{{#Wiki_filter:~CATEGORYlaREGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9904080022 DOC.DATE:
{{#Wiki_filter:~CATEGORYla REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9904080022 DOC.DATE: 99/03/29 NOTARIZED:
99/03/29NOTARIZED:
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME.AUTHOR AFFILIATION ST MARTIN,J.T.
NOFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester GAUTH.NAME.AUTHORAFFILIATION STMARTIN,J.T.
Rochester Gas&Electric Corp.MECREDY,R.C.
Rochester Gas&ElectricCorp.MECREDY,R.C.
Rochester Gas F Electric Corp.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 VISSING,G.S.
Rochester GasFElectricCorp.RECIP.NAME RECIPIENT AFFILIATION DOCKET05000244VISSING,G.S.
E Q 05000244 0 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72)
EQ050002440NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72)
.
.


==SUBJECT:==
==SUBJECT:==
LER99-002-00:bn 990227,discovered thatsurveillance hadnotbeenperfohned atfrequency,per TS.Caused bypersonnel error.Procedure 0-6.13willbeevaluated forenhancement documentation ofcompletion ofITSSRs.With990329ltr.DISTRIBUTION CODE:IE22TCOPIESRECEIVED:LTR ENCLSIZE:TITLE:50.73/50.9 LicenseeEventReport(LER),IncidentRpt,etc.RECIPIENT IDCODE/NAME PD1-1PDINTERNAL:AEODSCENT~DRG-QMBNRR/DSSA/SPLB RGN1FILE01EXTERNAL:
LER 99-002-00:bn 990227,discovered that surveillance had not been perfohned at frequency,per TS.Caused by personnel error.Procedure 0-6.13 will be evaluated for enhancement documentation of completion of ITS SRs.With 990329 ltr.DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.RECIPIENT ID CODE/NAME PD1-1 PD I NTERNAL: AEOD S CENT~DRG-QMB NRR/DSSA/SPLB RGN1 FILE 01 EXTERNAL: L ST LOBBY WARD NOAC POORE,W.NRC PDR COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1'RECIPIENT ID CODE/NAME VISSING,G.
LSTLOBBYWARDNOACPOORE,W.NRCPDRCOPIESLTTRENCL112211111111111111'RECIPIENT IDCODE/NAME VISSING,G.
AEOD/SPD/RRAB NRR/DRCH/HOHB NRR/DRPM/PECB RES/DET/EIB LMITCO MARSHALL NOAC QUEENER,DS NUDOCS FULL TXT COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D 0 N T NOTE TO ALL"RZDS" RECIPIENTS:
AEOD/SPD/RRAB NRR/DRCH/HOHB NRR/DRPM/PECB RES/DET/EIB LMITCOMARSHALLNOACQUEENER,DS NUDOCSFULLTXTCOPIESLTTRENCL1111111111111111D0NTNOTETOALL"RZDS"RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRZBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCDj ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 18 AND g~gPjP~Pw~'qP~,P'V'(', e'>'4 i<v'A A>>i".E s March 29, 1999 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, D.C.20555  
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRZBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCDjONEXTENSION 415-2083FULLTEXTCONVERSION REQUIREDTOTALNUMBEROFCOPIESREQUIRED:
LTTR18ENCL18 ANDg~gPjP~Pw
~'qP~,P'V'(',e'>'4i<v'AA>>i".EsMarch29,1999U.S.NuclearRegulatory Commission DocumentControlDeskAttn:GuyS.VissingProjectDirectorate I-1Washington, D.C.20555


==Subject:==
==Subject:==
LER1999-002, Surveillance NotPerformed, DuetoPersonnel Error,ResultedinViolation ofTechnical Specifications R.E.GinnaNuclearPowerPlantDocketNo.50-244
LER 1999-002, Surveillance Not Performed, Due to Personnel Error, Resulted in Violation of Technical Specifications R.E.Ginna Nuclear Power Plant Docket No.50-244  


