ML17263A828: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:tI'u7($@<j~IIWZROCHESTER GASANDELECTRICCORPORATION
{{#Wiki_filter:t I'u7($@<j~IIWZ ROCHESTER GAS AND ELECTRIC CORPORATION
~8944P'<<EASTAVENUE,ROCHESTER, N.Y.14649.0001 August30,1994TCLEPHONC i~rAcoo@.vie546.2700U.S.NuclearRegulatory Commission RegionalAdministrator, RegionIMr.ThomasT.Martin475Allendale RoadKingofPrussia,PA19406
~89 4 4P'<<EAST AVENUE, ROCHESTER, N.Y.14649.0001 August 30, 1994 TCLEPHONC i~rA coo@.vie 546.2700 U.S.Nuclear Regulatory Commission Regional Administrator, Region I Mr.Thomas T.Martin 475 Allendale Road King of Prussia, PA 19406


==Subject:==
==Subject:==
RequestForEnforcement Discretion R.E.GinnaNuclearPowerPlantDocketNo.50-244
Request For Enforcement Discretion R.E.Ginna Nuclear Power Plant Docket No.50-244  


==DearMr.Martin,==
==Dear Mr.Martin,==
Inaccordance with10CFRPart2,AppendixC,andusingtheguidancecontained inNRCInspection ManualPart9900,RG&ErequestsEnforcement Discretion withrespecttoGinnaStationTechnical Specification 3.4.2.1.a.
In accordance with 10 CFR Part 2, Appendix C, and using the guidance contained in NRC Inspection Manual Part 9900, RG&E requests Enforcement Discretion with respect to Ginna Station Technical Specification 3.4.2.1.a.
Therequest,background information, andjustification isattached.
The request, background information, and justification is attached.This request was initially discussed with the NRC during a conference call on August 20, 1994 at 1600 EST.RG&E received verbal approval of the enclosed Enforcement Discretion during a phone conversation between Mr.William Lazarus NRC, Region I, and Robert Mecredy, Vice President, Nuclear Production at approximately 1720 EST on that same date.This letter provides all necessary information requested during these two phone conversations.
Thisrequestwasinitially discussed withtheNRCduringaconference callonAugust20,1994at1600EST.RG&EreceivedverbalapprovaloftheenclosedEnforcement Discretion duringaphoneconversation betweenMr.WilliamLazarusNRC,RegionI,andRobertMecredy,VicePresident, NuclearProduction atapproximately 1720ESTonthatsamedate.Thisletterprovidesallnecessary information requested duringthesetwophoneconversations.
Very truly yours, Robert C.Mecr y XC: U.S.Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Assistant Director for Region I Reactors Mr.Jose A.Calvo Washington, D.C.20555 Ginna Station Senior Resident Inspector'P4ll030360 94i027 PDR ADaCK 05000244 P PDR~T~
Verytrulyyours,RobertC.MecryXC:U.S.NuclearRegulatory Commission OfficeofNuclearReactorRegulation Assistant DirectorforRegionIReactorsMr.JoseA.CalvoWashington, D.C.20555GinnaStationSeniorResidentInspector
I.-D CRIPTION F TECHNICAL PECIFICATI N RE UIREMENT Ginna Station Technical Specification (TS)3.4.2.1 requires that both motor-driven Auxiliary Feedwater (MDAFW)pumps be operable with the RCS temperature M 350'F.Action Statement 3.4.2.1.a states that if one MDAFW pump is inoperable, the pump must be restored to operable status within 7 days or the plant shall be in at least Hot Shutdown within 6 hours and at an RCS temperature
'P4ll030360 94i027PDRADaCK05000244PPDR~T~
<350'F within the following 6 hours.2.D CRIPTI N OF RE On August 24, 1994 at 0530 hours, MDAFW Pump B was removed from service to perform scheduled testing and maintenance of the associated service water cooling supply strainer and the AC lube oil pump (Procedures EM-785 and M-44.13, and Work Order&#xb9;19400838).
I.-DCRIPTIONFTECHNICAL PECIFICATI NREUIREMENTGinnaStationTechnical Specification (TS)3.4.2.1requiresthatbothmotor-driven Auxiliary Feedwater (MDAFW)pumpsbeoperablewiththeRCStemperature M350'F.ActionStatement 3.4.2.1.a statesthatifoneMDAFWpumpisinoperable, thepumpmustberestoredtooperablestatuswithin7daysortheplantshallbeinatleastHotShutdownwithin6hoursandatanRCStemperature
