IR 05000528/2018001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(15 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18127A004
| number = ML18127A004
| issue date = 05/07/2018
| issue date = 05/07/2018
| title = Palo Verde Nuclear Generating Station - NRC Integrated Inspection Report 05000528/2018001, 05000529/2018001, and 05000530/2018001
| title = NRC Integrated Inspection Report 05000528/2018001, 05000529/2018001, and 05000530/2018001
| author name = Miller G B
| author name = Miller G
| author affiliation = NRC/RGN-IV/DRP/RPB-D
| author affiliation = NRC/RGN-IV/DRP/RPB-D
| addressee name = Bement R
| addressee name = Bement R
Line 9: Line 9:
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
| license number = NPF-041, NPF-051, NPF-074
| license number = NPF-041, NPF-051, NPF-074
| contact person = Miller G B
| contact person = Miller G
| document report number = IR 2018001
| document report number = IR 2018001
| document type = Inspection Report, Letter
| document type = Inspection Report, Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:May 7, 2018
[[Issue date::May 7, 2018]]


Mr. Robert Bement Executive Vice President, Nuclear/CNO Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072
==SUBJECT:==
-2034
PALO VERDE NUCLEAR GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000528/2018001, 05000529/2018001, AND 05000530/2018001
 
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION  
- NRC INTEGRATED INSPECTION REPORT 05000528/2018001, 05000529/2018001, AND 05000530/2018001


==Dear Mr. Bement:==
==Dear Mr. Bement:==
On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Palo Verde Nuclear Generating Station Units 1, 2, and 3. On April 11, 2018, the NRC inspectors discussed the results of this inspection with Mr. Jack Cadogan and other members of your staff. The results of this inspection are documented in the enclosed report.
On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Palo Verde Nuclear Generating Station Units 1, 2, and 3. On April 11, 2018, the NRC inspectors discussed the results of this inspection with Mr. Jack Cadogan and other members of your staff. The results of this inspection are documented in the enclosed report.


NRC inspectors documented one finding of very low safety significance (Green) in this report. This finding involved a violation of NRC requirements
NRC inspectors documented one finding of very low safety significance (Green) in this report.
. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S.


Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555
This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the Palo Verde Nuclear Generating Station.


If you disagree with a cross
If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the Palo Verde Nuclear Generating Station.
-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S.


Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the Palo Verde Nuclear Generating Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the Palo Verde Nuclear Generating Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.ht ml and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."


Sincerely,/RA/ Geoffrey B. Miller, Chief Project Branch D Division of Reactor Projects Docket Nos. 50
Sincerely,
-528, 50-529, 50-530 License Nos. NPF
/RA/  
-41, NPF-51, NPF-74  
 
Geoffrey B. Miller, Chief Project Branch D Division of Reactor Projects  
 
Docket Nos. 50-528, 50-529, 50-530 License Nos. NPF-41, NPF-51, NPF-74  


===Enclosure:===
===Enclosure:===
Inspection Report 05000528/2018001, 05000529/2018001, 05000530/2018001 w/  
Inspection Report 05000528/2018001, 05000529/2018001, 05000530/2018001 w/ Attachment:
 
1. Supplemental Information 2. O
 
==Inspection Report==
Docket Numbers:
05000528, 05000529, 05000530
 
License Numbers:
NPF-41, NPF-51, NPF-74
 
Report Numbers:
05000528/2018001, 05000529/2018001, and 05000530/2018001
 
Enterprise Identifier: I-2018-001-0013
 
Licensee:
Arizona Public Service Company
 
Facility:
Palo Verde Nuclear Generating Station
 
Location:
5801 South Wintersburg Road, Tonopah, AZ 85354
 
Inspection Dates:
January 1, 2018 to March 31, 2018
 
Inspectors:
C. Peabody, Senior Resident Inspector
 
D. Reinert, PhD, Resident Inspector
 
D. You, Resident Inspector
 
L. Carson, Senior Health Physicist
 
S. Hedger, Emergency Preparedness Inspector
 
Approved By:
Geoffrey B. Miller, Chief, Project Branch D, Division of Reactor Projects


===Attachment:===
=SUMMARY=
1. Supplemental Information 2. Occupational Radiation Safety Inspection Item Request
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station,
Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.


Enclosure U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Numbers: 05000528, 05000529, 05000530 License Numbers: NPF-41, NPF-51, NPF-74 Report Numbers: 05000528/2018001, 05000529/2018001, and 05000530/2018001 Enterprise Identifier:
NRC and self-revealed findings, violations, and additional items are summarized in the table below.
I-2018-001-0013 Licensee:
Arizona Public Service Company Facility:
Palo Verde Nuclear Generating Station Location:
5801 South Wintersburg Road
, Tonopah, AZ 85354 Inspection Dates:
January 1, 2018 to March 31, 2018 Inspectors:
C. Peabody, Senior Resident Inspector D. Reinert, PhD, Resident Inspector D. You, Resident Inspector L. Carson, Senior Health Physicist S. Hedger, Emergency Preparedness Inspector Approved By:
Geoffrey B. Miller, Chief, Project Branch D, Division of Reactor Projects


2 SUMMARY The U.S. Nuclear Regulatory Commission (
===List of Findings and Violations===
NRC) continued monitoring the licensee's performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station, Units 1, 2, and 3, in accordance with the Reactor Oversight Process.
Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone Significance Cross-cutting Aspect Report Section Mitigating Systems Green NCV 05000528/2018001-01 Closed
[H.12] - Human Performance, Avoid Complacency 71111.12 -
Maintenance Effectiveness The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50,
Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A.


The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self
Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.
-revealed findings, violations, and additional items are summarized in the table below. List of Findings and Violations Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone Significance Cross-cutting Aspect Report Section Mitigating Systems Green NCV 05000528/2018001
-01 Closed [H.12] - Human Performance, Avoid Complacency 71111.12
- Maintenance Effectiveness The inspectors reviewed a self
-revealed, Green, non
-cited violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A. Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post
-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.


3 PLANT STATUS Unit 1 began the inspection period at rated thermal power. On February 15, 2018, the unit automatically tripped from full power when a control system failure caused a loss of generator field excitation. The unit was restarted on February 19, 2018
=PLANT STATUS=
, and remained at or near rated thermal power for the remainder of the inspection period.
 
Unit 1 began the inspection period at rated thermal power. On February 15, 2018, the unit automatically tripped from full power when a control system failure caused a loss of generator field excitation. The unit was restarted on February 19, 2018, and remained at or near rated thermal power for the remainder of the inspection period.


Units 2 and 3 operated at or near rated thermal power for the entire inspection period.
Units 2 and 3 operated at or near rated thermal power for the entire inspection period.


INSPECTION SCOPE S Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading
==INSPECTION SCOPES==
-rm/doc-collections/insp
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
-manual/inspection
 
-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, "Light
==REACTOR SAFETY==
-Water Reactor Inspection Program - Operations Phase." The inspectors performed plant status activities described in IMC 2515 Appendix D, "Plant Status" and conducted routine reviews using IP 71152, "Problem Identification and Resolution." The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
==71111.04 - Equipment Alignment==
===Partial Walkdown (3 Samples)===
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) Unit 1 containment spray system B on January 4, 2018
: (2) Unit 2 auxiliary feedwater system A on January 30, 2018
: (3) Unit 3 control building heating ventilation and air conditioning B on March 16, 2018
 
===Complete Walkdown (1 Sample)===
The inspectors evaluated system configurations during a complete walkdown of the Unit 3 containment spray system on January 18, 2018.
 
==71111.05AQ - Fire Protection Annual/Quarterly==
===Quarterly Inspection (5 Samples)===
The inspectors evaluated fire protection program implementation in the following selected areas:
: (1) Unit 3 main turbine operating deck and bearings area, Fire Zones 9 and 10, on January 4, 2018
: (2) Unit 2 control room, Fire Zone 17, on January 19, 2018
: (3) Unit 2 containment spray pump A room and adjacent corridor, Fire Zones 30A and 88A, on January 23, 2018
: (4) Unit 1 high pressure safety injection pump B room, Fire Zone 31B on February 2, 2018
: (5) Unit 3 vital switchgear room A, Fire Zone 5A, on February 8, 2018
 
==71111.07 - Heat Sink Performance==
===Heat Sink (1 Sample)===
The inspectors evaluated Unit 1 diesel generator A lube oil and jacket water heat exchanger performance on February 21, 2018.
 
==71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance==
===Operator Requalification (1 Sample)===
The inspectors observed and evaluated risk informed completion time program and 10 CFR 50.69 program classroom training on January 31, 2018.
 
===Operator Performance (1 Sample)===
The inspectors observed and evaluated operator performance synchronizing the Unit 1 main generator to the grid following a reactor trip caused by a fault in the main generator excitation system on February 19, 2018.
 
The inspectors observed and evaluated operator response to Unit 3 loss of A channel indication for main steam and feedwater isolation valves, MSIV-170, 171, 180, 181, and FWIV-174, 177, on February 27, 2018.
 
==71111.12 - Maintenance Effectiveness==
===Routine Maintenance Effectiveness (2 Samples)===
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
: (1) Reach rod operator gear box maintenance on safety injection valves SI-184 and SI-185 in Units 2 and 3
: (2) Diesel fuel oil transfer pump predictive engineering cable testing
 
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
{{IP sample|IP=IP 71111.13|count=5}}
 
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
: (1) Unit 1 elevated risk due to failure of emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 on January 4, 2018
: (2) Unit 1 emergent risk due to diesel generator A unexpectedly shutdown during a surveillance run on January 5, 2018
: (3) Unit 3 elevated risk due to planned maintenance on containment spray pump A atmospheric dump valves SG-179A and SG-184A, and low pressure safety injection valve SI-687 January 29, 2018 through February 4, 2018
: (4) Unit 1 elevated risk due to diesel generator A super outage on February 26, 2018
: (5) Unit 2 elevated risk due to diesel generator B super outage on March 19, 2018
 
==71111.15 - Operability Determinations and Functionality Assessments==
{{IP sample|IP=IP 71111.15|count=9}}
 
The inspectors evaluated the following operability determinations and functionality assessments:
: (1) Unit 2 abnormal trend for containment sump level transmitter, RDL-411, on January 3, 2018
: (2) Unit 1 essential spray pond A pressure relief valves lifting during pump starts on January 25, 2018
: (3) Unit 3 containment spray discharge to shutdown cooling heat exchanger valve, SI-685, failed to re-open during breaker maintenance on January 31, 2018
: (4) Unit 1 diesel generator B fuel oil leak from cylinder 8L fuel oil jerk pump on February 13, 2018
: (5) Unit 1 calculated qualified life of safety injection combined header isolation valves, SI-660 and SI-659, on February 23, 2018
: (6) Unit 3 loss of indication of the train A main steam isolation valves and feedwater isolation valves (MSIV-170, 171, 180, 181 and FWIV-174, 177) on February 27, 2018
: (7) Unit 1 auxiliary feedwater bypass motor operated valves SG-138A and SG-139A T-drains on March 6, 2018
: (8) Unit 1 essential cooling water pump A oil samples appear to contain metal or debris on March 7, 2018
: (9) Unit 2 steam generator sodium concentration increase on March 12, 2018
 
==71111.18 - Plant Modifications==
{{IP sample|IP=IP 71111.18|count=1}}
 
The inspectors evaluated the following temporary or permanent modifications:
: (1) Unit 1 480V electrical breaker for containment spray to low pressure safety cross-connect valve, SI-696, replacement with General Electrical model Spectra breaker per Design Equivalent Change 01035 on March 15, 2018
 
==71111.19 - Post Maintenance Testing==
{{IP sample|IP=IP 71111.19|count=6}}
 
The inspectors evaluated the following post maintenance tests:
: (1) Unit 1 emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 following limit switch adjustment on January 4, 2018
: (2) Unit 1 diesel generator A cooldown relay, power supply, and test hand switch replacement following an unplanned cooldown during a monthly surveillance run on January 9, 2018
: (3) Unit 3 containment spray pump A test following breaker maintenance on February 6, 2018
: (4) Unit 3 30-volt power supply replacement for lost indication to main steam isolation valves on February 28, 2018
: (5) Unit 2 essential cooling water pump A test and flow balance following planned maintenance to calibrate motor overcurrent relays and replace a high discharge pressure switch on March 20, 2018
: (6) Unit 2 diesel generator A emergency mode simulated engineered safeguards features fast start test following online maintenance outage on March 23, 2018
 
==71111.20 - Refueling and Other Outage Activities==
{{IP sample|IP=IP 71111.20|count=1}}
 
The inspectors evaluated activities from February 15 - 19, 2018, for the Unit 1 forced outage due to an unplanned reactor trip caused by a fault in the main generator excitation circuitry.
 
==71111.22 - Surveillance Testing==
The inspectors evaluated the following surveillance tests:
 
===Routine===
{{IP sample|IP=IP 71111.22|count=6}}
: (1) Unit 1 diesel fuel oil transfer pump A inservice test on January 24, 2018
: (2) Unit 1 atmospheric dump valve 178 stroke time testing on February 9, 2018
: (3) Unit 2 containment leakage type B and C testing, SR 3.0.3 entry for missed surveillance on February 28, 2018
: (4) Unit 3 diesel fuel oil transfer pump A inservice test on March 7, 2018
: (5) Unit 3, essential chiller A vibration analysis on March 8, 2018
: (6) Unit 1 containment spray pump B inservice test on March 22, 2018
 
===In-service (1 Sample)===
: (1) Unit 2 containment spray pump A inservice test on March 1, 2018
 
==71114.02 - Alert and Notification System Testing==
{{IP sample|IP=IP 71114.02|count=1}}
 
The inspectors evaluated the maintenance and testing of the alert and notification system between May 1, 2016 - February 20, 2018.
 
==71114.03 - Emergency Response Organization Staffing and Augmentation System==
{{IP sample|IP=IP 71114.03|count=1}}
 
The inspectors evaluated the readiness of the Emergency Response Organization between May 1, 2016 - February 20, 2018. Inspectors also evaluated the licensees ability to staff their emergency response facilities in accordance with emergency plan commitments.
 
==71114.04 - Emergency Action Level and Emergency Plan Changes==
{{IP sample|IP=IP 71114.04|count=1}}
 
The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and practices between May 1, 2016 - February 20, 2018. The evaluation reviewed screenings and evaluations documenting the implementation of this process. The review of the change process documentation does not constitute NRC approval.
 
==71114.05 - Maintenance of Emergency Preparedness==
{{IP sample|IP=IP 71114.05|count=1}}
 
The inspectors evaluated the maintenance of the emergency preparedness program between May 1, 2016 - February 20, 2018. The evaluation reviewed activations of the emergency plan, the conduct of drills and exercises, licensee audits and assessments, and the maintenance of equipment important to emergency preparedness.
 
==71114.06 - Drill Evaluation==
===Emergency Planning Drill (1 Sample)===
The inspectors evaluated a full-scale emergency preparedness drill on February 13,
 
==RADIATION SAFETY==
==71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls==
===Radiological Work Planning (1 Sample)===
The inspectors evaluated the licensees radiological work planning by reviewing the following activities:
: (1) RWP 2017-9-1016, RMC Operations and Routine Tasks
: (2) RWP 2018-1-1523, Temporary Mat Insulation Fiber Inspection
: (3) RWP 2017-3002, Reactor Destack/Restack
: (4) RWP 2017-3015, Cavity Decontamination
: (5) RWP 2017-3039, 10-Year In-Service Inspection Vessel
 
===Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)===
The inspectors evaluated dose estimates and exposure tracking.
 
==71124.04 - Occupational Dose Assessment==
===Source Term Characterization (1 Sample)===
The inspectors evaluated the licensees source term characterization.


REACTOR SAFETY 71111.04
===External Dosimetry (1 Sample)===
- Equipment Alignment Partial Walkdown (3 Samples) The inspectors evaluated system configuration s during partial walkdowns of the following systems/trains
The inspectors evaluated the licensees external dosimetry program.
: (1) Unit 1 containment spray system B on January 4, 2018 (2) Unit 2 auxiliary feedwater system A on January 30, 2018 (3) Unit 3 control building heating ventilation and air conditioning B on March 16, 2018 Complete Walkdown (1 Sample) The inspectors evaluated system configuration s during a complete walkdown of the Unit 3 containment spray system on January 18, 2018.


71111.05AQ
===Internal Dosimetry (1 Sample)===
- Fire Protection Annual/Quarterly Quarterly Inspection (5 Samples) The inspectors evaluated fire protection program implementation in the following selected areas: (1) Unit 3 main turbine operating deck and bearings area, Fire Zones 9 and 10, on January 4, 2018 4 (2) Unit 2 control room, Fire Zone 17
The inspectors evaluated the licensees internal dosimetry program.
, on January 19, 2018 (3) Unit 2 containment spray pump A room and adjacent corridor, Fire Zones 30A and 88A
, on January 23, 2018 (4) Unit 1 high pressure safety injection pump B room, Fire Zone 31B on February 2, 2018 (5) Unit 3 vital switchgear room A, Fire Zone 5A
, on February 8, 2018 71111.07
- Heat Sink Performance Heat Sink (1 Sample
) The inspectors evaluated Unit 1 diesel generator A lube oil and jacket water heat exchanger performance on February 21, 2018.


71111.11
===Special Dosimetric Situations (1 Sample)===
- Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification (1 Sample) The inspectors observed and evaluated risk informed completion time program and 10 CFR 50.69 program classroom training on January 31, 2018
The inspectors evaluated the licensees performance for special dosimetric situations.
. Operator Performance (1 Sample) The inspectors observed and evaluated operator performance synchronizing the Unit 1 main generator to the grid following a reactor trip caused by a fault in the main generator excitation system on February 19, 2018.