==DearMr.Vissing:==
==Dear Mr.Vissing:==
Inaccordance with10CFR50.73,LicenseeEventReportSystem,item(a)(2)(i)(B),whichrequiresareportof,"Anyoperation orcondition prohibited bytheplant'sTechnical Specifications",
In accordance with 10 CFR 50.73, Licensee Event Report System, item (a)(2)(i)(B), which requires a report of,"Any operation or condition prohibited by the plant's Technical Specifications", the attached Licensee Event Report LER 1999-002 is hereby submitted.
theattachedLicenseeEventReportLER1999-002isherebysubmitted.
This event has in no way affected the public's health and safety.Very ruly yours, Robert C.Me redy xc: Mr.Guy S.Vissing (Mail Stop SC2)Project Directorate I-1 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 Regional Administrator, Region I'U.S.Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector'7904080022 9'70329 PDR ADOCK 05000244 8 PDR NRC FORM 366 (9 1998).U.S.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)(See reverse for required number of digits/characters for each block)g(PF'IPJ(DQY OMB NOB 3$50$IPWILS 0+63@2001 infotmaUon cot(ection request: 50 hrs.Reported lessons learned aro incorporated into the licensing process and fod back to industry.Fonvard comments regarding burden esUmato to tho Records Management Branch (TW F33).U.S.Nuc(oar Regulatory Commission, Washington, DC 20555000(, and to tho Papetwotk Reduction Project (315(40104), Ofrco of Management and Budget, Washington, DC 20503.If an information coBection does nct display a currently valid OMB control number.the NRC may nct conduct or sponsor.and a FACILITY NAME (1)R.E.Ginna Nuclear Power Plant 00CKET NUMBER (2I 05000244 PAGE (3)1 OF 5 TITLE te)Surveillance Not Performed, Due to Personnel Error, Resulted in Violation of Technical Specifications EVENT DATE (5)LER NUMBER (6)REPORT DATE (7)OTHER FACILITIES INVOLVED (8)MONTH OAY YEAR YEAR SEQUENTIAL NUMBER REVISION NUMB(R MONTH OAY YEAR FACILIT Y N AM E DOCKET NUMBER 05000 02 27 OPERATING MODE (9)POWER LEVEL (10)1999 70 1999-002-00 03 29 1999 FACILITY NAME DOCKET NUMBER 05000 20.2201(b) 20.2203(a)(1) 20.2203(a)(2)(I)20.2203(a)(2)(v) 20.2203(a)(3)(l) 20.2203(a)
Thiseventhasinnowayaffectedthepublic'shealthandsafety.Veryrulyyours,RobertC.Meredyxc:Mr.GuyS.Vissing(MailStopSC2)ProjectDirectorate I-1DivisionofReactorProjects-I/IIOfficeofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, D.C.20555RegionalAdministrator, RegionI'U.S.NuclearRegulatory Commission 475Allendale RoadKingofPrussia,PA19406U.S.NRCGinnaSeniorResidentInspector
(3)(n)50.73(a)(2)(l)50.73(a)(2)(II 50.73(a)(2)(III 50.73(a)(2)(vill)50.73(a)(2)(xl 73.71 URSUANTTO THE REQUIREMENTS OF 10 CFR EI (Check ono or more)(11)THIS REPORT IS SUBMITTED P 20.2203(a)
'7904080022 9'70329PDRADOCK050002448PDR NRCFORM366(91998).U.S.NUCLEARREGULATORY COMMISSION LICENSEEEVENTREPORT(LER)(Seereverseforrequirednumberofdigits/characters foreachblock)g(PF'IPJ(DQY OMBNOB3$50$IPWILS0+63@2001 infotmaUon cot(ection request:50hrs.Reportedlessonslearnedaroincorporated intothelicensing processandfodbacktoindustry.
Fonvardcommentsregarding burdenesUmatotothoRecordsManagement Branch(TWF33).U.S.Nuc(oarRegulatory Commission, Washington, DC20555000(,
andtothoPapetwotk Reduction Project(315(40104),
OfrcoofManagement andBudget,Washington, DC20503.Ifaninformation coBection doesnctdisplayacurrently validOMBcontrolnumber.theNRCmaynctconductorsponsor.andaFACILITYNAME(1)R.E.GinnaNuclearPowerPlant00CKETNUMBER(2I05000244PAGE(3)1OF5TITLEte)Surveillance NotPerformed, DuetoPersonnel Error,ResultedinViolation ofTechnical Specifications EVENTDATE(5)LERNUMBER(6)REPORTDATE(7)OTHERFACILITIES INVOLVED(8)MONTHOAYYEARYEARSEQUENTIAL NUMBERREVISIONNUMB(RMONTHOAYYEARFACILITYNAMEDOCKETNUMBER050000227OPERATING MODE(9)POWERLEVEL(10)1999701999-002-0003291999FACILITYNAMEDOCKETNUMBER0500020.2201(b) 20.2203(a)(1) 20.2203(a)(2)
(I)20.2203(a)(2)(v) 20.2203(a)(3)(l) 20.2203(a)
(3)(n)50.73(a)(2)(l)50.73(a)(2)(II 50.73(a)(2)(III 50.73(a)(2)
(vill)50.73(a)(2)(xl73.71URSUANTTO THEREQUIREMENTS OF10CFREI(Checkonoormore)(11)THISREPORTISSUBMITTED P20.2203(a)
(2)(II)20.2203(a)
(2)(II)20.2203(a)
(2)(Ill)20.2203(a)(2)(lv) 20.2203(a)(4) 50.36(c)(1) 50.36(c)(2)LICENSEECONTACTFORTHISLER(12)50.73(a)(2)((v50.73(a)(2)(v50.73(a)(2)(vlOTHERSpecifyinAbstractbelowor(nNRCForm366ANAMETELEPHONE NUMBERUscexfeAtesCode)JohnT.St.Martin-Technical Assistant (716)771-3641CAUSESYSTEMCOMPONENT'ANUFACTURER REPORTABLE TOEPIXCAUSESYSTEMCOMPONENT MANUFACTURER REPORTABLE TOEPIXSUPPLEMENTAL REPORTEXPECTEDR4)YES(Ifyes,completeEXPECTEDSUBMISSION DATE).XNOEXPECTEDSUBMISSION DATE((5)MONTHOAYABSTRACT(Llmltto1400Spaces,I.e.,approximately 15single-spaced typewritten Hnos)(16)OnFebruary27,1999,atapproximately 1600EST,theplantwasincoastdown priortothe1999refueling outage,inMode1atapproximately 70%steadystatereactorpower.Itwasdiscovered thatasurveillance hadnotbeenperformed atthefrequency requiredbytheplant'sTechnical Specifications.
(2)(Ill)20.2203(a)(2)(lv) 20.2203(a)(4) 50.36(c)(1) 50.36(c)(2)LICENSEE CONTACT FOR THIS LER (12)50.73(a)(2)((v 50.73(a)(2)(v 50.73(a)(2)(vl OTHER Specify in Abstract below or (n NRC Form 366A NAME TELEPHONE NUMBER Uscexfe Ates Code)John T.St.Martin-Technical Assistant (716)771-3641 CAUSE SYSTEM COMPONENT'ANUFACTURER REPORTABLE TO EPIX CAUSE SYSTEM COMPONENT MANUFACTURER REPORTABLE TO EPIX SUPPLEMENTAL REPORT EXPECTED R4)YES (If yes, complete EXPECTED SUBMISSION DATE).X NO EXPECTED SUBMISSION DATE ((5)MONTH OAY ABSTRACT (Llmlt to 1400 Spaces, I.e., approximately 15 single-spaced typewritten Hnos)(16)On February 27, 1999, at approximately 1600 EST, the plant was in coastdown prior to the 1999 refueling outage, in Mode 1 at approximately 70%steady state reactor power.It was discovered that a surveillance had not been performed at the frequency required by the plant's Technical Specifications.
Thisconstituted amissedsurveillance, whichisacondition prohibited bytheplant'stechnical specifications.
This constituted a missed surveillance, which is a condition prohibited by the plant's technical specifications.
ControlRoomoperators verifiedthattheplantwascurrently incompliance withthesesurveillance requirements.
Control Room operators verified that the plant was currently in compliance with these surveillance requirements.
Noimmediate corrective actionwasneeded.Theunderlying causeofnotperforming thissurveillance wasapersonnel error.Corrective actiontopreventrecurrence isoutlinedinSectionV.B.  
No immediate corrective action was needed.The underlying cause of not performing this surveillance was a personnel error.Corrective action to prevent recurrence is outlined in Section V.B.  


