{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257  June 23, 2015   Mr. Joseph W. Shea
[[Issue date::June 23, 2015]]
Vice President, Nuclear Licensing  
 
Tennessee Valley Authority  
Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801
1101 Market Street, LP 3D-C  
 
Chattanooga, TN 37402-2801 SUBJECT: BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF LICENSED  
SUBJECT: BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000259/2015302, 05000260/2015302, AND 05000296/2015302
  OPERATOR INITIAL EXAMINATION 05000259/2015302, 05000260/2015302,
 
  AND 05000296/2015302 Dear Mr. Shea:
==Dear Mr. Shea:==
In a telephone conversation on June 17, 2015 between Mr. D. Binkley, Initial License Training  
In a telephone conversation on June 17, 2015 between Mr. D. Binkley, Initial License Training Supervisor, Mr. J. Viera, Chief Under Instruction, and Mr. P. Capehart, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at Browns Ferry Nuclear Plant during the week of November 16, 2015. The written examination is scheduled to be administered during the week of November 23, 2015. The on-site preparatory week is scheduled for the week of October 19, 2015.
Supervisor, Mr. J. Viera, Chief Under Instruction, and Mr. P. Capehart, Senior Operations  
 
Engineer, arrangements were made for the administration of licensing examinations at Browns Ferry Nuclear Plant during the week of November 16, 2015. The written examination is scheduled to be administered during the week of November 23, 2015. The on-site preparatory  
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
week is scheduled for the week of October 19, 2015.  
 
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by August 10, 2015. Mr. P. Capehart, provided the written examination outline to your staff in March 2015. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by September 17, 2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations, and tests before they are submitted to the Commission for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
As agreed during the telephone conversation, your staff will prepare the examinations based on  
 
the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make  
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
copies of all examination materials that are necessary for administering the examination.
 
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by August 10, 2015. Mr. P. Capehart, provided the written examination outline to your staff in March 2015. The written examinations, operating tests, and supporting reference  
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
materials identified in Attachment 3 to ES-201 will be due by September 17, 2015. Pursuant to  
 
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an  
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 2500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),
authorized representative of the facility licensee shall approve the examinations, and tests before they are submitted to the Commission for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately  
Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
marked. Any delay in receiving the required examination and reference materials, or the  
 
submittal of inadequate or incomplete materials, may cause the examinations to be  
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. D. Binkley has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. J. Viera at (404) 997-4643, (Internet E-mail: Joseph.Viera@nrc.gov), Mr. P. Capehart at (404) 997-4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov).
rescheduled. To conduct the requested written examinations and operating tests, it will be necessary for your  
 
staff to provide adequate space and accommodations in accordance with ES-402, and to make  
Sincerely,/RA/ Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-259, 50-260, and 50-296 License Nos.: DPR-33, DPR-52, and DPR-68
the simulation facility available on the dates noted above. In accordance with ES-302, your staff
 
J. Shea 2  should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.  
cc: Distribution via Listserv Thank you for your cooperation in this matter. Mr. D. Binkley has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. J. Viera at (404) 997-4643, (Internet E-mail: Joseph.Viera@nrc.gov), Mr. P. Capehart at (404) 997-4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov).
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.  
 
Sincerely,/RA/ Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-259, 50-260, and 50-296 License Nos.: DPR-33, DPR-52, and DPR-68  
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget  
 
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has  
been completed should be submitted at least 14 days before the first examination date.  
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 2500 hours per response, including the  
time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the  
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,  
Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),  
Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an  
information collection, unless it displays a currently valid OMB control number.  
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and  
Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
J. Shea 3 Thank you for your cooperation in this matter. Mr. D. Binkley has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. J. Viera at (404) 997-4643, (Internet E-mail: Joseph.Viera@nrc.gov), Mr. P. Capehart at (404) 997-4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov).
      Sincerely,  
      /RA/   Gerald J. McCoy, Chief       Operations Branch 1  
      Division of Reactor Safety Docket Nos.: 50-259, 50-260, and 50-296  
License Nos.: DPR-33, DPR-52, and DPR-68  
cc: Distribution via Listserv  
cc: Distribution via Listserv  
J. Shea 3 Thank you for your cooperation in this matter. Mr. D. Binkley has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. J. Viera at (404) 997-4643, (Internet E-mail: Joseph.Viera@nrc.gov), Mr. P. Capehart at (404) 997-4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov). 
      Sincerely,
      /RA/  Gerald J. McCoy, Chief      Operations Branch 1
      Division of Reactor Safety  Docket Nos.: 50-259, 50-260, and 50-296
License Nos.: DPR-33, DPR-52, and DPR-68
cc: Distribution via Listserv 
 
