{{#Wiki_filter:Dominion Energy Kewaunee, Inc. 4D minionN490 Hwy 42, Kewaunee, WI 54216Web Address: www.dom.comNOV 0 7 2013ATTN: Document Control Desk Serial No. 13-239U. S. Nuclear Regulatory Commission LIC/RR/R0Washington, DC 20555-0001 Docket No.: 50-305License No.: DPR-43DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATIONINSPECTION REPORT 0500030512013504 -RESPONSE TO NRC REQUESTOn January 24, 2013, the Nuclear Regulatory Commission (NRC) issued an inspectionreport for the Kewaunee Power Station (KPS) (Reference 1) indicating a preliminarysignificance determination for a White finding. On April 4, 2013, the NRC issued thefinal significance determination for a White finding and notice of violation (Reference 2).The April 4, 2013 letter (Reference 2) also informed Dominion Energy Kewaunee, Inc.(DEK) the NRC would be conducting a supplemental inspection using InspectionProcedure 95001, "Inspection for One or Two White Inputs in a Strategic PerformanceArea," when NRC has been notified by DEK of its readiness for the inspection.On May 31, 2013, the NRC issued a letter describing the termination of the ReactorOversight Process for KPS and commencement of the Decommissioning PowerReactor Inspection Program (Reference 3). In that letter the NRC states that it willconduct the inspection for the Emergency Preparedness White finding using InspectionProcedure 92702, "Follow-Up on Corrective Actions for Violations and Deviations," toverify appropriate corrective actions are being implemented instead of using InspectionProcedure 95001.DEK has undertaken the steps necessary to assure that the cause evaluation andcorrective actions are of sufficient scope and breadth to address the identifiedperformance deficiencies. DEK requests the NRC perform the inspection identified inReference 3 starting on or after November 12, 2013.If you have questions or require additional information, please feel free to contact Mr.Richard P. Repshas at 920-388-8217.Very truly yours,Site Vi e resident, Kewaunee Power Station Serial No. 13-239Page 2 of 2References:1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "KewauneePower Station-NRC Emergency Preparedness Inspection Report05000305/2012503; Preliminary White Finding," dated January 24, 2013. (ADAMSAccession No. ML13024A422)2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final SignificanceDetermination of A White Finding With Proposed Followup and Notice of Violation;NRC Inspection Report No. 05000305/2013504; Kewaunee Power Station," datedApril 4, 2013. (ADAMS Accession No. ML13094A270)3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination OfReactor Oversight Process For Kewaunee Power Station And Commencement OfDecommissioning Inspection Program," dated May 31, 2013. (ADAMS AccessionNo. ML13151A375)Commitments made by this letter: NONEcc: Regional Administrator, Region IIIU. S. Nuclear Regulatory Commission2443 Warrenville RoadSuite 210Lisle, IL 60532-4352Mr. K. D. FeintuchProject ManagerU.S. Nuclear Regulatory CommissionOne White Flint North, Mail Stop 08-Dl 511555 Rockville PikeRockville, MD 20852-2738NRC Senior Resident InspectorKewaunee Power Station
{{#Wiki_filter:Dominion Energy Kewaunee, Inc. 4D minionN490 Hwy 42, Kewaunee, WI 54216Web Address: www.dom.comNOV 0 7 2013ATTN: Document Control Desk Serial No. 13-239U. S. Nuclear Regulatory Commission LIC/RR/R0Washington, DC 20555-0001 Docket No.: 50-305License No.: DPR-43DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATIONINSPECTION REPORT 0500030512013504 -RESPONSE TO NRC REQUESTOn January 24, 2013, the Nuclear Regulatory Commission (NRC) issued an inspectionreport for the Kewaunee Power Station (KPS) (Reference 1) indicating a preliminarysignificance determination for a White finding. On April 4, 2013, the NRC issued thefinal significance determination for a White finding and notice of violation (Reference 2).The April 4, 2013 letter (Reference 2) also informed Dominion Energy Kewaunee, Inc.(DEK) the NRC would be conducting a supplemental inspection using InspectionProcedure 95001, "Inspection for One or Two White Inputs in a Strategic PerformanceArea," when NRC has been notified by DEK of its readiness for the inspection.On May 31, 2013, the NRC issued a letter describing the termination of the ReactorOversight Process for KPS and commencement of the Decommissioning PowerReactor Inspection Program (Reference 3). In that letter the NRC states that it willconduct the inspection for the Emergency Preparedness White finding using InspectionProcedure 92702, "Follow-Up on Corrective Actions for Violations and Deviations," toverify appropriate corrective actions are being implemented instead of using InspectionProcedure 95001.DEK has undertaken the steps necessary to assure that the cause evaluation andcorrective actions are of sufficient scope and breadth to address the identifiedperformance deficiencies. DEK requests the NRC perform the inspection identified inReference 3 starting on or after November 12, 2013.If you have questions or require additional information, please feel free to contact Mr.Richard P. Repshas at 920-388-8217.Very truly yours,Site Vi e resident, Kewaunee Power Station  
Serial No. 13-239Page 2 of 2References:1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "KewauneePower Station-NRC Emergency Preparedness Inspection Report05000305/2012503; Preliminary White Finding," dated January 24, 2013. (ADAMSAccession No. ML13024A422)2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final SignificanceDetermination of A White Finding With Proposed Followup and Notice of Violation;NRC Inspection Report No. 05000305/2013504; Kewaunee Power Station," datedApril 4, 2013. (ADAMS Accession No. ML13094A270)3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination OfReactor Oversight Process For Kewaunee Power Station And Commencement OfDecommissioning Inspection Program," dated May 31, 2013. (ADAMS AccessionNo. ML13151A375)Commitments made by this letter: NONEcc: Regional Administrator, Region IIIU. S. Nuclear Regulatory Commission2443 Warrenville RoadSuite 210Lisle, IL 60532-4352Mr. K. D. FeintuchProject ManagerU.S. Nuclear Regulatory CommissionOne White Flint North, Mail Stop 08-Dl 511555 Rockville PikeRockville, MD 20852-2738NRC Senior Resident InspectorKewaunee Power Station  
 