0NRCFORM366A(61996)LICENSEEEVENTREPORT(LER)TEXTCONTINUATION U.S.NUCLEARREGULATORY COMMISSION FACILITYNAME(1)DOCKET(2)LERNUMBER(6)yEARSEQUENTIAL ONREVISINUMBERNUMBEPAGE(3)R.E.GinnaNuclearPowerPlant050002441999002-002OF5TEXTillmorespaceisreouired, useadditional copiesolNRCForm366AI(171PRE-EVENT PLANTCONDITIONS:
0 NRC FORM 366A (6 1996)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME (1)DOCKET (2)LER NUMBER (6)yEAR SEQUENTIAL ON REVISI NUMBER NUMBE PAGE (3)R.E.Ginna Nuclear Power Plant 05000244 1999 002-00 2 OF 5 TEXT ill more spaceis reouired, use additional copies ol NRC Form 366AI (171 PRE-EVENT PLANT CONDITIONS:
OnFebruary27,1999,atapproximately 1600EST,theplantwasincoastdown priortothe1999refueling outage,inMode1atapproximately 70%steadystatereactorpower.Oneoftheresponsibilities oftheControlRoomoperators istoperformthecomputerchecksinaccordance withplantprocedure S-26.1(Computer ProgramCheck).ControlRoomoperators hadjustcompleted thesecomputerchecks,tomeettheSurveillance Requirements (SR)oftheGinnaStationImprovedTechnical Specifications (ITS).Step5.4ofplantprocedure 0-6.13(DailySurveillance Log)requiresthatthecomputerprogramchecksbeperformed every8hours.II.DESCRIPTION OFEVENT:A.DATESANDAPPROXIMATE TIMES,OFMAJOROCCURRENCES oFebruary26,1999,2318EST:SR3.2.3.1isperformed.
On February 27, 1999, at approximately 1600 EST, the plant was in coastdown prior to the 1999 refueling outage, in Mode 1 at approximately 70%steady state reactor power.One of the responsibilities of the Control Room operators is to perform the computer checks in accordance with plant procedure S-26.1 (Computer Program Check).Control Room operators had just completed these computer checks, to meet the Surveillance Requirements (SR)of the Ginna Station Improved Technical Specifications (ITS).Step 5.4 of plant procedure 0-6.13 (Daily Surveillance Log)requires that the computer program checks be performed every 8 hours.II.DESCRIPTION OF EVENT: A.DATES AND APPROXIMATE TIMES, OF MAJOR OCCURRENCES o February 26, 1999, 2318 EST: SR 3.2.3.1 is performed.
oFebruary27,1999,0728EST:ItwasintendedthatSR3.2.3.1beperformed.
o February 27, 1999, 0728 EST: It was intended that SR 3.2.3.1 be performed.
oFebruary27,1999,1418EST:Eventdateandtime.oFebruary27,1999,1539EST:SR3.2.3.1isperformed.
o February 27, 1999, 1418 EST: Event date and time.o February 27, 1999, 1539 EST: SR 3.2.3.1 is performed.
oFebruary27,1999,1600EST:Discovery dateandtime.oFebruary27,1999,2326EST:SR3.2.3.1isperformed.
o February 27, 1999, 1600 EST: Discovery date and time.o February 27, 1999, 2326 EST: SR 3.2.3.1 is performed.
EVENT:OnFebruary27,1999,atapproximately 1600EST,theplantwasincoastdown priortothe1999refueling outage,inMode1atapproximately 70%steadystatereactorpower.ControlRoomoperators hadjustcompleted computerchecks,tomeettheSRoftheITS.Specifically, SR3.2.3.1,whichverifiesoperability oftheAxialFluxDifference (AFD)monitor,hadbeenperformed atapproximately 1539EST.Performance ofthisSRisrequiredataFrequency of12hours,perITSSR3.2.3.1.GinnaStationadministrative requirements, aslistedinOperations Procedure 0-6.13,"DailySurveillance Log",aretoperformthisSRonceduringeveryeighthourtimeblock.Oneoftheoperators mentallyquestioned whetherhehadactuallyperformed SR3.2.3.1whenhehadpreviously performed thesecomputerchecksatapproximately 0728EST.Notethatproperperformance ofSR3.2.3.1resultsinthereceiptofseveralalarmswhicharereceivedonthePlantProcessComputerSystem(PPCS)anddocumented onthePPCSalarmprintout.
EVENT: On February 27, 1999, at approximately 1600 EST, the plant was in coastdown prior to the 1999 refueling outage, in Mode 1 at approximately 70%steady state reactor power.Control Room operators had just completed computer checks, to meet the SR of the ITS.Specifically, SR 3.2.3.1, which verifies operability of the Axial Flux Difference (AFD)monitor, had been performed at approximately 1539 EST.Performance of this SR is required at a Frequency of 12 hours, per ITS SR 3.2.3.1.Ginna Station administrative requirements, as listed in Operations Procedure 0-6.13,"Daily Surveillance Log", are to perform this SR once during every eight hour time block.One of the operators mentally questioned whether he had actually performed SR 3.2.3.1 when he had previously performed these computer checks at approximately 0728 EST.Note that proper performance of SR 3.2.3.1 results in the receipt of several alarms which are received on the Plant Process Computer System (PPCS)and documented on the PPCS alarm printout.The Control Room operator conducted additional self-checking.
TheControlRoomoperatorconducted additional self-checking.
He realized his error during the second check of the day when, using the procedure, he could not recall performing step 5.4 of procedure S-26.1.He immediately informed the Control Room Foreman about the potential missed surveillance.
Herealizedhiserrorduringthesecondcheckofthedaywhen,usingtheprocedure, hecouldnotrecallperforming step5.4ofprocedure S-26.1.Heimmediately informedtheControlRoomForemanaboutthepotential missedsurveillance.
After a check of the PPCS alarm printout, both the Foreman and the Control Room Operator realized that the surveillance had, in fact, been missed.They discovered that there had been no PPCS alarms generated around the timeframe of 0738 EST, and concluded that SR 3.2.3.1 had not been performed at 0728 EST.Review of the PPCS alarm printout confirmed that SR 3.2.3.1 had been performed at approximately 2318 EST on February 26, 1999.  
AfteracheckofthePPCSalarmprintout, boththeForemanandtheControlRoomOperatorrealizedthatthesurveillance had,infact,beenmissed.Theydiscovered thattherehadbeennoPPCSalarmsgenerated aroundthetimeframe of0738EST,andconcluded thatSR3.2.3.1hadnotbeenperformed at0728EST.ReviewofthePPCSalarmprintoutconfirmed thatSR3.2.3.1hadbeenperformed atapproximately 2318ESTonFebruary26,1999.  
~-
~-
NRCFORM366A(6.1998)LICENSEEEVENTREPORT(LER)TEXTCONTINUATION U.S.NUCLEARREGULATORY COMMISSION FACILITYNAMEI1)R.E.GinnaNuclearPowerPlantDOCKET(2)05000244LERNUMBER(6)SEQUENTIAL REVISINUMBERNUMBE1999-002-00PAGEI3)3OF5TEXTfffmorespeceisrerfuired, useedditionelcopiesofNRCForm366Af)171Inaccordance withITSSR3.2.3.1,thisSRwasduewithin12hours.Applyingtheapplicability requirements'of ITSSR3.0.2,thespecificFrequency ismetifthesurveillance isperformed within1.25timestheintervalspecified (1.25times12resultsin15hours).Thus,thelatestSR3.2.3.1couldbeperformed wouldhavebeen15hoursafter2318hours,orapproximately 1418ESTonFebruary27,1999.Time1418onFebruary27istheEventdateandtime.AlthoughSR3.2.3.1hadbeenmissedat0728EST,theAFDmonitorcontinued tobefullyfunctional.