The inspectors observed and evaluated operator response to Unit 3 loss of A channel indication for main steam and feedwater isolation valves, MSIV-170, 171, 180, 181
==OTHER ACTIVITIES - BASELINE==
, and FWIV-174, 177, on February 27, 2018
===71151 - Performance Indicator Verification===
. 71111.12
{{IP sample|IP=IP 71151|count=15}}
- Maintenance Effectiveness Routine Maintenance Effectiveness (2 Samples) The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
(1) Reach rod operator gear box maintenance on safety injection valves SI
-184 and SI
-185 in Units 2 and 3 (2) Diesel fuel oil transfer pump predictive engineering cable testing 71111.13
- Maintenance Risk Assessments and Emergent Work Control (5 Samples) The inspectors evaluated the risk assessments for the following planned and emergent work activities:
(1) Unit 1 elevated risk due to failure of emergency core cooling system A combined minimum flow recirculation valve SIA
-UV660 on January 4, 201 8
5 (2) Unit 1 emergent risk due to diesel generator A unexpectedly shutdown during a surveillance run on January 5, 2018 (3) Unit 3 elevated risk due to planned maintenance on containment spray pump A atmospheric dump valves SG-179A and SG
-184A, and low pressure safety injection valve SI-687 January 29, 2018 through February 4, 2018 (4) Unit 1 elevated risk due to diesel generator A super outage on February 26, 2018 (5) Unit 2 elevated risk due to diesel generator B super outage on March 19, 2018 71111.15
- Operability Determinations and Functionality Assessments (9 Samples) The inspectors evaluated the following operability determinations and functionality assessments:
(1) Unit 2 abnormal trend for containment sump level transmitter, RDL
-411, on January 3, 2018 (2) Unit 1 essential spray pond A pressure relief valves lifting during pump starts on January 25, 2018 (3) Unit 3 containment spray discharge to shutdown cooling heat exchanger valve, SI
-685, failed to re
-open during breaker maintenance on January 31, 2018 (4) Unit 1 diesel generator B fuel oil leak from cylinder 8L fuel oil jerk pump on February 13, 2018 (5) Unit 1 calculated qualified life of safety injection combined header isolation valves, SI-660 and SI
-659, on February 23, 2018 (6) Unit 3 loss of indication of the train A main steam isolation valves and feedwater isolation valves (MSIV-170, 171, 180, 181 and FWIV
-174, 177)
on February 27, 2018 (7) Unit 1 auxiliary feedwater bypass motor operated valves SG
-138A and SG
-139A T-drains on March 6, 2018 (8) Unit 1 essential cooling water pump A oil samples appear to contain metal or debris on March 7, 2018 (9) Unit 2 steam generator sodium concentration increase on March 12, 2018 71111.18
- Plant Modifications (1 Sample
) The inspectors evaluated the following temporary or permanent modifications:
(1) Unit 1 480V electrical breaker for containment spray to low pressure safety cross
-connect valve, SI
-696, replacement with General Electrical model Spectra breaker per Design Equivalent Change 01035 on March 15, 2018


6 71111.19
The inspectors verified licensee performance indicators submittals listed below:
- Post Maintenance Testing (6 Samples) The inspectors evaluated the following post maintenance tests: (1) Unit 1 emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 following limit switch adjustment on January 4, 2018 (2) Unit 1 diesel generator A cooldown relay, power supply, and test hand switch replacement following an unplanned cooldown during a monthly surveillance run on January 9, 2018 (3) Unit 3 containment spray pump A test following breaker maintenance on February 6, 2018 (4) Unit 3 30-volt power supply replacement for lost indication to main steam isolation valves on February 28, 2018 (5) Unit 2 essential cooling water pum p A test and flow balance following planned maintenance to calibrate motor overcurrent relays and replace a high discharge pressure switch on March 20, 2018 (6) Unit 2 diesel generator A emergency mode simulated engineered safeguards features fast start test following online maintenance outage on March 23, 2018 71111.20
: (1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (January 1, 2017 - December 31, 2017)
- Refueling and Other Outage Activities (1 Sample) The inspectors evaluated activities from February 15
: (2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (January 1, 2017 - December 31, 2017)
- 19, 2018, for the Unit 1 forced outage due to an unplanned reactor trip caused by a fault in the main generator excitation circuitry.
: (3) IE04: Unplanned Scrams with Complications (USwC) Sample (January 1, 2017 - December 31, 2017)
: (4) MS05: Safety System Functional Failures (SSFFs) Sample (April 1, 2017 - December 31, 2017)
: (5) EP01: Drill/Exercise Performance (DEP) Sample (January 1, 2017 - December 31, 2017)
: (6) EP02: Emergency Response Organization (ERO) Drill Participation Sample (January 1, 2017 - December 31, 2017)
: (7) EP03: Alert and Notification System (ANS) Reliability Sample (January 1, 2017 - December 31, 2017)


71111.22
==71152 - Problem Identification and Resolution==
- Surveillance Testing The inspectors evaluated the following surveillance tests:
===Annual Follow-up of Selected Issues (1 Sample)===
Routine (6 Samples) (1) Unit 1 diesel fuel oil transfer pump A inservice test on January 24, 2018 (2) Unit 1 atmospheric dump valve 178 stroke time testing on February 9, 2018 (3) Unit 2 containment leakage type "B and C" testing, SR 3.0.3 entry for missed surveillance on February 28, 2018 (4) Unit 3 diesel fuel oil transfer pump A inservice test on March 7, 2018 (5) Unit 3, essential chiller A vibration analysis on March 8, 2018 (6) Unit 1 containment spray pump B inservice test on March 22, 2018 In-service (1 Sample) (1) Unit 2 containment spray pump A inservice test on March 1, 2018
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
: (1) Multiple failures of diesel generator underfrequency protective relay on March 26, 2018  


7 71114.02
===71153 - Follow-up of Events and Notices of Enforcement Discretion Events===
- Alert and Notification System Testing (1 Sample)
{{IP sample|IP=IP 71153|count=1}}
The inspectors evaluated the maintenance and testing of the alert and notification system between May 1, 2016
- February 20, 2018
. 71114.03
- Emergency Response Organization Staffing and Augmentation System (1 Sample)
The inspectors evaluated the readiness of the Emergency Response Organization between May 1, 2016
- February 20, 2018. Inspectors also evaluated the licensee's ability to staff their emergency response facilities in accordance with emergency plan commitments.


71114.04
The inspectors evaluated the Unit 1 reactor trip following a loss of main generator excitation and licensees response on February 15 - 16,
- Emergency Action Level and Emergency Plan Changes (1 Sample)
The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and practices between May 1, 2016
- February 20, 2018. The evaluation reviewed screenings and evaluations documenting the implementation of this process. The review of the change process documentation does not constitute NRC approval.


71114.05
==INSPECTION RESULTS==
- Maintenance of Emergency Preparedness (1 Sample)
Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone Significance Cross-cutting Aspect Report Section Mitigating Systems Green NCV 05000528/2018001-01 Closed
The inspectors evaluated the maintenance of the emergency preparedness program between May 1, 2016
- February 20, 2018. The evaluation reviewed activations of the emergency plan, the conduct of drills and exercises, licensee audits and assessments, and the maintenance of equipment important to emergency preparedness.


71114.06
[H.12] -
- Drill Evaluation Emergency Planning Drill (1 Sample
Human Performance, Avoid Complacency
) The inspectors evaluated a full-scale emergency preparedness drill on February 13, 2018.


RADIATION SAFET Y 71124.02
==71111.12 - Maintenance==
- Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls Radiological Work Planning (1 Sample)
Effectiveness The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A.
The inspectors evaluated the licensee's radiological work planning by reviewing the following activities:
(1) RWP 2017-9-1016, RMC Operations and Routine Tasks (2) RWP 2018-1-1523, Temporary Mat Insulation Fiber Inspection (3) RWP 2017-3002, Reactor Destack/Restack (4) RWP 2017-3015, Cavity Decontamination (5) RWP 2017-3039, 10-Year In-Service Inspection Vessel


8 Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)
Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.
The inspectors evaluated dose estimates and exposure tracking
. 71124.04 - Occupational Dose Assessment Source Term Characterization (1 Sample) The inspectors evaluated the licensee's source term characterization
. External Dosimetry (1 Sample) The inspectors evaluated the licensee's external dosimetry program. Internal Dosimetry (1 Sample) The inspectors evaluated the licensee's internal dosimetry program
. Special Dosimetric Situations (1 Sample) The inspectors evaluated the licensee's performance for special dosimetric situations
. OTHER ACTIVITIES
- BASELINE 71151 - Performance Indicator Verification (15 Samples) The inspectors verified licensee performance indicators submittals listed below: (1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (January 1, 2017
- December 31, 2017) (2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (January 1, 2017
- December 31, 2017
) (3) IE04: Unplanned Scrams with Complications (USwC) Sample (January 1, 2017
- December 31, 2017
) (4) MS05: Safety System Functional Failures (SSFFs) Sample (April 1, 2017 - December 31, 2017) (5) EP01: Drill/Exercise Performance (DEP) Sample (January 1, 2017
- December 31, 2017) (6) EP02: Emergency Response Organization (ERO) Drill Participation Sample (January 1, 2017 - December 31, 2017
) (7) EP03: Alert and Notification System (ANS) Reliability Sample (January 1, 2017
- December 31, 2017
)
9 71152 - Problem Identification and Resolution Annual Follow
-up of Selected Issues (1 Sample) The inspectors reviewed the licensee's implementation of its corrective action program related to the following issues:
(1) Multiple failures of diesel generator underfrequency protective relay on March 26, 2018 71153 - Follow-up of Events and Notices of Enforcement Discretion Events (1 Sample) The inspectors evaluated the Unit 1 reactor trip following a loss of main generator excitation and licensee's response on February 15
- 16, 2018. INSPECTION RESULTS Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone Significance Cross-cutting Aspect Report Section Mitigating Systems Green NCV 05000528/2018001
-01 Closed [H.12] - Human Performance, Avoid Complacency 71111.12
- Maintenance Effectiveness The inspectors reviewed a self
-revealed, Green, non
-cited violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A. Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post
-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.


Description: On November 12, 2017, the licensee was conducting a 24
=====Description:=====
-hour surveillance test run of Unit 1 diesel generator (EDG) A. The EDG was fully loaded at 10:19 a.m. which began the 24-hour test period. At 10:53 a.m.
On November 12, 2017, the licensee was conducting a 24-hour surveillance test run of Unit 1 diesel generator (EDG) A. The EDG was fully loaded at 10:19 a.m. which began the 24-hour test period. At 10:53 a.m., control room operators received a fuel oil transfer pump A inoperable equipment status alarm. The diesel fuel oil transfer pump A did not start on a diesel fuel oil day tank low level signal. Operators manually unloaded and stopped the EDG a few minutes later and declared the Unit 1 EDG A inoperable due to its inability to run for its design basis mission time and began troubleshooting the failed fuel oil transfer pump.


, control room operators received a fuel oil transfer pump A inoperable equipment status alarm. The diesel fuel oil transfer pump A did not start on a diesel fuel oil day tank low level signal. Operators manually unloaded and stopped the EDG a few minutes later and declared the Unit 1 EDG A inoperable due to its inability to run for its design basis mission time and began troubleshooting the failed fuel oil transfer pump.
Licensee electricians took electrical resistance readings across the connections in the motor control center for the fuel oil transfer pump breaker. The electricians identified that the direct cause of the transfer pump failure was a high variable resistance secondary stab connection in the motor control center cubicle. The electricians removed the breaker and cleaned and adjusted the connection. Electricians reinstalled the breaker and confirmed an acceptable as left connection resistance of less than 0.2 ohms. The diesel fuel oil transfer pump was successfully retested with a 20 minute functional run and the Unit 1 EDG A was declared operable following the successful completion of the 24-hour surveillance run on November 14, 2017.


Licensee electricians took electrical resistance readings across the connections in the motor control center for the fuel oil transfer pump breaker. The electricians identified that the direct cause of the transfer pump failure was a high variable resistance secondary stab connection in the motor control center cubicle. The electricians removed the breaker and cleaned and adjusted the connection. Electricians reinstalled the breaker and confirmed an acceptable as left connection resistance of less than 0.2 ohms. The diesel fuel oil transfer pump was successfully retested with a 20 minute functional run and the Unit 1 EDG A was declared operable following the successful completion of the 24
The licensees apparent cause investigation determined that the diesel fuel oil transfer pump breaker had been removed from service for periodic predictive maintenance on November 9, 2017, under work order 4685719. During this maintenance activity licensee engineers disconnected the diesel fuel oil transfer pump motor power and control cables for megger testing. Cable lug screw connections attach each of these cables to the secondary stab connections on the movable motor breaker and the stationary motor control center chassis.
-hour surveillance run on November 14, 2017.


10 The licensee's apparent cause investigation determine d that the diesel fuel oil transfer pump breaker had been removed from service for periodic predictive maintenance on November 9, 2017, under work order 4685719. During this maintenance activity licensee engineers disconnected the diesel fuel oil transfer pump motor power and control cables for megger testing. Cable lug screw connections attach each of these cables to the secondary stab connections on the movable motor breaker and the stationary motor control center chassis. Cable connections on the secondary stab connections are removed for testing, and then following testing, the cables are re
Cable connections on the secondary stab connections are removed for testing, and then following testing, the cables are re-landed onto the secondary stabs of the breaker and motor control center chassis. The licensees work planners had not recognized the possibility that removing and re-landing the cables on the lug screw connections had the potential to disturb the motor control center secondary stab connections.
-landed onto the secondary stabs of the breaker and motor control center chassis. The licensee's work planners had not recognized the possibility that removing and re
-landing the cables on the lug screw connections had the potential to disturb the motor control center secondary stab connections.


The post-maintenance test associated with the cable testing was a momentary start of the diesel fuel oil transfer pump. The transfer pump's control switch was held in the start position for only a few seconds.
The post-maintenance test associated with the cable testing was a momentary start of the diesel fuel oil transfer pump. The transfer pumps control switch was held in the start position for only a few seconds. The licensees apparent cause investigation identified that nonintrusive as-left quantitative resistance checks could have been used to assess the integrity of the secondary stab connections. The licensee performs similar checks when performing individual breaker cubicle preventative maintenance tasks that actively remove and re-test the individual motor control center bucket. Such a check was the method used by the electricians to initially diagnose the breaker failure. However, no such quantitative resistance check was specified in the cable testing work order.


The licensee's apparent cause investigation identified that nonintrusive as
The post-maintenance test was not written in accordance with station procedure 30DP-9WP04, Post-Maintenance Testing Development, Revision 19, Step 4.1.1, which states, in part, that the post-maintenance test shall ensure that equipment performs its intended function when returned to service following maintenance, that a new deficiency has not been created, and that the equipment will function as designed for safe and reliable plant operation.
-left quantitative resistance checks could have been used to assess the integrity of the secondary stab connections. The licensee performs similar checks when performing individual breaker cubicle preventative maintenance tasks that actively remove and re-test the individual motor control center bucket. Such a check was the method used by the electricians to initially diagnose the breaker failure. However, no such quantitative resistance check was specified in the cable testing work order.


The post-maintenance test was not written in accordance with station procedure 30DP
The act of de-terminating and re-terminating the diesel fuel oil transfer pump cable for testing created new failure deficiency by disturbing electrical continuity and creating a high resistance condition at the secondary stab connection that impacted EDG operability. The post-maintenance test following the cable testing maintenance was not adequate to ensure that a new deficiency had not been created.
-9WP04, "Post
-Maintenance Testing Development,
" Revision 19, Step 4.1.1
, which states, in part, that the post
-maintenance test shall ensure that equipment performs its intended function when returned to service following maintenance, that a new deficiency has not been created, and that the equipment will function as designed for safe and reliable plant operation. The act of de
-terminating and re-terminating the diesel fuel oil transfer pump cable for testing created new failure deficiency by disturbing electrical continuity and creating a high resistance condition at the secondary stab connection that impacted EDG operability. The post
-maintenance test following the cable testing maintenance was not adequate to ensure that a new deficiency had not been created.


Corrective Action: The licensee has taken corrective action to revise the work instructions for performing future cable testing to include quantitative resistance retests when re
Corrective Action: The licensee has taken corrective action to revise the work instructions for performing future cable testing to include quantitative resistance retests when re-terminating motor control center secondary stab connections. As an interim measure, the inspectors confirmed that all safety-related 480V electrical breakers that have been subject to this cable testing have performed satisfactorily during subsequent diesel generator surveillance testing.
-terminating motor control center secondary stab connections. As an interim measure
, the inspectors confirmed that all safety
-related 480V electrical breakers that have been subject to this cable testing have performed satisfactorily during subsequent diesel generator surveillance testing.


Corrective Action Reference
Corrective Action Reference: Condition Report 17-16497  
: Condition Report 17
-16497 Performance Assessment
: Performance Deficiency: The licensee's failure to prescribe appropriate retest activities following predictive maintenance on diesel fuel oil transfer pump cables is a performance deficiency.


Screening: The performance deficiency is more
=====Performance Assessment:=====
-than-minor and a finding because it is associated with the equipment performance attribute of the mitigating systems cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, on November 9, 2017, the licensee performed cable testing that disturbed the power cables for the Unit 1 diesel fuel 11 oil transfer pump A. Without an appropriate post
Performance Deficiency: The licensees failure to prescribe appropriate retest activities following predictive maintenance on diesel fuel oil transfer pump cables is a performance deficiency.
-maintenance test, this activity rendered the Unit 1 diesel generator A inoperable.


Significance: The inspectors performed the initial significance determination using NRC Inspection Manual Chapter 0609, Appendix A, "Significance Determination Process for Findings at Power," Exhibit 2, "Mitigating Systems Screening Questions
Screening: The performance deficiency is more-than-minor and a finding because it is associated with the equipment performance attribute of the mitigating systems cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, on November 9, 2017, the licensee performed cable testing that disturbed the power cables for the Unit 1 diesel fuel oil transfer pump A. Without an appropriate post-maintenance test, this activity rendered the Unit 1 diesel generator A inoperable.
" and determined that the finding was of very low safety significance (Green) because the finding did not represent an actual loss of safety function of a single train for greater that its technical specification allowed outage time.


Cross-cutting Aspect: The finding has a cross
Significance: The inspectors performed the initial significance determination using NRC Inspection Manual Chapter 0609, Appendix A, Significance Determination Process for Findings at Power, Exhibit 2, Mitigating Systems Screening Questions and determined that the finding was of very low safety significance (Green) because the finding did not represent an actual loss of safety function of a single train for greater that its technical specification allowed outage time.
-cutting aspect in the area of human performance associated with the avoid complacency aspect. Specifically, licensee work planners did not consider potential undesired consequences associated with disturbing the power cables leads, instead relying on past successful tests [H.12].
Enforcement
: Violation: Title 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," requires, in part, that activities affecting quality be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and be accomplished in accordance with these instructions, procedures, or drawings.


