ML17265A626: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY1REGULAINFORMATION DISTRIBUTIO YSTEM(RIDS)T05000244NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
{{#Wiki_filter:CATEGORY 1 REGULA INFORMATION DISTRIBUTIO YSTEM (RIDS)T 05000244 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
ACCESSION NBR:9904270207 DOC.DATE:
ACCESSION NBR:9904270207 DOC.DATE: 99/04/18 NOTARIZED:
99/04/18NOTARIZED:
NO DOCKET¹FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION
NODOCKET¹FACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244AUTH.NAMEAUTHORAFFILIATION
*Rochester Gas S Electric Corp.RECIP.NAME RECIPIENT AFFILIATION Isiig/~s  
*Rochester GasSElectricCorp.RECIP.NAME RECIPIENT AFFILIATION Isiig/~s


==SUBJECT:==
==SUBJECT:==
Rev10to"Technical Requirements Manual(TRM),"forGinnaStation.DISTRIBUTION CODE:A001DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:ORSubmittal:
Rev 10 to"Technical Requirements Manual (TRM)," for Ginna Station.DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:
GeneralDistribution INTERNALRECIPIENT IDCODE/NAME LPD1-1LAVISSING,G.
General Distribution INTERNAL RECIPIENT ID CODE/NAME LPD1-1 LA VISSING,G.
NRR/DE/EMEB NRR/DSSA/SRXB NUDOCS-ABSTRACT COPIESLTTRENCLRECIPIENT IDCODE/NAME LPD1-1PDNRR/DE/EMCB NRR/DSSA/SPLB NRR/SPSBJUNG,IOGC/HDS3COPIESLTTRENCLEXTERNAL:
NRR/DE/EMEB NRR/DSSA/SRXB NUDOCS-ABSTRACT COPIES LTTR ENCL RECIPIENT ID CODE/NAME LPD1-1 PD NRR/DE/EMCB NRR/DSSA/SPLB NRR/SPSB JUNG,I OGC/HDS3 COPIES LTTR ENCL EXTERNAL: NOAC NRC PDR D L.iIIJLih0.JIIl IIL~I.I JL<L4 N NOTE TO ALL"RIDS" RECIPIENTS:
NOACNRCPDRDL.iIIJLih0.JIIl IIL~I.IJL<L4NNOTETOALL"RIDS"RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR ENCL 12
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
, DISR261'HESTER GAS Ec ELECTRIC C ORATION DOCUMENT CONTROL Document Transmittal Transmittal:
LTTRENCL12
9904077N 055 Date: 04/17/1999 Holder: 1217 To: DOCUMENT CONTROL DESK US NRC ATT: ALLEN JOHNSON PROJECT DOCTORATE 1-1 WASHINGTON DC 20555 LISTED BELOW ARE NEW OR REVISED CONTROLLED DOCUMENTS.
,DISR261'HESTER GASEcELECTRICCORATIONDOCUMENTCONTROLDocumentTransmittal Transmittal:
REVIEW THE ATTACHED INSTRUCTION LETTER (IF APPLICABLE), AND UPDATE YOUR CONTROLLED DOCUMENT IN ACCORDANCE WITH IP-DOC-1.Doc Id TRM Doc Title Rev Rev Date Qty TECHNICAL REQUIREMENTS MANUAL FOR 010-04/18/1999 1 GINNA STATION"i'COGS Receipt Acknowledgement and Action Taken: Signature Date Return to: Rochester Gas&Electric Corporation Ginna Station-Records Management 1503 Lake Road Ontario, New York 14519 9'F04270207 990418 PDR ADQCK 05000244 P PDR E Jl Rochester Gas and Electric Corporation Inter-Office Correspondence April 16, 1999  
9904077N055Date:04/17/1999 Holder:1217To:DOCUMENTCONTROLDESKUSNRCATT:ALLENJOHNSONPROJECTDOCTORATE 1-1WASHINGTON DC20555LISTEDBELOWARENEWORREVISEDCONTROLLED DOCUMENTS.
REVIEWTHEATTACHEDINSTRUCTION LETTER(IFAPPLICABLE),
ANDUPDATEYOURCONTROLLED DOCUMENTINACCORDANCE WITHIP-DOC-1.
DocIdTRMDocTitleRevRevDateQtyTECHNICAL REQUIREMENTS MANUALFOR010-04/18/1999 1GINNASTATION"i'COGSReceiptAcknowledgement andActionTaken:Signature DateReturnto:Rochester Gas&ElectricCorporation GinnaStation-RecordsManagement 1503LakeRoadOntario,NewYork145199'F04270207 990418PDRADQCK05000244PPDR EJl Rochester GasandElectricCorporation Inter-Office Correspondence April16,1999