NRC FORM 366A (6.1998)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME I1)R.E.Ginna Nuclear Power Plant DOCKET (2)05000244 LER NUMBER (6)SEQUENTIAL REVISI NUMBER NUMBE 1999-002-00 PAGE I3)3 OF 5 TEXT fff more spece is rerfuired, use eddi tionel copies of NRC Form 366Af)171 In accordance with ITS SR 3.2.3.1, this SR was due within 12 hours.Applying the applicability requirements'of ITS SR 3.0.2, the specific Frequency is met if the surveillance is performed within 1.25 times the interval specified (1.25 times 12 results in 15 hours).Thus, the latest SR 3.2.3.1 could be performed would have been 15 hours after 2318 hours, or approximately 1418 EST on February 27, 1999.Time 1418 on February 27 is the Event date and time.Although SR 3.2.3.1 had been missed at 0728 EST, the AFD monitor continued to be fully functional.
ReviewofPPCSalarmsconfirmed thatSR3.2.3.1hadbeenproperlyperformed atallothertimesinFebruary1999,atthefrequency requiredbytheplant'sTechnical Specifications andprocedure 0-6.13.C.INOPERABLE STRUCTURES, COMPONENTS, ORSYSTEMSTHATCONTRIBUTED TOTHEEVENT:NoneD.OTHERSYSTEMSORSECONDARY FUNCTIONS AFFECTED:
Review of PPCS alarms confirmed that SR 3.2.3.1 had been properly performed at all other times in February 1999, at the frequency required by the plant's Technical Specifications and procedure 0-6.13.C.INOPERABLE STRUCTURES, COMPONENTS, OR SYSTEMS THAT CONTRIBUTED TO THE EVENT: None D.OTHER SYSTEMS OR SECONDARY FUNCTIONS AFFECTED: None E.METHOD OF DISCOVERY:
NoneE.METHODOFDISCOVERY:
This event was indicated during mental questioning of previous.actions, and was formally discovered by review of PPCS alarm printouts.
Thiseventwasindicated duringmentalquestioning ofprevious.
F.OPERATOR ACTION: The Control Room operators identified that SR 3.2.3.1 had inadvertently not been performed at approximately 0728 EST on February 27.At the time of discovery (1600 EST), Control Room operators verified that the plant was currently in compliance with these surveillance requirements and that the AFD monitor was, and had been, operable.No immediate corrective action was needed.G.SAFETY SYSTEM RESPONSES:
actions,andwasformallydiscovered byreviewofPPCSalarmprintouts.
None III.CAUSE OF EVENT: A.IMMEDIATE CAUSE: The immediate cause of the condition prohibited by Technical Specifications was a missed surveillance in that SR 3.2.3.1 was not performed within 15 hours after 2318 EST on February 26.
F.OPERATORACTION:TheControlRoomoperators identified thatSR3.2.3.1hadinadvertently notbeenperformed atapproximately 0728ESTonFebruary27.Atthetimeofdiscovery (1600EST),ControlRoomoperators verifiedthattheplantwascurrently incompliance withthesesurveillance requirements andthattheAFDmonitorwas,andhadbeen,operable.
r t O NRC FORM 366A (6.1999)LICENSEE EVENT REPORT (LERJ TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME (1)R.E.Ginna Nuclear Power Plant OOCKET (2)05000244 LER NUMBER (6)YEAR SEQUENTIAL ON REVISI NUMBER NUMBE 1999-002-00 PAGE (3)4 OF 5 TEXT fil more speco is recurred, uso eddidonel copies of NRC Form 366AJ 1171 B.INTERMEDIATE CAUSE: The intermediate cause of the missed surveillance was inadvertently not performing SR 3.2.3.1 at approximately 0728 EST on February 27.ROOT CAUSE: The underlying cause of the missed surveillance was a personnel error by an RG(tIE licensed operator, who performed several separate tasks associated with some routine ITS SRs that are performed using the PPCS, and inadvertently did not perform ITS SR 3.2:3.1 at that time.This error was a cognitive error in that the licensed operator did not recognize or detect that he had failed to perform SR 3.2.3.1 at 0728 EST.Inadvertently not performing SR 3.2.3.1 was contrary to approved procedures, in that the procedure required the SR be performed every eight hours.There were no unusual characteristics in the Control Room that directly contributed to the error.IV.ANALYSIS OF EVENT: This event is reportable in accordance with 10 CFR 50.73, Licensee Event Report System, item (a)(2)(i)(B), which requires a report of,"Any operation or condition prohibited by the plant's Technical Specifications".
Noimmediate corrective actionwasneeded.G.SAFETYSYSTEMRESPONSES:
The missed surveillance is a condition prohibited by the plant's techncial specifications.
NoneIII.CAUSEOFEVENT:A.IMMEDIATE CAUSE:Theimmediate causeofthecondition prohibited byTechnical Specifications wasamissedsurveillance inthatSR3.2.3.1wasnotperformed within15hoursafter2318ESTonFebruary26.
An assessment was performed considering both the safety consequences and implications of this event with the following results and conclusions:
rt ONRCFORM366A(6.1999)LICENSEEEVENTREPORT(LERJTEXTCONTINUATION U.S.NUCLEARREGULATORY COMMISSION FACILITYNAME(1)R.E.GinnaNuclearPowerPlantOOCKET(2)05000244LERNUMBER(6)YEARSEQUENTIAL ONREVISINUMBERNUMBE1999-002-00PAGE(3)4OF5TEXTfilmorespecoisrecurred, usoeddidonel copiesofNRCForm366AJ1171B.INTERMEDIATE CAUSE:Theintermediate causeofthemissedsurveillance wasinadvertently notperforming SR3.2.3.1atapproximately 0728ESTonFebruary27.ROOTCAUSE:Theunderlying causeofthemissedsurveillance wasapersonnel errorbyanRG(tIElicensedoperator, whoperformed severalseparatetasksassociated withsomeroutineITSSRsthatareperformed usingthePPCS,andinadvertently didnotperformITSSR3.2:3.1atthattime.Thiserrorwasacognitive errorinthatthelicensedoperatordidnotrecognize ordetectthathehadfailedtoperformSR3.2.3.1at0728EST.Inadvertently notperforming SR3.2.3.1wascontrarytoapprovedprocedures, inthattheprocedure requiredtheSRbeperformed everyeighthours.Therewerenounusualcharacteristics intheControlRoomthatdirectlycontributed totheerror.IV.ANALYSISOFEVENT:Thiseventisreportable inaccordance with10CFR50.73,LicenseeEventReportSystem,item(a)(2)(i)(B),whichrequiresareportof,"Anyoperation orcondition prohibited bytheplant'sTechnical Specifications".
