Verify that the systems walk{hrough outline meets the criteria specified on Form ES-301'2: (t ) ifre outline(s) contain(s) the required number of control room and in-plant tasks distributed among the safety functions as specified on the form (2) task repetition from the last two NRC examinations is within ihe limits specified on the form (3) no tasks are duplicated from the applicants' audit test(s) )(4) the number of new or modified tasks meets or exceeds the minimums specified on the form (Sl the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.s\*\tfr4 b. Verify that the administrative outline meets the crteria specifed on Form ES-30'1-'1 (1) the tasks are distributed among the topics as specifed on the form at least one task is new or significa no more than one task is repeated ntly modified from the last two NRC licensing examinations S\P{$\op c. Determine if there are enough different outlnes to test the projected number and mix of and ensure that no items are du ons nt${ll\ctf)4.(t E N E R A L a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the riate exam sections.rPút$@b. Assess whether the 10 CFR 55.41143 and 55.45 ts tP'$rD$\@c. Ensure that KA ratin for at least 2.5.$\D 0J!?$f\qd. Check for duplication and exam sectionsn,taú>$.qf'e. Check the entire exam for balance of covens^ûtnøf. Assess whether the exam fits the a level orngncdb Printed re Date ill sltL ,, I t/ry.tU t //b?/e/r¿a. Author b. Facility Reviewer (-)c. NRC Chief Examiner (#)d. NRC Supervisor R 0 Note:# lndepe ndent NRC reviewer initial items in Column "c"; chief examiner concurrence required- Not applicable for N RC-prepa red examination outlines.* tÅ):ff r*rrie, c.*¿;+ tect ahen quai (c\blt 'nçq