The maintenance activities were completed on August 25, 1994 and a limited test was subsequently performed on MDAFW Pump B beginning at 1430 hours to verify the operability of the AC lube oil pump breaker.At 1432 hours, the operators noticed that the normally closed recirculation line air-operated valve (AOV 4310)for MDAFW Pump B did not open as required.The pump was then secured and a trouble card was initiated for AOV 4310 at 1435 hours.Preparations were then initiated to perform the repair of AOV 4310.The valve was repaired and a full pump test (Procedure PT-16Q-B)was then performed on August 26, 1994 to verify pump and valve operability.
<350'Fwithinthefollowing 6hours.2.DCRIPTINOFREOnAugust24,1994at0530hours,MDAFWPumpBwasremovedfromservicetoperformscheduled testingandmaintenance oftheassociated servicewatercoolingsupplystrainerandtheAClubeoilpump(Procedures EM-785andM-44.13,andWorkOrder&#xb9;19400838).
At 2220 hours, it was determined that the MDAFW pump did not meet the~p requirements and a trouble card was initiated for the pump.Major repairs on MDAFW Pump B were subsequently initiated which included complete disassembly of the pump.It is noted that Procedure PT-16Q-B was successfully performed on MDAFW Pump B on August 18th.RGB'as conservatively assumed that MDAFW Pump B has been inoperable since August 24, 1994 at 0530 hours when initial work activities began and the LCO was entered.However, since repair activities of the pump were not initiated until late on August 26, 1994, and due to the lead time for replacement parts and the need to perform post-maintenance testing, RG&E does not anticipate that the necessary repairs'and testing can be accomplished within the TS required 7 days.Enforcement Discretion is therefore requested to grant RGB'elief from compliance with the requirements of TS 3.4.2.1.a.
Themaintenance activities werecompleted onAugust25,1994andalimitedtestwassubsequently performed onMDAFWPumpBbeginning at1430hourstoverifytheoperability oftheAClubeoilpumpbreaker.At1432hours,theoperators noticedthatthenormallyclosedrecirculation lineair-operated valve(AOV4310)forMDAFWPumpBdidnotopenasrequired.
This Enforcement Discretion is requested to begin on August 31, 1994 at 0530 hours when the current LCO for TS 3.4.2.l.a will expire.The Enforcement Discretion is requested to end on September 2 at 0800 hours when all necessary repair and testing activities will be completed.
Thepumpwasthensecuredandatroublecardwasinitiated forAOV4310at1435hours.Preparations weretheninitiated toperformtherepairofAOV4310.Thevalvewasrepairedandafullpumptest(Procedure PT-16Q-B) wasthenperformed onAugust26,1994toverifypumpandvalveoperability.
This is an extension of 50.5 hours. 3..BAST FOR RK T There are a total of five AFW pumps installed at Ginna Station.The preferred AFW system has two 100%capacity MDAFW pumps and one 200%capacity turbine driven (TDAFW)pump.The Standby Auxiliary Feedwater (SAFW)system has two 100%capacity MDAFW pumps which are manually started by the operators if normal AFW is lost (e.g., high energy line breaks in the Intermediate Building).
At2220hours,itwasdetermined thattheMDAFWpumpdidnotmeetthe~prequirements andatroublecardwasinitiated forthepump.MajorrepairsonMDAFWPumpBweresubsequently initiated whichincludedcompletedisassembly ofthepump.ItisnotedthatProcedure PT-16Q-Bwassuccessfully performed onMDAFWPumpBonAugust18th.RGB'asconservatively assumedthatMDAFWPumpBhasbeeninoperable sinceAugust24,1994at0530hourswheninitialworkactivities beganandtheLCOwasentered.However,sincerepairactivities ofthepumpwerenotinitiated untillateonAugust26,1994,andduetotheleadtimeforreplacement partsandtheneedtoperformpost-maintenance testing,RG&Edoesnotanticipate thatthenecessary repairs'andtestingcanbeaccomplished withintheTSrequired7days.Enforcement Discretion istherefore requested tograntRGB'elief fromcompliance withtherequirements ofTS3.4.2.1.a.
The safety-related function of the AFW system at Ginna Station is to mitigate the following accidents or events (UFSAR Section 10.5.2.1):
ThisEnforcement Discretion isrequested tobeginonAugust31,1994at0530hourswhenthecurrentLCOforTS3.4.2.l.a willexpire.TheEnforcement Discretion isrequested toendonSeptember 2at0800hourswhenallnecessary repairandtestingactivities willbecompleted.