There were no operational or safety consequences or implications attributed to the missed surveillance because: The AFD is a measure of axial power distribution skewing to the top or bottom half of the core.The AFD is.defined as the difference in normalized flux signals between the top and bottom halves of a two section excore neutron detector in each detector well.For convenience, this flux difference is converted to provide flux difference units.The allowed range of the AFD is used in the nuclear design process to help ensure that core peaking factors and axial power distributions meet safety analysis requirements.
Themissedsurveillance isacondition prohibited bytheplant'stechncial specifications.
SR 3.2.3.1 is the verification that the AFD monitor is operable.This is normally accomplished by iritroducing a signal into the PPCS to verify control room annunciation of AFD not within the target band.The Frequency of 12 hours is sufficient to ensure operability of the AFD monitor, since under normal plant operation the AFD is not expected to significantly change.SR 3.2.3.1 had been properly performed at all times prior to this event, and was properly performed at approximately 1539 EST and 2326 EST on February 27, confirming that the AFD monitor was operable.The frequency of monitoring the AFD by the PPCS is nominally once per minute.This monitoring continued throughout this event.
Anassessment wasperformed considering boththesafetyconsequences andimplications ofthiseventwiththefollowing resultsandconclusions:
NRC FORM 366A 16 19)8)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION
Therewerenooperational orsafetyconsequences orimplications attributed tothemissedsurveillance because:TheAFDisameasureofaxialpowerdistribution skewingtothetoporbottomhalfofthecore.TheAFDis.definedasthedifference innormalized fluxsignalsbetweenthetopandbottomhalvesofatwosectionexcoreneutrondetectorineachdetectorwell.Forconvenience, thisfluxdifference isconverted toprovidefluxdifference units.TheallowedrangeoftheAFDisusedinthenucleardesignprocesstohelpensurethatcorepeakingfactorsandaxialpowerdistributions meetsafetyanalysisrequirements.
~FACILITY NAME I1)R.E.Ginna Nuclear Power Plant DOCKET I2)05000244 LER NUMBER I6)YEAR SEOUENTIAL ON REVISI NUMBER NUMBE 1999-002-00 PAGE I3)5 OF 5 TEXT ill more speceis required, use eddaionel copies ol ltiRC Form J66AI 117)o With thermal power (90%of reactor thermal power (RTP), the AFD may be outside the target'band provided that the deviation time is restricted.
SR3.2.3.1istheverification thattheAFDmonitorisoperable.
It is intended that the plant is operated with the AFD within the target band about the target flux difference.
Thisisnormallyaccomplished byiritroducing asignalintothePPCStoverifycontrolroomannunciation ofAFDnotwithinthetargetband.TheFrequency of12hoursissufficient toensureoperability oftheAFDmonitor,sinceundernormalplantoperation theAFDisnotexpectedtosignificantly change.SR3.2.3.1hadbeenproperlyperformed atalltimespriortothisevent,andwasproperlyperformed atapproximately 1539ESTand2326ESTonFebruary27,confirming thattheAFDmonitorwasoperable.
o Inoperability of the alarm does not necessarily prevent the actual AFD values from being available (e.g., from the computer logs or hand logs).AFD values for the preceding 24 hours can be obtained from the hourly PPCS printouts or hand logs.If the AFD monitor had been inoperable during operation at (90%RTP, the AFD measurement is monitored at a Surveillance Frequency of 1 hour to ensure that the AFD is within its limits.Based on the above, it can be concluded that there were no unreviewed safety questions, and that the public's health and safety was assured at all times.V.CORRECTIVE ACTION: A.ACTION TAKEN TO RETURN AFFECTED SYSTEMS TO PRE-EVENT NORMAL STATUS: Since the AFD monitor was operable at the time of discovery, no immediate corrective actions were needed.B.ACTION TAKEN OR PLANNED TO PREVENT RECURRENCE:
Thefrequency ofmonitoring theAFDbythePPCSisnominally onceperminute.Thismonitoring continued throughout thisevent.
o Procedure 0-6.13 will be evaluated for the enhancement of documentation of the completion of ITS SRs.o Lessons learned from this event were discussed with the licensed operator who inadvertently did not perform SR 3.2.3.1.Emphasis was placed on attention to detail.o Operations supervision will review this LER and corrective actions with all operating shifts.VI.ADDITIONAL INFORMATION:
NRCFORM366A1619)8)LICENSEEEVENTREPORT(LER)TEXTCONTINUATION U.S.NUCLEARREGULATORY COMMISSION
A.FAILED COMPONENTS:
~FACILITYNAMEI1)R.E.GinnaNuclearPowerPlantDOCKETI2)05000244LERNUMBERI6)YEARSEOUENTIAL ONREVISINUMBERNUMBE1999-002-00PAGEI3)5OF5TEXTillmorespeceisrequired, useeddaionel copiesolltiRCFormJ66AI117)oWiththermalpower(90%ofreactorthermalpower(RTP),theAFDmaybeoutsidethetarget'band providedthatthedeviation timeisrestricted.
None B.PREVIOUS LERs ON SIMILAR EVENTS: A similar LER event historical search was conducted with the following results: No documentation of similar LER events with the same root cause at Ginna Station could be identified.
ItisintendedthattheplantisoperatedwiththeAFDwithinthetargetbandaboutthetargetfluxdifference.
C.SPECIAL COMMENTS: None}}
oInoperability ofthealarmdoesnotnecessarily preventtheactualAFDvaluesfrombeingavailable (e.g.,fromthecomputerlogsorhandlogs).AFDvaluesforthepreceding 24hourscanbeobtainedfromthehourlyPPCSprintouts orhandlogs.IftheAFDmonitorhadbeeninoperable duringoperation at(90%RTP,theAFDmeasurement ismonitored ataSurveillance Frequency of1hourtoensurethattheAFDiswithinitslimits.Basedontheabove,itcanbeconcluded thattherewerenounreviewed safetyquestions, andthatthepublic'shealthandsafetywasassuredatalltimes.V.CORRECTIVE ACTION:A.ACTIONTAKENTORETURNAFFECTEDSYSTEMSTOPRE-EVENT NORMALSTATUS:SincetheAFDmonitorwasoperableatthetimeofdiscovery, noimmediate corrective actionswereneeded.B.ACTIONTAKENORPLANNEDTOPREVENTRECURRENCE:
oProcedure 0-6.13willbeevaluated fortheenhancement ofdocumentation ofthecompletion ofITSSRs.oLessonslearnedfromthiseventwerediscussed withthelicensedoperatorwhoinadvertently didnotperformSR3.2.3.1.Emphasiswasplacedonattention todetail.oOperations supervision willreviewthisLERandcorrective actionswithalloperating shifts.VI.ADDITIONAL INFORMATION:
A.FAILEDCOMPONENTS:
NoneB.PREVIOUSLERsONSIMILAREVENTS:AsimilarLEReventhistorical searchwasconducted withthefollowing results:Nodocumentation ofsimilarLEReventswiththesamerootcauseatGinnaStationcouldbeidentified.
C.SPECIALCOMMENTS:
None}}

