2017 Fermi Ile Outline ES-301-2 RO-SRO
ML17194A754
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/03/2017
From:
NRC/RGN-III
To:
Detroit Edison, Co
Shared Package
ML17061A779 List:
References
Download: ML17194A754 (2)


Text

ES-301 Control Room/ln-Plant Systems Outline Form ES-301-2 X

Facility:

Fermi 2 Exam Level: RO SRo-I T SRO-U T Date of Examination Operating Test No.:

312012017 2017-r Control Room Systems:'8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code*

Safety Function

^ Conduct CRD Coupling Integrity Check (Alt Path) o' 0p-op-r5-0n0-408) [K/A 201003 A2.02] 3.zl3.B S,L,M,A 1

b Transfer FW Control from Long Cycle Cleanup to Startup Level Control (lP,oP-3 1 s -0 107 -002) [K/A 2s900 I A4.0s] 4.0 I 3.9 S,L,P,D

')

Perform On-Load Closure of a Low Pressure Intercept Valve

"' 0p-op-:rs-o129-00s) [K/A 241000 A4.0sl 3.zt3.r S,D 3

d. Rapid Power Reduction (Alt Path)(JP-op-3 1 s-0 104-007) IK/A 20200r A4.0tl 3.7 I 3.7 S,A,D 4
e. Shift RHR from the Torus Spray Mode to the LPCI Injection Mode (Alt Path) (TP-OP-3 i s-0 1 4t - 4t2\\ tK/A 203000 A4.091 4.U 4.0 S, A, EN, D 5

Restore 480V ESF Bus 72B to Normal Power Source - Dead Bus Transfer (IP-OP-3 1 5 -0058 -00 I ) lKl A 26200 l A4.0tl 3.41 3.7 r

S,D 6

g. SRM/IRM Overlap Verification and SRM Detector Withdrawal during Reactor StârtuD ITP-OP-802-4101-445) tKiA 215004 A4.071 3.613.6 S,L,D 7
h. Restore RB HVAC to operation following automatic isolation ITP-OP-315-0166-002) tK/A 28800 A4.0rl 3.U2.9 S,D ln-Plant Systems. (3 for RO); (3 for SRO-I); (3 or 2for SRO-U)

Respond to stuck open SRV - pull fuses (fP-op-3ls-000s-203) [K/A 239002 A2.03] 4.114.2 E,D,R J

j Transfer UPS from Normal to Alternate Power Supply (Alt Path) llP - o P - 3 1 s - 0 262 - 003). tK I A 262002 A2.0 11 2.6 I 2.8 R,A,P,D 6

Shift RBCCW Supplemental Cooling Chilled Water to Mode 2 lTp-op-31 s-0167-00s) IK/A 400000 A2.031 2.913.0 k.

R,N All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

. Type Codes Criteria for RO / SRO-I/ SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)cA (S)imulator

<91<81<4

>11>11>1

>1 I >1 l> 1 (control room system)

>1t>11>1

>21>21>1

< 3 / < 3 / < 2 (randomly selected)

>11>11>1 4-6 I 4-61 2-3

ES-301 Control Room/ln-Plant Systems Outline Form ES-301-2 Facility:

Fermi 2 Date of Examination Operating Test No.:

3 o17 Exam Level: RO I SRo-l X

SRO-U 2017-r Control Room Systems:.8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code*

Safety Function a

Conduct CRD Coupling Integrity Check (Alt Path)

P-OP-3 l s-0 1 1 0-408) [K/A 20 1 003

^2.02]

3.7 I 3.8 S,L,M,A I

b Transfer FW Control from Long Cycle Cleanup to Startup Level Control fi p-oP-3 1 s-0 107 -002) [K/A 2se00 1 L4.0s1 4.0 I 3.9 S,L,P,D 2

_ Perform On-Load Closure of a Low Pressure Intercept Valve

"' 0p-op-rs-o129-00s) [K/A 241000 A4.09] 3.2ti.l S,D 3

d.

Rapid Power Reduction (Alt Path)

P-OP-3ls-0104-007) IK/A 20200r

^4.011 3.7 13.7 S,A,D 4

e.

Shift RHR from the Torus Spray Mode to the LPCI Injection Mode lAlt pârh) ITP-OP-3 I s-0 141 - 412\\ lKiA 203000 A4.091 4.1 I 4.0 S, A, EN, D 5

f. N/A N/A N/A
g. SRM/IRM Overlap Verifcation and SRM Detector Withdrawal during Reactor Startun ITP-OP-802-4101-445) tK/A 215004 A4.071 3.613.6 S,L,D 7
h. Restore RB HVAC to operation following automatic isolation llp-op-31s-0166-001) K/A 28800 A4.0l 3.112.9 s,D 8

ln-Plant Systems'(3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

Respond to stuck open SRV - pull fuses ()P-p-11q-005-203) tK/A 239002 A2.O31 4.U4.2 E,D,R 3

I Transfer UPS from Normal to Alternate Power Supply (Alt Path) lIp-op-31 s-0262-002\\ lKl A 262002 A2.Otl 2.612.8 R,A,P,D 6

k Shift RBCCW Supplemental Cooling Chilled Water to Mode 2

"' llp-oP-il5-0r67-005) tK/A 400000 A2.031 2.913.0 R,N 8

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I/ SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6t4-6I2-3

<91<8134

>11>11>1

>1 l>1 l> 1 (control room system)

>11>11>1

>21>21>1 s 3 / < 3 / < 2 (randomly selected)

>11>11>1