a.b.C.d.e.f.g.h.Loss of main feedwater (MFW)with offsite power available Loss of MFW without offsite power available MFW line rupture Main Steam line rupture Loss of all AC power (onsite and offsite)LOCA Steam Generator Tube Rupture (SGTR)Cooldown Items c and d have been evaluated for Ginna Station assuming that only the redundant SAFW system is available (UFSAR Section 15.2.7.3)while item e only requires the TDAFW pump (UFSAR Section 15.2.5).Items a and b are bounded by the analysis for the high energy line breaks in the Intermediate Building (i.e., items c and d)due to the available water inventory in the intact SGs.The SAFW system can also be used for cooldown events (item g)due to the time which would be available as a result of low decay heat levels.Consequently, only LOCAs and SGTRs (i.e., items f and g)must be considered with respect to the inoperable MDAFW pump.Following a LOCA or SGTR, the preferred AFW system will receive an automatic start signal to provide cooling water to the steam generators.
Thisisanextension of50.5hours. 3..BASTFORRKTThereareatotaloffiveAFWpumpsinstalled atGinnaStation.Thepreferred AFWsystemhastwo100%capacityMDAFWpumpsandone200%capacityturbinedriven(TDAFW)pump.TheStandbyAuxiliary Feedwater (SAFW)systemhastwo100%capacityMDAFWpumpswhicharemanuallystartedbytheoperators ifnormalAFWislost(e.g.,highenergylinebreaksintheIntermediate Building).
However, for all LOCAs, both the TDAFW pump and MDAFW Pump A will be available to provide the necessary cooling water.There is no single failure which can result in the loss of both of these pumps during a LOCA.In the case of a SGTR, it can be postulated that a rupture occurs in SG A which would result in the isolation of automatic AFW flow from MDAFW Pump A and the TDAFW pump (to S/G A only).Only automatic flow from the TDAFW pump to'G B would be available in this instance.Operator action is already required for a SGTR event to depressurize the RCS.Since this ten minute delay is already assumed in the accident analysis, it can be assumed that time is also available to use the SAFW system or cross-tie MDAFW A to SG B if the TDAFW pump were to fail.In addition, it is noted that the increased SG level in the ruptured SG provides additional time before AFW would be required. A review of the Ginna Station PRA indicates that a tube rupture in SG A with a subsequent failure of the TDAFW pump, thus requiring the need for SAFW, is of very low probability
Thesafety-related functionoftheAFWsystematGinnaStationistomitigatethefollowing accidents orevents(UFSARSection10.5.2.1):
(-1.4E-06 for the additional 2 day MDAFW Pump outage).In addition, the AFW system is in standby during normal power operations.
a.b.C.d.e.f.g.h.Lossofmainfeedwater (MFW)withoffsitepoweravailable LossofMFWwithoutoffsitepoweravailable MFWlineruptureMainSteamlineruptureLossofallACpower(onsiteandoffsite)LOCASteamGenerator TubeRupture(SGTR)CooldownItemscanddhavebeenevaluated forGinnaStationassumingthatonlytheredundant SAFWsystemisavailable (UFSARSection15.2.7.3) whileitemeonlyrequirestheTDAFWpump(UFSARSection15.2.5).ItemsaandbareboundedbytheanalysisforthehighenergylinebreaksintheIntermediate Building(i.e.,itemscandd)duetotheavailable waterinventory intheintactSGs.TheSAFWsystemcanalsobeusedforcooldownevents(itemg)duetothetimewhichwouldbeavailable asaresultoflowdecayheatlevels.Consequently, onlyLOCAsandSGTRs(i.e.,itemsfandg)mustbeconsidered withrespecttotheinoperable MDAFWpump.Following aLOCAorSGTR,thepreferred AFWsystemwillreceiveanautomatic startsignaltoprovidecoolingwatertothesteamgenerators.
It is not considered prudent to require a plant shutdown through modes in which the preferred AFW system is used to provide normal SG'cooling water needs with one MDAFW pump inoperable.
However,forallLOCAs,boththeTDAFWpumpandMDAFWPumpAwillbeavailable toprovidethenecessary coolingwater.ThereisnosinglefailurewhichcanresultinthelossofbothofthesepumpsduringaLOCA.InthecaseofaSGTR,itcanbepostulated thataruptureoccursinSGAwhichwouldresultintheisolation ofautomatic AFWflowfromMDAFWPumpAandtheTDAFWpump(toS/GAonly).Onlyautomatic flowfromtheTDAFWpumpto'GBwouldbeavailable inthisinstance.