Revision as of 13:34, 7 July 2018

LER 99-002-00:on 990227,discovered That Surveillance Had Not Been Performed at Frequency,Per Ts.Caused by Personnel Error.Procedure O-6.13 Will Be Evaluated for Enhancement Documentation of Completion of ITS Srs.With 990329 Ltr
ML17265A613
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/29/1999
From: MECREDY R C, ST MARTIN J T
ROCHESTER GAS & ELECTRIC CORP.
To: VISSING G S
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-99-002, LER-99-2, NUDOCS 9904080022
Download: ML17265A613 (10)


Text

~CATEGORYla REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9904080022 DOC.DATE: 99/03/29 NOTARIZED:

NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME.AUTHOR AFFILIATION ST MARTIN,J.T.

Rochester Gas&Electric Corp.MECREDY,R.C.

Rochester Gas F Electric Corp.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 VISSING,G.S.

E Q 05000244 0 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72)

.

SUBJECT:

LER 99-002-00:bn 990227,discovered that surveillance had not been perfohned at frequency,per TS.Caused by personnel error.Procedure 0-6.13 will be evaluated for enhancement documentation of completion of ITS SRs.With 990329 ltr.DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.RECIPIENT ID CODE/NAME PD1-1 PD I NTERNAL: AEOD S CENT~DRG-QMB NRR/DSSA/SPLB RGN1 FILE 01 EXTERNAL: L ST LOBBY WARD NOAC POORE,W.NRC PDR COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1'RECIPIENT ID CODE/NAME VISSING,G.

AEOD/SPD/RRAB NRR/DRCH/HOHB NRR/DRPM/PECB RES/DET/EIB LMITCO MARSHALL NOAC QUEENER,DS NUDOCS FULL TXT COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D 0 N T NOTE TO ALL"RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRZBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCDj ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 18 AND g~gPjP~Pw~'qP~,P'V'(', e'>'4 i<v'A A>>i".E s March 29, 1999 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, D.C.20555

Subject:

LER 1999-002, Surveillance Not Performed, Due to Personnel Error, Resulted in Violation of Technical Specifications R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Vissing:

In accordance with 10 CFR 50.73, Licensee Event Report System, item (a)(2)(i)(B), which requires a report of,"Any operation or condition prohibited by the plant's Technical Specifications", the attached Licensee Event Report LER 1999-002 is hereby submitted.

This event has in no way affected the public's health and safety.Very ruly yours, Robert C.Me redy xc: Mr.Guy S.Vissing (Mail Stop SC2)Project Directorate I-1 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 Regional Administrator, Region I'U.S.Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector'7904080022 9'70329 PDR ADOCK 05000244 8 PDR NRC FORM 366 (9 1998).U.S.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)(See reverse for required number of digits/characters for each block)g(PF'IPJ(DQY OMB NOB 3$50$IPWILS 0+63@2001 infotmaUon cot(ection request: 50 hrs.Reported lessons learned aro incorporated into the licensing process and fod back to industry.Fonvard comments regarding burden esUmato to tho Records Management Branch (TW F33).U.S.Nuc(oar Regulatory Commission, Washington, DC 20555000(, and to tho Papetwotk Reduction Project (315(40104), Ofrco of Management and Budget, Washington, DC 20503.If an information coBection does nct display a currently valid OMB control number.the NRC may nct conduct or sponsor.and a FACILITY NAME (1)R.E.Ginna Nuclear Power Plant 00CKET NUMBER (2I 05000244 PAGE (3)1 OF 5 TITLE te)Surveillance Not Performed, Due to Personnel Error, Resulted in Violation of Technical Specifications EVENT DATE (5)LER NUMBER (6)REPORT DATE (7)OTHER FACILITIES INVOLVED (8)MONTH OAY YEAR YEAR SEQUENTIAL NUMBER REVISION NUMB(R MONTH OAY YEAR FACILIT Y N AM E DOCKET NUMBER 05000 02 27 OPERATING MODE (9)POWER LEVEL (10)1999 70 1999-002-00 03 29 1999 FACILITY NAME DOCKET NUMBER 05000 20.2201(b) 20.2203(a)(1) 20.2203(a)(2)(I)20.2203(a)(2)(v) 20.2203(a)(3)(l) 20.2203(a)

