ML17263A276: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:EOP:FR-S.2RESPONSETOLOSSOFCORESHUTDOWNREV:3PAGE1of5ROCHESTER GASANDELECTRICCORPORATION GINNASTATIONCONTROLLED COPYNUMBERTECHNICAL REVIEWPORCREVIEDATEPLANTSUPERINTENDENT EFECTIVEDATECATEGORY1.0REVIEWEDBY:9305i40057 930505PDRADOCK05000244~FPDR
{{#Wiki_filter:EOP: FR-S.2 RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 1 of 5 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIE DATE PLANT SUPERINTENDENT E FECTIVE DATE CATEGORY 1.0 REVIEWED BY: 9305i40057 930505 PDR ADOCK 05000244~F PDR


FR-S.2RESPONSETOLOSSOFCORESHUTDOWNREV:3PAGE2of5A.PURPOSE-Thisprocedure providesactionstorestorethecoretoanadequateshutdowncondition.
FR-S.2 RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 2 of 5 A.PURPOSE-This procedure provides actions to restore the core to an adequate shutdown condition.
B.ENTRYCONDITIONS/SYMPTOMS 1.ENTRYCONDITIONS
B.ENTRY CONDITIONS/SYMPTOMS 1.ENTRY CONDITIONS
-Thisprocedure isenteredfrom:a.F-0.1,SUBCRITICALITY CriticalSafetyFunctionStatusTree,oneitherYELLOWcondition.  
-This procedure is entered from: a.F-0.1, SUBCRITICALITY Critical Safety Function Status Tree, on either YELLOW condition.  


EOP:FR-ST2RESPONSETOLOSSOFCORESHUTDOWNREV:3PAGE3of5STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINEDNOTE:oAdverseCNMTvaluesshouldbeusedwheneverCNMTpressureisgreaterthan4psigorCNMTradiation isgreaterthan10+5R/hr.oAdverseCNMTconditions orlossofforcedaircoolingmayresultinfailureofNISdetectors.
EOP: FR-ST 2 RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 3 of 5 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: o Adverse CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+5 R/hr.o Adverse CNMT conditions or loss of forced air cooling may result in failure of NIS detectors.
1CheckIntermediate RangeFlux:a.Flux-EITHERCHANNELLESSTHAN10-10AMPSa.ContinuewithSte~2.WHENfluxisLESSTHAN10ampsonanyoperablechannel,THENdoStepslb,candd.b.Checkthefollowing:
1 Check Intermediate Range Flux: a.Flux-EITHER CHANNEL LESS THAN 10-10 AMPS a.Continue with Ste~2.WHEN flux is LESS THAN 10 amps on any operable channel, THEN do Steps lb, c and d.b.Check the following:
oBothintermediate rangechannels-LESSTHAN10AMPSb.Continuewithstep2.WHENeithercondition met,THENdoStepslcandd.-OR-oGreaterthan20minutessincereactortripc.Verifysourcerangedetectors ENERGIZED cdManuallyenergizesourcerangedetectors bydepressing P-6permissive defeatpushbuttons (2of2).IFsourcerangescanNOTberestored, THENrefertoER-NIS.1, SRMALFUNCTION, andgotoStep2.d,TransferRk-45recordertoonesour'ce'ange andoneintermediate rangechannel
o Both intermediate range channels-LESS THAN 10 AMPS b.Continue with step 2.WHEN either condition met, THEN do Steps lc and d.-OR-o Greater than 20 minutes since reactor trip c.Verify source range detectors ENERGIZED cd Manually energize source range detectors by depressing P-6 permissive defeat pushbuttons (2 of 2).IF source ranges can NOT be restored, THEN refer to ER-NIS.1, SR MALFUNCTION, and go to Step 2.d, Transfer Rk-45 recorder to one sour'ce'ange and one intermediate range channel