The potential for plant transients and the subsequent need for AFW during these mode transitions is also increased.
OperatoractionisalreadyrequiredforaSGTReventtodepressurize theRCS.Sincethistenminutedelayisalreadyassumedintheaccidentanalysis, itcanbeassumedthattimeisalsoavailable tousetheSAFWsystemorcross-tie MDAFWAtoSGBiftheTDAFWpumpweretofail.Inaddition, itisnotedthattheincreased SGlevelintherupturedSGprovidesadditional timebeforeAFWwouldberequired. AreviewoftheGinnaStationPRAindicates thatatuberuptureinSGAwithasubsequent failureoftheTDAFWpump,thusrequiring theneedforSAFW,isofverylowprobability
MPENSAT RY ACTI N RG&E will not perform any testing or maintenance related to the remaining AFW and SAFW pumps and their necessary support systems during the requested two day extension.
(-1.4E-06fortheadditional 2dayMDAFWPumpoutage).Inaddition, theAFWsystemisinstandbyduringnormalpoweroperations.
In addition, operator awareness of RCS leakage has been increased since leakage can be used as an indication of a potential LOCA or SGTR.The Operations Plan of the Day (POD)has also been revised to enhance operator awareness of the use of the MDAFW pump cross-tie lines if required.TIFICATI N F R DURATI N OF RE UEST The requested two day LCO extension is necessary to ensure completion repairs on MDAFW Pump B and to perform the required testing.The two day extension is based on the need to complete the alignment of the pump including the speed increaser.
Itisnotconsidered prudenttorequireaplantshutdownthroughmodesinwhichthepreferred AFWsystemisusedtoprovidenormalSG'cooling waterneedswithoneMDAFWpumpinoperable.
Based on previous experience, these activities may require multiple iterations.
Thepotential forplanttransients andthesubsequent needforAFWduringthesemodetransitions isalsoincreased.
During this requested extension, three 100%capacity AFW pumps and one 200%capacity TDAFW pump are available to provide the necessary cooling water to the SGs for decay heat removal.As discussed in Section 3, the probability of an accident which requires the AFW pumps during the two day extension is very small.MDAFW Pump A was successfully tested on August 16, 1994 (Procedure PT-16Q-A)~Testing of the TDAFW pump was also successfully performed on August 22, 1994 (Procedure PT-16Q-T)providing additional assurance the continued operability of these pumps.Attachment A provides a summary of the most recent AFW and SAFW pump tests.IGNIFICANT HAZARDS EVALUATION RG&E has evaluated the Enforcement Discretion request and concluded that there is no potential detriment to the public health and safety and that a significant safety hazard is not involved.This basis for this conclusion is summarized below:  
MPENSATRYACTINRG&Ewillnotperformanytestingormaintenance relatedtotheremaining AFWandSAFWpumpsandtheirnecessary supportsystemsduringtherequested twodayextension.
-4 ,a" Extending the current outage of MDAFW Pump B for approximately two days does not result in a significant increase in the probability or consequences of an accident previously evaluated.
Inaddition, operatorawareness ofRCSleakagehasbeenincreased sinceleakagecanbeusedasanindication ofapotential LOCAorSGTR.TheOperations PlanoftheDay(POD)hasalsobeenrevisedtoenhanceoperatorawareness oftheuseoftheMDAFWpumpcross-tie linesifrequired.
The remaining AFW and SAFW pumps provide sufficient redundancy to mitigate all potential accidents.
TIFICATINFRDURATINOFREUESTTherequested twodayLCOextension isnecessary toensurecompletion repairsonMDAFWPumpBandtoperformtherequiredtesting.Thetwodayextension isbasedontheneedtocompletethealignment ofthepumpincluding thespeedincreaser.
b.Extending the current outage of MDAFW Pump 8 for approximately two days does not create the possibility of a new or different kind of accident from any previously evaluated.
Basedonpreviousexperience, theseactivities mayrequiremultipleiterations.
The only accident which can be initiated by AFW is an overcooling event caused by spurious actuation.