Contrary to the above, on November 9, 2017, the licensee performed maintenance on the Unit 1 diesel fuel oil transfer pump A, an activity affecting quality to which Appendix B applies, without documented instructions, procedures, or drawings of a type appropriate to the circumstances. Specifically, work order 4685719 did not include appropriate testing to ensure the maintenance was successful and the pump was returned to service, and as a result
Cross-cutting Aspect: The finding has a cross-cutting aspect in the area of human performance associated with the avoid complacency aspect. Specifically, licensee work planners did not consider potential undesired consequences associated with disturbing the power cables leads, instead relying on past successful tests [H.12].  
, the Unit 1 diesel generator A was rendered inoperable from November 9, 2017 to November 14, 2017. Disposition:
This violation is being treated as a non
-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.


EXIT MEETINGS AND DEBRIEFS The inspectors verified no proprietary information was retained or documented in this report.
=====Enforcement:=====
Violation: Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, requires, in part, that activities affecting quality be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and be accomplished in accordance with these instructions, procedures, or drawings.
 
Contrary to the above, on November 9, 2017, the licensee performed maintenance on the Unit 1 diesel fuel oil transfer pump A, an activity affecting quality to which Appendix B applies, without documented instructions, procedures, or drawings of a type appropriate to the circumstances. Specifically, work order 4685719 did not include appropriate testing to ensure the maintenance was successful and the pump was returned to service, and as a result, the Unit 1 diesel generator A was rendered inoperable from November 9, 2017 to November 14, 2017.
 
Disposition: This violation is being treated as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.
 
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.


On February 16, 2018, the inspector presented the radiation safety inspection results to Ms. M. Lacal, Senior Vice President, Regulatory and Oversight, and other members of the licensee staff.
On February 16, 2018, the inspector presented the radiation safety inspection results to Ms. M. Lacal, Senior Vice President, Regulatory and Oversight, and other members of the licensee staff.
Line 251: Line 333:
On March 2, 2018, the inspector provided a debrief for the emergency preparedness program inspection to Mr. M. McLaughlin, Vice President, Operations Support, and other members of the licensee staff. On March 29, 2018, the inspector communicated the inspection results telephonically to Mr. T. Weber, Acting Director, Nuclear Regulatory Affairs, and other members of the licensee staff.
On March 2, 2018, the inspector provided a debrief for the emergency preparedness program inspection to Mr. M. McLaughlin, Vice President, Operations Support, and other members of the licensee staff. On March 29, 2018, the inspector communicated the inspection results telephonically to Mr. T. Weber, Acting Director, Nuclear Regulatory Affairs, and other members of the licensee staff.


On April 11, 2018, the inspector presented the quarterly resident's inspection results to Mr. J. Cadogan, Senior Vice President, Site Operations, and other members of the licensee staff.
On April 11, 2018, the inspector presented the quarterly residents inspection results to Mr. J. Cadogan, Senior Vice President, Site Operations, and other members of the licensee staff.


Attachment 1 SUPPLEMENTAL INFORMATION DOCUMENTS REVIEWED Section 1R04: Equipment Alignment Procedures Number Title Revision 40ST-9AF07 Auxiliary Feedwater Pump AFA
=SUPPLEMENTAL INFORMATION=
-P01 Monthly Valve Alignment 6 40ST-9SI13 LPSI and CS System Alignment Verification 33 Condition Reports (CRs)
16-17321 17-03027 Drawings Number Title Revision 03-M-HJP-001 P&I Diagram Control Building HVAC 14 03-M-HJP-002 P&I Diagram Control Building HVAC 14 03-M-SIP-001 P&I Diagram Safety Injection & Shutdown Cooling System 49 03-P-SIF-0207 Auxiliary Building Isometric Safety Injection System LPSI & Cont. Spray Discharge 6 03-P-SIF-0201 Auxiliary Building Isometric Safety Injection System ESF Pump Suction Lines 7 Miscellaneous Number Title Revision STM-30D System Training Manual Volume 30D: Control Building HVAC System (HJ)
6 Section 1R05: Fire Protection Procedures Number Title Revision 14FT-9FP70 Appendix R & Former Tech Spec Penetration Seal Surveillance 13 A1-2 Condition Reports (CRs)
17-03870 18-00999 Miscellaneous Number Title Revision/Date PVNGS Pre
-Fire Strategies Manual 26 13-MM-0650 Fire Protection & Spray System Sub 007 13-MS-A083 NFPA Code Applicability and Conformance Review 007 4834415 Fire Safety Component Condition Record November 3, 2016 4834430 Fire Safety Component Condition Record November 3, 2016 4843902 Fire Safety Component Condition Record December 6, 2016 Unit 3 Tamper/Vital/Security Tour
- Post 31 February 7, 2018 4971714 Open Door/Hatch/Floor Plug Permit January 29, 20 18 4971687 Open Door/Hatch/Floor Plug Permit January 29, 2018 Section 1R07: Heat Sink Performance Procedures Number Title Revision 73DP-9ZZ21 Heat Exchanger Visual Inspection 6 73DP-9ZZ11 Heat Exchanger Program 15 Condition Reports (CRs)
18-03133 18-03138 18-03139 Work Orders (WOs) 4591574 4591575 4667054 4667055 4667098 Section 1R11: Licensed Operator Requalification Program and Licensed Operator Performance Procedures Number Title Revision 40OP-9MB01 Main Generation and Excitation 63 40DP-9OP02 Conduct of Operations 72 A1-3 Procedures Number Title Revision 40AL-9RK6A Panel B06A Alarm Responses 18 Condition Reports (CRs)
18-02797 18-02593 18-03215 Miscellaneous Number Title Date Current Alarm Status Report February 16, 20 18 Section 1R12: Maintenance Effectiveness Procedures Number Title Revision 32MT-9ZZ74 Molded Case Circuit Breaker Test 48 30DP-9WP04 Post-Maintenance Testing Development 19 Condition Reports (CRs)
17-08025-005 17-08025 17-16497 Work Orders (WOs) 4925959 4925966 4925967 4925969 4685719 4788985 Section 1R13: Maintenance Risk Assessments and Emergent Work Control Procedures Number Title Revision 40DP-9AP21 Protected Equipment 7 70DP-0RA05 Assessment and Management of Risk when Performing Maintenance in Modes 1 and 2 23 40MT-9ZZ01 Operations Maintenance Activities 5 40DP-9RS01 Operations Department Online Nuclear Risk Management Mode 1 and 2 4
A1-4 Condition Reports (CRs)
18-00249 185-00136 18-00336 18-02544 Miscellaneous Number Title Date Scheduler's Evaluation for PV Unit 1 January 4, 2018 Scheduler's Evaluation for PV Unit 1 February 23, 2018 Scheduler's Evaluation for PV Unit 3 February 1, 2018 Scheduler's Evaluation for PV Unit 2 March 19, 2018 Unit 3 Archived Operator Logs January 29, 2018
- February 4, 2018 Section 1R15: Operability Determinations and Functionality Assessments Procedures Number Title Revision 40ST-9ZZm1 Operations Mode 1 Surveillance Logs 71 40AL-9RK6A Panel B06A Alarm Responses 18 74DP-9CY04 Systems Chemistry Specifications 94 Condition Reports (CRs)
17-18475 12-01397 17-17856 13-01198 18-03127 17-16393 18-03215 18-03291 18-02839 18-01610 18-02334 3127427 18-02468 18-03980 Miscellaneous Number Title Revision/Date 03-E-SGF-023 Control Wiring Diagram Main Steam Isolation Valves 11 18-02334-003 Engineering Evaluation February 15, 20 18 4428056 Adverse CRDR July 19, 2013 EQ Program Manual 26 A1-5 Section 1R18: Plant Modifications Condition Reports (CRs)
18-04116 Work Orders (WOs) 4989102 Miscellaneous Number Title Date DEC-01035 Design Equivalent Change April 12, 2017 Section 1R19: Post
-Maintenance Testing Procedures Number Title Revision 40OP-9CH12 Refueling Water Tank (RWT) Operations 41 32MT-9ZZ13 Testing and Calibration of 121FC66K01A Time Overcurrent Relays 4 32MT-9ZZ17 Testing and Calibration of 12PJC11AV1A Instantaneous Overcurrent Relays 4 40OP-9EW02 Essential Cooling Water System (EW) Train B 26 40ST-9DG01 Diesel Generator A Test 49 73ST-9DG08 Class 1E Diesel Generator Load Reject 24 Hour Rated Load and Hot Start Test Train B 13 40ST-9DG02 Diesel Generator B Test 54 Condition Reports (CRs)
18-00136 18-00197 18-01931 18-00210 18-00290 18-00336 18-00377 18-00346 18-04731 18-04732 Work Orders (WOs) 4964492 4822983 4981967 4726747 4821113 4847651 4965079 4972486 4847637 A1-6 Drawings Number Title Revision 01-E-DGB-007 Elementary Diagram: Diesel Engine Control 15 01-E-DGF-007 Control Wiring Diagram: Diesel Engine 13 13-M018-00141 Control Schematic (Starting Sequence Control)
25 Miscellaneous Number Title Revision/Date 18-00210-004 Engineering Evaluation: EDG 1A Unexpected Cooldown during Surveillance Run 1/5/2018 January 8, 2018 Section 1R20: Refueling and Other Outage Activities Procedures Number Title Revision 40OP-9MB01 Main Generation and Excitation 63 Section 1R22: Surveillance Testing Procedures Number Title Revision 73DP-9CL02 Containment Leakage Rate Testing Program 33 73ST-9XI20 Atmospheric Dump Valves
- Inservice Test 47 73ST-9SI06 Containment Spray Pumps and Check valves
- Inservice Test 42 73ST-9DF01 Diesel Fuel Oil Transfer Pumps
- Inservice Test 34 40DP-9OP06 Operations Department Repetitive Task Program 130 73ST-9SI06 Containment Spray Pumps and Check Valves
- Inservice Test 42 Condition Reports (CRs)
16-15793 18-03304 18-01314 18-03825 Work Orders (WOs) 4822921 4840032 4843076 4843390 A1-7 Miscellaneous Number Title Revision/Date 13-JC-SI-0215 Containment Spray Pump Discharge Flow Indication Loops Uncertainty Calculation 18 18-01314-002 Engineering Evaluation: ADV 178 Fast Stroke Time January 26, 2018 18-03304-002 Engineering Evaluation: SR 3.0.3 Evaluation for SB-200, 202, and 205 March 2, 2018 Section 1EP2: Alert and Notification System Testing Miscellaneous Documents Number Title Date ID/Letter Number:
240-02802 Palo Verde Nuclear Generating Station Alert and Notification System (ANS) FEMA 350 Report
- May 2017 May 26, 2017 Palo Verde Nuclear Generating Station, Alert and Notification System (ANS), FEMA 350 Report May 2017 Palo Verde Nuclear Generating Station Siren Operating Manual November 2015 January 4, 2018 Letter from FEMA Region IX to Director, Division of Emergency Management, State of Arizona September 19, 2017 State of Arizona/Maricopa County Offsite Emergency Response Plan, Palo Verde Nuclear Generating Station November 2017 The Maricopa County Sheriff's Office Emergency Response to Palo Verde Nuclear Generating Station August 2016 Work Orders (WOs) 474965/0 Section 1EP3: Emergency Response Organization Staffing and Augmentation Procedures Number Title Revision EP-0902 Notifications 10 EP-0901 Classifications 10 40AL-9RK7C Panel B07C Alarm Responses 15 40AO-9ZZ21 Acts of Nature 37 79IS-9SM01 Analysis of Seismic Event 27 A1-8 Miscellaneous Documents Number Title Date 240-02799 JF/MA 2017 1st Quarter - Emergency Preparedness Augmentation Drill Report March 21, 2017 240-02803 CS/MA 2017 2nd Quarter - Emergency Preparedness Augmentation Drill Report June 6, 2017 240-02797 2017 3rd Quarter
- Emergency Preparedness Augmentation Drill Report (After Hours)
July 25, 2017 240-02808 2017 3rd Quarter
- Emergency Preparedness Augmentation Drill Repo rt September 6, 2017 240-02817 CS/ma 2017 4th Quarter - Emergency Preparedness Augmentation Drill Report December 13, 2017 240-02790 JF/MA 2016 2nd Quarter - Emergency Preparedness Augmentation Drill Report June 23, 2016 240-02791 JF/MA 2016 3rd Quarter - Emergency Preparedness Augmentation Drill Report August 3, 2016 240-02798 December 5, 2016, Alert Event Report January 17, 2017 Section 1EP4: Emergency Action Level and Emergency Plan Changes Procedure Number Title Revision 16DP-0EP22 Emergency Plan Maintenance 11, 12 Miscellaneous Documents Number Title Date Evaluation Tracking Number 2017-001E Replace the Meteorological Instrumentation and Data Transmission System (MDTS)
August 8, 2017 Evaluation Tracking Number 2017-003E EP-0900, Rev. 16 August 17, 2017 Evaluation Tracking Number 2017-004E EP-0901, Rev. 10 August 21, 2017 Screening Tracking Number 2017-002S 74RM-9EF42, Radiation Monitor Alarm Setpoint Determination, Rev. 30 April 16, 2017 Screening Tracking Number 2017-022S Procedure EP
-0901, Classifications, Added New EALs form EPLAN R60, Revise PV Proc Format August 20, 2017


A1-9 Miscellaneous Documents Number Title Date Screening Tracking Number 2017-014S EP-905, Revision 9, Protective Actions June 7, 2017 Screening Tracking Number 2017-023S DMWO 3452940 Palo Verde Nuclear Generating Station Radio Replacement Project September 8, 2017 Screening Tracking Number 2017-029S 40AO-9ZZ18 R018 Fire Outside Control Room September 26, 2017 EPM Tracking Number 2015-006S DEC-00720 Allow Solar
DOCUMENTS REVIEWED
-Charged Offsite Sirens to Replace AC
Section 1R04: Equipment Alignment
-Charged Offsite Sirens February 18, 2015 Section 1EP5: Maintenance of Emergency Preparedness Procedures Number Title Revision 01DP-0AP12 Condition Reporting Process 28 01DP-0AP12-01 Condition Reporting Process Administrative Guide 4 EP-0905 Protective Actions 9 EP-0902 Notifications 8, 9, 10 16DP-0EP31 Emergency Preparedness Equipment Out
Procedures
-of-Service 9 16DP-0EP27 Emergency Preparedness Equipment Testing 10 16DP-0EP28 Emergency Facility/Kit Inventories and Inspections 5 Condition Reports (CRs)
Number
16-08461 16-09213 16-11134 16-11930 16-12640 16-13501 16-14593 16-14934 16-16710 17-02188 17-03147 17-03149 17-03202 17-03605 17-03721 17-03736 17-03826 17-03828 17-03829 17-03884 17-04633 17-06893 17-08328 17-10906 17-10949 17-11437 17-13663 17-14927 17-15449 17-15797 17-15884 17-16771 17-17091 17-17218 17-17739 17-18443 18-03244 A1-10 Miscellaneous Documents Number Title Revision/Date KLD TR-983 Palo Verde Nuclear Generating Station, 2017 Population Update Analysis December 7, 2017 KLD TR-895 Palo Verde Nuclear Generating Station, 2016 Population Update Analysis December 8, 2016 Updated Review of Palo Verde Nuclear Generating Station Emergency Plan 2016 Letters of Agreement September 29, 2016 Letter # 240
Title
-02819 2017 Review of Palo Verde Nuclear Generating Station Emergency Plan Letters of Agreement December 26, 2017 NAD Audit 2016
Revision
-010 Nuclear Assurance Department (NAD) Audit Plan and Report, 2016
40ST-9AF07
-010, Emergency Preparedness December 14, 2016 Palo Verde Nuclear Generating Station After Action Report/Improvement Plan, Exercise Date
Auxiliary Feedwater Pump AFA-P01 Monthly Valve
- June 1, 2017, Radiological Emergency Preparedness Program August 18
Alignment
, 2017 ID: 240-02806 2017 Onsite Contaminated Injury/Health Physics Drill Report (Revised)
40ST-9SI13
June 23, 2017 ID: 240-02816 2017 Health Physics Drill Report (November 2017)
LPSI and CS System Alignment Verification
December 12, 2017 ID: 240-02818 1709 ERO Mini Drill
- ERO Blue Team (December 2017)
December 21, 2017 NAD Audit 2017
-008 Nuclear Assurance Department (NAD) Audit Plan and Report, 2017
-008, Emergency Preparedness January 25, 2018 240-02812 CS/MA 1704 and 1705 ERO Mini Drills
- ERO White Team and Green Team (June and July 2017)
October 18, 2017 240-02813 CS/MA 1706 ERO Mini Drill
- ERO Gold Team (July 2017)
October 18, 2017 240-02814 TW/MA 1707 ERO Mini Drill
- ERO Red Team (August 2017) Revision 1 October 18, 2017 Emergency Response Facility Telephone Book, 1st Quarter Edition 2018 January 1, 2018 240-02801 JF/MA 1702 IPZ Evaluated Exercise
- ERO White Team (March 2017)
April 6, 2017 240-02797 JF/MA 1608 ERO Mini Drill
- ERO Red Team (December 2016)
January 4, 2017 240-02792 JF/MA 1604 and 1605 ERO Drills September 14, 2016 240-02793 JF/MA 1606 ERO Mini Drill
- ERO Green Team (September 2016)
October 4, 2016 A1-11 Miscellaneous Documents Number Title Revision/Date 240-02795 JF/MA 1609 Off-Hours Drive-in Augmentation Drill
- (November 2016)
December 2, 2016 240-02796 2016 Health Physics Drill Report (November 2016)
December 7, 2016 Evaluation Report 16
-11134 Evaluate Adding STSC ENS Communicator Duties to STSC Communicator September 7, 2016 17-11437-002 Actual Event Investigation, Unit 3 Ammonia Sight glass Break September 28, 2017 17-13663-001 Actual Event Investigation, Unit 2 Loss of Annunciators October 11, 2017 Level 4 Evaluation Report 17
-15797-001 Default Values Used in Dose Assessment November 30, 2017 Document No.


