MONTHYEARML24197A0622024-07-15015 July 2024 Retake Exam Form 5.1-1 Postexamination Check Sheet IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A0992024-06-14014 June 2024 Retake Exam Form 1.3-1 Examination Security Agreement ML24173A1002024-06-14014 June 2024 Retake Exam Form 2.1-1 Examination Preparation Checklist ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24173A0862024-06-0505 June 2024 Retake Exam Form 2.3-2 Operating Test Quality Checklist NRC-24-0038, Retake Exam Proposed Exam Submittal Letter2024-05-22022 May 2024 Retake Exam Proposed Exam Submittal Letter NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24149A1102024-03-13013 March 2024 Form 1.3-1, Examination Security ML24149A1152024-03-13013 March 2024 Form 5.1-1 Post Examination Check Sheet (Fermi 2024) ML24149A1132024-03-13013 March 2024 Form 2.1-1, Examination Preparation Checklist (Fermi 2024) ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 ML24149A0702024-02-14014 February 2024 Form 3.4-1 Events and Evolutions Checklist (Fermi 2024 Ile - Final) ML24149A0682024-02-14014 February 2024 NRC Form 2.3-1 Examination Outline Quality Checklist ML24149A0862024-01-0505 January 2024 Form 2.3-4, Written Exam Quality Checklist, Fermi 2024 Ile ML24149A0852024-01-0505 January 2024 Form 2.3-2, Operating Test Quality Checklist, Fermi 2024 Ile NRC-23-0078, Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day2023-12-13013 December 2023 Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day NRC-23-0067, NRC-23-0067 signed-150 Day Outline Submittal2023-09-29029 September 2023 NRC-23-0067 signed-150 Day Outline Submittal IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21326A1532021-06-16016 June 2021 ES-401-1 and ES-401-3_Initial ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A0922021-06-16016 June 2021 ES-301-6 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 2024-07-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24197A0622024-07-15015 July 2024 Retake Exam Form 5.1-1 Postexamination Check Sheet IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A0992024-06-14014 June 2024 Retake Exam Form 1.3-1 Examination Security Agreement ML24173A1002024-06-14014 June 2024 Retake Exam Form 2.1-1 Examination Preparation Checklist ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24173A0862024-06-0505 June 2024 Retake Exam Form 2.3-2 Operating Test Quality Checklist NRC-24-0038, Retake Exam Proposed Exam Submittal Letter2024-05-22022 May 2024 Retake Exam Proposed Exam Submittal Letter NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24149A1102024-03-13013 March 2024 Form 1.3-1, Examination Security ML24149A1152024-03-13013 March 2024 Form 5.1-1 Post Examination Check Sheet (Fermi 2024) ML24149A1132024-03-13013 March 2024 Form 2.1-1, Examination Preparation Checklist (Fermi 2024) ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 ML24149A0702024-02-14014 February 2024 Form 3.4-1 Events and Evolutions Checklist (Fermi 2024 Ile - Final) ML24149A0682024-02-14014 February 2024 NRC Form 2.3-1 Examination Outline Quality Checklist ML24149A0862024-01-0505 January 2024 Form 2.3-4, Written Exam Quality Checklist, Fermi 2024 Ile ML24149A0852024-01-0505 January 2024 Form 2.3-2, Operating Test Quality Checklist, Fermi 2024 Ile NRC-23-0078, Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day2023-12-13013 December 2023 Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day NRC-23-0067, NRC-23-0067 signed-150 Day Outline Submittal2023-09-29029 September 2023 NRC-23-0067 signed-150 Day Outline Submittal IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21326A1532021-06-16016 June 2021 ES-401-1 and ES-401-3_Initial ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A0922021-06-16016 June 2021 ES-301-6 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 2024-07-09
[Table view] |
Text
ES-301 Administrative Topics Outline Form ES-301-l Facility: Fermi 2 Date of Examination 3120120t7 Examination Level: RO E SRO Operating Test Number: 2017-r Administrative Topic (see Note) Type Describe activity to be performed Code*
Complete the Mode Shiftly/Daily Surveillances Conduct of Operations R,D lKtA2.2.4414.214.4 802-4r0r Determine the availability of RPV level instruments Conduct of Operations S/R,N
[KtA2.r.4s] 4.314.3 802-4101-450 IdentiSr the isolation boundaries for a clearance to replace a pump impeller Equipment Control S/R, D,P lKtA2.2.r3l4.U4.3 802-4r0r-44r Enter and Exit a contaminated area Radiation Control S,D lKtA 2.3.7l 3.s13.6 802-4r0t-442 Emergency Plan N/A N/A NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type (C)ontrol room, (S)imulator, or Class(R)oom Codes & Criteria (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (> 1)
(P)revious 2 exams (s 1; randomly selected)
ES-301 Adm inistrative Topics Outline Form ES-301-l Facility: Fermi 2 Date of Examination 312012017 Examination Level: RO SRO X Operating Test Number: 2017-l Administrative Topic (see Note) Type Describe activity to be performed Code*
Review the Mode 5 Shiftly/Daily Surveillances Conduct of Operations S/R,D lKtA2.r.4ol2.813.e 802-4r0t-440 Determine availability of RPV level instruments Conduct of Operations S/R,N lKtA 2.r.4s1.3t4.3 802-4r0t-450 Evaluate a Temporary Change Notice Equipment Control S/R,D lKtA2.2.sl2.213.2 802-4t0t-420 and Exit a contaminated area Radiation Control S/R,D lKtA2.3.7l3.st3.6 802-4r0r-442 Activate ECOS using a phone Emergency Plan S/R, D,P lKtA2.4.43) 3.213.8 802-4r0t-443 NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- (C)ontrol room, (S)imulator, or Class(R)oom Type Codes & Criteria (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (> 1)
(P)revious 2 exams (< 1; randomly selected)