Duringthisrequested extension, three100%capacityAFWpumpsandone200%capacityTDAFWpumpareavailable toprovidethenecessary coolingwatertotheSGsfordecayheatremoval.Asdiscussed inSection3,theprobability ofanaccidentwhichrequirestheAFWpumpsduringthetwodayextension isverysmall.MDAFWPumpAwassuccessfully testedonAugust16,1994(Procedure PT-16Q-A)~TestingoftheTDAFWpumpwasalsosuccessfully performed onAugust22,1994(Procedure PT-16Q-T) providing additional assurance thecontinued operability ofthesepumps.Attachment AprovidesasummaryofthemostrecentAFWandSAFWpumptests.IGNIFICANT HAZARDSEVALUATION RG&Ehasevaluated theEnforcement Discretion requestandconcluded thatthereisnopotential detriment tothepublichealthandsafetyandthatasignificant safetyhazardisnotinvolved.
Since MDAFW Pump B is not operable, this accident is not credible during the requested extension.
Thisbasisforthisconclusion issummarized below:  
No other new or different kinds of accident are created by the plant condition during the two day extension.
-4,a"Extending thecurrentoutageofMDAFWPumpBforapproximately twodaysdoesnotresultinasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated.
C.Extending the current outage of MDAFW Pump 3 for approximately two days does not involve a significant reduction in a margin of safety.The remaining AFW and SAFW pumps provide sufficient redundancy to mitigate all potential accidents.
Theremaining AFWandSAFWpumpsprovidesufficient redundancy tomitigateallpotential accidents.
In addition, operators are sufficiently trained and procedures address the response to a loss of MFW.7.NVIR NMKNTAL IMPACT There are no environmental releases associated with the current plant condition.
b.Extending thecurrentoutageofMDAFWPump8forapproximately twodaysdoesnotcreatethepossibility ofanewordifferent kindofaccidentfromanypreviously evaluated.
The probability of requiring use of the inoperable MDAFW pump is very small.In addition, sufficient guidance is currently available to the operators to respond to any, postulated scenario which would require AFW or the SAFW system.Therefore, there are no environmental consequences associated with this request.8.REVIEW BY RC The Ginna Station PORC has reviewed and approved this request for Enforcement Discretion.
Theonlyaccidentwhichcanbeinitiated byAFWisanovercooling eventcausedbyspuriousactuation.
Thomas Marlow Ginna Station PORC Chairman Date OVERALL AFW PUMP STATUS CEMENT 4 P/4 P LIMIT VIBRATIONS"A" MDAFWP 1150/1120<'>
SinceMDAFWPumpBisnotoperable, thisaccidentisnotcredibleduringtherequested extension.
No Adverse Trends"B" MDAFWP (Pending Rebaseline Test Following Corrective Maintenance
Noothernewordifferent kindsofaccidentarecreatedbytheplantcondition duringthetwodayextension.
-8/30/94)Turbine AFWP 1160/1131">
C.Extending thecurrentoutageofMDAFWPump3forapproximately twodaysdoesnotinvolveasignificant reduction inamarginofsafety.Theremaining AFWandSAFWpumpsprovidesufficient redundancy tomitigateallpotential accidents.
No Adverse Trends"C" SBAFWP 1250/1122~~
Inaddition, operators aresufficiently trainedandprocedures addresstheresponsetoalossofMFW.7.NVIRNMKNTALIMPACTTherearenoenvironmental releasesassociated withthecurrentplantcondition.
No Adverse Trends"D" SBAFWP 1267/1152 No Adverse Trends (1)-Based on NSSL Design Analysis (2)-Based on ASME Section XZ Code Formula
Theprobability ofrequiring useoftheinoperable MDAFWpumpisverysmall.Inaddition, sufficient guidanceiscurrently available totheoperators torespondtoany,postulated scenariowhichwouldrequireAFWortheSAFWsystem.Therefore, therearenoenvironmental consequences associated withthisrequest.8.REVIEWBYRCTheGinnaStationPORChasreviewedandapprovedthisrequestforEnforcement Discretion.
~/~N 4}}
ThomasMarlowGinnaStationPORCChairmanDate OVERALLAFWPUMPSTATUSCEMENT4P/4PLIMITVIBRATIONS "A"MDAFWP1150/1120<'>
NoAdverseTrends"B"MDAFWP(PendingRebaseline TestFollowing Corrective Maintenance
-8/30/94)TurbineAFWP1160/1131">
NoAdverseTrends"C"SBAFWP1250/1122~~
NoAdverseTrends"D"SBAFWP1267/1152 NoAdverseTrends(1)-Based onNSSLDesignAnalysis(2)-Based onASMESectionXZCodeFormula
~/~N4}}

