NRC-23-0078, Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day

From kanterella
Jump to navigation Jump to search
Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day
ML24149A084
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/13/2023
From: Angel J
DTE Energy
To: April Nguyen
NRC/RGN-III
Travis Iskierka-Boggs
Shared Package
ML22251A160 List:
References
NRC-23-0078
Download: ML24149A084 (1)


Text

DTE Electric Company 6400 N. Dixie Highway, Newport, MI 48166 December 13, 2023 10 CFR 55.40 NRC-23-0078 Ms. April Nguyen, Chief, Operations Branch Division of Reactor Safety Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Fermi 2 Power Plant NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Fermi 2 Initial Licensed Operator Examination Materials Enclosed please find the proposed examination materials for the upcoming Fermi 2 Initial License Examination that is scheduled to begin the week of February 26, 2024. The following items are enclosed:

Modified Examination Outlines (modified during the examination development process)

Seventy-five (75) written examination items for the Reactor Operator examination Twenty-five (25) written examination items for the Senior Reactor Operator examination Eleven (11) Plant Systems related Job Performance Measures Nine (9) Administrative topic Job Performance Measures Four (4) Simulator Scenarios Supporting Reference Material BWR Examination Outline (Form 4.1)

Record of Rejected K/As (Form 4.1-1)

Quality Verification Checklists from NUREG-1021, Revision 12 The examination materials were developed using the appropriate guidance contained in NUREG 1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11.

The examination materials shall be withheld from public disclosure until after the examinations are complete.

USNRC NRC-23-0078 Page 2 We look forward to working with you and your examination team during the examination development and administration process. If you have any questions or comments regarding the contents of the items listed above, please contact Mr. Justin Angel, Director - Nuclear Training, at (734) 586-4055.

No new commitments are being made in this submittal.

Sincerely,

/

(

/.

Justin Angel Director - Nuclear Training

Enclosure:

Fermi 2 Initial Licensed Operator Examination Materials cc: [w/o enclosure(s)]

NRC Project Manager Reactor Projects Chief, Branch 2, Region III NRC Resident Office

Enclosure to NRC-23-0078 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Fermi 2 Initial Licensed Operator Examination Materials