500599510 Master Agreement Between Arizona Public Service Company and Westinghouse Electric Company LLC for Goods and Services (Effective January 29, 2016 to December 31, 2018)
Condition Reports (CRs)
0 Palo Verde Nuclear Generating Station After Action Report/Improvement Plan, Exercise Dates
16-17321
- March 7-8, 2017, Radiological Emergency Preparedness Program (REPP) May 26, 2017 240-02789 JF/TW 2016 Health Physics Drill Report (Re
17-03027
-Demonstration)
June 9, 2016 240-02788 JF/MA 2016 Contaminated Injury/Health Physics Drill Report April 22, 2016 Palo Verde Nuclear Generating Station After Action Report/Improvement Plan, Exercise Date
- November 16, 2016, Radiological Emergency Preparedness Program (REPP)
February 9, 2017 240-02787 JF/MA 1602 IPZ Exercise
- ERO Green Team (March 2016)
March 25, 2016 Palo Verde Nuclear Generating Station After Action Report/Improvement Plan, Exercise Date
- November 16, 2016, Radiological Emergency Preparedness Program (REPP)
February 9, 2017 Level 3 Evaluation Report 18
-02668-002 March 22, 2018


A1-12 Work Orders (WOs)
Drawings
4782667 4783959/0 4787729/0 4787847/0 4836236 4836263/0 4860832/0 4862234/0 4862502/0 4885361/0 4889725/0 4896971/0 4901070 4916668/0 4918303/0 4918455/0 4937577/0 4947802/0 Section 1EP6: Drill Evaluation Procedures Number Title Revision EP-0900 Emergency Response Organization (ERO) Position Checklists 16 EP-0901 Classifications 10 Condition Reports (CRs)
Number
18-02352 18-02503 18-02655 Section 2RS2: Occupational ALARA Planning and Controls Procedures Number Title Revision 75DP-0RP03 ALARA Program Overview 06 75DP-0RP06 ALARA Committee 07 75DP-0RP08 Managing Radiological Risk 02 75RP-9RP02 Radiation Work Permits 31 75RP-9RP25 Temporary Shielding 14 75TD-9RP02 ALARA Work Planning 11 Audits and Self
Title
-Assessments Title Date PVGS Integrated Performance Assessment Report Radiation Protection 2nd Quarter 2017 September 14, 2017 2016 Annual ALARA/Management Evaluation Report June 23, 2017 2016 Annual Radiation Protection Program Summary Report July 27, 2017
Revision
03-M-HJP-001
P&I Diagram Control Building HVAC
03-M-HJP-002
P&I Diagram Control Building HVAC
03-M-SIP-001
P&I Diagram Safety Injection & Shutdown Cooling System
03-P-SIF-0207
Auxiliary Building Isometric Safety Injection System LPSI &
Cont. Spray Discharge
03-P-SIF-0201
Auxiliary Building Isometric Safety Injection System ESF
Pump Suction Lines


A1-13 Condition Reports (CRs)
Miscellaneous
17-15502 17-15529 17-15802 17-16741 17-17944 17-18180 18-01890 Radiation Work Permits/ALARA Reviews Number Title RWP 2017-9-1016 RMC Operations and Routine Tasks RWP 2018-1-1523 Temporary Mat Insulation Fiber Inspection RWP 2017-3002 Reactor Destack/Restack RWP 2017-3015 Cavity Decontamination RWP 2017-3039 10-Year In-Service Inspection Vessel Miscellaneous Title Date ALARA 5-Year Plan 2015
Number
- 2019 November 2015 1R20 Radiological Safety Summary In Perspective November 7, 2017 2R20 Radiological Safety Summary In Perspective May 9, 2017 3R19 Radiological Safety Summary In Perspective November 10, 2016 Section 2RS4 : Occupational Dose Assessment Procedures Number Title Revision 75DP-0RP01 RP Program Overview 11 75DP-0RP06 Managing Radiological Risk 2 75RP-9ME23 Exposure Evaluation for Lost, Damaged, or Suspect Dosimetry, and Anticipated EPD Dose Rate Alarm 12 75RP-9ME24 Dosimetry Processing, Evaluation, and Documentation 5 75RP-9ME25 TLD Reader Calibration and Response Check 6 75RP-9RP03 Bioassay Analysis 10 75RP-9RP05 Contamination Dose Evaluation 7 75RP-9RP16 Special Dosimetry 24 75RP-9QE21 Calibration of Self
Title
-Indicating Dosimeters 13 A1-14 Procedures Number Title Revision 75RP-9QE26 Operation and Verification of the Merlin Gerin Model CDM
Revision
-21 Calibrator 10 Audits and Self
STM-30D
-Assessments Title Date 2016 Annual ALARA/Management Evaluation Report June 23, 2017 2016 Annual Radiation Protection Program Summary Report July 27, 2017 Condition Reports (CRs)
System Training Manual Volume 30D: Control Building
17-14033 17-14127 17-14527 17-15700 18-01423 Self-Reading Dosimeter Calibration Records Number Title Date 837097 Self-Reading Dosimeter September 8, 2017 836204 Self-Reading Dosimeter September 9, 2017 833059 Self-Reading Dosimeter September 30, 2017 810641 Self-Reading Dosimeter gamma/neutron December 12, 2017 810633 Self-Reading Dosimeter gamma/neutron December 12, 2017 810552 Self-Reading Dosimeter gamma/neutron December 13, 2017 Miscellaneous Number Title Date 2017 Multi-Pack TLD Results 2017 100536 NVLAP Accreditation Report April 8, 2016 100536 NVLAP Proficiency Testing Results
HVAC System (HJ)  
- TLD May 2, 2016 100536 NVLAP Proficiency Testing Results
-EPD August 5, 2016 100536 NVLAP Accreditation Report February 15, 2018 2017 Unit 1 Dry Active Waste December 1, 2017 2017 Unit 2 Dry Active Waste May 18, 2017 2016 Unit 3 Dry Active Waste December 22, 2016 25116 Intake Dose Assessment April 21, 2016


A1-15 Miscellaneous Number Title Date 47194 Personnel Dosimetry Processing Report November 15, 2017 Section 4OA1: Performance Indicator Verification Miscellaneous Number Title Date 2016-002-01 Licensee Event Report June 27, 2017 2017-001-00 June 27, 2017 June 14, 2017 Palo Verde Plant Computer PI ProcessBook Palo Verde Control Room Logs (1/1/17
Section 1R05: Fire Protection
- 12/31/17)
Procedures
Section 4OA2: Problem Identification and Resolution Procedures Number Title Revision 40ST-9DG01 Diesel Generator A Test 49 Condition Reports (CRs)
Number
17-15901 18-03517 17-15838 17-11155 17-09750 16-03783 Section 4OA3:
Title
Follow-up of Events and Notices of Enforcement Discretion Condition Reports (CRs)
Revision
18-02544 18-02688 18-02664 18-02605 18-02716 Attachment 2 The following items are requested for the Occupational Radiation Safety Inspection at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 February 12 to 16, 2018 Integrated Report 2018001 Inspection areas are listed in the attachments below.
14FT-9FP70
Appendix R & Former Tech Spec Penetration Seal Surveillance


Please provide the requested information on or before January 26, 2018.
Condition Reports (CRs)
17-03870
18-00999
 
Miscellaneous
Number
Title
Revision/Date
PVNGS Pre-Fire Strategies Manual
13-MM-0650
Fire Protection & Spray System Sub
007
13-MS-A083
NFPA Code Applicability and Conformance Review
007
4834415
Fire Safety Component Condition Record
November 3, 2016
4834430
Fire Safety Component Condition Record
November 3, 2016
4843902
Fire Safety Component Condition Record
December 6, 2016
Unit 3 Tamper/Vital/Security Tour - Post 31
February 7, 2018
4971714
Open Door/Hatch/Floor Plug Permit
January 29, 2018
4971687
Open Door/Hatch/Floor Plug Permit
January 29, 2018
Section 1R07: Heat Sink Performance
Procedures
Number
Title
Revision
73DP-9ZZ21
Heat Exchanger Visual Inspection
73DP-9ZZ11
Heat Exchanger Program
 
Condition Reports (CRs)
18-03133
18-03138
18-03139
 
Work Orders (WOs)
4591574
4591575
4667054
4667055
4667098
Section 1R11: Licensed Operator Requalification Program and Licensed Operator
Performance
Procedures
Number
Title
Revision
40OP-9MB01
Main Generation and Excitation
40DP-9OP02
Conduct of Operations
 
Procedures
Number
Title
Revision
40AL-9RK6A
Panel B06A Alarm Responses
 
Condition Reports (CRs)
18-02797
18-02593
18-03215
 
Miscellaneous
Number
Title
Date
Current Alarm Status Report
February 16, 2018
Section 1R12: Maintenance Effectiveness
Procedures
Number
Title
Revision
2MT-9ZZ74
Molded Case Circuit Breaker Test
30DP-9WP04
Post-Maintenance Testing Development
 
Condition Reports (CRs)
17-08025-005
17-08025
17-16497
 
Work Orders (WOs)
25959
25966
25967
25969
4685719
4788985
 
Section 1R13: Maintenance Risk Assessments and Emergent Work Control
Procedures
Number
Title
Revision
40DP-9AP21
Protected Equipment
70DP-0RA05
Assessment and Management of Risk when Performing
Maintenance in Modes 1 and 2
40MT-9ZZ01
Operations Maintenance Activities
40DP-9RS01
Operations Department Online Nuclear Risk Management
Mode 1 and 2
 
Condition Reports (CRs)
18-00249
185-00136
18-00336
18-02544
 
Miscellaneous
Number
Title
Date
Schedulers Evaluation for PV Unit 1
January 4, 2018
Schedulers Evaluation for PV Unit 1
February 23, 2018
Schedulers Evaluation for PV Unit 3
February 1, 2018
Schedulers Evaluation for PV Unit 2
March 19, 2018
Unit 3
Archived Operator Logs
January 29, 2018 -
February 4, 2018
Section 1R15: Operability Determinations and Functionality Assessments
Procedures
Number
Title
Revision
40ST-9ZZm1
Operations Mode 1 Surveillance Logs
40AL-9RK6A
Panel B06A Alarm Responses
74DP-9CY04
Systems Chemistry Specifications
 
Condition Reports (CRs)
17-18475
2-01397
17-17856
13-01198
18-03127
17-16393
18-03215
18-03291
18-02839
18-01610
18-02334
27427
18-02468
18-03980
 
Miscellaneous
Number
Title
Revision/Date
03-E-SGF-023
Control Wiring Diagram Main Steam Isolation Valves
18-02334-003
Engineering Evaluation
February 15, 2018
28056
Adverse CRDR
July 19, 2013
EQ Program Manual
 
Section 1R18: Plant Modifications
Condition Reports (CRs)
18-04116
 
Work Orders (WOs)
4989102
 
Miscellaneous
Number
Title
Date
DEC-01035
Design Equivalent Change
April 12, 2017
Section 1R19: Post-Maintenance Testing
Procedures
Number
Title
Revision
40OP-9CH12
Refueling Water Tank (RWT) Operations
2MT-9ZZ13
Testing and Calibration of 121FC66K01A Time Overcurrent
Relays
2MT-9ZZ17
Testing and Calibration of 12PJC11AV1A Instantaneous
Overcurrent Relays
40OP-9EW02
Essential Cooling Water System (EW) Train B
40ST-9DG01
Diesel Generator A Test
73ST-9DG08
Class 1E Diesel Generator Load Reject 24 Hour Rated Load
and Hot Start Test Train B
40ST-9DG02
Diesel Generator B Test
 
Condition Reports (CRs)
18-00136
18-00197
18-01931
18-00210
18-00290
18-00336
18-00377
18-00346
18-04731
18-04732
Work Orders (WOs)
4964492
22983
4981967
26747
21113
4847651
4965079
4972486
4847637
 
Drawings
Number
Title
Revision
01-E-DGB-007
Elementary Diagram: Diesel Engine Control
01-E-DGF-007
Control Wiring Diagram: Diesel Engine
13-M018-00141
Control Schematic (Starting Sequence Control)
 
Miscellaneous
Number
Title
Revision/Date
18-00210-004
Engineering Evaluation: EDG 1A Unexpected Cooldown
during Surveillance Run 1/5/2018
January 8, 2018
Section 1R20: Refueling and Other Outage Activities
Procedures
Number
Title
Revision
40OP-9MB01
Main Generation and Excitation
 
Section 1R22: Surveillance Testing
Procedures
Number
Title
Revision
73DP-9CL02
Containment Leakage Rate Testing Program
73ST-9XI20
Atmospheric Dump Valves - Inservice Test
73ST-9SI06
Containment Spray Pumps and Check valves - Inservice
Test
73ST-9DF01
Diesel Fuel Oil Transfer Pumps - Inservice Test
40DP-9OP06
Operations Department Repetitive Task Program
130
73ST-9SI06
Containment Spray Pumps and Check Valves-Inservice
Test
 
Condition Reports (CRs)
16-15793
18-03304
18-01314
18-03825
 
Work Orders (WOs)
22921
4840032
4843076
4843390
 
Miscellaneous
Number
Title
Revision/Date
13-JC-SI-0215
Containment Spray Pump Discharge Flow Indication
Loops Uncertainty Calculation
18-01314-002
Engineering Evaluation: ADV 178 Fast Stroke Time
January 26, 2018
18-03304-002
Engineering Evaluation: SR 3.0.3 Evaluation for
SB-200, 202, and 205
March 2, 2018
Section 1EP2: Alert and Notification System Testing
Miscellaneous Documents
Number
Title
Date
ID/Letter
Number:
240-02802
Palo Verde Nuclear Generating Station Alert and
Notification System (ANS) FEMA 350 Report -
May 2017
May 26, 2017
Palo Verde Nuclear Generating Station, Alert and
Notification System (ANS), FEMA 350 Report
May 2017
Palo Verde Nuclear Generating Station Siren Operating
Manual
November 2015
January 4, 2018
Letter from FEMA Region IX to Director, Division of
Emergency Management, State of Arizona
September 19,
2017
State of Arizona/Maricopa County Offsite Emergency
Response Plan, Palo Verde Nuclear Generating Station
November 2017
The Maricopa County Sheriffs Office Emergency
Response to Palo Verde Nuclear Generating Station
August 2016
Work Orders (WOs)
474965/0
 
Section 1EP3: Emergency Response Organization Staffing and Augmentation
Procedures
 
Number
Title
Revision
EP-0902
Notifications
EP-0901
Classifications
40AL-9RK7C
Panel B07C Alarm Responses
40AO-9ZZ21
Acts of Nature
79IS-9SM01
Analysis of Seismic Event
 
Miscellaneous Documents
Number
Title
Date
240-02799
JF/MA
2017 1st Quarter - Emergency Preparedness
Augmentation Drill Report
March 21, 2017
240-02803
CS/MA
2017 2nd Quarter - Emergency Preparedness
Augmentation Drill Report
June 6, 2017
240-02797
2017 3rd Quarter - Emergency Preparedness
Augmentation Drill Report (After Hours)
July 25, 2017
240-02808
2017 3rd Quarter - Emergency Preparedness
Augmentation Drill Report
September 6, 2017
240-02817
CS/ma
2017 4th Quarter - Emergency Preparedness
Augmentation Drill Report
December 13,
2017
240-02790
JF/MA
2016 2nd Quarter - Emergency Preparedness
Augmentation Drill Report
June 23, 2016
240-02791
JF/MA
2016 3rd Quarter - Emergency Preparedness
Augmentation Drill Report
August 3, 2016
240-02798
December 5, 2016, Alert Event Report
January 17, 2017
Section 1EP4: Emergency Action Level and Emergency Plan Changes
Procedure
 
Number
Title
Revision
16DP-0EP22
Emergency Plan Maintenance
11, 12
Miscellaneous Documents
Number
Title
Date
Evaluation
Tracking Number
2017-001E
Replace the Meteorological Instrumentation and Data
Transmission System (MDTS)
August 8, 2017
Evaluation
Tracking Number
2017-003E
EP-0900, Rev. 16
August 17, 2017
Evaluation
Tracking Number
2017-004E
EP-0901, Rev. 10
August 21, 2017
Screening
Tracking Number
2017-002S
74RM-9EF42, Radiation Monitor Alarm Setpoint
Determination, Rev. 30
April 16, 2017
Screening
Tracking Number
2017-022S
Procedure EP-0901, Classifications, Added New EALs
form EPLAN R60, Revise PV Proc Format
August 20, 2017
 
Miscellaneous Documents
Number
Title
Date
Screening
Tracking Number
2017-014S
EP-905, Revision 9, Protective Actions
June 7, 2017
Screening
Tracking Number
2017-023S
DMWO 3452940 Palo Verde Nuclear Generating
Station Radio Replacement Project
September 8,
2017
Screening
Tracking Number
2017-029S
40AO-9ZZ18 R018 Fire Outside Control Room
September 26,
2017
EPM Tracking
Number
2015-006S
DEC-00720 Allow Solar-Charged Offsite Sirens to
Replace AC-Charged Offsite Sirens
February 18,
2015
Section 1EP5: Maintenance of Emergency Preparedness
Procedures
Number
Title
Revision
01DP-0AP12
Condition Reporting Process
01DP-0AP12-01
Condition Reporting Process Administrative Guide
EP-0905
Protective Actions
EP-0902
Notifications
8, 9, 10
16DP-0EP31
Emergency Preparedness Equipment Out-of-Service
16DP-0EP27
Emergency Preparedness Equipment Testing
16DP-0EP28
Emergency Facility/Kit Inventories and Inspections
 
Condition Reports (CRs)
16-08461
16-09213
16-11134
16-11930
16-12640
16-13501
16-14593
16-14934
16-16710
17-02188
17-03147
17-03149
17-03202
17-03605
17-03721
17-03736
17-03826
17-03828
17-03829
17-03884
17-04633
17-06893
17-08328
17-10906
17-10949
17-11437
17-13663
17-14927
17-15449
17-15797
17-15884
17-16771
17-17091
17-17218
17-17739
17-18443
18-03244
 