==Subject:==
==Subject:==
CoreOperating LimitsReport(COLR)Cycle28Revision1andTechnical Requirements Manual(TRM)Revision10TQ:Distribution AttachedisRevision1oftheGinnaStationCoreOperating LimitsReportforCycle28andtheassociated pagesforRevision10oftheTechnical Requirements Manual.Revision1oftheCOLRCycle28isduetochangesintherequiredshutdownmarginastheresultofanewsteamlinebreakanalysis.
Core Operating Limits Report (COLR)Cycle 28 Revision 1 and Technical Requirements Manual (TRM)Revision 10 TQ: Distribution Attached is Revision 1 of the Ginna Station Core Operating Limits Report for Cycle 28 and the associated pages for Revision 10 of the Technical Requirements Manual.Revision 1 of the COLR Cycle 28 is due to changes in the required shutdown margin as the result of a new steam line break analysis.Revision 10 of the TRM is due to the combining of the S07 and S08 halon systems and typos.Cycle 28 Revision 1 of the COLR and Revision 10 of the TRM are considered effective April 18, 1999.Instructions for the necessary changes to the ITS for your controlled copy of the COLR and TRM are as follows: Volume Section Remove Insert III III III III III III III III COLR TRM.TRM TRM Chapter 3.3 TRM Chapter 3.7 TRM Chapter 3.7 TRM Chapter 3.8 TRM Chapter 3.7 COLR Cycle 28r0 Cover Page LEP-i TRM 3.3-10 TRM 3.7-11 TRM 3.7-13 TRM 3.8-3 TRM 3.9-5 COLR Cycle 28rl Cover Page LEP-i TRM 3.3-10 TRM 3.7-11 TRM 3.7-13 TRM 3.8-3 TRM 3.9-5 Please contact Tom Harding (extension 3384)if you have any questions.
Revision10oftheTRMisduetothecombining oftheS07andS08halonsystemsandtypos.Cycle28Revision1oftheCOLRandRevision10oftheTRMareconsidered effective April18,1999.Instructions forthenecessary changestotheITSforyourcontrolled copyoftheCOLRandTRMareasfollows:VolumeSectionRemoveInsertIIIIIIIIIIIIIIIIIIIIIIIICOLRTRM.TRMTRMChapter3.3TRMChapter3.7TRMChapter3.7TRMChapter3.8TRMChapter3.7COLRCycle28r0CoverPageLEP-iTRM3.3-10TRM3.7-11TRM3.7-13TRM3.8-3TRM3.9-5COLRCycle28rlCoverPageLEP-iTRM3.3-10TRM3.7-11TRM3.7-13TRM3.8-3TRM3.9-5PleasecontactTomHarding(extension 3384)ifyouhaveanyquestions.
Thomas L.Harding 0 GINNA STATION TRM Revis on 9 TECHNICAL REQUI EMENTS MANUAL{TyRMI R sponsible Hanag'g-27-'f'7 Effective Date Controlled Copy Ho.i@7  
ThomasL.Harding 0GINNASTATIONTRMRevison9TECHNICAL REQUIEMENTSMANUAL{TyRMIRsponsible Hanag'g-27-'f'7Effective DateControlled CopyHo.i@7  


