{{#Wiki_filter:" " December 16, 2014 Rafael Flores, Senior Vice President and Chief Nuclear Officer Attention: Regulatory Affairs Luminant Generation Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043 | {{#Wiki_filter:" " December 16, 2014 | ||
Rafael Flores, Senior Vice President | |||
and Chief Nuclear Officer | |||
Attention: Regulatory Affairs Luminant Generation Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043 | |||
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION 05000445/2014405 AND 05000446/2014405 | SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION 05000445/2014405 AND 05000446/2014405 | ||
==Dear Mr. Flores:== | ==Dear Mr. Flores:== | ||
On December 4, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Comanche Peak Nuclear Power Plant. The inspection covered a key attribute of the Security Cornerstone of the NRC's Reactor Oversight Process, Material Control and Accounting of Special Nuclear Material. The enclosed inspection report documents the inspection results, which were discussed on December 4, 2014, with Mr. T. McCool, Vice President, Nuclear Engineering and Support, and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. | On December 4, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Comanche Peak Nuclear Power Plant. The inspection covered a key attribute of the Security Cornerstone of the NRC' | ||
s Reactor Oversight Process, Material Control and Accounting of Special Nuclear Material. The enclosed inspection report documents the inspection results, which were discussed on December 4, 2014, with Mr. T. McCool, Vice President, Nuclear Engineering and Support, and other members of your staff. | |||
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. | |||
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
Based on the results of this inspection, no findings were identified. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | |||
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system, (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). | |||
Sincerely,/RA/ | Sincerely,/RA/ | ||
Line 38: | Line 51: | ||
===w/Attachment:=== | ===w/Attachment:=== | ||
Supplemental Information cc w/enclosure: Mr. Neil Harris (interim) Manager, Nuclear Security Luminant Generation Company, LLC Comanche Peak Nuclear Power Plant | Supplemental Information cc w/enclosure: Mr. Neil Harris (interim) Manager, Nuclear Security Luminant Generation Company, LLC Comanche Peak Nuclear Power Plant | ||
ML14350A201 Entire Report: ADAMS: Publicly Available Non-Sensitive Keyword SUNSI Review By: JJO Yes No Non-Publicly Available Sensitive MD 3.4 Non-Public A.3 Cover Letter Only: ADAMS: Publicly Available Non-Sensitive Keyword SUNSI Review Complete SUNSI Review By: JJO Yes No Non-Publicly Available Sensitive NRC-002 OFFICE HP:PSB2 C:PBA C:PSB2 NAME J. O'Donnell:PBH W. Walker H. Gepford SIGNATURE /RA/ /RA/ /RA/ DATE 12/15/2014 12/15/2014 12/16/2014 Distribution w/enclosure: Security Specialist/NSIR (Eric.Wharton@nrc.gov) Security Specialist/NSIR (Niry.Simonian@nrc.gov) | Mail Code X02 6322 North FM 56 Glen Rose, TX 76043 | ||
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) | |||
Security Specialist/ | cc w/o enclosure: Electronic distribution by RIV | ||
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov) Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov) Senior Resident Inspector (John.Kramer@nrc.gov) | |||
ML14350A201 Entire Report: | |||
ADAMS: Publicly Available Non-Sensitive Keyword SUNSI Review By: JJO Yes No Non-Publicly Available Sensitive MD 3.4 Non-Public A.3 Cover Letter Only: | |||
ADAMS: Publicly Available Non-Sensitive Keyword SUNSI Review Complete SUNSI Review By: JJO Yes No Non-Publicly Available Sensitive NRC-002 OFFICE HP:PSB2 C:PBA C:PSB2 NAME J. O'Donnell:PBH W. Walker H. Gepford SIGNATURE /RA/ /RA/ /RA/ DATE 12/15/2014 12/15/2014 12/16/2014 Distribution w/enclosure: | |||
Security Specialist/NSIR (Eric.Wharton@nrc.gov) Security Specialist/NSIR (Niry.Simonian@nrc.gov) | |||
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) | |||
Security Specialist/NSI R (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov) | |||
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov) Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov | |||
) Senior Resident Inspector (John.Kramer@nrc.gov) | |||
Administrative Assistant (Rhonda.Smith@nrc.gov) | Administrative Assistant (Rhonda.Smith@nrc.gov) | ||
Line 53: | Line 75: | ||
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) | Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) | ||
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov) | Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov) | ||
Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Stephen.Monarque@nrc.gov) | Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) | ||
Project Manager (Stephen.Monarque@nrc.gov) | |||
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) | Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) | ||
RITS Coordinator (Marisa.Herrera@nrc.gov) | RITS Coordinator (Marisa.Herrera@nrc.gov) | ||
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) | ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) | ||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | Congressional Affairs Officer (Jenny.Weil@nrc.gov) |
Revision as of 07:46, 1 July 2018
ML14350A201 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 12/16/2014 |
From: | Gepford H J NRC/RGN-IV/DRS/PSB-2 |
To: | Flores R Luminant Generation Co |
Gepford H J | |
References | |
IR 2014405 | |
Download: ML14350A201 (4) | |
Text
" " December 16, 2014
Rafael Flores, Senior Vice President
and Chief Nuclear Officer
Attention: Regulatory Affairs Luminant Generation Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION 05000445/2014405 AND 05000446/2014405
Dear Mr. Flores:
On December 4, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Comanche Peak Nuclear Power Plant. The inspection covered a key attribute of the Security Cornerstone of the NRC'
s Reactor Oversight Process, Material Control and Accounting of Special Nuclear Material. The enclosed inspection report documents the inspection results, which were discussed on December 4, 2014, with Mr. T. McCool, Vice President, Nuclear Engineering and Support, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system, (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,/RA/
Heather J. Gepford, Chief Plant Support Branch 2 Division of Reactor Safety
Docket No.: 50-445; 50-446 License No.: NPF-87; NPF-89 Nonpublic
Enclosure:
NRC Inspection Report 05000445/2014405, 05000446/2014405
w/Attachment:
Supplemental Information cc w/enclosure: Mr. Neil Harris (interim) Manager, Nuclear Security Luminant Generation Company, LLC Comanche Peak Nuclear Power Plant
Mail Code X02 6322 North FM 56 Glen Rose, TX 76043
cc w/o enclosure: Electronic distribution by RIV
ML14350A201 Entire Report:
ADAMS: Publicly Available Non-Sensitive Keyword SUNSI Review By: JJO Yes No Non-Publicly Available Sensitive MD 3.4 Non-Public A.3 Cover Letter Only:
ADAMS: Publicly Available Non-Sensitive Keyword SUNSI Review Complete SUNSI Review By: JJO Yes No Non-Publicly Available Sensitive NRC-002 OFFICE HP:PSB2 C:PBA C:PSB2 NAME J. O'Donnell:PBH W. Walker H. Gepford SIGNATURE /RA/ /RA/ /RA/ DATE 12/15/2014 12/15/2014 12/16/2014 Distribution w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov) Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSI R (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov) Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov
) Senior Resident Inspector (John.Kramer@nrc.gov)
Administrative Assistant (Rhonda.Smith@nrc.gov)
cc w/o enclosure: Electronic distribution by RIV Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Jason.Kozal@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Resident Inspector (Rayomand.Kumana@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Stephen.Monarque@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Cayetano.Santos@nrc.gov)
OEDO RIV Coordinator (Margie.Kotzalas@nrc.gov) Executive Technical Assistant (John.Giessner@nrc.gov