Revision as of 14:00, 7 July 2018

Requests Enforcement Discretion W/Respect to TS 3.4.2.1.a. Request Background Info & Justification Encl
ML17263A828
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/30/1994
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: MARTIN T T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17263A826 List:
References
NUDOCS 9411030360
Download: ML17263A828 (7)


Text

t I'u7($@<j~IIWZ ROCHESTER GAS AND ELECTRIC CORPORATION

~89 4 4P'<<EAST AVENUE, ROCHESTER, N.Y.14649.0001 August 30, 1994 TCLEPHONC i~rA coo@.vie 546.2700 U.S.Nuclear Regulatory Commission Regional Administrator, Region I Mr.Thomas T.Martin 475 Allendale Road King of Prussia, PA 19406

Subject:

Request For Enforcement Discretion R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Martin,

In accordance with 10 CFR Part 2, Appendix C, and using the guidance contained in NRC Inspection Manual Part 9900, RG&E requests Enforcement Discretion with respect to Ginna Station Technical Specification 3.4.2.1.a.

The request, background information, and justification is attached.This request was initially discussed with the NRC during a conference call on August 20, 1994 at 1600 EST.RG&E received verbal approval of the enclosed Enforcement Discretion during a phone conversation between Mr.William Lazarus NRC, Region I, and Robert Mecredy, Vice President, Nuclear Production at approximately 1720 EST on that same date.This letter provides all necessary information requested during these two phone conversations.

Very truly yours, Robert C.Mecr y XC: U.S.Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Assistant Director for Region I Reactors Mr.Jose A.Calvo Washington, D.C.20555 Ginna Station Senior Resident Inspector'P4ll030360 94i027 PDR ADaCK 05000244 P PDR~T~

I.-D CRIPTION F TECHNICAL PECIFICATI N RE UIREMENT Ginna Station Technical Specification (TS)3.4.2.1 requires that both motor-driven Auxiliary Feedwater (MDAFW)pumps be operable with the RCS temperature M 350'F.Action Statement 3.4.2.1.a states that if one MDAFW pump is inoperable, the pump must be restored to operable status within 7 days or the plant shall be in at least Hot Shutdown within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and at an RCS temperature

<350'F within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.2.D CRIPTI N OF RE On August 24, 1994 at 0530 hours0.00613 days <br />0.147 hours <br />8.763227e-4 weeks <br />2.01665e-4 months <br />, MDAFW Pump B was removed from service to perform scheduled testing and maintenance of the associated service water cooling supply strainer and the AC lube oil pump (Procedures EM-785 and M-44.13, and Work Order¹19400838).