ListofEffective Pages(TRM)PaeRev.TOCPageRev.Section3.3(con'd)PageRev.Section3.7(con'd)PageRev.Section1.0TRM1.0-1Section2.0TRH2.0-1Section3.0TRH3.0-1Section3.1TRH3.1-1TRM3.1-2TRM3.1-3TRH3.1-4TRH3.1-5TRH3.1-6TRM3.1-7Section3.2TRH3.2-1Section3.3TRM3.3-1TRH3.3-2TRN3.3-3TRH3.3-4TRH3.3-5TRH3.3-6TRH3.3-7TRH3.3-8TRH3.3-9TRM.3.3-10TRH3.3-11TRM3.3-126TRM3.3-13TRH3.3-14TRH3.3-15.TRH3.3-16Section3.4TRH3.4-1TRH3.4-2TRH3.4-3TRH3.4-4TRH3.4-5TRH3.4-6TRH3.4-7-TRH3.4-8TRH3.4-9TRH3.4-10TRH3.4-11TRN3.4-12TRH3.4-13TRH3.4-14Section3.5TRN3.5-1Section3.6TRM3.6-1Section3.7TRH3.7-1TRH3.7-2TRH3.7-3TRH3.7-4TRH3.7-5TRH3.7-6TRH3.7-7TRH3.7-8TRH3.7-9000033'31161131TRH3.7-10TRH3.7-11TRH3.7-12TRN3.7-13TRN3.7-14TRH3.7-15TRH3.7-16TRH3.7-17TRH3.7-18TRH3.7-19TRH3.7-20TRH3.7-21TRH3.7-22TRH3.7-23TRH3.7-24TRM3.7-25TRH3.7-26SectionTRM3.8-1TRH3.8-2TRH3.8-3SectionTRM3.9-1TRH3.9-2TRM3.9-3TRM3.9-4TRN3.9-5TRN3.9-6TRM3.9-7SectionTRM4.0-1SectionTRH5.0-1TRN5.0-23.83.94.05.061411416116661188GinnaStationTRHLEP-iRevision8 FireDctionInstrumentation TR3.3.4TableTR3.3.4-1(page1of2)FireDetection Instrumentation LOCATIONREQUIREDHEATREQUIREDSNOKEFIREZONEDETECTORS DETECTORS 1.Containment a.PostAccidentCharcoalFilterAb.PostAccidentCharcoalFilter8c.Auxiliary FilterCharcoalBankAd.Auxiliary FilterCharcoalBank8e.CableTrays-BasementElevation f.CableTrays-Intermediate Elevation g.CableTrays-Operating Floorh.ReactorCoolantPump(RCP)A-Intermediate FloorRCP8-Intermediate FloorAreaDetection
List of Effective Pages (TRM)Pa e Rev.TOC Page Rev.Section 3.3 (con'd)Page Rev.Section 3.7 (con'd)Page Rev.Section 1.0 TRM 1.0-1 Section 2.0 TRH 2.0-1 Section 3.0 TRH 3.0-1 Section 3.1 TRH 3.1-1 TRM 3.1-2 TRM 3.1-3 TRH 3.1-4 TRH 3.1-5 TRH 3.1-6 TRM 3.1-7 Section 3.2 TRH 3.2-1 Section 3.3 TRM 3.3-1 TRH 3.3-2 TRN 3.3-3 TRH 3.3-4 TRH 3.3-5 TRH 3.3-6 TRH 3.3-7 TRH 3.3-8 TRH 3.3-9 TRM.3.3-10 TRH 3.3-11 TRM 3.3-12 6 TRM 3.3-13 TRH 3.3-14 TRH 3.3-15.TRH 3.3-16 Section 3.4 TRH 3.4-1 TRH 3.4-2 TRH 3.4-3 TRH 3.4-4 TRH 3.4-5 TRH 3.4-6 TRH 3.4-7-TRH 3.4-8 TRH 3.4-9 TRH 3.4-10 TRH 3.4-11 TRN 3.4-12 TRH 3.4-13 TRH 3.4-14 Section 3.5 TRN 3.5-1 Section 3.6 TRM 3.6-1 Section 3.7 TRH 3.7-1 TRH 3.7-2 TRH 3.7-3 TRH 3.7-4 TRH 3.7-5 TRH 3.7-6 TRH 3.7-7 TRH 3.7-8 TRH 3.7-9 0 0 0 0 3 3'3 1 1 6 1 1 3 1 TRH 3.7-10 TRH 3.7-11 TRH 3.7-12 TRN 3.7-13 TRN 3.7-14 TRH 3.7-15 TRH 3.7-16 TRH 3.7-17 TRH 3.7-18 TRH 3.7-19 TRH 3.7-20 TRH 3.7-21 TRH 3.7-22 TRH 3.7-23 TRH 3.7-24 TRM 3.7-25 TRH 3.7-26 Section TRM 3.8-1 TRH 3.8-2 TRH 3.8-3 Section TRM 3.9-1 TRH 3.9-2 TRM 3.9-3 TRM 3.9-4 TRN 3.9-5 TRN 3.9-6 TRM 3.9-7 Section TRM 4.0-1 Section TRH 5.0-1 TRN 5.0-2 3.8 3.9 4.0 5.0 6 1 4 1 1 4 1 6 1 1 6 6 6 1 1 8 8 Ginna Station TRH LEP-i Revision 8 Fire D ction Instrumentation TR 3.3.4 Table TR 3.3.4-1 (page 1 of 2)Fire Detection Instrumentation LOCATION REQUIRED HEAT REQUIRED SNOKE FIRE ZONE DETECTORS DETECTORS 1.Containment a.Post Accident Charcoal Filter A b.Post Accident Charcoal Filter 8 c.Auxiliary Filter Charcoal Bank A d.Auxiliary Filter Charcoal Bank 8 e.Cable Trays-Basement Elevation f.Cable Trays-Intermediate Elevation g.Cable Trays-Operating Floor h.Reactor Coolant Pump (RCP)A-Intermediate Floor RCP 8-Intermediate Floor Area Detection-Operating Floor Z09, Z10 Z11, Z12 Z06 Z07 ZOB Z15 Z16 Z13 Z14 Z16 3(+)A)(c)3 (+)(0)(c)I (b)(c)1(0)(c)1&i(<)2(a)(b)(d)
-Operating FloorZ09,Z10Z11,Z12Z06Z07ZOBZ15Z16Z13Z14Z163(+)A)(c) 3(+)(0)(c)
