Line 22: Line 22:
   OFFICIAL USE ONLY  
   OFFICIAL USE ONLY  
- SECURITY-RELATED INFORMATION
- SECURITY-RELATED INFORMATION
       July 31, 2017    Mr. Adam C. Heflin, President and  
       July 31 , 2017    Mr. Adam C. Heflin, President and  
   Chief Executive Officer
   Chief Executive Officer
  Wolf Creek Nuclear Operating Corporation
  Wolf Creek Nuclear Operating Corporation
Line 29: Line 29:
  Burlington, KS  66839
  Burlington, KS  66839
   SUBJECT: WOLF CREEK GENERATING STATION  
   SUBJECT: WOLF CREEK GENERATING STATION  
- NRC SECURITY INSPECTION REPORT 05000482/2017404  
- NRC SECURITY INSPECTION REPORT 05000482/201740 4  
Dear Mr. Heflin:
Dear Mr. Heflin:
    
    
On June 22, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Wolf Creek Generating Station.  The NRC inspectors discussed the results of this inspection with Mr.
On June 22, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Wolf Creek Generating Station.  The NRC inspectors discussed the results of this inspection with Mr.
  C. Reasoner
  C. Reasoner , Site Vice President and other members of your staff.  The inspectors documented the results of this inspection in the enclosed inspection report.
, Site Vice President and other members of your staff.  The inspectors documented the results of this inspection in the enclosed inspection report.
   One self-revealed finding w as identified during this inspection.  The NRC is treating this violation as a non-cited violation
   One self-revealed finding w
as identified during this inspection.  The NRC is treating this violation
as a non-cited violation
  (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
  (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
   If you contest th
   If you contest th
is violation or significance of  
is violation or significance of  
this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial,  
th is non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial,  to the U.S. Nuclear Regulatory Commission, ATTN:  Document Control Desk, Washington,  DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555
  to the U.S. Nuclear Regulatory Commission, ATTN:  Document Control Desk, Washington,  
  DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555
-0001; and the NRC resident inspector at the Wolf Creek Generating Station.
-0001; and the NRC resident inspector at the Wolf Creek Generating Station.
    
    
Line 74: Line 69:
  CFR 2.390(b)(1)(ii).
  CFR 2.390(b)(1)(ii).
    
    
  Sincerely,
  Sincerely,
 
  /RA/   
  /RA/   
   Jeremy R. Groom
   Jeremy R. Groom
Line 140: Line 134:
  Entire Report:
  Entire Report:
  ADAMS:    Non-Publicly Available
  ADAMS:    Non-Publicly Available
   Non-Sensitive
   Non-Sensitive Keyword:  SUNSI Review
Keyword:  
   SUNSI Review
  By:  Yes    No  Publicly Available
  By:  Yes    No  Publicly Available
   Sensitive _______MD 3.4 A.3
   Sensitive _______MD 3.4 A.3
Line 149: Line 141:
  Cover Letter Only:
  Cover Letter Only:
  ADAMS:    Non-Publicly Available
  ADAMS:    Non-Publicly Available
   Non-Sensitive
   Non-Sensitive Keyword:  SUNSI Review By:
Keyword:  
   SUNSI Review By:
   Yes    No  Publicly Available
   Yes    No  Publicly Available
   Sensitive
   Sensitive NRC-002 OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBB C:EB2 C:PSB1 NAME AMeyen RLanfear JGroom NTaylor GWerner JGroom SIGNATURE /RA/ /RA/  email
  NRC-002 OFFICE SPSI:PSB1
  /RA/ /RA/ /RA/ /RA/ DATE 07/18/20 17 07/18/20 17 07/24/2017
PSI:PSB1 C:PSB1 C:PBB C:EB2 C:PSB1 NAME AMeyen RLanfear JGroom NTaylor GWerner JGroom SIGNATURE
  7/26/2017 07/31/2017
/RA/ /RA/  email
  /RA/ /RA/ /RA/ /RA/ DATE 07/18/2017 07/18/2017 07/24/2017
  7/26/2017
07/31/2017
  07/31/2017
  07/31/2017
  OFFICIAL RECORD COPY
  OFFICIAL RECORD COPY
}}
}}

Revision as of 18:02, 7 July 2018

Wolf Creek Generating Station - NRC Security Inspection Report 05000482/2017404
ML17212A923
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/31/2017
From: Groom J R
NRC Region 4
To: Heflin A C
Wolf Creek
Groom J R
References
IR 2017404
Download: ML17212A923 (3)


See also: IR 05000482/2017404

Text

OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION

Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this transmittal document is decontrolled.

OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION

July 31 , 2017 Mr. Adam C. Heflin, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

SUBJECT: WOLF CREEK GENERATING STATION

- NRC SECURITY INSPECTION REPORT 05000482/201740 4

Dear Mr. Heflin:

On June 22, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Wolf Creek Generating Station. The NRC inspectors discussed the results of this inspection with Mr.

C. Reasoner , Site Vice President and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.

One self-revealed finding w as identified during this inspection. The NRC is treating this violation as a non-cited violation

(NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest th

is violation or significance of

th is non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555

-0001; and the NRC resident inspector at the Wolf Creek Generating Station.

A cross-cutting aspect is assigned to this finding in the area of human performance, procedures in that station personnel failed to follow procedures

(H.8). If you disagree with a cross

-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555

-0001; with copies to the Regional Administrator, Region IV, and the NRC Resident Inspectors at the Wolf Creek Generating Station.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading

-rm/adams.html

and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, and Requests for Withholding."

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV 1600 E. LAMAR BLVD.

ARLINGTON, TX

76011-4511

OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION

A. Heflin 2 OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION

However, the enclosed report contains Security

-Related Information, so the enclosed report will not be made publically available in accordance with 10

CFR 2.390(d)(1). If you choose to provide a response that contains Security

-Related Information, please mark your entire response "Security

-Related Information

- Withhold from Public Disclosure under 10 CFR 2.390"

in accordance with 10

CFR 2.390(d)(1) and follow the instructions for withholding in

10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10

CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Jeremy R. Groom

Chief, Plant Support Branch

1 Division of Reactor Safety

Docket No. 50

-482 License No. NPF

-42

Non-public Enclosure:

NRC Inspection Report 05000482/2017404

w/Attachment: Supplemental Information

cc w/enclosure:

Mr. Mike Skiles

Security Manager

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

cc w/o enclosure:

Electronic Distribution

OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION

A. Heflin OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION

WOLF CREEK GENERATING STATION

- NRC SECURITY INSPECTION REPORT 05000482/2017404

- JULY 31, 2017 Distribution w/enclosure

EWharton, NSIR

NSimonian, NSIR CJohnson, NSIR

DGarner, NSIR

RMcKinley, RI DRS

BDesai, RII DRS

SOrth, RIII DRS

KKennedy, ORA

SMorris, ORA

TPruett DRP

RLantz, DRP

AVegel, DRS

JClark, DRS

JGroom, DRS

DDodson, DRP

FThomas, DRP

NTaylor, DRP

DProulx, DRP

SJanicki, DRP

JMelfi, DRP

SGalemore, DRP

Distribution w/o enclosure

VDricks, ORA

BSingal, NRR

THipschman, DRS

MHerrera, FRMB

KFuller, ORA

EUribe, DRS

JWeil, RIV/CAO

AMoreno RIV/CAO

JBowen, RIV/OEDO

ACES GWalker, OI

BMaier, ORA

RidsOeMailCenter Resource

ADAMS ACCESSION

NUMBER: ML17212A830

Entire Report:

ADAMS: Non-Publicly Available

Non-Sensitive Keyword: SUNSI Review

By: Yes No Publicly Available

Sensitive _______MD 3.4 A.3

ADAMS ACCESSION

NUMBER: ML17212A923

Cover Letter Only:

ADAMS: Non-Publicly Available

Non-Sensitive Keyword: SUNSI Review By:

Yes No Publicly Available

Sensitive NRC-002 OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBB C:EB2 C:PSB1 NAME AMeyen RLanfear JGroom NTaylor GWerner JGroom SIGNATURE /RA/ /RA/ email

/RA/ /RA/ /RA/ /RA/ DATE 07/18/20 17 07/18/20 17 07/24/2017

7/26/2017 07/31/2017

07/31/2017

OFFICIAL RECORD COPY