The maintenance activities were completed on August 25, 1994 and a limited test was subsequently performed on MDAFW Pump B beginning at 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br /> to verify the operability of the AC lube oil pump breaker.At 1432 hours0.0166 days <br />0.398 hours <br />0.00237 weeks <br />5.44876e-4 months <br />, the operators noticed that the normally closed recirculation line air-operated valve (AOV 4310)for MDAFW Pump B did not open as required.The pump was then secured and a trouble card was initiated for AOV 4310 at 1435 hours0.0166 days <br />0.399 hours <br />0.00237 weeks <br />5.460175e-4 months <br />.Preparations were then initiated to perform the repair of AOV 4310.The valve was repaired and a full pump test (Procedure PT-16Q-B)was then performed on August 26, 1994 to verify pump and valve operability.

At 2220 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.4471e-4 months <br />, it was determined that the MDAFW pump did not meet the~p requirements and a trouble card was initiated for the pump.Major repairs on MDAFW Pump B were subsequently initiated which included complete disassembly of the pump.It is noted that Procedure PT-16Q-B was successfully performed on MDAFW Pump B on August 18th.RGB'as conservatively assumed that MDAFW Pump B has been inoperable since August 24, 1994 at 0530 hours0.00613 days <br />0.147 hours <br />8.763227e-4 weeks <br />2.01665e-4 months <br /> when initial work activities began and the LCO was entered.However, since repair activities of the pump were not initiated until late on August 26, 1994, and due to the lead time for replacement parts and the need to perform post-maintenance testing, RG&E does not anticipate that the necessary repairs'and testing can be accomplished within the TS required 7 days.Enforcement Discretion is therefore requested to grant RGB'elief from compliance with the requirements of TS 3.4.2.1.a.

This Enforcement Discretion is requested to begin on August 31, 1994 at 0530 hours0.00613 days <br />0.147 hours <br />8.763227e-4 weeks <br />2.01665e-4 months <br /> when the current LCO for TS 3.4.2.l.a will expire.The Enforcement Discretion is requested to end on September 2 at 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> when all necessary repair and testing activities will be completed.

This is an extension of 50.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. 3..BAST FOR RK T There are a total of five AFW pumps installed at Ginna Station.The preferred AFW system has two 100%capacity MDAFW pumps and one 200%capacity turbine driven (TDAFW)pump.The Standby Auxiliary Feedwater (SAFW)system has two 100%capacity MDAFW pumps which are manually started by the operators if normal AFW is lost (e.g., high energy line breaks in the Intermediate Building).

The safety-related function of the AFW system at Ginna Station is to mitigate the following accidents or events (UFSAR Section 10.5.2.1):

a.b.C.d.e.f.g.h.Loss of main feedwater (MFW)with offsite power available Loss of MFW without offsite power available MFW line rupture Main Steam line rupture Loss of all AC power (onsite and offsite)LOCA Steam Generator Tube Rupture (SGTR)Cooldown Items c and d have been evaluated for Ginna Station assuming that only the redundant SAFW system is available (UFSAR Section 15.2.7.3)while item e only requires the TDAFW pump (UFSAR Section 15.2.5).Items a and b are bounded by the analysis for the high energy line breaks in the Intermediate Building (i.e., items c and d)due to the available water inventory in the intact SGs.The SAFW system can also be used for cooldown events (item g)due to the time which would be available as a result of low decay heat levels.Consequently, only LOCAs and SGTRs (i.e., items f and g)must be considered with respect to the inoperable MDAFW pump.Following a LOCA or SGTR, the preferred AFW system will receive an automatic start signal to provide cooling water to the steam generators.

However, for all LOCAs, both the TDAFW pump and MDAFW Pump A will be available to provide the necessary cooling water.There is no single failure which can result in the loss of both of these pumps during a LOCA.In the case of a SGTR, it can be postulated that a rupture occurs in SG A which would result in the isolation of automatic AFW flow from MDAFW Pump A and the TDAFW pump (to S/G A only).Only automatic flow from the TDAFW pump to'G B would be available in this instance.Operator action is already required for a SGTR event to depressurize the RCS.Since this ten minute delay is already assumed in the accident analysis, it can be assumed that time is also available to use the SAFW system or cross-tie MDAFW A to SG B if the TDAFW pump were to fail.In addition, it is noted that the increased SG level in the ruptured SG provides additional time before AFW would be required. A review of the Ginna Station PRA indicates that a tube rupture in SG A with a subsequent failure of the TDAFW pump, thus requiring the need for SAFW, is of very low probability

(-1.4E-06 for the additional 2 day MDAFW Pump outage).In addition, the AFW system is in standby during normal power operations.