(3)(n)50.73(a)(2)(l)50.73(a)(2)(II 50.73(a)(2)(III 50.73(a)(2)(vill)50.73(a)(2)(xl 73.71 URSUANTTO THE REQUIREMENTS OF 10 CFR EI (Check ono or more)(11)THIS REPORT IS SUBMITTED P 20.2203(a)

(2)(II)20.2203(a)

(2)(Ill)20.2203(a)(2)(lv) 20.2203(a)(4) 50.36(c)(1) 50.36(c)(2)LICENSEE CONTACT FOR THIS LER (12)50.73(a)(2)((v 50.73(a)(2)(v 50.73(a)(2)(vl OTHER Specify in Abstract below or (n NRC Form 366A NAME TELEPHONE NUMBER Uscexfe Ates Code)John T.St.Martin-Technical Assistant (716)771-3641 CAUSE SYSTEM COMPONENT'ANUFACTURER REPORTABLE TO EPIX CAUSE SYSTEM COMPONENT MANUFACTURER REPORTABLE TO EPIX SUPPLEMENTAL REPORT EXPECTED R4)YES (If yes, complete EXPECTED SUBMISSION DATE).X NO EXPECTED SUBMISSION DATE ((5)MONTH OAY ABSTRACT (Llmlt to 1400 Spaces, I.e., approximately 15 single-spaced typewritten Hnos)(16)On February 27, 1999, at approximately 1600 EST, the plant was in coastdown prior to the 1999 refueling outage, in Mode 1 at approximately 70%steady state reactor power.It was discovered that a surveillance had not been performed at the frequency required by the plant's Technical Specifications.

This constituted a missed surveillance, which is a condition prohibited by the plant's technical specifications.

Control Room operators verified that the plant was currently in compliance with these surveillance requirements.

No immediate corrective action was needed.The underlying cause of not performing this surveillance was a personnel error.Corrective action to prevent recurrence is outlined in Section V.B.

0 NRC FORM 366A (6 1996)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME (1)DOCKET (2)LER NUMBER (6)yEAR SEQUENTIAL ON REVISI NUMBER NUMBE PAGE (3)R.E.Ginna Nuclear Power Plant 05000244 1999 002-00 2 OF 5 TEXT ill more spaceis reouired, use additional copies ol NRC Form 366AI (171 PRE-EVENT PLANT CONDITIONS:

On February 27, 1999, at approximately 1600 EST, the plant was in coastdown prior to the 1999 refueling outage, in Mode 1 at approximately 70%steady state reactor power.One of the responsibilities of the Control Room operators is to perform the computer checks in accordance with plant procedure S-26.1 (Computer Program Check).Control Room operators had just completed these computer checks, to meet the Surveillance Requirements (SR)of the Ginna Station Improved Technical Specifications (ITS).Step 5.4 of plant procedure 0-6.13 (Daily Surveillance Log)requires that the computer program checks be performed every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.II.DESCRIPTION OF EVENT: A.DATES AND APPROXIMATE TIMES, OF MAJOR OCCURRENCES o February 26, 1999, 2318 EST: SR 3.2.3.1 is performed.

o February 27, 1999, 0728 EST: It was intended that SR 3.2.3.1 be performed.

o February 27, 1999, 1418 EST: Event date and time.o February 27, 1999, 1539 EST: SR 3.2.3.1 is performed.

o February 27, 1999, 1600 EST: Discovery date and time.o February 27, 1999, 2326 EST: SR 3.2.3.1 is performed.

EVENT: On February 27, 1999, at approximately 1600 EST, the plant was in coastdown prior to the 1999 refueling outage, in Mode 1 at approximately 70%steady state reactor power.Control Room operators had just completed computer checks, to meet the SR of the ITS.Specifically, SR 3.2.3.1, which verifies operability of the Axial Flux Difference (AFD)monitor, had been performed at approximately 1539 EST.Performance of this SR is required at a Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, per ITS SR 3.2.3.1.Ginna Station administrative requirements, as listed in Operations Procedure 0-6.13,"Daily Surveillance Log", are to perform this SR once during every eight hour time block.One of the operators mentally questioned whether he had actually performed SR 3.2.3.1 when he had previously performed these computer checks at approximately 0728 EST.Note that proper performance of SR 3.2.3.1 results in the receipt of several alarms which are received on the Plant Process Computer System (PPCS)and documented on the PPCS alarm printout.The Control Room operator conducted additional self-checking.

He realized his error during the second check of the day when, using the procedure, he could not recall performing step 5.4 of procedure S-26.1.He immediately informed the Control Room Foreman about the potential missed surveillance.

After a check of the PPCS alarm printout, both the Foreman and the Control Room Operator realized that the surveillance had, in fact, been missed.They discovered that there had been no PPCS alarms generated around the timeframe of 0738 EST, and concluded that SR 3.2.3.1 had not been performed at 0728 EST.Review of the PPCS alarm printout confirmed that SR 3.2.3.1 had been performed at approximately 2318 EST on February 26, 1999.

