ML13351A273: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:January 9, 2014
Mr. James T. Brett
President & Chief Executive Officer The New England Council 98 North Washington St. Boston, MA 02114
==Dear Mr. Brett,==
I am writing to you in response to your November 21, 2013, letter related to my tour of the Pilgrim Nuclear Power Station in Plymouth, Massachusetts on November 8, 2013. I regret that I was unable to meet with the New England Council during that visit. Unfortunately, the schedule for the visit was very tight, and it only allowed for limited engagements.
I would like to thank you for your insights r egarding the Pilgrim Nuclear Power Station. The NRC is a mature regulator and has a very robust inspection program in place to monitor the licensee's performance and to ensure protection of public health and safety and the environment. This inspection program helps ensure the continued safe operations of all of the country's nuclear reactors by verifying that the organizational structure, operator qualifications, design, maintenance, operations, fuel handling, and environmental and radiation protection programs are adequate and comply with the NRC's safety and security requirements.
In the event that I visit the New England area in the future, I will ensure my staff reaches out to your organization in advance of the visit. If you or anyone from your delegation visits the Washington, DC area, I would be pleased to make ti me for you to have a brief visit with myself or one of my staff.
Thank you for your letter and your attention to the safety and security of NRC-licensed facilities.
Sincerely,
            /RA/
Allison M. Macfarlane}}

Revision as of 10:08, 3 July 2018

G20130846/LTR-13-0911 - James Brett, the New England Council Ltr. Chairman'S Recent Tour and the Council'S Support for the Pilgrim Nuclear Power Station - Response
ML13351A273
Person / Time
Site: Pilgrim
Issue date: 01/09/2014
From: Macfarlane A M
NRC/OCM/AMM
To: Brett J T
The New England Council
Rini B A
Shared Package
ML13326B087 List:
References
G20130846, LTR-13-0911
Download: ML13351A273 (2)


Text

January 9, 2014

Mr. James T. Brett

President & Chief Executive Officer The New England Council 98 North Washington St. Boston, MA 02114

Dear Mr. Brett,

I am writing to you in response to your November 21, 2013, letter related to my tour of the Pilgrim Nuclear Power Station in Plymouth, Massachusetts on November 8, 2013. I regret that I was unable to meet with the New England Council during that visit. Unfortunately, the schedule for the visit was very tight, and it only allowed for limited engagements.

I would like to thank you for your insights r egarding the Pilgrim Nuclear Power Station. The NRC is a mature regulator and has a very robust inspection program in place to monitor the licensee's performance and to ensure protection of public health and safety and the environment. This inspection program helps ensure the continued safe operations of all of the country's nuclear reactors by verifying that the organizational structure, operator qualifications, design, maintenance, operations, fuel handling, and environmental and radiation protection programs are adequate and comply with the NRC's safety and security requirements.

In the event that I visit the New England area in the future, I will ensure my staff reaches out to your organization in advance of the visit. If you or anyone from your delegation visits the Washington, DC area, I would be pleased to make ti me for you to have a brief visit with myself or one of my staff.

Thank you for your letter and your attention to the safety and security of NRC-licensed facilities.

Sincerely,

/RA/

Allison M. Macfarlane