I (I)(d)I(b)(d)H/A H/A N/A N/A H/A H/A N/A H/A H/A H/A 7(~)(h)2.Control Building a.Control Room-Area and Cabinet b.Control Room/Turbine Building Wall c.Air Handling Room d.Relay Room e.Computer (HUX)Room Ceiling f.Battery Rooms A and 8 3.Diesel Generators (OGs)a.OG Room A b.DG Vault A c.OG Room 8 d.OG Vault 8 Z19 S29 S06 ZIB, SOB S07 pyrotronics area 2 zone 4 S12 Z20 S13 Z21 4(~)N/A 3(i)H/A H/A N/A H/A 17" H/A 3(+)IG(>)3(+)3(~)N/A H/A continued)(a)There is one additional detector at each zone which is not required to be OPERABLE per this TR.(b)This instrument is not required to be OPERABLE during performance of integrated leak rate tests.(c)Resistance temperature detectors (RTDs)only.(d)Line type detectors.
I(b)(c)1(0)(c)1&i(<)2(a)(b)(d)
Ginna Station TRH 3.3-10 Revision 4 Halon Systems TR 3.7.3 3.7 PLANT SYSTEMS 3.7.3 Halon Systems TR 3.7.3 Halon systems in Table TR 3.7.3-1 shall be OPERABLE.APPLICABILITY:
I(I)(d)I(b)(d)H/AH/AN/AN/AH/AH/AN/AH/AH/AH/A7(~)(h)2.ControlBuildinga.ControlRoom-AreaandCabinetb.ControlRoom/Turbine BuildingWallc.AirHandlingRoomd.RelayRoome.Computer(HUX)RoomCeilingf.BatteryRoomsAand83.DieselGenerators (OGs)a.OGRoomAb.DGVaultAc.OGRoom8d.OGVault8Z19S29S06ZIB,SOBS07pyrotronics area2zone4S12Z20S13Z214(~)N/A3(i)H/AH/AN/AH/A17"H/A3(+)IG(>)3(+)3(~)N/AH/Acontinued)
When equipment in the room is required to achieve or maintain safe shutdown.ACTIONS-NOTE Separate Condition entry is allowed for each halon system.CONDITION REQUIRED ACTION COMPLETION TIME A.Required halon system inoperable.
(a)Thereisoneadditional detectorateachzonewhichisnotrequiredtobeOPERABLEperthisTR.(b)Thisinstrument isnotrequiredtobeOPERABLEduringperformance ofintegrated leakratetests.(c)Resistance temperature detectors (RTDs)only.(d)Linetypedetectors.
GinnaStationTRH3.3-10Revision4 HalonSystemsTR3.7.33.7PLANTSYSTEMS3.7.3HalonSystemsTR3.7.3HalonsystemsinTableTR3.7.3-1shallbeOPERABLE.
APPLICABILITY:
Whenequipment intheroomisrequiredtoachieveormaintainsafeshutdown.
ACTIONS-NOTESeparateCondition entryisallowedforeachhalonsystem.CONDITION REQUIREDACTIONCOMPLETION TIMEA.Requiredhalonsysteminoperable.
A.l--------NOTE--------
A.l--------NOTE--------
Notrequiredtobeperformed duringemergency conditions thatprohibitaccesstoaffectedroom.ANDA.2Establish acontinuous firewatchwithbackupfiresuppression equipment.
Not required to be performed during emergency conditions that prohibit access to affected room.AND A.2 Establish a continuous fire watch with backup fire suppression equipment.
Restoreaffectedpenetration toOPERABLEstatus.1hour14days(continued)
Restore affected penetration to OPERABLE status.1 hour 14 days (continued)
GinnaStationTRM3.7-11Revision1 HalonSystemsTR3.7.3TableTR3.7.3-1(page1ofI)HalonSystemsLOCATIONSYSTEMNUMBERSURVEILLANCE RE(UIRENENTS 2.ComputerRoomRelayRoomS07S08TSR3.7.3.1TSR3.7.3.2TSR3.7.3.3TSR3.7.3.4TSR3.7.3.5TSR3.7.3.1TSR3.7.3.2TSR3.7.3.3TSR3.7.3.4TSR3.7.3.5GinnaStationTRH3.7-13Revision1 IInstrument Bus0TR3.8.2TableTR3.8.2-1(page1of1)Instrument BusDSupported Functions FUNCTIONSUPPORTSYSTEMFailstoTrippedCondition7 MOOEOFAPPLICABILITY 2.LCO3.9.2,SourceRangeAudibleCountRateLCOTable3.3.6-1,Functions 3.a,3.band3.c(CREATSIntakeRadiation Monitors)