Miscellaneous Documents
Number
Title
Revision/Date
KLD TR-983
Palo Verde Nuclear Generating Station,
2017 Population Update Analysis
December 7,
2017
KLD TR-895
Palo Verde Nuclear Generating Station,
2016 Population Update Analysis
December 8,
2016
Updated Review of Palo Verde Nuclear Generating
Station Emergency Plan 2016 Letters of Agreement
September 29,
2016
Letter # 240-
2819
2017 Review of Palo Verde Nuclear Generating Station
Emergency Plan Letters of Agreement
December 26,
2017
NAD Audit 2016-
010
Nuclear Assurance Department (NAD) Audit Plan and
Report, 2016-010, Emergency Preparedness
December 14,
2016
Palo Verde Nuclear Generating Station After Action
Report/Improvement Plan, Exercise Date - June 1,
2017, Radiological Emergency Preparedness Program
August 18,
2017
ID: 240-02806
2017 Onsite Contaminated Injury/Health Physics Drill
Report (Revised)
June 23, 2017
ID: 240-02816
2017 Health Physics Drill Report (November 2017)
December 12,
2017
ID: 240-02818
1709 ERO Mini Drill - ERO Blue Team
(December 2017)
December 21,
2017
NAD Audit 2017-
008
Nuclear Assurance Department (NAD) Audit Plan and
Report, 2017-008, Emergency Preparedness
January 25,
2018
240-02812
CS/MA
1704 and 1705 ERO Mini Drills - ERO White Team and
Green Team (June and July 2017)
October 18,
2017
240-02813
CS/MA
1706 ERO Mini Drill - ERO Gold Team (July 2017)
October 18,
2017
240-02814
TW/MA
1707 ERO Mini Drill - ERO Red Team (August 2017)
Revision 1
October 18,
2017
Emergency Response Facility Telephone Book,
1st Quarter Edition 2018
January 1,
2018
240-02801
JF/MA
1702 IPZ Evaluated Exercise - ERO White Team
(March 2017)
April 6, 2017
240-02797
JF/MA
1608 ERO Mini Drill - ERO Red Team
(December 2016)
January 4,
2017
240-02792
JF/MA
1604 and 1605 ERO Drills
September 14,
2016
240-02793
JF/MA
1606 ERO Mini Drill - ERO Green Team
(September 2016)
October 4,
2016
 
Miscellaneous Documents
Number
Title
Revision/Date
240-02795
JF/MA
1609 Off-Hours Drive-in Augmentation Drill -
(November 2016)
December 2,
2016
240-02796
2016 Health Physics Drill Report (November 2016)
December 7,
2016
Evaluation
Report 16-11134
Evaluate Adding STSC ENS Communicator Duties to
STSC Communicator
September 7,
2016
17-11437-002
Actual Event Investigation, Unit 3 Ammonia Sight glass
Break
September 28,
2017
17-13663-001
Actual Event Investigation, Unit 2 Loss of Annunciators
October 11,
2017
Level 4
Evaluation
Report 17-
15797-001
Default Values Used in Dose Assessment
November 30,
2017
Document No.
500599510
Master Agreement Between Arizona Public Service
Company and Westinghouse Electric Company LLC for
Goods and Services (Effective January 29, 2016 to
December 31, 2018)
 
Palo Verde Nuclear Generating Station After Action
Report/Improvement Plan, Exercise Dates - March 7-8,
2017, Radiological Emergency Preparedness Program
(REPP)
May 26, 2017
240-02789
JF/TW
2016 Health Physics Drill Report (Re-Demonstration)
June 9, 2016
240-02788
JF/MA
2016 Contaminated Injury/Health Physics Drill Report
April 22, 2016
Palo Verde Nuclear Generating Station After Action
Report/Improvement Plan, Exercise Date -
November 16, 2016, Radiological Emergency
Preparedness Program (REPP)
February 9,
2017
240-02787
JF/MA
1602 IPZ Exercise - ERO Green Team (March 2016)
March 25, 2016
Palo Verde Nuclear Generating Station After Action
Report/Improvement Plan, Exercise Date -
November 16, 2016, Radiological Emergency
Preparedness Program (REPP)
February 9,
2017
Level 3 Evaluation Report 18-02668-002
March 22, 2018  
 
Work Orders (WOs)
4782667
4783959/0
4787729/0
4787847/0
4836236
4836263/0
4860832/0
4862234/0
4862502/0
4885361/0
4889725/0
4896971/0
4901070
4916668/0
4918303/0
4918455/0
4937577/0
4947802/0
 
Section 1EP6: Drill Evaluation
Procedures
Number
Title
Revision
EP-0900
Emergency Response Organization (ERO) Position
Checklists
EP-0901
Classifications
 
Condition Reports (CRs)
18-02352
18-02503
18-02655
 
Section 2RS2: Occupational ALARA Planning and Controls
Procedures
Number
Title
Revision
75DP-0RP03
ALARA Program Overview
75DP-0RP06
ALARA Committee
75DP-0RP08
Managing Radiological Risk
75RP-9RP02
Radiation Work Permits
75RP-9RP25
Temporary Shielding
75TD-9RP02
ALARA Work Planning
 
Audits and Self-Assessments
Title
Date
PVGS Integrated Performance Assessment Report Radiation
Protection 2nd Quarter 2017
September 14, 2017
2016 Annual ALARA/Management Evaluation Report
June 23, 2017
2016 Annual Radiation Protection Program Summary Report
July 27, 2017
 
Condition Reports (CRs)
17-15502
17-15529
17-15802
17-16741
17-17944
17-18180
18-01890
 
Radiation Work Permits/ALARA Reviews
Number
Title
RWP 2017-9-1016
RMC Operations and Routine Tasks
RWP 2018-1-1523
Temporary Mat Insulation Fiber Inspection
RWP 2017-3002
Reactor Destack/Restack
RWP 2017-3015
Cavity Decontamination
RWP 2017-3039
10-Year In-Service Inspection Vessel
 
Miscellaneous
Title
Date
ALARA 5-Year Plan 2015 - 2019
November 2015
1R20 Radiological Safety Summary In Perspective
November 7, 2017
2R20 Radiological Safety Summary In Perspective
May 9, 2017
3R19 Radiological Safety Summary In Perspective
November 10, 2016
Section 2RS4 : Occupational Dose Assessment
Procedures
Number
Title
Revision
75DP-0RP01
RP Program Overview
75DP-0RP06
Managing Radiological Risk
75RP-9ME23
Exposure Evaluation for Lost, Damaged, or Suspect
Dosimetry, and Anticipated EPD Dose Rate Alarm
75RP-9ME24
Dosimetry Processing, Evaluation, and Documentation
75RP-9ME25
TLD Reader Calibration and Response Check
75RP-9RP03
Bioassay Analysis
75RP-9RP05
Contamination Dose Evaluation
75RP-9RP16
Special Dosimetry
75RP-9QE21
Calibration of Self-Indicating Dosimeters
 
Procedures
Number
Title
Revision
75RP-9QE26
Operation and Verification of the Merlin Gerin Model CDM-
Calibrator


Please submit this information using the same lettering system as below. For example, all contacts and phone numbers for Inspection Procedure 71124.0 1 should be in a file/folder titled
Audits and Self-Assessments
"1- A," applicable organization charts in file/folder "
Title
1- B," etc. If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at least 30 days later than the onsite inspection dates, so the inspectors will have access to the information while writing the report.
Date
2016 Annual ALARA/Management Evaluation Report
June 23, 2017
2016 Annual Radiation Protection Program Summary Report
July 27, 2017
Condition Reports (CRs)
17-14033
17-14127
17-14527
17-15700
18-01423
Self-Reading Dosimeter Calibration Records
Number
Title
Date
837097
Self-Reading Dosimeter
September 8, 2017
836204
Self-Reading Dosimeter
September 9, 2017
833059
Self-Reading Dosimeter
September 30, 2017
810641
Self-Reading Dosimeter gamma/neutron
December 12, 2017
810633
Self-Reading Dosimeter gamma/neutron
December 12, 2017
810552
Self-Reading Dosimeter gamma/neutron
December 13, 2017
Miscellaneous
Number
Title
Date
2017
Multi-Pack TLD Results
2017
100536
NVLAP Accreditation Report
April 8, 2016
100536
NVLAP Proficiency Testing Results - TLD
May 2, 2016
100536
NVLAP Proficiency Testing Results-EPD
August 5, 2016
100536
NVLAP Accreditation Report
February 15, 2018
2017
Unit 1 Dry Active Waste
December 1, 2017
2017
Unit 2 Dry Active Waste
May 18, 2017
2016
Unit 3 Dry Active Waste
December 22, 2016
25116
Intake Dose Assessment
April 21, 2016


In addition to the corrective action document lists provided for each inspection procedure listed below, please provide updated lists of corrective action documents at the entrance meeting. The dates for these lists should range from the end dates of the original lists to the day of the entrance meeting.
Miscellaneous
Number
Title
Date
47194
Personnel Dosimetry Processing Report
November 15, 2017
Section 4OA1: Performance Indicator Verification
Miscellaneous
Number
Title
Date
2016-002-01
Licensee Event Report
June 27, 2017
2017-001-00
June 27, 2017
June 14, 2017
Palo Verde Plant Computer PI ProcessBook


If more than one inspection procedure is to be conducted and the information requests appear to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which file the information can be found.
Palo Verde Control Room Logs (1/1/17 - 12/31/17)


If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or louis.carson@nrc.gov
Section 4OA2: Problem Identification and Resolution
. PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150
Procedures
-0011.
Number
Title
Revision
40ST-9DG01
Diesel Generator A Test


A2-2 2. Occupational ALARA Planning and Controls (71124.02)
Condition Reports (CRs)
Date of Last Inspection:
17-15901
October 20, 2017 A. List of contacts and telephone numbers for ALARA program personnel B. Applicable organization charts C. Copies of audits, self
18-03517
-assessments, and LERs, written since date of last inspection
17-15838
, focusing on ALARA D. Procedure index for ALARA Program E. Please provide specific procedures related to the following areas noted below. Additional Specific Procedures may be requested by number after the inspector reviews the procedure indexes.
17-11155
17-09750
16-03783


1. ALARA Program 2. ALARA Committee 3. Radiation Work Permit Preparation F. A summary list of corrective action documents (including corporate and sub
Section 4OA3: Follow-up of Events and Notices of Enforcement Discretion
-tiered systems) written since date of last inspection, related to the ALARA program. In addition to ALARA, the summary should also address Radiation Work Permit violations, Electronic Dosimeter Alarms, and RWP Dose Estimates NOTE: The lists should indicate the significance level of each issue and the search criteria used. Please provide in document formats which are "searchable" so that the inspector can perform word searches.
Condition Reports (CRs)
18-02544
18-02688
18-02664
18-02605
18-02716


G. List of work activities greater than 1 rem, since date of last inspection, Include original dose estimate and actual dose.
The following items are requested for the
Occupational Radiation Safety Inspection
at Palo Verde Nuclear Generating Station, Units 1, 2, and 3
February 12 to 16, 2018
Integrated Report 2018001
Inspection areas are listed in the attachments below.
Please provide the requested information on or before January 26, 2018.
Please submit this information using the same lettering system as below. For example, all
contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled
1-A, applicable organization charts in file/folder 1-B, etc.
If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at
least 30 days later than the onsite inspection dates, so the inspectors will have access to the
information while writing the report.
In addition to the corrective action document lists provided for each inspection procedure listed
below, please provide updated lists of corrective action documents at the entrance meeting.
The dates for these lists should range from the end dates of the original lists to the day of the
entrance meeting.
If more than one inspection procedure is to be conducted and the information requests appear
to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which
file the information can be found.
If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or
louis.carson@nrc.gov.  


H. Site dose totals and 3
PAPERWORK REDUCTION ACT STATEMENT
-year rolling averages for the past 3 years (based on dose of record) I. Outline of source term reduction strategy J. If available, provide a copy of the ALARA outage report for the most recently completed outages for each unit K. Please provide your most recent Annual ALARA Report.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget,
control number 3150-0011.  


A2-3 4. Occupational Dose Assessment (Inspection Procedure 71124.04)
2.
Occupational ALARA Planning and Controls (71124.02)
Date of Last Inspection:
Date of Last Inspection:
January 22, 2016 A. List of contacts and telephone numbers for the following areas:
October 20, 2017
1. Dose Assessment personnel B. Applicable organization charts C. Audits, self
A.
-assessments, vendor or NUPIC audits of contractor support, and LERs written since date of last inspection, related to:
List of contacts and telephone numbers for ALARA program personnel
1. Occupational Dose Assessment D. Procedure indexes for the following areas:
B.
1. Occupational Dose Assessment E. Please provide specific procedures related to the following areas noted below. Additional Specific Procedures will be requested by number after the inspector reviews the procedure indexes.
Applicable organization charts
C.
Copies of audits, self-assessments, and LERs, written since date of last inspection,
focusing on ALARA
D.
Procedure index for ALARA Program
E.
Please provide specific procedures related to the following areas noted below.
Additional Specific Procedures may be requested by number after the inspector reviews
the procedure indexes.
1. ALARA Program
2. ALARA Committee
3. Radiation Work Permit Preparation
F.
A summary list of corrective action documents (including corporate and sub-tiered
systems) written since date of last inspection, related to the ALARA program. In addition
to ALARA, the summary should also address Radiation Work Permit violations,
Electronic Dosimeter Alarms, and RWP Dose Estimates
NOTE: The lists should indicate the significance level of each issue and the search
criteria used. Please provide in document formats which are searchable so that
the inspector can perform word searches.
G.
List of work activities greater than 1 rem, since date of last inspection,
Include original dose estimate and actual dose.
H.
Site dose totals and 3-year rolling averages for the past 3 years (based on dose of
record)
I.
Outline of source term reduction strategy
J.
If available, provide a copy of the ALARA outage report for the most recently completed
outages for each unit
K.
Please provide your most recent Annual ALARA Report.  


1. Radiation Protection Program 2. Radiation Protection Conduct of Operations 3. Personnel Dosimetry Program 4. Radiological Posting and Warning Devices 5. Air Sample Analysis 6. Performance of High Exposure Work 7. Declared Pregnant Worker 8. Bioassay Program F. List of corrective action documents (including corporate and sub
4. Occupational Dose Assessment (Inspection Procedure 71124.04)
-tiered systems) written since date of last inspection, associated with:
Date of Last Inspection:
January 22, 2016
A.
List of contacts and telephone numbers for the following areas:
1. Dose Assessment personnel
B.
Applicable organization charts
C.
Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs
written since date of last inspection, related to:
1. Occupational Dose Assessment
D.
Procedure indexes for the following areas:
1. Occupational Dose Assessment
E.
Please provide specific procedures related to the following areas noted below.
Additional Specific Procedures will be requested by number after the inspector reviews
the procedure indexes.
1. Radiation Protection Program
2. Radiation Protection Conduct of Operations
3. Personnel Dosimetry Program
4. Radiological Posting and Warning Devices
5. Air Sample Analysis
6. Performance of High Exposure Work
7. Declared Pregnant Worker
8. Bioassay Program
F.
List of corrective action documents (including corporate and sub-tiered systems) written
since date of last inspection, associated with:
1. National Voluntary Laboratory Accreditation Program (NVLAP)
1. National Voluntary Laboratory Accreditation Program (NVLAP)
2. Dosimetry (TLD/OSL, etc.) problems 3. Electronic alarming dosimeters 4. Bioassays or internally deposited radionuclides or internal dose 5. Neutron dose NOTE: The lists should indicate the significance level of each issue and the search criteria used. Please provide in document formats which are "searchable" so that the inspector can perform word searches.
2. Dosimetry (TLD/OSL, etc.) problems
3. Electronic alarming dosimeters
4. Bioassays or internally deposited radionuclides or internal dose
5. Neutron dose
NOTE: The lists should indicate the significance level of each issue and the search
criteria used. Please provide in document formats which are searchable so that
the inspector can perform word searches.
G.
List of positive whole body counts since date of last inspection, names redacted if
desired
H.
Part 61 analyses/scaling factors
I.
The most recent National Voluntary Laboratory Accreditation Program (NVLAP)
accreditation report or, if dosimetry is provided by a vendor, the vendors most recent
results
ML18127A004
SUNSI Review:
ADAMS:
Non-Publicly Available
Non-Sensitive
Keyword:
By: JDixon
Yes No
Publicly Available
Sensitive
NRC-002
OFFICE
DRP/SRI
DRP/RI
DRP/RI
C:DRS/EB1
C:DRS/EB2
C:DRS/OB
NAME
CPeabody
DReinert
DYou
TFarnholtz
JDrake
VGaddy
SIGNATURE
/RA/
/RA/
/RA/
/RA/
/RA/
/RA/
DATE
4/30/18
5/1/2018
5/1/18
04/30/2018
4/30/18
4/30/18
OFFICE
C:DRS/PS2
TL:IPAT
C:DRP/D
 
NAME
HGepford
GGeorge
GMiller


G. List of positive whole body counts since date of last inspection, names redacted if desired H. Part 61 analyses/scaling factors I. The most recent National Voluntary Laboratory Accreditation Program (NVLAP) accreditation report or, if dosimetry is provided by a vendor, the vendor's most recent results
SIGNATURE
/RA/
/RA/
/RA/  


ML18127A004 SUNSI Review:
DATE
ADAMS: Non-Publicly Available Non-Sensitive Keyword:
4/30/18
By: JDixon Yes No Publicly Available Sensitive NRC-002 OFFICE DRP/SRI DRP/RI DRP/RI C:DRS/EB1 C:DRS/EB2 C:DRS/OB NAME CPeabody DReinert DYou TFarnholtz JDrake VGaddy SIGNATURE
4/30/2018
/RA/ /RA/ /RA/ /RA/ /RA/ /RA/ DATE 4/30/18 5/1/2018 5/1/18 04/30/2018 4/30/18 4/30/18 OFFICE C:DRS/PS2 TL:IPAT C:DRP/D NAME HGepford GGeorge GMiller SIGNATURE
5/7/18  
/RA/ /RA/ /RA/ DATE 4/30/18 4/30/2018 5/7/18 May 7, 2018 Mr. Robert Bement Executive Vice President, Nuclear/CNO Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072
-2034


SUBJECT: PALO VERDE NUCLEAR GENERATING STATION
May 7, 2018
- NRC INTEGRATED INSPECTION REPORT 05000528/2018001, 05000529/2018001, AND 05000530/2018001


==Dear Mr. Bement:==
Mr. Robert Bement
On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Palo Verde Nuclear Generating Station Units 1, 2, and 3. On April 11, 2018, the NRC inspectors discussed the results of this inspection with Mr. Jack Cadogan and other members of your staff. The results of this inspection are documented in the enclosed report.
Executive Vice President, Nuclear/CNO
Mail Station 7602
Arizona Public Service Company
P.O. Box 52034
Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION - NRC INTEGRATED
INSPECTION REPORT 05000528/2018001, 05000529/2018001, AND
05000530/2018001
Dear Mr. Bement:
On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection
at your Palo Verde Nuclear Generating Station Units 1, 2, and 3. On April 11, 2018, the NRC
inspectors discussed the results of this inspection with Mr. Jack Cadogan and other members of
your staff. The results of this inspection are documented in the enclosed report.
NRC inspectors documented one finding of very low safety significance (Green) in this report.
This finding involved a violation of NRC requirements. The NRC is treating this violation as a
non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violation or significance of the NCV, you should provide a response within
days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with
copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the
NRC resident inspector at the Palo Verde Nuclear Generating Station.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a
response within 30 days of the date of this inspection report, with the basis for your
disagreement, to the
: [[contact::U.S. Nuclear Regulatory Commission]], ATTN: Document Control Desk,
Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the
NRC resident inspector at the Palo Verde Nuclear Generating Station.
 
R. Bement
 
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for
Withholding.
 
Sincerely,
/RA/
 
Geoffrey
: [[contact::B. Miller]], Chief
Project Branch D
Division of Reactor Projects
Docket Nos. 50-528, 50-529, 50-530
License Nos. NPF-41, NPF-51, NPF-74
Enclosure:
Inspection Report 05000528/2018001,
05000529/2018001, 05000530/2018001
w/ Attachment:
1. Supplemental Information
2. Occupational Radiation Safety
Inspection Item Request
 
U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report


NRC inspectors documented one finding of very low safety significance (Green) in this report. This finding involved a violation of NRC requirements
Docket Numbers:
. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S.
05000528, 05000529, 05000530


Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555
License Numbers:
-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the Palo Verde Nuclear Generating Station.
NPF-41, NPF-51, NPF-74


If you disagree with a cross
Report Numbers:
-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S.
05000528/2018001, 05000529/2018001, and 05000530/2018001


Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555
Enterprise Identifier: I-2018-001-0013
-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the Palo Verde Nuclear Generating Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.ht ml and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."


Sincerely,/RA/ Geoffrey B. Miller, Chief Project Branch D Division of Reactor Projects Docket Nos. 50
Licensee:
-528, 50-529, 50-530 License Nos. NPF
Arizona Public Service Company
-41, NPF-51, NPF-74


===Enclosure:===
Facility:
Inspection Report 05000528/2018001, 05000529/2018001, 05000530/2018001 w/
Palo Verde Nuclear Generating Station


===Attachment:===
Location:
1. Supplemental Information 2. Occupational Radiation Safety Inspection Item Request
5801 South Wintersburg Road, Tonopah, AZ 85354


Enclosure U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Numbers: 05000528, 05000529, 05000530 License Numbers: NPF-41, NPF-51, NPF-74 Report Numbers: 05000528/2018001, 05000529/2018001, and 05000530/2018001 Enterprise Identifier:
Inspection Dates:
I-2018-001-0013 Licensee:
January 1, 2018 to March 31, 2018  
Arizona Public Service Company Facility:
Palo Verde Nuclear Generating Station Location:
5801 South Wintersburg Road
, Tonopah, AZ 85354 Inspection Dates:
January 1, 2018 to March 31, 2018 Inspectors:
C. Peabody, Senior Resident Inspector D. Reinert, PhD, Resident Inspector D. You, Resident Inspector L. Carson, Senior Health Physicist S. Hedger, Emergency Preparedness Inspector Approved By:
Geoffrey B. Miller, Chief, Project Branch D, Division of Reactor Projects


2 SUMMARY The U.S. Nuclear Regulatory Commission (
Inspectors:
NRC) continued monitoring the licensee's performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station, Units 1, 2, and 3, in accordance with the Reactor Oversight Process.
: [[contact::C. Peabody]], Senior Resident Inspector
: [[contact::D. Reinert]], PhD, Resident Inspector
: [[contact::D. You]], Resident Inspector
: [[contact::L. Carson]], Senior Health Physicist
: [[contact::S. Hedger]], Emergency Preparedness Inspector


The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self
Approved By:
-revealed findings, violations, and additional items are summarized in the table below. List of Findings and Violations Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone Significance Cross-cutting Aspect Report Section Mitigating Systems Green NCV 05000528/2018001
Geoffrey
-01 Closed [H.12] - Human Performance, Avoid Complacency 71111.12
: [[contact::B. Miller]], Chief, Project Branch D, Division of Reactor Projects
- Maintenance Effectiveness The inspectors reviewed a self
-revealed, Green, non
-cited violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A. Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post
-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.


3 PLANT STATUS Unit 1 began the inspection period at rated thermal power. On February 15, 2018, the unit automatically tripped from full power when a control system failure caused a loss of generator field excitation. The unit was restarted on February 19, 2018
SUMMARY
, and remained at or near rated thermal power for the remainder of the inspection period.
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees
performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station,
Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight
Process is the NRCs program for overseeing the safe operation of commercial nuclear power
reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
NRC and self-revealed findings, violations, and additional items are summarized in the table
below.
List of Findings and Violations
Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump
Cornerstone
Significance
Cross-cutting Aspect Report
Section
Mitigating
Systems
Green
NCV 05000528/2018001-01
Closed
[H.12] - Human
Performance, Avoid
Complacency
71111.12 -
Maintenance
Effectiveness
The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50,
Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe
appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A.
Specifically, following power cable maintenance on November 9, 2017, the instructions for
conducting a post-maintenance test for the transfer pump were inadequate to detect a high
resistance connection in the associated motor control center.  


PLANT STATUS
Unit 1 began the inspection period at rated thermal power. On February 15, 2018, the unit
automatically tripped from full power when a control system failure caused a loss of generator
field excitation. The unit was restarted on February 19, 2018, and remained at or near rated
thermal power for the remainder of the inspection period.
Units 2 and 3 operated at or near rated thermal power for the entire inspection period.
Units 2 and 3 operated at or near rated thermal power for the entire inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared
complete when the IP requirements most appropriate to the inspection activity were met
consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection
Program - Operations Phase. The inspectors performed plant status activities described in
IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem
Identification and Resolution. The inspectors reviewed selected procedures and records,
observed activities, and interviewed personnel to assess licensee performance and compliance
with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.04 - Equipment Alignment
Partial Walkdown (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following
systems/trains:
(1) Unit 1 containment spray system B on January 4, 2018
(2) Unit 2 auxiliary feedwater system A on January 30, 2018
(3) Unit 3 control building heating ventilation and air conditioning B on March 16, 2018
Complete Walkdown (1 Sample)
The inspectors evaluated system configurations during a complete walkdown of the Unit 3
containment spray system on January 18, 2018.
71111.05AQ - Fire Protection Annual/Quarterly
Quarterly Inspection (5 Samples)
The inspectors evaluated fire protection program implementation in the following selected
areas:
(1) Unit 3 main turbine operating deck and bearings area, Fire Zones 9 and 10, on
January 4, 2018
(2) Unit 2 control room, Fire Zone 17, on January 19, 2018
(3) Unit 2 containment spray pump A room and adjacent corridor, Fire Zones 30A and 88A,
on January 23, 2018
(4) Unit 1 high pressure safety injection pump B room, Fire Zone 31B on February 2, 2018
(5) Unit 3 vital switchgear room A, Fire Zone 5A, on February 8, 2018
71111.07 - Heat Sink Performance
Heat Sink (1 Sample)
The inspectors evaluated Unit 1 diesel generator A lube oil and jacket water heat exchanger
performance on February 21, 2018.
71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance
Operator Requalification (1 Sample)
The inspectors observed and evaluated risk informed completion time program and
CFR 50.69 program classroom training on January 31, 2018.
Operator Performance (1 Sample)
The inspectors observed and evaluated operator performance synchronizing the Unit 1 main
generator to the grid following a reactor trip caused by a fault in the main generator
excitation system on February 19, 2018.
The inspectors observed and evaluated operator response to Unit 3 loss of A channel
indication for main steam and feedwater isolation valves, MSIV-170, 171, 180, 181, and
FWIV-174, 177, on February 27, 2018.
71111.12 - Maintenance Effectiveness
Routine Maintenance Effectiveness (2 Samples)
The inspectors evaluated the effectiveness of routine maintenance activities associated
with the following equipment and/or safety significant functions:
(1) Reach rod operator gear box maintenance on safety injection valves SI-184 and SI-185
in Units 2 and 3
(2) Diesel fuel oil transfer pump predictive engineering cable testing
71111.13 - Maintenance Risk Assessments and Emergent Work Control (5 Samples)
The inspectors evaluated the risk assessments for the following planned and emergent
work activities:
(1) Unit 1 elevated risk due to failure of emergency core cooling system A combined
minimum flow recirculation valve SIA-UV660 on January 4, 2018


INSPECTION SCOPE S Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading
(2) Unit 1 emergent risk due to diesel generator A unexpectedly shutdown during a
-rm/doc-collections/insp
surveillance run on January 5, 2018
-manual/inspection
(3) Unit 3 elevated risk due to planned maintenance on containment spray pump A
-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, "Light
atmospheric dump valves SG-179A and SG-184A, and low pressure safety injection
-Water Reactor Inspection Program - Operations Phase." The inspectors performed plant status activities described in IMC 2515 Appendix D, "Plant Status" and conducted routine reviews using IP 71152, "Problem Identification and Resolution." The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
valve SI-687 January 29, 2018 through February 4, 2018
(4) Unit 1 elevated risk due to diesel generator A super outage on February 26, 2018
(5) Unit 2 elevated risk due to diesel generator B super outage on March 19, 2018
71111.15 - Operability Determinations and Functionality Assessments (9 Samples)
The inspectors evaluated the following operability determinations and functionality
assessments:
(1) Unit 2 abnormal trend for containment sump level transmitter, RDL-411, on
January 3, 2018
(2) Unit 1 essential spray pond A pressure relief valves lifting during pump starts on
January 25, 2018
(3) Unit 3 containment spray discharge to shutdown cooling heat exchanger valve, SI-685,
failed to re-open during breaker maintenance on January 31, 2018
(4) Unit 1 diesel generator B fuel oil leak from cylinder 8L fuel oil jerk pump on
February 13, 2018
(5) Unit 1 calculated qualified life of safety injection combined header isolation valves,
SI-660 and SI-659, on February 23, 2018
(6) Unit 3 loss of indication of the train A main steam isolation valves and feedwater
isolation valves (MSIV-170, 171, 180, 181 and FWIV-174, 177) on February 27, 2018
(7) Unit 1 auxiliary feedwater bypass motor operated valves SG-138A and SG-139A
T-drains on March 6, 2018
(8) Unit 1 essential cooling water pump A oil samples appear to contain metal or debris on
March 7, 2018
(9) Unit 2 steam generator sodium concentration increase on March 12, 2018
71111.18 - Plant Modifications (1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
(1) Unit 1 480V electrical breaker for containment spray to low pressure safety cross-
connect valve, SI-696, replacement with General Electrical model Spectra breaker per
Design Equivalent Change 01035 on March 15, 2018


REACTOR SAFETY 71111.04
71111.19 - Post Maintenance Testing (6 Samples)
- Equipment Alignment Partial Walkdown (3 Samples) The inspectors evaluated system configuration s during partial walkdowns of the following systems/trains
The inspectors evaluated the following post maintenance tests:
: (1) Unit 1 containment spray system B on January 4, 2018 (2) Unit 2 auxiliary feedwater system A on January 30, 2018 (3) Unit 3 control building heating ventilation and air conditioning B on March 16, 2018 Complete Walkdown (1 Sample) The inspectors evaluated system configuration s during a complete walkdown of the Unit 3 containment spray system on January 18, 2018.
(1) Unit 1 emergency core cooling system A combined minimum flow recirculation valve
SIA-UV660 following limit switch adjustment on January 4, 2018  
(2) Unit 1 diesel generator A cooldown relay, power supply, and test hand switch
replacement following an unplanned cooldown during a monthly surveillance run on
January 9, 2018  
(3) Unit 3 containment spray pump A test following breaker maintenance on
February 6, 2018
(4) Unit 3 30-volt power supply replacement for lost indication to main steam isolation valves
on February 28, 2018
(5) Unit 2 essential cooling water pump A test and flow balance following planned
maintenance to calibrate motor overcurrent relays and replace a high discharge
pressure switch on March 20, 2018
(6) Unit 2 diesel generator A emergency mode simulated engineered safeguards features
fast start test following online maintenance outage on March 23, 2018
71111.20 - Refueling and Other Outage Activities (1 Sample)
The inspectors evaluated activities from February 15 - 19, 2018, for the Unit 1 forced
outage due to an unplanned reactor trip caused by a fault in the main generator excitation
circuitry.
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Routine (6 Samples)
(1) Unit 1 diesel fuel oil transfer pump A inservice test on January 24, 2018
(2) Unit 1 atmospheric dump valve 178 stroke time testing on February 9, 2018
(3) Unit 2 containment leakage type B and C testing, SR 3.0.3 entry for missed
surveillance on February 28, 2018
(4) Unit 3 diesel fuel oil transfer pump A inservice test on March 7, 2018
(5) Unit 3, essential chiller A vibration analysis on March 8, 2018
(6) Unit 1 containment spray pump B inservice test on March 22, 2018
In-service (1 Sample)
(1) Unit 2 containment spray pump A inservice test on March 1, 2018  


71111.05AQ
71114.02 - Alert and Notification System Testing (1 Sample)
- Fire Protection Annual/Quarterly Quarterly Inspection (5 Samples) The inspectors evaluated fire protection program implementation in the following selected areas: (1) Unit 3 main turbine operating deck and bearings area, Fire Zones 9 and 10, on January 4, 2018 4 (2) Unit 2 control room, Fire Zone 17
The inspectors evaluated the maintenance and testing of the alert and notification system
, on January 19, 2018 (3) Unit 2 containment spray pump A room and adjacent corridor, Fire Zones 30A and 88A
between May 1, 2016 - February 20, 2018.
, on January 23, 2018 (4) Unit 1 high pressure safety injection pump B room, Fire Zone 31B on February 2, 2018 (5) Unit 3 vital switchgear room A, Fire Zone 5A
71114.03 - Emergency Response Organization Staffing and Augmentation System (1 Sample)
, on February 8, 2018 71111.07
The inspectors evaluated the readiness of the Emergency Response Organization between
- Heat Sink Performance Heat Sink (1 Sample
May 1, 2016 - February 20, 2018. Inspectors also evaluated the licensees ability to staff
) The inspectors evaluated Unit 1 diesel generator A lube oil and jacket water heat exchanger performance on February 21, 2018.
their emergency response facilities in accordance with emergency plan commitments.
71114.04 - Emergency Action Level and Emergency Plan Changes (1 Sample)
The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and
practices between May 1, 2016 - February 20, 2018. The evaluation reviewed
screenings and evaluations documenting the implementation of this process. The review
of the change process documentation does not constitute NRC approval.
71114.05 - Maintenance of Emergency Preparedness (1 Sample)
The inspectors evaluated the maintenance of the emergency preparedness program
between May 1, 2016 - February 20, 2018. The evaluation reviewed activations of the
emergency plan, the conduct of drills and exercises, licensee audits and assessments,
and the maintenance of equipment important to emergency preparedness.
71114.06 - Drill Evaluation
Emergency Planning Drill (1 Sample)
The inspectors evaluated a full-scale emergency preparedness drill on February 13, 2018.
RADIATION SAFETY
71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls
Radiological Work Planning (1 Sample)
The inspectors evaluated the licensees radiological work planning by reviewing the
following activities:
(1) RWP 2017-9-1016, RMC Operations and Routine Tasks
(2) RWP 2018-1-1523, Temporary Mat Insulation Fiber Inspection
(3) RWP 2017-3002, Reactor Destack/Restack
(4) RWP 2017-3015, Cavity Decontamination
(5) RWP 2017-3039, 10-Year In-Service Inspection Vessel


71111.11
Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)
- Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification (1 Sample) The inspectors observed and evaluated risk informed completion time program and 10 CFR 50.69 program classroom training on January 31, 2018
The inspectors evaluated dose estimates and exposure tracking.
. Operator Performance (1 Sample) The inspectors observed and evaluated operator performance synchronizing the Unit 1 main generator to the grid following a reactor trip caused by a fault in the main generator excitation system on February 19, 2018.
71124.04 - Occupational Dose Assessment
Source Term Characterization (1 Sample)
The inspectors evaluated the licensees source term characterization.
External Dosimetry (1 Sample)
The inspectors evaluated the licensees external dosimetry program.
Internal Dosimetry (1 Sample)
The inspectors evaluated the licensees internal dosimetry program.
Special Dosimetric Situations (1 Sample)
The inspectors evaluated the licensees performance for special dosimetric situations.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification (15 Samples)
The inspectors verified licensee performance indicators submittals listed below:
(1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (January 1, 2017 -
December 31, 2017)
(2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (January 1, 2017 -
December 31, 2017)
(3) IE04: Unplanned Scrams with Complications (USwC) Sample (January 1, 2017 -
December 31, 2017)
(4) MS05: Safety System Functional Failures (SSFFs) Sample (April 1, 2017 -
December 31, 2017)
(5) EP01: Drill/Exercise Performance (DEP) Sample (January 1, 2017 - December 31,
2017)
(6) EP02: Emergency Response Organization (ERO) Drill Participation Sample (January 1,
2017 - December 31, 2017)
(7) EP03: Alert and Notification System (ANS) Reliability Sample (January 1, 2017 -
December 31, 2017)


The inspectors observed and evaluated operator response to Unit 3 loss of A channel indication for main steam and feedwater isolation valves, MSIV-170, 171, 180, 181
71152 - Problem Identification and Resolution
, and FWIV-174, 177, on February 27, 2018
Annual Follow-up of Selected Issues (1 Sample)
. 71111.12
The inspectors reviewed the licensees implementation of its corrective action program
- Maintenance Effectiveness Routine Maintenance Effectiveness (2 Samples) The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
related to the following issues:  
(1) Reach rod operator gear box maintenance on safety injection valves SI
(1) Multiple failures of diesel generator underfrequency protective relay on March 26, 2018
-184 and SI
71153 - Follow-up of Events and Notices of Enforcement Discretion
-185 in Units 2 and 3 (2) Diesel fuel oil transfer pump predictive engineering cable testing 71111.13
Events (1 Sample)
- Maintenance Risk Assessments and Emergent Work Control (5 Samples) The inspectors evaluated the risk assessments for the following planned and emergent work activities:
The inspectors evaluated the Unit 1 reactor trip following a loss of main generator excitation
(1) Unit 1 elevated risk due to failure of emergency core cooling system A combined minimum flow recirculation valve SIA
and licensees response on February 15 - 16, 2018.
-UV660 on January 4, 201 8
INSPECTION RESULTS
5 (2) Unit 1 emergent risk due to diesel generator A unexpectedly shutdown during a surveillance run on January 5, 2018 (3) Unit 3 elevated risk due to planned maintenance on containment spray pump A atmospheric dump valves SG-179A and SG
Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump
-184A, and low pressure safety injection valve SI-687 January 29, 2018 through February 4, 2018 (4) Unit 1 elevated risk due to diesel generator A super outage on February 26, 2018 (5) Unit 2 elevated risk due to diesel generator B super outage on March 19, 2018 71111.15
Cornerstone
- Operability Determinations and Functionality Assessments (9 Samples) The inspectors evaluated the following operability determinations and functionality assessments:
Significance
(1) Unit 2 abnormal trend for containment sump level transmitter, RDL
Cross-cutting
-411, on January 3, 2018 (2) Unit 1 essential spray pond A pressure relief valves lifting during pump starts on January 25, 2018 (3) Unit 3 containment spray discharge to shutdown cooling heat exchanger valve, SI
Aspect
-685, failed to re
Report
-open during breaker maintenance on January 31, 2018 (4) Unit 1 diesel generator B fuel oil leak from cylinder 8L fuel oil jerk pump on February 13, 2018 (5) Unit 1 calculated qualified life of safety injection combined header isolation valves, SI-660 and SI
Section
-659, on February 23, 2018 (6) Unit 3 loss of indication of the train A main steam isolation valves and feedwater isolation valves (MSIV-170, 171, 180, 181 and FWIV
Mitigating
-174, 177)
Systems
on February 27, 2018 (7) Unit 1 auxiliary feedwater bypass motor operated valves SG
Green
-138A and SG
NCV 05000528/2018001-01
-139A T-drains on March 6, 2018 (8) Unit 1 essential cooling water pump A oil samples appear to contain metal or debris on March 7, 2018 (9) Unit 2 steam generator sodium concentration increase on March 12, 2018 71111.18
Closed
- Plant Modifications (1 Sample
[H.12] -
) The inspectors evaluated the following temporary or permanent modifications:
Human
(1) Unit 1 480V electrical breaker for containment spray to low pressure safety cross
Performance,
-connect valve, SI
Avoid
-696, replacement with General Electrical model Spectra breaker per Design Equivalent Change 01035 on March 15, 2018
Complacency
71111.12 -
Maintenance
Effectiveness
The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50,
Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe
appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A.
Specifically, following power cable maintenance on November 9, 2017, the instructions for
conducting a post-maintenance test for the transfer pump were inadequate to detect a high
resistance connection in the associated motor control center.
Description: On November 12, 2017, the licensee was conducting a 24-hour surveillance test
run of Unit 1 diesel generator (EDG) A. The EDG was fully loaded at 10:19 a.m. which began
the 24-hour test period. At 10:53 a.m., control room operators received a fuel oil transfer
pump A inoperable equipment status alarm. The diesel fuel oil transfer pump A did not start
on a diesel fuel oil day tank low level signal. Operators manually unloaded and stopped the
EDG a few minutes later and declared the Unit 1 EDG A inoperable due to its inability to run
for its design basis mission time and began troubleshooting the failed fuel oil transfer pump.
Licensee electricians took electrical resistance readings across the connections in the motor
control center for the fuel oil transfer pump breaker. The electricians identified that the direct
cause of the transfer pump failure was a high variable resistance secondary stab connection
in the motor control center cubicle. The electricians removed the breaker and cleaned and
adjusted the connection. Electricians reinstalled the breaker and confirmed an acceptable as
left connection resistance of less than 0.2 ohms. The diesel fuel oil transfer pump was
successfully retested with a 20 minute functional run and the Unit 1 EDG A was declared
operable following the successful completion of the 24-hour surveillance run on November
14, 2017.


6 71111.19
The licensees apparent cause investigation determined that the diesel fuel oil transfer pump
- Post Maintenance Testing (6 Samples) The inspectors evaluated the following post maintenance tests: (1) Unit 1 emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 following limit switch adjustment on January 4, 2018 (2) Unit 1 diesel generator A cooldown relay, power supply, and test hand switch replacement following an unplanned cooldown during a monthly surveillance run on January 9, 2018 (3) Unit 3 containment spray pump A test following breaker maintenance on February 6, 2018 (4) Unit 3 30-volt power supply replacement for lost indication to main steam isolation valves on February 28, 2018 (5) Unit 2 essential cooling water pum p A test and flow balance following planned maintenance to calibrate motor overcurrent relays and replace a high discharge pressure switch on March 20, 2018 (6) Unit 2 diesel generator A emergency mode simulated engineered safeguards features fast start test following online maintenance outage on March 23, 2018 71111.20
breaker had been removed from service for periodic predictive maintenance on November 9,
- Refueling and Other Outage Activities (1 Sample) The inspectors evaluated activities from February 15
2017, under work order 4685719. During this maintenance activity licensee engineers
- 19, 2018, for the Unit 1 forced outage due to an unplanned reactor trip caused by a fault in the main generator excitation circuitry.
disconnected the diesel fuel oil transfer pump motor power and control cables for megger
testing. Cable lug screw connections attach each of these cables to the secondary stab
connections on the movable motor breaker and the stationary motor control center chassis.
Cable connections on the secondary stab connections are removed for testing, and then
following testing, the cables are re-landed onto the secondary stabs of the breaker and motor
control center chassis. The licensees work planners had not recognized the possibility that
removing and re-landing the cables on the lug screw connections had the potential to disturb
the motor control center secondary stab connections.
The post-maintenance test associated with the cable testing was a momentary start of the
diesel fuel oil transfer pump. The transfer pumps control switch was held in the start position
for only a few seconds. The licensees apparent cause investigation identified that
nonintrusive as-left quantitative resistance checks could have been used to assess the
integrity of the secondary stab connections. The licensee performs similar checks when
performing individual breaker cubicle preventative maintenance tasks that actively remove
and re-test the individual motor control center bucket. Such a check was the method used by
the electricians to initially diagnose the breaker failure. However, no such quantitative
resistance check was specified in the cable testing work order.
The post-maintenance test was not written in accordance with station procedure 30DP-
9WP04, Post-Maintenance Testing Development, Revision 19, Step 4.1.1, which states, in
part, that the post-maintenance test shall ensure that equipment performs its intended
function when returned to service following maintenance, that a new deficiency has not been
created, and that the equipment will function as designed for safe and reliable plant operation.
The act of de-terminating and re-terminating the diesel fuel oil transfer pump cable for testing
created new failure deficiency by disturbing electrical continuity and creating a high resistance
condition at the secondary stab connection that impacted EDG operability. The post-
maintenance test following the cable testing maintenance was not adequate to ensure that a
new deficiency had not been created.
Corrective Action: The licensee has taken corrective action to revise the work instructions for
performing future cable testing to include quantitative resistance retests when re-terminating
motor control center secondary stab connections. As an interim measure, the inspectors
confirmed that all safety-related 480V electrical breakers that have been subject to this cable
testing have performed satisfactorily during subsequent diesel generator surveillance testing.
Corrective Action Reference: Condition Report 17-16497
Performance Assessment:
Performance Deficiency: The licensees failure to prescribe appropriate retest activities
following predictive maintenance on diesel fuel oil transfer pump cables is a performance
deficiency.
Screening: The performance deficiency is more-than-minor and a finding because it is
associated with the equipment performance attribute of the mitigating systems cornerstone
objective to ensure the availability, reliability, and capability of systems that respond to
initiating events to prevent undesirable consequences. Specifically, on November 9, 2017,
the licensee performed cable testing that disturbed the power cables for the Unit 1 diesel fuel


71111.22
oil transfer pump
- Surveillance Testing The inspectors evaluated the following surveillance tests:
: [[contact::A. Without an appropriate post-maintenance test]], this activity rendered the
Routine (6 Samples) (1) Unit 1 diesel fuel oil transfer pump A inservice test on January 24, 2018 (2) Unit 1 atmospheric dump valve 178 stroke time testing on February 9, 2018 (3) Unit 2 containment leakage type "B and C" testing, SR 3.0.3 entry for missed surveillance on February 28, 2018 (4) Unit 3 diesel fuel oil transfer pump A inservice test on March 7, 2018 (5) Unit 3, essential chiller A vibration analysis on March 8, 2018 (6) Unit 1 containment spray pump B inservice test on March 22, 2018 In-service (1 Sample) (1) Unit 2 containment spray pump A inservice test on March 1, 2018
Unit 1 diesel generator A inoperable.
Significance: The inspectors performed the initial significance determination using NRC
Inspection Manual Chapter 0609, Appendix A, Significance Determination Process for
Findings at Power, Exhibit 2, Mitigating Systems Screening Questions and determined that
the finding was of very low safety significance (Green) because the finding did not represent
an actual loss of safety function of a single train for greater that its technical specification
allowed outage time.
Cross-cutting Aspect: The finding has a cross-cutting aspect in the area of human
performance associated with the avoid complacency aspect. Specifically, licensee work
planners did not consider potential undesired consequences associated with disturbing the
power cables leads, instead relying on past successful tests [H.12].
Enforcement:
Violation: Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and
Drawings, requires, in part, that activities affecting quality be prescribed by documented
instructions, procedures, or drawings, of a type appropriate to the circumstances and be
accomplished in accordance with these instructions, procedures, or drawings.
Contrary to the above, on November 9, 2017, the licensee performed maintenance on the
Unit 1 diesel fuel oil transfer pump A, an activity affecting quality to which Appendix B applies,
without documented instructions, procedures, or drawings of a type appropriate to the
circumstances. Specifically, work order 4685719 did not include appropriate testing to ensure
the maintenance was successful and the pump was returned to service, and as a result, the
Unit 1 diesel generator A was rendered inoperable from November 9, 2017 to November 14,
2017.
Disposition: This violation is being treated as a non-cited violation consistent with Section
2.3.2.a of the Enforcement Policy.


7 71114.02
EXIT MEETINGS AND DEBRIEFS
- Alert and Notification System Testing (1 Sample)
The inspectors verified no proprietary information was retained or documented in this report.
The inspectors evaluated the maintenance and testing of the alert and notification system between May 1, 2016
On February 16, 2018, the inspector presented the radiation safety inspection results to
- February 20, 2018
Ms.  
. 71114.03
: [[contact::M. Lacal]], Senior Vice President, Regulatory and Oversight, and other members of the
- Emergency Response Organization Staffing and Augmentation System (1 Sample)
licensee staff.
The inspectors evaluated the readiness of the Emergency Response Organization between May 1, 2016
On March 2, 2018, the inspector provided a debrief for the emergency preparedness program
- February 20, 2018. Inspectors also evaluated the licensee's ability to staff their emergency response facilities in accordance with emergency plan commitments.
inspection to Mr.
: [[contact::M. McLaughlin]], Vice President, Operations Support, and other members of the
licensee staff. On March 29, 2018, the inspector communicated the inspection results
telephonically to Mr.  
: [[contact::T. Weber]], Acting Director, Nuclear Regulatory Affairs, and other members
of the licensee staff.
On April 11, 2018, the inspector presented the quarterly residents inspection results to
Mr.
: [[contact::J. Cadogan]], Senior Vice President, Site Operations, and other members of the licensee
staff.  


71114.04
SUPPLEMENTAL INFORMATION
- Emergency Action Level and Emergency Plan Changes (1 Sample)
DOCUMENTS REVIEWED
The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and practices between May 1, 2016
Section 1R04: Equipment Alignment
- February 20, 2018. The evaluation reviewed screenings and evaluations documenting the implementation of this process. The review of the change process documentation does not constitute NRC approval.
Procedures
Number
Title
Revision
40ST-9AF07
Auxiliary Feedwater Pump AFA-P01 Monthly Valve
Alignment
40ST-9SI13
LPSI and CS System Alignment Verification


71114.05
Condition Reports (CRs)
- Maintenance of Emergency Preparedness (1 Sample)
16-17321
The inspectors evaluated the maintenance of the emergency preparedness program between May 1, 2016
17-03027
- February 20, 2018. The evaluation reviewed activations of the emergency plan, the conduct of drills and exercises, licensee audits and assessments, and the maintenance of equipment important to emergency preparedness.


71114.06
Drawings
- Drill Evaluation Emergency Planning Drill (1 Sample
Number
) The inspectors evaluated a full-scale emergency preparedness drill on February 13, 2018.
Title
Revision
03-M-HJP-001
P&I Diagram Control Building HVAC
03-M-HJP-002
P&I Diagram Control Building HVAC
03-M-SIP-001
P&I Diagram Safety Injection & Shutdown Cooling System
03-P-SIF-0207
Auxiliary Building Isometric Safety Injection System LPSI &
Cont. Spray Discharge
03-P-SIF-0201
Auxiliary Building Isometric Safety Injection System ESF
Pump Suction Lines


RADIATION SAFET Y 71124.02
Miscellaneous
- Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls Radiological Work Planning (1 Sample)
Number
The inspectors evaluated the licensee's radiological work planning by reviewing the following activities:
Title
(1) RWP 2017-9-1016, RMC Operations and Routine Tasks (2) RWP 2018-1-1523, Temporary Mat Insulation Fiber Inspection (3) RWP 2017-3002, Reactor Destack/Restack (4) RWP 2017-3015, Cavity Decontamination (5) RWP 2017-3039, 10-Year In-Service Inspection Vessel
Revision
STM-30D
System Training Manual Volume 30D: Control Building
HVAC System (HJ)  


8 Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)
Section 1R05: Fire Protection
The inspectors evaluated dose estimates and exposure tracking
Procedures
. 71124.04 - Occupational Dose Assessment Source Term Characterization (1 Sample) The inspectors evaluated the licensee's source term characterization
Number
. External Dosimetry (1 Sample) The inspectors evaluated the licensee's external dosimetry program. Internal Dosimetry (1 Sample) The inspectors evaluated the licensee's internal dosimetry program
Title
. Special Dosimetric Situations (1 Sample) The inspectors evaluated the licensee's performance for special dosimetric situations
Revision
. OTHER ACTIVITIES
14FT-9FP70
- BASELINE 71151 - Performance Indicator Verification (15 Samples) The inspectors verified licensee performance indicators submittals listed below: (1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (January 1, 2017
Appendix R & Former Tech Spec Penetration Seal Surveillance
- December 31, 2017) (2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (January 1, 2017
- December 31, 2017
) (3) IE04: Unplanned Scrams with Complications (USwC) Sample (January 1, 2017
- December 31, 2017
) (4) MS05: Safety System Functional Failures (SSFFs) Sample (April 1, 2017 - December 31, 2017) (5) EP01: Drill/Exercise Performance (DEP) Sample (January 1, 2017
- December 31, 2017) (6) EP02: Emergency Response Organization (ERO) Drill Participation Sample (January 1, 2017 - December 31, 2017
) (7) EP03: Alert and Notification System (ANS) Reliability Sample (January 1, 2017
- December 31, 2017
)
9 71152 - Problem Identification and Resolution Annual Follow
-up of Selected Issues (1 Sample) The inspectors reviewed the licensee's implementation of its corrective action program related to the following issues:
(1) Multiple failures of diesel generator underfrequency protective relay on March 26, 2018 71153 - Follow-up of Events and Notices of Enforcement Discretion Events (1 Sample) The inspectors evaluated the Unit 1 reactor trip following a loss of main generator excitation and licensee's response on February 15
- 16, 2018. INSPECTION RESULTS Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone Significance Cross-cutting Aspect Report Section Mitigating Systems Green NCV 05000528/2018001
-01 Closed [H.12] - Human Performance, Avoid Complacency 71111.12
- Maintenance Effectiveness The inspectors reviewed a self
-revealed, Green, non
-cited violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A. Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post
-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.