EOP:FR-Ss2T!TLE:RESPONSETOLOSSOFCORESHUTDOWNREV'PAGE4of5STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINEDNOTE:Ifoffsitepowerislostcoincident withSI,thenMCCCandMCCDlockoutrelaysmustberesettorestoreBAandRMWpumps.2InitiateImmediate BorationOfRCS:a.CheckSIstatus:oAllSIannunciators-EXTINGUISHED oAllSIpumps-OFFINAUTOb.Verifyatleastonechargingpump-RUNNING!c.Alignborationpath:1)StarttueBAtransferpumps2)OpenMOV-350I3)VerifyBAflow!d.Verifychargingflowpath:!oCh'arging valvetoloopBcold18g"-'(AOV-294)
EOP: FR-Ss2 T!TLE: RESPONSE TO LOSS OF CORE SHUTDOWN REV'PAGE 4 of 5 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: If offsite power is lost coincident with SI, then MCC C and MCC D lockout relays must be reset to restore BA and RMW pumps.2 Initiate Immediate Boration Of RCS: a.Check SI status: o All SI annunciators-EXTINGUISHED o All SI pumps-OFF IN AUTO b.Verify at least one charging pump-RUNNING!c.Align boration path: 1)Start tue BA transfer pumps 2)Open MOV-350 I 3)Verify BA flow!d.Verify charging flow path:!o Ch'arging valve to loop B cold 18g"-'(AOV-294)
-OPEN~,g'Ch'arging flowcontrolvalve(HCV-142)
-OPEN~, g'Ch'arging flow control valve (HCV-142)-DEMAND AT 0%1)Complete the immediate actions of E-O, REACTOR TRIP OR SAFETY INJECTION, while continuing with this procedure 2)IF SI flow indicated, THEN go to Step 3.IF NOT, THEN go to Step 2b.b.Perform the following:
-DEMANDAT0%1)Completetheimmediate actionsofE-O,REACTORTRIPORSAFETYINJECTION, whilecontinuing withthisprocedure 2)IFSIflowindicated, THENgotoStep3.IFNOT,THENgotoStep2b.b.Performthefollowing:
1)Reset SI if necessary.
1)ResetSIifnecessary.
2)Start one charging pump.c.Initiate normal boration at maximum rate using the boric acid flow control valve, FCV-110A.IF flow can NOT be established, THEN refer to ER-CVCS.l, REACTOR MAKEUP CONTROL MALFUNCTION.
2)Startonechargingpump.c.Initiatenormalborationatmaximumrateusingtheboricacidflowcontrolvalve,FCV-110A.
d.Manually align valves and verify flow.  
IFflowcanNOTbeestablished, THENrefertoER-CVCS.l, REACTORMAKEUPCONTROLMALFUNCTION.
d.Manuallyalignvalvesandverifyflow.  


EOP:FR-ST2TITLE:RESPONSETOLOSSOFCORESHUTDOWNREV:3PAGE5of5STEPACTION/EXPECTED RESPONSERESPONSENOTOBTAINED3CheckSourceRangeChannels:
EOP: FR-ST 2 TITLE: RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 5 of 5 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 3 Check Source Range Channels: o Source range channels-ENERGIZED o Source range channels startup rate-ZERO OR NEGATIVE Continue boration until adequate shutdown margin is verified by RCS sample (Refer to Figure SDM).4 Verify Adequate Shutdown Margin a.Direct HP to sample RCS for boron concentration I b.Verify boron concentration-GREATER THAN REQUIREMENTS OF FIGURE SDM b.Continue boration until adequate shutdown margin verified.c.Stop boration 5 Return To Procedure And Step In Effect.-END-  
oSourcerangechannels-ENERGIZED oSourcerangechannelsstartuprate-ZEROORNEGATIVEContinueborationuntiladequateshutdownmarginisverifiedbyRCSsample(RefertoFigureSDM).4VerifyAdequateShutdownMargina.DirectHPtosampleRCSforboronconcentration Ib.Verifyboronconcentration-GREATERTHANREQUIREMENTS OFFIGURESDMb.Continueborationuntiladequateshutdownmarginverified.
c.Stopboration5ReturnToProcedure AndStepInEffect.-END-  


FR-S.2TITLE%RESPONSETOLOSSOFCORESHUTDOWNREV:3PAGE1of1FR-S.2APPENDIXLISTTITLEPAGES1)FIGURESDM
FR-S.2 TITLE%RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 1 of 1 FR-S.2 APPENDIX LIST TITLE PAGES 1)FIGURE SDM


EOP:FR-ST2TITLE:RESPONSETOLOSSOFCORESHUTDOWNREV:3PAGE1of1FIGURESDMNOTE:oCurveincludesallowance foronestuckrod.Add100ppmforeachadditional stuckrod.oToobtaincoreburnup,usePPCSturnoncodeBURNUP.BORONCONCENTRATION (PPM)18001600BORONINCREMENTS 20PPM140012001000ADEQUATESDM100PPHCONSERVATISH INCLUDED800600400TEBORA200BURNUPINCREMENTS 100MWD/HTU01000200030004000500060007000800090001000011000CYCLE23BURNUP(HWD/HTU)}}
EOP: FR-ST 2 TITLE: RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 1 of 1 FIGURE SDM NOTE: o Curve includes allowance for one stuck rod.Add 100 ppm for each additional stuck rod.o To obtain core burnup, use PPCS turn on code BURNUP.BORON CONCENTRATION (PPM)1800 1600 BORON INCREMENTS 20 PPM 1400 1200 1000 ADEQUATE SDM 100 PPH CONSERVATISH INCLUDED 800 600 400 TE BORA 200 BURNUP INCREMENTS 100 MWD/HTU 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 CYCLE 23 BURNUP (HWD/HTU)}}