Ginna Station TRM 3.7-11 Revision 1 Halon Systems TR 3.7.3 Table TR 3.7.3-1 (page 1 of I)Halon Systems LOCATION SYSTEM NUMBER SURVEILLANCE RE(UIRENENTS 2.Computer Room Relay Room S07 S08 TSR 3.7.3.1 TSR 3.7.3.2 TSR 3.7.3.3 TSR 3.7.3.4 TSR 3.7.3.5 TSR 3.7.3.1 TSR 3.7.3.2 TSR 3.7.3.3 TSR 3.7.3.4 TSR 3.7.3.5 Ginna Station TRH 3.7-13 Revision 1 I Instrument Bus 0 TR 3.8.2 Table TR 3.8.2-1 (page 1 of 1)Instrument Bus D Supported Functions FUNCTION SUPPORT SYSTEM Fails to Tripped Condition7 MOOE OF APPLICABILITY 2.LCO 3.9.2, Source Range Audible Count Rate LCO Table 3.3.6-1, Functions 3.a, 3.b and 3.c (CREATS Intake Radiation Monitors)Yes 1,2,3,4,5,6, and Movement of irradiated fuel 3.LCO Table 3.3.1-1, Function 2 (N-44)4.LCO Table 3.3.1-1, Function 5 (OTDT Channel 4)5.LCO Table 3.3.3-2, Functions Sb and 6c (SG A LT-463)6.LCO Table 3.3.3-2, Functions Sb and 6c (SG 8 LT-471)7.LCO Table 3.3.3-2, Functions 4d and 4e (SG B FT-475)8.LCO Table 3.3.3-1, Function 1 (Pzr Pressure PT-449)9.LCO Table 3.3.3-1, Function 23 (SG A LT-463)10'CO Table 3.3.3-1, Function 24 (SG 8 LT-471)11.TR Table 3.3.1-1, Functions 1 and 2 (CREATS Toxic Gas Intrunentation)
Yes1,2,3,4,5,6, andMovementofirradiated fuel3.LCOTable3.3.1-1,Function2(N-44)4.LCOTable3.3.1-1,Function5(OTDTChannel4)5.LCOTable3.3.3-2,Functions Sband6c(SGALT-463)6.LCOTable3.3.3-2,Functions Sband6c(SG8LT-471)7.LCOTable3.3.3-2,Functions 4dand4e(SGBFT-475)8.LCOTable3.3.3-1,Function1(PzrPressurePT-449)9.LCOTable3.3.3-1,Function23(SGALT-463)10'COTable3.3.3-1,Function24(SG8LT-471)11.TRTable3.3.1-1,Functions 1and2(CREATSToxicGasIntrunentation)
Yes Yes Yes Yes Yes Yes Yes Yes Yes 1,2 1,2,3 1,2,3 1,2,3 1,2,3 1,2,3 1,2,3 1,2,3,4,5,6 Ginna Station TRH TRH 3.8-3 Revision 6
YesYesYesYesYesYesYesYesYes1,21,2,31,2,31,2,31,2,31,2,31,2,31,2,3,4,5,6 GinnaStationTRHTRH3.8-3Revision6
~~V" Full C Offload for Cycle 27 TR 3.9.4 3.9 REFUELING OPERATIONS 3.9.4 Full Core Offload for Cycle 27 TR 3.9.4 For the removal of all irradiated fuel assemblies from the reactor to the spent fuel pool (SFP), the following shall be met: a.Two SFP cooling systems shall be OPERABLE, each commensurate with the SFP heat load;and b.The combination of the following screenhouse bay water temperature (T).and in-reactor decay time shall be met: Sceenhouse Bay Water Temperature,'F T s 60 60 (T (80 minimum In-Reactor Decay Time, hrs.132 280---NOTES 1.The SFP heat load and SFP cooling system capabilities are determined by Nuclear Engineering Services.2.The combination of screenhouse bay water temperature and minimum in-reactor decay time is cycle/outage specific.APPLICABILITY:
~~V" FullCOffloadforCycle27TR3.9.43.9REFUELING OPERATIONS 3.9.4FullCoreOffloadforCycle27TR3.9.4Fortheremovalofallirradiated fuelassemblies fromthereactortothespentfuelpool(SFP),thefollowing shallbemet:a.TwoSFPcoolingsystemsshallbeOPERABLE, eachcommensurate withtheSFPheatload;andb.Thecombination ofthefollowing screenhouse baywatertemperature (T).andin-reactor decaytimeshallbemet:Sceenhouse BayWaterTemperature,'F Ts6060(T(80minimumIn-Reactor DecayTime,hrs.132280---NOTES1.TheSFPheatloadandSFPcoolingsystemcapabilities aredetermined byNuclearEngineering Services.
During the complete removal of irradiated fuel assemblies from the reactor to the SFP, and until the reactor has been refueled.Ginna Station TRH TRM 3.9-5 Revision 8 0}}
2.Thecombination ofscreenhouse baywatertemperature andminimumin-reactor decaytimeiscycle/outage specific.
APPLICABILITY:
Duringthecompleteremovalofirradiated fuelassemblies fromthereactortotheSFP,anduntilthereactorhasbeenrefueled.
GinnaStationTRHTRM3.9-5Revision8 0}}

