ML14262A322: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 13: Line 13:
| page count = 3
| page count = 3
}}
}}
=Text=
{{#Wiki_filter:September 19, 2014   
Mr. Michael R. Chisum, Site Vice President Entergy Operations, Inc.
17265 River Road Killona, LA  70057-0751 
==SUBJECT:==
RESPONSE TO NOTIFICATION OF READINESS FOR NRC INSPECTION PROCEDURE 95001 
==Dear Mr. Chisum:==
By letter dated April 2, 2014, (ADAMS ML14093A093) the Nuclear Regulatory Commission (NRC) notified Entergy Operations, Inc., that the Waterford Steam Electric Station, Unit 3, had been placed in the Regulatory Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix due to having one White finding in the Mitigating Systems Cornerstone. In that letter, the NRC notified you of our intent to conduct a supplemental inspection in accordance with Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," once we receive written notification of your readiness for the inspection.
By letter dated September 8, 2014, (ADAMS ML14252A044) you informed the NRC of Entergy's readiness for the performance of the supplemental inspection. We have scheduled this inspection for October 6-10, 2014. Please contact Mr. Cale Young at (817) 200-1250 with any questions concerning the details of this inspection.
Sincerely,
/RA/  Cale H. Young for  Gregory E. Werner, Acting Chief Project Branch E Division of Reactor Projects Docket No.:  50-382 License No.:  NPF-38  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 
ML14262A322  SUNSI Review By:  CYoung ADAMS  Yes    No  Publicly Available  Non-Publicly Available  Non-Sensitive  Sensitive Keyword: NRC-002 OFFICE SPE:DRP/E C:DRP/E      NAME CYoung/dch GWerner      SIGNATURE /RA/  /RA/ CHY for      DATE 9/19/14 9/19/14 Letter to Michael Chisum from Gregory Werner, dated September 19, 2014 
==SUBJECT:==
RESPONSE TO NOTIFICATION OF READINESS FOR NRC INSPECTION PROCEDURE 95001 Electronic distribution by RIV: Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Michael.Hay@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Frances.Ramirez@nrc.gov)
Resident Inspector (Chris.Speer@nrc.gov) WAT Administrative Assistant (Linda.Dufrene@nrc.gov) Branch Chief, DRP/E (Greg.Werner@nrc.gov)
Senior Project Engineer, DRP/E (Cale.Young@nrc.gov)
Project Engineer, DRP/E (Jim.Melfi@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Michael.Orenak@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (John.Jandovitz@nrc.gov)
ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov}}

Revision as of 15:46, 26 June 2018

Response to Notification of Readiness for NRC Inspection Procedure 95001
ML14262A322
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/19/2014
From: Werner G E
NRC/RGN-IV/DRP/RPB-E
To: Chisum M R
Entergy Operations
References
Download: ML14262A322 (3)


Text

September 19, 2014

Mr. Michael R. Chisum, Site Vice President Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751

SUBJECT:

RESPONSE TO NOTIFICATION OF READINESS FOR NRC INSPECTION PROCEDURE 95001

Dear Mr. Chisum:

By letter dated April 2, 2014, (ADAMS ML14093A093) the Nuclear Regulatory Commission (NRC) notified Entergy Operations, Inc., that the Waterford Steam Electric Station, Unit 3, had been placed in the Regulatory Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix due to having one White finding in the Mitigating Systems Cornerstone. In that letter, the NRC notified you of our intent to conduct a supplemental inspection in accordance with Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," once we receive written notification of your readiness for the inspection.

By letter dated September 8, 2014, (ADAMS ML14252A044) you informed the NRC of Entergy's readiness for the performance of the supplemental inspection. We have scheduled this inspection for October 6-10, 2014. Please contact Mr. Cale Young at (817) 200-1250 with any questions concerning the details of this inspection.

Sincerely,

/RA/ Cale H. Young for Gregory E. Werner, Acting Chief Project Branch E Division of Reactor Projects Docket No.: 50-382 License No.: NPF-38 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511

ML14262A322 SUNSI Review By: CYoung ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE SPE:DRP/E C:DRP/E NAME CYoung/dch GWerner SIGNATURE /RA/ /RA/ CHY for DATE 9/19/14 9/19/14 Letter to Michael Chisum from Gregory Werner, dated September 19, 2014

SUBJECT:

RESPONSE TO NOTIFICATION OF READINESS FOR NRC INSPECTION PROCEDURE 95001 Electronic distribution by RIV: Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Michael.Hay@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Frances.Ramirez@nrc.gov)

Resident Inspector (Chris.Speer@nrc.gov) WAT Administrative Assistant (Linda.Dufrene@nrc.gov) Branch Chief, DRP/E (Greg.Werner@nrc.gov)

Senior Project Engineer, DRP/E (Cale.Young@nrc.gov)

Project Engineer, DRP/E (Jim.Melfi@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Michael.Orenak@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (John.Jandovitz@nrc.gov)

ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov