Follow-Up Assessment Letter for Waterford Steam Electric Station, Unit 3
ML14093A093
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/02/2014
From: Kennedy K
NRC/RGN-IV/DRP
To: Chisum M
Entergy Operations
Werner G
References
Download: ML14093A093 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 April 2, 2014 Mr. Michael Chisum, Site Vice President Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751

SUBJECT:

FOLLOW-UP ASSESSMENT LETTER FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3

Dear Mr. Chisum:

As a result of our continuous review of plant performance, on March 28, 2014, the U. S. Nuclear Regulatory Commission (NRC) updated its assessment of the Waterford Steam Electric Station, Unit 3. The NRCs evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRCs assessment and plans for a future inspection at your facility. This letter supplements, but does not supersede, the annual assessment letter issued on March 4, 2014.

In a letter (ML14086A768) dated March 28, 2014, the NRC communicated the final significance determination of a White finding in the Mitigating Systems Cornerstone. The finding involved your staffs failure to identify and perform adequate testing on the train B emergency diesel generator exhaust fan to demonstrate that the exhaust fan would perform satisfactorily in service. As a result, your staff failed to ensure that the safety-related exhaust fan would perform satisfactorily such that it would provide sufficient flow and remove heat during accident conditions.

Based on this finding, the NRC determined the performance at the Waterford Steam Electric Station, Unit 3, to be in the Regulatory Response Column of the Reactor Oversight Process Action Matrix beginning on December 19, 2013, the date the preliminary finding was discussed with your staff at the exit meeting for NRC Inspection Report 05000382/2013008 (ML14030A616). The NRC plans to conduct a supplemental inspection to review the actions taken to address the performance issues using Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area. The NRC will plan this inspection activity when you provide written notification of your readiness for the inspection.

M. Chisum The supplemental inspection will provide assurance that the root causes and contributing causes of risk-significant performance issues are understood; the extent of condition and extent of cause of risk-significant performance issues are identified; and, the corrective actions for risk-significant performance issues are sufficient to address the root and contributing causes and prevent recurrence.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.

Please contact Gregory Werner at 817-200-1574 with any questions that you have regarding this letter.

Sincerely,

/RA/

Kriss M. Kennedy, Director Division of Reactor Projects Docket: 50-382 License: NPF-38

M. Chisum Electronic distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Steven.Reynolds@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

Acting DRS Director (Jeff.Clark@nrc.gov)

Acting DRS Deputy Director (Geoffrey.Miller@nrc.gov)

Senior Resident Inspector (Marlone.Davis@nrc.gov)

Resident Inspector (Chris.Speer@nrc.gov)

WAT Administrative Assistant (Linda.Dufrene@nrc.gov)

Acting Branch Chief, DRP/E (Greg.Werner@nrc.gov)

Senior Project Engineer, DRP/E (Michael.Bloodgood@nrc.gov)

Project Engineer, DRP/E (Jim.Melfi@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Michael.Orenak@nrc.gov)

Branch Chief/DRS/EB1 (Thomas.Farnoltz@nrc.gov)

Acting Branch Chief/DRS/EB2 (John.Dixon@nrc.gov)

Branch Chief/DRS/PSB1 (Mark.Haire@nrc.gov)

Branch Chief/DRS/PSB2 (Heather.Gepford@nrc.gov)

Branch Chief/DRS/OB (Vincent.Gaddy@nrc.gov)

Director, DIRS, NRR (Ho.Nieh@nrc.gov)

Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov)

Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov)

Chief, PLB II, DORL, NRR (Doug.Broaddus@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov)

ROPreports ROPassessment Resource@nrc.gov OEMail Resource@nrc.gov R:_Reactors\EOC2013\WAT Followup Assessment Letter.pdf R:_Reactors\WAT\2013\WAT EOC2013 Follow-up Assessment Letter.pdf ML14093A093 ADAMS No Yes SUNSI Review Complete Reviewer Initials: MRB Publicly Available Non-publicly Available Sensitive Non-sensitive SPE:DRP C:DRP D:DRP MBloodgood GWerner KKennedy

/RA/GWerner /RA/ /RA/

for 3/12/14 3/12/14 4/3/14 OFFICIAL RECORD COPY T-Telephone E-Email F-Fax