Revision as of 13:34, 7 July 2018

Rev 10 to Technical Requirements Manual (Trm), for Ginna Station
ML17265A626
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/18/1999
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
PROC-990418, NUDOCS 9904270207
Download: ML17265A626 (14)


Text

CATEGORY 1 REGULA INFORMATION DISTRIBUTIO YSTEM (RIDS)T 05000244 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

ACCESSION NBR:9904270207 DOC.DATE: 99/04/18 NOTARIZED:

NO DOCKET¹FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION

  • Rochester Gas S Electric Corp.RECIP.NAME RECIPIENT AFFILIATION Isiig/~s

SUBJECT:

Rev 10 to"Technical Requirements Manual (TRM)," for Ginna Station.DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:

General Distribution INTERNAL RECIPIENT ID CODE/NAME LPD1-1 LA VISSING,G.

NRR/DE/EMEB NRR/DSSA/SRXB NUDOCS-ABSTRACT COPIES LTTR ENCL RECIPIENT ID CODE/NAME LPD1-1 PD NRR/DE/EMCB NRR/DSSA/SPLB NRR/SPSB JUNG,I OGC/HDS3 COPIES LTTR ENCL EXTERNAL: NOAC NRC PDR D L.iIIJLih0.JIIl IIL~I.I JL<L4 N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR ENCL 12

, DISR261'HESTER GAS Ec ELECTRIC C ORATION DOCUMENT CONTROL Document Transmittal Transmittal:

9904077N 055 Date: 04/17/1999 Holder: 1217 To: DOCUMENT CONTROL DESK US NRC ATT: ALLEN JOHNSON PROJECT DOCTORATE 1-1 WASHINGTON DC 20555 LISTED BELOW ARE NEW OR REVISED CONTROLLED DOCUMENTS.

REVIEW THE ATTACHED INSTRUCTION LETTER (IF APPLICABLE), AND UPDATE YOUR CONTROLLED DOCUMENT IN ACCORDANCE WITH IP-DOC-1.Doc Id TRM Doc Title Rev Rev Date Qty TECHNICAL REQUIREMENTS MANUAL FOR 010-04/18/1999 1 GINNA STATION"i'COGS Receipt Acknowledgement and Action Taken: Signature Date Return to: Rochester Gas&Electric Corporation Ginna Station-Records Management 1503 Lake Road Ontario, New York 14519 9'F04270207 990418 PDR ADQCK 05000244 P PDR E Jl Rochester Gas and Electric Corporation Inter-Office Correspondence April 16, 1999

Subject:

Core Operating Limits Report (COLR)Cycle 28 Revision 1 and Technical Requirements Manual (TRM)Revision 10 TQ: Distribution Attached is Revision 1 of the Ginna Station Core Operating Limits Report for Cycle 28 and the associated pages for Revision 10 of the Technical Requirements Manual.Revision 1 of the COLR Cycle 28 is due to changes in the required shutdown margin as the result of a new steam line break analysis.Revision 10 of the TRM is due to the combining of the S07 and S08 halon systems and typos.Cycle 28 Revision 1 of the COLR and Revision 10 of the TRM are considered effective April 18, 1999.Instructions for the necessary changes to the ITS for your controlled copy of the COLR and TRM are as follows: Volume Section Remove Insert III III III III III III III III COLR TRM.TRM TRM Chapter 3.3 TRM Chapter 3.7 TRM Chapter 3.7 TRM Chapter 3.8 TRM Chapter 3.7 COLR Cycle 28r0 Cover Page LEP-i TRM 3.3-10 TRM 3.7-11 TRM 3.7-13 TRM 3.8-3 TRM 3.9-5 COLR Cycle 28rl Cover Page LEP-i TRM 3.3-10 TRM 3.7-11 TRM 3.7-13 TRM 3.8-3 TRM 3.9-5 Please contact Tom Harding (extension 3384)if you have any questions.