}}
}}

Revision as of 10:58, 22 March 2018

Kewaunne Power Station, Response to NRC Inspection Report 05000305-13-504 Request
ML13322A416
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 11/07/2013
From: Jordan A J
Dominion, Dominion Energy Kewaunee
To:
Document Control Desk, NRC/RGN-III
References
Download: ML13322A416 (2)


See also: IR 05000305/2013504

Text

Dominion Energy Kewaunee, Inc. 4D minionN490 Hwy 42, Kewaunee, WI 54216Web Address: www.dom.comNOV 0 7 2013ATTN: Document Control Desk Serial No. 13-239U. S. Nuclear Regulatory Commission LIC/RR/R0Washington, DC 20555-0001 Docket No.: 50-305License No.: DPR-43DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATIONINSPECTION REPORT 0500030512013504 -RESPONSE TO NRC REQUESTOn January 24, 2013, the Nuclear Regulatory Commission (NRC) issued an inspectionreport for the Kewaunee Power Station (KPS) (Reference 1) indicating a preliminarysignificance determination for a White finding. On April 4, 2013, the NRC issued thefinal significance determination for a White finding and notice of violation (Reference 2).The April 4, 2013 letter (Reference 2) also informed Dominion Energy Kewaunee, Inc.(DEK) the NRC would be conducting a supplemental inspection using InspectionProcedure 95001, "Inspection for One or Two White Inputs in a Strategic PerformanceArea," when NRC has been notified by DEK of its readiness for the inspection.On May 31, 2013, the NRC issued a letter describing the termination of the ReactorOversight Process for KPS and commencement of the Decommissioning PowerReactor Inspection Program (Reference 3). In that letter the NRC states that it willconduct the inspection for the Emergency Preparedness White finding using InspectionProcedure 92702, "Follow-Up on Corrective Actions for Violations and Deviations," toverify appropriate corrective actions are being implemented instead of using InspectionProcedure 95001.DEK has undertaken the steps necessary to assure that the cause evaluation andcorrective actions are of sufficient scope and breadth to address the identifiedperformance deficiencies. DEK requests the NRC perform the inspection identified inReference 3 starting on or after November 12, 2013.If you have questions or require additional information, please feel free to contact Mr.Richard P. Repshas at 920-388-8217.Very truly yours,Site Vi e resident, Kewaunee Power Station

Serial No. 13-239Page 2 of 2References:1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "KewauneePower Station-NRC Emergency Preparedness Inspection Report05000305/2012503; Preliminary White Finding," dated January 24, 2013. (ADAMSAccession No. ML13024A422)2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final SignificanceDetermination of A White Finding With Proposed Followup and Notice of Violation;NRC Inspection Report No. 05000305/2013504; Kewaunee Power Station," datedApril 4, 2013. (ADAMS Accession No. ML13094A270)3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination OfReactor Oversight Process For Kewaunee Power Station And Commencement OfDecommissioning Inspection Program," dated May 31, 2013. (ADAMS AccessionNo. ML13151A375)Commitments made by this letter: NONEcc: Regional Administrator, Region IIIU. S. Nuclear Regulatory Commission2443 Warrenville RoadSuite 210Lisle, IL 60532-4352Mr. K. D. FeintuchProject ManagerU.S. Nuclear Regulatory CommissionOne White Flint North, Mail Stop 08-Dl 511555 Rockville PikeRockville, MD 20852-2738NRC Senior Resident InspectorKewaunee Power Station