~-

NRC FORM 366A (6.1998)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME I1)R.E.Ginna Nuclear Power Plant DOCKET (2)05000244 LER NUMBER (6)SEQUENTIAL REVISI NUMBER NUMBE 1999-002-00 PAGE I3)3 OF 5 TEXT fff more spece is rerfuired, use eddi tionel copies of NRC Form 366Af)171 In accordance with ITS SR 3.2.3.1, this SR was due within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.Applying the applicability requirements'of ITS SR 3.0.2, the specific Frequency is met if the surveillance is performed within 1.25 times the interval specified (1.25 times 12 results in 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br />).Thus, the latest SR 3.2.3.1 could be performed would have been 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> after 2318 hours0.0268 days <br />0.644 hours <br />0.00383 weeks <br />8.81999e-4 months <br />, or approximately 1418 EST on February 27, 1999.Time 1418 on February 27 is the Event date and time.Although SR 3.2.3.1 had been missed at 0728 EST, the AFD monitor continued to be fully functional.

Review of PPCS alarms confirmed that SR 3.2.3.1 had been properly performed at all other times in February 1999, at the frequency required by the plant's Technical Specifications and procedure 0-6.13.C.INOPERABLE STRUCTURES, COMPONENTS, OR SYSTEMS THAT CONTRIBUTED TO THE EVENT: None D.OTHER SYSTEMS OR SECONDARY FUNCTIONS AFFECTED: None E.METHOD OF DISCOVERY:

This event was indicated during mental questioning of previous.actions, and was formally discovered by review of PPCS alarm printouts.

F.OPERATOR ACTION: The Control Room operators identified that SR 3.2.3.1 had inadvertently not been performed at approximately 0728 EST on February 27.At the time of discovery (1600 EST), Control Room operators verified that the plant was currently in compliance with these surveillance requirements and that the AFD monitor was, and had been, operable.No immediate corrective action was needed.G.SAFETY SYSTEM RESPONSES:

None III.CAUSE OF EVENT: A.IMMEDIATE CAUSE: The immediate cause of the condition prohibited by Technical Specifications was a missed surveillance in that SR 3.2.3.1 was not performed within 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> after 2318 EST on February 26.

r t O NRC FORM 366A (6.1999)LICENSEE EVENT REPORT (LERJ TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION FACILITY NAME (1)R.E.Ginna Nuclear Power Plant OOCKET (2)05000244 LER NUMBER (6)YEAR SEQUENTIAL ON REVISI NUMBER NUMBE 1999-002-00 PAGE (3)4 OF 5 TEXT fil more speco is recurred, uso eddidonel copies of NRC Form 366AJ 1171 B.INTERMEDIATE CAUSE: The intermediate cause of the missed surveillance was inadvertently not performing SR 3.2.3.1 at approximately 0728 EST on February 27.ROOT CAUSE: The underlying cause of the missed surveillance was a personnel error by an RG(tIE licensed operator, who performed several separate tasks associated with some routine ITS SRs that are performed using the PPCS, and inadvertently did not perform ITS SR 3.2:3.1 at that time.This error was a cognitive error in that the licensed operator did not recognize or detect that he had failed to perform SR 3.2.3.1 at 0728 EST.Inadvertently not performing SR 3.2.3.1 was contrary to approved procedures, in that the procedure required the SR be performed every eight hours.There were no unusual characteristics in the Control Room that directly contributed to the error.IV.ANALYSIS OF EVENT: This event is reportable in accordance with 10 CFR 50.73, Licensee Event Report System, item (a)(2)(i)(B), which requires a report of,"Any operation or condition prohibited by the plant's Technical Specifications".

The missed surveillance is a condition prohibited by the plant's techncial specifications.

An assessment was performed considering both the safety consequences and implications of this event with the following results and conclusions:

There were no operational or safety consequences or implications attributed to the missed surveillance because: The AFD is a measure of axial power distribution skewing to the top or bottom half of the core.The AFD is.defined as the difference in normalized flux signals between the top and bottom halves of a two section excore neutron detector in each detector well.For convenience, this flux difference is converted to provide flux difference units.The allowed range of the AFD is used in the nuclear design process to help ensure that core peaking factors and axial power distributions meet safety analysis requirements.

SR 3.2.3.1 is the verification that the AFD monitor is operable.This is normally accomplished by iritroducing a signal into the PPCS to verify control room annunciation of AFD not within the target band.The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient to ensure operability of the AFD monitor, since under normal plant operation the AFD is not expected to significantly change.SR 3.2.3.1 had been properly performed at all times prior to this event, and was properly performed at approximately 1539 EST and 2326 EST on February 27, confirming that the AFD monitor was operable.The frequency of monitoring the AFD by the PPCS is nominally once per minute.This monitoring continued throughout this event.

NRC FORM 366A 16 19)8)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION

~FACILITY NAME I1)R.E.Ginna Nuclear Power Plant DOCKET I2)05000244 LER NUMBER I6)YEAR SEOUENTIAL ON REVISI NUMBER NUMBE 1999-002-00 PAGE I3)5 OF 5 TEXT ill more speceis required, use eddaionel copies ol ltiRC Form J66AI 117)o With thermal power (90%of reactor thermal power (RTP), the AFD may be outside the target'band provided that the deviation time is restricted.

It is intended that the plant is operated with the AFD within the target band about the target flux difference.

o Inoperability of the alarm does not necessarily prevent the actual AFD values from being available (e.g., from the computer logs or hand logs).AFD values for the preceding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> can be obtained from the hourly PPCS printouts or hand logs.If the AFD monitor had been inoperable during operation at (90%RTP, the AFD measurement is monitored at a Surveillance Frequency of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to ensure that the AFD is within its limits.Based on the above, it can be concluded that there were no unreviewed safety questions, and that the public's health and safety was assured at all times.V.CORRECTIVE ACTION: A.ACTION TAKEN TO RETURN AFFECTED SYSTEMS TO PRE-EVENT NORMAL STATUS: Since the AFD monitor was operable at the time of discovery, no immediate corrective actions were needed.B.ACTION TAKEN OR PLANNED TO PREVENT RECURRENCE:

o Procedure 0-6.13 will be evaluated for the enhancement of documentation of the completion of ITS SRs.o Lessons learned from this event were discussed with the licensed operator who inadvertently did not perform SR 3.2.3.1.Emphasis was placed on attention to detail.o Operations supervision will review this LER and corrective actions with all operating shifts.VI.ADDITIONAL INFORMATION:

A.FAILED COMPONENTS:

None B.PREVIOUS LERs ON SIMILAR EVENTS: A similar LER event historical search was conducted with the following results: No documentation of similar LER events with the same root cause at Ginna Station could be identified.

C.SPECIAL COMMENTS: None