ML14014A056: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 2
| page count = 2
| project = TAC:ME2609, TAC:ME2610
| project = TAC:ME2609, TAC:ME2610
| stage =  
| stage = Other
}}
}}



Revision as of 20:39, 1 April 2018

Prairie Island, Units 1 and 2, Notification of Alternative Source Term (AST) Implementation and Unit 2 Steam Generator Replacement
ML14014A056
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 01/13/2014
From: Davison K K
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-PI-13-111, TAC ME2609, TAC ME2610
Download: ML14014A056 (2)


Text

Xcel Energy January 13, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Units 1 and 2 Dockets 50-282 and 50-306 Renewed License Nos. DPR-42 and DPR-60 Prairie Island Nuclear Generating Plant 1717 Wakonade Drive East Welch, MN 55089 L-PI-13-111 10 CFR 50.4 Notification of Alternative Source Term (AST) Implementation and Unit 2 Steam Generator Replacement (TAC Nos. ME2609 and ME2610) In a letter to the U.S. Nuclear Regulatory Commission (NRC) dated October 27, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML093160605), the Northern States Power Company, a Minnesota corporation doing business as Xcel Energy (hereafter "NSPM"), requested an amendment to the Technical Specifications (TS) for Prairie Island Nuclear Generating Plant (PINGP). The proposed amendment requested adoption of the Alternative Source Term (AST) methodology, in addition to TS changes supported by AST design basis accident radiological consequence analyses. In a letter to NSPM dated January 22, 2013 (ADAMS Accession No. ML 112521289), the NRC issued Unit 1 and Unit 2 license amendments 206/193 to adopt the AST methodology. Appendix 8 of the respective Renewed Operating Licenses imposes the following additional condition: "NSPM will provide the NRC written notification when Unit 2 [Replacement Steam Generator] RSG installation is complete and AST License Amendment implementation has commenced." The purpose of this letter is to inform the NRC that the Unit 2 RSGs have been installed, and with Unit 2 startup entering Mode 4 (on December 27, 2013), the installation is considered complete. Also, Technical Specification changes associated with Amendments 206/193 have been distributed. Thereby, NSPM has commenced AST license amendment implementation, and the submittal of this letter completes the action required by the subject license condition prior to the required due date (within 30 days after completion of the outage in which the Unit 2 RSGs are installed). NSPM submits this notification in accordance with the provisions of 10 CFR 50.4.

Document Control Desk Page 2 If there are any questions or if additional information is needed, please contact Glenn Adams at (612) 330-6777. Summary of Commitments This letter contains no new commitments or changes to existing commitments. Kevin K. Davison Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company -Minnesota cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island Nuclear Generating Plant, USNRC Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC State of Minnesota