Thomas L.Harding 0 GINNA STATION TRM Revis on 9 TECHNICAL REQUI EMENTS MANUAL{TyRMI R sponsible Hanag'g-27-'f'7 Effective Date Controlled Copy Ho.i@7

List of Effective Pages (TRM)Pa e Rev.TOC Page Rev.Section 3.3 (con'd)Page Rev.Section 3.7 (con'd)Page Rev.Section 1.0 TRM 1.0-1 Section 2.0 TRH 2.0-1 Section 3.0 TRH 3.0-1 Section 3.1 TRH 3.1-1 TRM 3.1-2 TRM 3.1-3 TRH 3.1-4 TRH 3.1-5 TRH 3.1-6 TRM 3.1-7 Section 3.2 TRH 3.2-1 Section 3.3 TRM 3.3-1 TRH 3.3-2 TRN 3.3-3 TRH 3.3-4 TRH 3.3-5 TRH 3.3-6 TRH 3.3-7 TRH 3.3-8 TRH 3.3-9 TRM.3.3-10 TRH 3.3-11 TRM 3.3-12 6 TRM 3.3-13 TRH 3.3-14 TRH 3.3-15.TRH 3.3-16 Section 3.4 TRH 3.4-1 TRH 3.4-2 TRH 3.4-3 TRH 3.4-4 TRH 3.4-5 TRH 3.4-6 TRH 3.4-7-TRH 3.4-8 TRH 3.4-9 TRH 3.4-10 TRH 3.4-11 TRN 3.4-12 TRH 3.4-13 TRH 3.4-14 Section 3.5 TRN 3.5-1 Section 3.6 TRM 3.6-1 Section 3.7 TRH 3.7-1 TRH 3.7-2 TRH 3.7-3 TRH 3.7-4 TRH 3.7-5 TRH 3.7-6 TRH 3.7-7 TRH 3.7-8 TRH 3.7-9 0 0 0 0 3 3'3 1 1 6 1 1 3 1 TRH 3.7-10 TRH 3.7-11 TRH 3.7-12 TRN 3.7-13 TRN 3.7-14 TRH 3.7-15 TRH 3.7-16 TRH 3.7-17 TRH 3.7-18 TRH 3.7-19 TRH 3.7-20 TRH 3.7-21 TRH 3.7-22 TRH 3.7-23 TRH 3.7-24 TRM 3.7-25 TRH 3.7-26 Section TRM 3.8-1 TRH 3.8-2 TRH 3.8-3 Section TRM 3.9-1 TRH 3.9-2 TRM 3.9-3 TRM 3.9-4 TRN 3.9-5 TRN 3.9-6 TRM 3.9-7 Section TRM 4.0-1 Section TRH 5.0-1 TRN 5.0-2 3.8 3.9 4.0 5.0 6 1 4 1 1 4 1 6 1 1 6 6 6 1 1 8 8 Ginna Station TRH LEP-i Revision 8 Fire D ction Instrumentation TR 3.3.4 Table TR 3.3.4-1 (page 1 of 2)Fire Detection Instrumentation LOCATION REQUIRED HEAT REQUIRED SNOKE FIRE ZONE DETECTORS DETECTORS 1.Containment a.Post Accident Charcoal Filter A b.Post Accident Charcoal Filter 8 c.Auxiliary Filter Charcoal Bank A d.Auxiliary Filter Charcoal Bank 8 e.Cable Trays-Basement Elevation f.Cable Trays-Intermediate Elevation g.Cable Trays-Operating Floor h.Reactor Coolant Pump (RCP)A-Intermediate Floor RCP 8-Intermediate Floor Area Detection-Operating Floor Z09, Z10 Z11, Z12 Z06 Z07 ZOB Z15 Z16 Z13 Z14 Z16 3(+)A)(c)3 (+)(0)(c)I (b)(c)1(0)(c)1&i(<)2(a)(b)(d)

I (I)(d)I(b)(d)H/A H/A N/A N/A H/A H/A N/A H/A H/A H/A 7(~)(h)2.Control Building a.Control Room-Area and Cabinet b.Control Room/Turbine Building Wall c.Air Handling Room d.Relay Room e.Computer (HUX)Room Ceiling f.Battery Rooms A and 8 3.Diesel Generators (OGs)a.OG Room A b.DG Vault A c.OG Room 8 d.OG Vault 8 Z19 S29 S06 ZIB, SOB S07 pyrotronics area 2 zone 4 S12 Z20 S13 Z21 4(~)N/A 3(i)H/A H/A N/A H/A 17" H/A 3(+)IG(>)3(+)3(~)N/A H/A continued)(a)There is one additional detector at each zone which is not required to be OPERABLE per this TR.(b)This instrument is not required to be OPERABLE during performance of integrated leak rate tests.(c)Resistance temperature detectors (RTDs)only.(d)Line type detectors.