It is not considered prudent to require a plant shutdown through modes in which the preferred AFW system is used to provide normal SG'cooling water needs with one MDAFW pump inoperable.

The potential for plant transients and the subsequent need for AFW during these mode transitions is also increased.

MPENSAT RY ACTI N RG&E will not perform any testing or maintenance related to the remaining AFW and SAFW pumps and their necessary support systems during the requested two day extension.

In addition, operator awareness of RCS leakage has been increased since leakage can be used as an indication of a potential LOCA or SGTR.The Operations Plan of the Day (POD)has also been revised to enhance operator awareness of the use of the MDAFW pump cross-tie lines if required.TIFICATI N F R DURATI N OF RE UEST The requested two day LCO extension is necessary to ensure completion repairs on MDAFW Pump B and to perform the required testing.The two day extension is based on the need to complete the alignment of the pump including the speed increaser.

Based on previous experience, these activities may require multiple iterations.

During this requested extension, three 100%capacity AFW pumps and one 200%capacity TDAFW pump are available to provide the necessary cooling water to the SGs for decay heat removal.As discussed in Section 3, the probability of an accident which requires the AFW pumps during the two day extension is very small.MDAFW Pump A was successfully tested on August 16, 1994 (Procedure PT-16Q-A)~Testing of the TDAFW pump was also successfully performed on August 22, 1994 (Procedure PT-16Q-T)providing additional assurance the continued operability of these pumps.Attachment A provides a summary of the most recent AFW and SAFW pump tests.IGNIFICANT HAZARDS EVALUATION RG&E has evaluated the Enforcement Discretion request and concluded that there is no potential detriment to the public health and safety and that a significant safety hazard is not involved.This basis for this conclusion is summarized below:

-4 ,a" Extending the current outage of MDAFW Pump B for approximately two days does not result in a significant increase in the probability or consequences of an accident previously evaluated.

The remaining AFW and SAFW pumps provide sufficient redundancy to mitigate all potential accidents.

b.Extending the current outage of MDAFW Pump 8 for approximately two days does not create the possibility of a new or different kind of accident from any previously evaluated.

The only accident which can be initiated by AFW is an overcooling event caused by spurious actuation.

Since MDAFW Pump B is not operable, this accident is not credible during the requested extension.

No other new or different kinds of accident are created by the plant condition during the two day extension.

C.Extending the current outage of MDAFW Pump 3 for approximately two days does not involve a significant reduction in a margin of safety.The remaining AFW and SAFW pumps provide sufficient redundancy to mitigate all potential accidents.

In addition, operators are sufficiently trained and procedures address the response to a loss of MFW.7.NVIR NMKNTAL IMPACT There are no environmental releases associated with the current plant condition.

The probability of requiring use of the inoperable MDAFW pump is very small.In addition, sufficient guidance is currently available to the operators to respond to any, postulated scenario which would require AFW or the SAFW system.Therefore, there are no environmental consequences associated with this request.8.REVIEW BY RC The Ginna Station PORC has reviewed and approved this request for Enforcement Discretion.

Thomas Marlow Ginna Station PORC Chairman Date OVERALL AFW PUMP STATUS CEMENT 4 P/4 P LIMIT VIBRATIONS"A" MDAFWP 1150/1120<'>

No Adverse Trends"B" MDAFWP (Pending Rebaseline Test Following Corrective Maintenance

-8/30/94)Turbine AFWP 1160/1131">

No Adverse Trends"C" SBAFWP 1250/1122~~

No Adverse Trends"D" SBAFWP 1267/1152 No Adverse Trends (1)-Based on NSSL Design Analysis (2)-Based on ASME Section XZ Code Formula

~/~N 4