Revision as of 14:08, 7 July 2018

Rev 3 to EOP FR-S.2, Response to Loss of Core Shutdown.
ML17263A276
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/14/1993
From: MARLOW T A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17263A269 List:
References
FR-S.2, NUDOCS 9305140057
Download: ML17263A276 (14)


Text

EOP: FR-S.2 RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 1 of 5 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIE DATE PLANT SUPERINTENDENT E FECTIVE DATE CATEGORY 1.0 REVIEWED BY: 9305i40057 930505 PDR ADOCK 05000244~F PDR

FR-S.2 RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 2 of 5 A.PURPOSE-This procedure provides actions to restore the core to an adequate shutdown condition.

B.ENTRY CONDITIONS/SYMPTOMS 1.ENTRY CONDITIONS

-This procedure is entered from: a.F-0.1, SUBCRITICALITY Critical Safety Function Status Tree, on either YELLOW condition.

EOP: FR-ST 2 RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 3 of 5 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: o Adverse CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+5 R/hr.o Adverse CNMT conditions or loss of forced air cooling may result in failure of NIS detectors.

1 Check Intermediate Range Flux: a.Flux-EITHER CHANNEL LESS THAN 10-10 AMPS a.Continue with Ste~2.WHEN flux is LESS THAN 10 amps on any operable channel, THEN do Steps lb, c and d.b.Check the following:

o Both intermediate range channels-LESS THAN 10 AMPS b.Continue with step 2.WHEN either condition met, THEN do Steps lc and d.-OR-o Greater than 20 minutes since reactor trip c.Verify source range detectors ENERGIZED cd Manually energize source range detectors by depressing P-6 permissive defeat pushbuttons (2 of 2).IF source ranges can NOT be restored, THEN refer to ER-NIS.1, SR MALFUNCTION, and go to Step 2.d, Transfer Rk-45 recorder to one sour'ce'ange and one intermediate range channel

EOP: FR-Ss2 T!TLE: RESPONSE TO LOSS OF CORE SHUTDOWN REV'PAGE 4 of 5 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: If offsite power is lost coincident with SI, then MCC C and MCC D lockout relays must be reset to restore BA and RMW pumps.2 Initiate Immediate Boration Of RCS: a.Check SI status: o All SI annunciators-EXTINGUISHED o All SI pumps-OFF IN AUTO b.Verify at least one charging pump-RUNNING!c.Align boration path: 1)Start tue BA transfer pumps 2)Open MOV-350 I 3)Verify BA flow!d.Verify charging flow path:!o Ch'arging valve to loop B cold 18g"-'(AOV-294)

-OPEN~, g'Ch'arging flow control valve (HCV-142)-DEMAND AT 0%1)Complete the immediate actions of E-O, REACTOR TRIP OR SAFETY INJECTION, while continuing with this procedure 2)IF SI flow indicated, THEN go to Step 3.IF NOT, THEN go to Step 2b.b.Perform the following:

1)Reset SI if necessary.

2)Start one charging pump.c.Initiate normal boration at maximum rate using the boric acid flow control valve, FCV-110A.IF flow can NOT be established, THEN refer to ER-CVCS.l, REACTOR MAKEUP CONTROL MALFUNCTION.

d.Manually align valves and verify flow.

EOP: FR-ST 2 TITLE: RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 5 of 5 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 3 Check Source Range Channels: o Source range channels-ENERGIZED o Source range channels startup rate-ZERO OR NEGATIVE Continue boration until adequate shutdown margin is verified by RCS sample (Refer to Figure SDM).4 Verify Adequate Shutdown Margin a.Direct HP to sample RCS for boron concentration I b.Verify boron concentration-GREATER THAN REQUIREMENTS OF FIGURE SDM b.Continue boration until adequate shutdown margin verified.c.Stop boration 5 Return To Procedure And Step In Effect.-END-

FR-S.2 TITLE%RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 1 of 1 FR-S.2 APPENDIX LIST TITLE PAGES 1)FIGURE SDM

EOP: FR-ST 2 TITLE: RESPONSE TO LOSS OF CORE SHUTDOWN REV: 3 PAGE 1 of 1 FIGURE SDM NOTE: o Curve includes allowance for one stuck rod.Add 100 ppm for each additional stuck rod.o To obtain core burnup, use PPCS turn on code BURNUP.BORON CONCENTRATION (PPM)1800 1600 BORON INCREMENTS 20 PPM 1400 1200 1000 ADEQUATE SDM 100 PPH CONSERVATISH INCLUDED 800 600 400 TE BORA 200 BURNUP INCREMENTS 100 MWD/HTU 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 CYCLE 23 BURNUP (HWD/HTU)