Ginna Station TRH 3.3-10 Revision 4 Halon Systems TR 3.7.3 3.7 PLANT SYSTEMS 3.7.3 Halon Systems TR 3.7.3 Halon systems in Table TR 3.7.3-1 shall be OPERABLE.APPLICABILITY:

When equipment in the room is required to achieve or maintain safe shutdown.ACTIONS-NOTE Separate Condition entry is allowed for each halon system.CONDITION REQUIRED ACTION COMPLETION TIME A.Required halon system inoperable.

A.l--------NOTE--------

Not required to be performed during emergency conditions that prohibit access to affected room.AND A.2 Establish a continuous fire watch with backup fire suppression equipment.

Restore affected penetration to OPERABLE status.1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 14 days (continued)

Ginna Station TRM 3.7-11 Revision 1 Halon Systems TR 3.7.3 Table TR 3.7.3-1 (page 1 of I)Halon Systems LOCATION SYSTEM NUMBER SURVEILLANCE RE(UIRENENTS 2.Computer Room Relay Room S07 S08 TSR 3.7.3.1 TSR 3.7.3.2 TSR 3.7.3.3 TSR 3.7.3.4 TSR 3.7.3.5 TSR 3.7.3.1 TSR 3.7.3.2 TSR 3.7.3.3 TSR 3.7.3.4 TSR 3.7.3.5 Ginna Station TRH 3.7-13 Revision 1 I Instrument Bus 0 TR 3.8.2 Table TR 3.8.2-1 (page 1 of 1)Instrument Bus D Supported Functions FUNCTION SUPPORT SYSTEM Fails to Tripped Condition7 MOOE OF APPLICABILITY 2.LCO 3.9.2, Source Range Audible Count Rate LCO Table 3.3.6-1, Functions 3.a, 3.b and 3.c (CREATS Intake Radiation Monitors)Yes 1,2,3,4,5,6, and Movement of irradiated fuel 3.LCO Table 3.3.1-1, Function 2 (N-44)4.LCO Table 3.3.1-1, Function 5 (OTDT Channel 4)5.LCO Table 3.3.3-2, Functions Sb and 6c (SG A LT-463)6.LCO Table 3.3.3-2, Functions Sb and 6c (SG 8 LT-471)7.LCO Table 3.3.3-2, Functions 4d and 4e (SG B FT-475)8.LCO Table 3.3.3-1, Function 1 (Pzr Pressure PT-449)9.LCO Table 3.3.3-1, Function 23 (SG A LT-463)10'CO Table 3.3.3-1, Function 24 (SG 8 LT-471)11.TR Table 3.3.1-1, Functions 1 and 2 (CREATS Toxic Gas Intrunentation)

Yes Yes Yes Yes Yes Yes Yes Yes Yes 1,2 1,2,3 1,2,3 1,2,3 1,2,3 1,2,3 1,2,3 1,2,3,4,5,6 Ginna Station TRH TRH 3.8-3 Revision 6

~~V" Full C Offload for Cycle 27 TR 3.9.4 3.9 REFUELING OPERATIONS 3.9.4 Full Core Offload for Cycle 27 TR 3.9.4 For the removal of all irradiated fuel assemblies from the reactor to the spent fuel pool (SFP), the following shall be met: a.Two SFP cooling systems shall be OPERABLE, each commensurate with the SFP heat load;and b.The combination of the following screenhouse bay water temperature (T).and in-reactor decay time shall be met: Sceenhouse Bay Water Temperature,'F T s 60 60 (T (80 minimum In-Reactor Decay Time, hrs.132 280---NOTES 1.The SFP heat load and SFP cooling system capabilities are determined by Nuclear Engineering Services.2.The combination of screenhouse bay water temperature and minimum in-reactor decay time is cycle/outage specific.APPLICABILITY:

During the complete removal of irradiated fuel assemblies from the reactor to the SFP, and until the reactor has been refueled.Ginna Station TRH TRM 3.9-5 Revision 8 0