  PUBLICLY AVAILABLE  NON-PUBLICLY AVAILABLE  SENSITIVE  NON-SENSITIVE ADAMS:  Yes ACCESSION NUMBER:_________________________  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS    SIGNATURE JXV3 VIA EMAILPGC1 VIA EMAILGJM1    NAME JVIERA PCAPEHART JMcCOY    DATE 6/23/2015 6/22/2015 6/23/2015 6/    /2015 6/    /2015 6/    /2015 6/    /2015 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO    OFFICIAL RECORD COPY          DOCUMENT NAME:  G:\OLEXAMS\BROWNS FERRY EXAMINATIONS\BF 2015-302 INITIAL EXAM (PHIL)\CORRESPONDENCE\2015-302 CORPORATE NOTIFICATION LETTER.DOCX 
   


PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER:_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE JXV3 VIA EMAILPGC1 VIA EMAILGJM1 NAME JVIERA PCAPEHART JMcCOY DATE 6/23/2015 6/22/2015 6/23/2015 6/ /2015 6/ /2015 6/ /2015 6/ /2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\BROWNS FERRY EXAMINATIONS\BF 2015-302 INITIAL EXAM (PHIL)\CORRESPONDENCE\2015-302 CORPORATE NOTIFICATION LETTER.DOCX
}}
}}

Revision as of 20:31, 21 March 2018

Browns Ferry Nuclear Plant - Notification of Licensed Operator Initial Examination 05000259/2015302, 05000260/2015302, and 05000296/2015302
ML15175A402
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/23/2015
From: McCoy G J
Division of Reactor Safety II
To: Shea J W
Tennessee Valley Authority
References
50-259/15-302, 50-260/15-302, 50-296/15-302
Download: ML15175A402 (4)


See also: IR 05000259/2015302

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 23, 2015 Mr. Joseph W. Shea

Vice President, Nuclear Licensing

Tennessee Valley Authority

1101 Market Street, LP 3D-C

Chattanooga, TN 37402-2801 SUBJECT: BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000259/2015302, 05000260/2015302,

AND 05000296/2015302 Dear Mr. Shea:

In a telephone conversation on June 17, 2015 between Mr. D. Binkley, Initial License Training

Supervisor, Mr. J. Viera, Chief Under Instruction, and Mr. P. Capehart, Senior Operations

Engineer, arrangements were made for the administration of licensing examinations at Browns Ferry Nuclear Plant during the week of November 16, 2015. The written examination is scheduled to be administered during the week of November 23, 2015. The on-site preparatory

week is scheduled for the week of October 19, 2015.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by August 10, 2015. Mr. P. Capehart, provided the written examination outline to your staff in March 2015. The written examinations, operating tests, and supporting reference

materials identified in Attachment 3 to ES-201 will be due by September 17, 2015. Pursuant to

Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an

authorized representative of the facility licensee shall approve the examinations, and tests before they are submitted to the Commission for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately

marked. Any delay in receiving the required examination and reference materials, or the

submittal of inadequate or incomplete materials, may cause the examinations to be

rescheduled. To conduct the requested written examinations and operating tests, it will be necessary for your

staff to provide adequate space and accommodations in accordance with ES-402, and to make

the simulation facility available on the dates noted above. In accordance with ES-302, your staff

J. Shea 2 should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),

Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

J. Shea 3 Thank you for your cooperation in this matter. Mr. D. Binkley has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. J. Viera at (404) 997-4643, (Internet E-mail: Joseph.Viera@nrc.gov), Mr. P. Capehart at (404) 997-4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov).

Sincerely,

/RA/ Gerald J. McCoy, Chief Operations Branch 1

Division of Reactor Safety Docket Nos.: 50-259, 50-260, and 50-296

License Nos.: DPR-33, DPR-52, and DPR-68

cc: Distribution via Listserv

J. Shea 3 Thank you for your cooperation in this matter. Mr. D. Binkley has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. J. Viera at (404) 997-4643, (Internet E-mail: Joseph.Viera@nrc.gov), Mr. P. Capehart at (404) 997-4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov).

Sincerely,

/RA/ Gerald J. McCoy, Chief Operations Branch 1

Division of Reactor Safety Docket Nos.: 50-259, 50-260, and 50-296

License Nos.: DPR-33, DPR-52, and DPR-68

cc: Distribution via Listserv

PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER:_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE JXV3 VIA EMAILPGC1 VIA EMAILGJM1 NAME JVIERA PCAPEHART JMcCOY DATE 6/23/2015 6/22/2015 6/23/2015 6/ /2015 6/ /2015 6/ /2015 6/ /2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\BROWNS FERRY EXAMINATIONS\BF 2015-302 INITIAL EXAM (PHIL)\CORRESPONDENCE\2015-302 CORPORATE NOTIFICATION LETTER.DOCX