Description: On November 12, 2017, the licensee was conducting a 24
Condition Reports (CRs)
-hour surveillance test run of Unit 1 diesel generator (EDG) A. The EDG was fully loaded at 10:19 a.m. which began the 24-hour test period. At 10:53 a.m.
17-03870
18-00999


, control room operators received a fuel oil transfer pump A inoperable equipment status alarm. The diesel fuel oil transfer pump A did not start on a diesel fuel oil day tank low level signal. Operators manually unloaded and stopped the EDG a few minutes later and declared the Unit 1 EDG A inoperable due to its inability to run for its design basis mission time and began troubleshooting the failed fuel oil transfer pump.
Miscellaneous
Number
Title
Revision/Date
PVNGS Pre-Fire Strategies Manual
13-MM-0650
Fire Protection & Spray System Sub
007
13-MS-A083
NFPA Code Applicability and Conformance Review
007
4834415
Fire Safety Component Condition Record
November 3, 2016
4834430
Fire Safety Component Condition Record
November 3, 2016
4843902
Fire Safety Component Condition Record
December 6, 2016
Unit 3 Tamper/Vital/Security Tour - Post 31
February 7, 2018
4971714
Open Door/Hatch/Floor Plug Permit
January 29, 2018
4971687
Open Door/Hatch/Floor Plug Permit
January 29, 2018
Section 1R07: Heat Sink Performance
Procedures
Number
Title
Revision
73DP-9ZZ21
Heat Exchanger Visual Inspection
73DP-9ZZ11
Heat Exchanger Program


Licensee electricians took electrical resistance readings across the connections in the motor control center for the fuel oil transfer pump breaker. The electricians identified that the direct cause of the transfer pump failure was a high variable resistance secondary stab connection in the motor control center cubicle. The electricians removed the breaker and cleaned and adjusted the connection. Electricians reinstalled the breaker and confirmed an acceptable as left connection resistance of less than 0.2 ohms. The diesel fuel oil transfer pump was successfully retested with a 20 minute functional run and the Unit 1 EDG A was declared operable following the successful completion of the 24
Condition Reports (CRs)
-hour surveillance run on November 14, 2017.
18-03133
18-03138
18-03139


10 The licensee's apparent cause investigation determine d that the diesel fuel oil transfer pump breaker had been removed from service for periodic predictive maintenance on November 9, 2017, under work order 4685719. During this maintenance activity licensee engineers disconnected the diesel fuel oil transfer pump motor power and control cables for megger testing. Cable lug screw connections attach each of these cables to the secondary stab connections on the movable motor breaker and the stationary motor control center chassis. Cable connections on the secondary stab connections are removed for testing, and then following testing, the cables are re
Work Orders (WOs)
-landed onto the secondary stabs of the breaker and motor control center chassis. The licensee's work planners had not recognized the possibility that removing and re
4591574
-landing the cables on the lug screw connections had the potential to disturb the motor control center secondary stab connections.
4591575
4667054
4667055
4667098
Section 1R11: Licensed Operator Requalification Program and Licensed Operator
Performance
Procedures
Number
Title
Revision
40OP-9MB01
Main Generation and Excitation
40DP-9OP02
Conduct of Operations


The post-maintenance test associated with the cable testing was a momentary start of the diesel fuel oil transfer pump. The transfer pump's control switch was held in the start position for only a few seconds.
Procedures
Number
Title
Revision
40AL-9RK6A
Panel B06A Alarm Responses


The licensee's apparent cause investigation identified that nonintrusive as
Condition Reports (CRs)
-left quantitative resistance checks could have been used to assess the integrity of the secondary stab connections. The licensee performs similar checks when performing individual breaker cubicle preventative maintenance tasks that actively remove and re-test the individual motor control center bucket. Such a check was the method used by the electricians to initially diagnose the breaker failure. However, no such quantitative resistance check was specified in the cable testing work order.
18-02797
18-02593
18-03215


The post-maintenance test was not written in accordance with station procedure 30DP
Miscellaneous
-9WP04, "Post
Number
-Maintenance Testing Development,
Title
" Revision 19, Step 4.1.1
Date
, which states, in part, that the post
Current Alarm Status Report
-maintenance test shall ensure that equipment performs its intended function when returned to service following maintenance, that a new deficiency has not been created, and that the equipment will function as designed for safe and reliable plant operation. The act of de
February 16, 2018
-terminating and re-terminating the diesel fuel oil transfer pump cable for testing created new failure deficiency by disturbing electrical continuity and creating a high resistance condition at the secondary stab connection that impacted EDG operability. The post
Section 1R12: Maintenance Effectiveness
-maintenance test following the cable testing maintenance was not adequate to ensure that a new deficiency had not been created.
Procedures
Number
Title
Revision
2MT-9ZZ74
Molded Case Circuit Breaker Test
30DP-9WP04
Post-Maintenance Testing Development


Corrective Action: The licensee has taken corrective action to revise the work instructions for performing future cable testing to include quantitative resistance retests when re
Condition Reports (CRs)
-terminating motor control center secondary stab connections. As an interim measure
17-08025-005
, the inspectors confirmed that all safety
17-08025
-related 480V electrical breakers that have been subject to this cable testing have performed satisfactorily during subsequent diesel generator surveillance testing.
17-16497


Corrective Action Reference
Work Orders (WOs)
: Condition Report 17
25959
-16497 Performance Assessment
25966
: Performance Deficiency: The licensee's failure to prescribe appropriate retest activities following predictive maintenance on diesel fuel oil transfer pump cables is a performance deficiency.
25967
25969
4685719
4788985


Screening: The performance deficiency is more
Section 1R13: Maintenance Risk Assessments and Emergent Work Control
-than-minor and a finding because it is associated with the equipment performance attribute of the mitigating systems cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, on November 9, 2017, the licensee performed cable testing that disturbed the power cables for the Unit 1 diesel fuel 11 oil transfer pump A. Without an appropriate post
Procedures
-maintenance test, this activity rendered the Unit 1 diesel generator A inoperable.
Number
Title
Revision
40DP-9AP21
Protected Equipment
70DP-0RA05
Assessment and Management of Risk when Performing
Maintenance in Modes 1 and 2
40MT-9ZZ01
Operations Maintenance Activities
40DP-9RS01
Operations Department Online Nuclear Risk Management
Mode 1 and 2


Significance: The inspectors performed the initial significance determination using NRC Inspection Manual Chapter 0609, Appendix A, "Significance Determination Process for Findings at Power," Exhibit 2, "Mitigating Systems Screening Questions
Condition Reports (CRs)
" and determined that the finding was of very low safety significance (Green) because the finding did not represent an actual loss of safety function of a single train for greater that its technical specification allowed outage time.
18-00249
185-00136
18-00336
18-02544


Cross-cutting Aspect: The finding has a cross
Miscellaneous
-cutting aspect in the area of human performance associated with the avoid complacency aspect. Specifically, licensee work planners did not consider potential undesired consequences associated with disturbing the power cables leads, instead relying on past successful tests [H.12].
Number
Enforcement
Title
: Violation: Title 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," requires, in part, that activities affecting quality be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and be accomplished in accordance with these instructions, procedures, or drawings.
Date
Schedulers Evaluation for PV Unit 1
January 4, 2018
Schedulers Evaluation for PV Unit 1
February 23, 2018
Schedulers Evaluation for PV Unit 3
February 1, 2018
Schedulers Evaluation for PV Unit 2
March 19, 2018
Unit 3
Archived Operator Logs
January 29, 2018 -
February 4, 2018
Section 1R15: Operability Determinations and Functionality Assessments
Procedures
Number
Title
Revision
40ST-9ZZm1
Operations Mode 1 Surveillance Logs
40AL-9RK6A
Panel B06A Alarm Responses
74DP-9CY04
Systems Chemistry Specifications


Contrary to the above, on November 9, 2017, the licensee performed maintenance on the Unit 1 diesel fuel oil transfer pump A, an activity affecting quality to which Appendix B applies, without documented instructions, procedures, or drawings of a type appropriate to the circumstances. Specifically, work order 4685719 did not include appropriate testing to ensure the maintenance was successful and the pump was returned to service, and as a result
Condition Reports (CRs)
, the Unit 1 diesel generator A was rendered inoperable from November 9, 2017 to November 14, 2017. Disposition:
17-18475
This violation is being treated as a non
2-01397
-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.
17-17856
13-01198
18-03127
17-16393
18-03215
18-03291
18-02839
18-01610
18-02334
27427
18-02468
18-03980


EXIT MEETINGS AND DEBRIEFS The inspectors verified no proprietary information was retained or documented in this report.
Miscellaneous
Number
Title
Revision/Date
03-E-SGF-023
Control Wiring Diagram Main Steam Isolation Valves
18-02334-003
Engineering Evaluation
February 15, 2018
28056
Adverse CRDR
July 19, 2013
EQ Program Manual


On February 16, 2018, the inspector presented the radiation safety inspection results to Ms. M. Lacal, Senior Vice President, Regulatory and Oversight, and other members of the licensee staff.
Section 1R18: Plant Modifications
Condition Reports (CRs)
18-04116
 
Work Orders (WOs)
4989102
 
Miscellaneous
Number
Title
Date
DEC-01035
Design Equivalent Change
April 12, 2017
Section 1R19: Post-Maintenance Testing
Procedures
Number
Title
Revision
40OP-9CH12
Refueling Water Tank (RWT) Operations
2MT-9ZZ13
Testing and Calibration of 121FC66K01A Time Overcurrent
Relays
2MT-9ZZ17
Testing and Calibration of 12PJC11AV1A Instantaneous
Overcurrent Relays
40OP-9EW02
Essential Cooling Water System (EW) Train B
40ST-9DG01
Diesel Generator A Test
73ST-9DG08
Class 1E Diesel Generator Load Reject 24 Hour Rated Load
and Hot Start Test Train B
40ST-9DG02
Diesel Generator B Test
 
Condition Reports (CRs)
18-00136
18-00197
18-01931
18-00210
18-00290
18-00336
18-00377
18-00346
18-04731
18-04732
Work Orders (WOs)
4964492
22983
4981967
26747
21113
4847651
4965079
4972486
4847637
 
Drawings
Number
Title
Revision
01-E-DGB-007
Elementary Diagram: Diesel Engine Control
01-E-DGF-007
Control Wiring Diagram: Diesel Engine
13-M018-00141
Control Schematic (Starting Sequence Control)
 
Miscellaneous
Number
Title
Revision/Date
18-00210-004
Engineering Evaluation: EDG 1A Unexpected Cooldown
during Surveillance Run 1/5/2018
January 8, 2018
Section 1R20: Refueling and Other Outage Activities
Procedures
Number
Title
Revision
40OP-9MB01
Main Generation and Excitation
 
Section 1R22: Surveillance Testing
Procedures
Number
Title
Revision
73DP-9CL02
Containment Leakage Rate Testing Program
73ST-9XI20
Atmospheric Dump Valves - Inservice Test
73ST-9SI06
Containment Spray Pumps and Check valves - Inservice
Test
73ST-9DF01
Diesel Fuel Oil Transfer Pumps - Inservice Test
40DP-9OP06
Operations Department Repetitive Task Program
130
73ST-9SI06
Containment Spray Pumps and Check Valves-Inservice
Test
 
Condition Reports (CRs)
16-15793
18-03304
18-01314
18-03825
 
Work Orders (WOs)
22921
4840032
4843076
4843390
 
Miscellaneous
Number
Title
Revision/Date
13-JC-SI-0215
Containment Spray Pump Discharge Flow Indication
Loops Uncertainty Calculation
18-01314-002
Engineering Evaluation: ADV 178 Fast Stroke Time
January 26, 2018
18-03304-002
Engineering Evaluation: SR 3.0.3 Evaluation for
SB-200, 202, and 205
March 2, 2018
Section 1EP2: Alert and Notification System Testing
Miscellaneous Documents
Number
Title
Date
ID/Letter
Number:
240-02802
Palo Verde Nuclear Generating Station Alert and
Notification System (ANS) FEMA 350 Report -
May 2017
May 26, 2017
Palo Verde Nuclear Generating Station, Alert and
Notification System (ANS), FEMA 350 Report
May 2017
Palo Verde Nuclear Generating Station Siren Operating
Manual
November 2015
January 4, 2018
Letter from FEMA Region IX to Director, Division of
Emergency Management, State of Arizona
September 19,
2017
State of Arizona/Maricopa County Offsite Emergency
Response Plan, Palo Verde Nuclear Generating Station
November 2017
The Maricopa County Sheriffs Office Emergency
Response to Palo Verde Nuclear Generating Station
August 2016
Work Orders (WOs)
474965/0
 
Section 1EP3: Emergency Response Organization Staffing and Augmentation
Procedures
 
Number
Title
Revision
EP-0902
Notifications
EP-0901
Classifications
40AL-9RK7C
Panel B07C Alarm Responses
40AO-9ZZ21
Acts of Nature
79IS-9SM01
Analysis of Seismic Event
 
Miscellaneous Documents
Number
Title
Date
240-02799
JF/MA
2017 1st Quarter - Emergency Preparedness
Augmentation Drill Report
March 21, 2017
240-02803
CS/MA
2017 2nd Quarter - Emergency Preparedness
Augmentation Drill Report
June 6, 2017
240-02797
2017 3rd Quarter - Emergency Preparedness
Augmentation Drill Report (After Hours)
July 25, 2017
240-02808
2017 3rd Quarter - Emergency Preparedness
Augmentation Drill Report
September 6, 2017
240-02817
CS/ma
2017 4th Quarter - Emergency Preparedness
Augmentation Drill Report
December 13,
2017
240-02790
JF/MA
2016 2nd Quarter - Emergency Preparedness
Augmentation Drill Report
June 23, 2016
240-02791
JF/MA
2016 3rd Quarter - Emergency Preparedness
Augmentation Drill Report
August 3, 2016
240-02798
December 5, 2016, Alert Event Report
January 17, 2017
Section 1EP4: Emergency Action Level and Emergency Plan Changes
Procedure
 
Number
Title
Revision
16DP-0EP22
Emergency Plan Maintenance
11, 12
Miscellaneous Documents
Number
Title
Date
Evaluation
Tracking Number
2017-001E
Replace the Meteorological Instrumentation and Data
Transmission System (MDTS)
August 8, 2017
Evaluation
Tracking Number
2017-003E
EP-0900, Rev. 16
August 17, 2017
Evaluation
Tracking Number
2017-004E
EP-0901, Rev. 10
August 21, 2017
Screening
Tracking Number
2017-002S
74RM-9EF42, Radiation Monitor Alarm Setpoint
Determination, Rev. 30
April 16, 2017
Screening
Tracking Number
2017-022S
Procedure EP-0901, Classifications, Added New EALs
form EPLAN R60, Revise PV Proc Format
August 20, 2017
 
Miscellaneous Documents
Number
Title
Date
Screening
Tracking Number
2017-014S
EP-905, Revision 9, Protective Actions
June 7, 2017
Screening
Tracking Number
2017-023S
DMWO 3452940 Palo Verde Nuclear Generating
Station Radio Replacement Project
September 8,
2017
Screening
Tracking Number
2017-029S
40AO-9ZZ18 R018 Fire Outside Control Room
September 26,
2017
EPM Tracking
Number
2015-006S
DEC-00720 Allow Solar-Charged Offsite Sirens to
Replace AC-Charged Offsite Sirens
February 18,
2015
Section 1EP5: Maintenance of Emergency Preparedness
Procedures
Number
Title
Revision
01DP-0AP12
Condition Reporting Process
01DP-0AP12-01
Condition Reporting Process Administrative Guide
EP-0905
Protective Actions
EP-0902
Notifications
8, 9, 10
16DP-0EP31
Emergency Preparedness Equipment Out-of-Service
16DP-0EP27
Emergency Preparedness Equipment Testing
16DP-0EP28
Emergency Facility/Kit Inventories and Inspections
 
Condition Reports (CRs)
16-08461
16-09213
16-11134
16-11930
16-12640
16-13501
16-14593
16-14934
16-16710
17-02188
17-03147
17-03149
17-03202
17-03605
17-03721
17-03736
17-03826
17-03828
17-03829
17-03884
17-04633
17-06893
17-08328
17-10906
17-10949
17-11437
17-13663
17-14927
17-15449
17-15797
17-15884
17-16771
17-17091
17-17218
17-17739
17-18443
18-03244
 
Miscellaneous Documents
Number
Title
Revision/Date
KLD TR-983
Palo Verde Nuclear Generating Station,
2017 Population Update Analysis
December 7,
2017
KLD TR-895
Palo Verde Nuclear Generating Station,
2016 Population Update Analysis
December 8,
2016
Updated Review of Palo Verde Nuclear Generating
Station Emergency Plan 2016 Letters of Agreement
September 29,
2016
Letter # 240-
2819
2017 Review of Palo Verde Nuclear Generating Station
Emergency Plan Letters of Agreement
December 26,
2017
NAD Audit 2016-
010
Nuclear Assurance Department (NAD) Audit Plan and
Report, 2016-010, Emergency Preparedness
December 14,
2016
Palo Verde Nuclear Generating Station After Action
Report/Improvement Plan, Exercise Date - June 1,
2017, Radiological Emergency Preparedness Program
August 18,
2017
ID: 240-02806
2017 Onsite Contaminated Injury/Health Physics Drill
Report (Revised)
June 23, 2017
ID: 240-02816
2017 Health Physics Drill Report (November 2017)
December 12,
2017
ID: 240-02818
1709 ERO Mini Drill - ERO Blue Team
(December 2017)
December 21,
2017
NAD Audit 2017-
008
Nuclear Assurance Department (NAD) Audit Plan and
Report, 2017-008, Emergency Preparedness
January 25,
2018
240-02812
CS/MA
1704 and 1705 ERO Mini Drills - ERO White Team and
Green Team (June and July 2017)
October 18,
2017
240-02813
CS/MA
1706 ERO Mini Drill - ERO Gold Team (July 2017)
October 18,
2017
240-02814
TW/MA
1707 ERO Mini Drill - ERO Red Team (August 2017)
Revision 1
October 18,
2017
Emergency Response Facility Telephone Book,
1st Quarter Edition 2018
January 1,
2018
240-02801
JF/MA
1702 IPZ Evaluated Exercise - ERO White Team
(March 2017)
April 6, 2017
240-02797
JF/MA
1608 ERO Mini Drill - ERO Red Team
(December 2016)
January 4,
2017
240-02792
JF/MA
1604 and 1605 ERO Drills
September 14,
2016
240-02793
JF/MA
1606 ERO Mini Drill - ERO Green Team
(September 2016)
October 4,
2016
 
Miscellaneous Documents
Number
Title
Revision/Date
240-02795
JF/MA
1609 Off-Hours Drive-in Augmentation Drill -
(November 2016)
December 2,
2016
240-02796
2016 Health Physics Drill Report (November 2016)
December 7,
2016
Evaluation
Report 16-11134
Evaluate Adding STSC ENS Communicator Duties to
STSC Communicator
September 7,
2016
17-11437-002
Actual Event Investigation, Unit 3 Ammonia Sight glass
Break
September 28,
2017
17-13663-001
Actual Event Investigation, Unit 2 Loss of Annunciators
October 11,
2017
Level 4
Evaluation
Report 17-
15797-001
Default Values Used in Dose Assessment
November 30,
2017
Document No.
500599510
Master Agreement Between Arizona Public Service
Company and Westinghouse Electric Company LLC for
Goods and Services (Effective January 29, 2016 to
December 31, 2018)
 
Palo Verde Nuclear Generating Station After Action
Report/Improvement Plan, Exercise Dates - March 7-8,
2017, Radiological Emergency Preparedness Program
(REPP)
May 26, 2017
240-02789
JF/TW
2016 Health Physics Drill Report (Re-Demonstration)
June 9, 2016
240-02788
JF/MA
2016 Contaminated Injury/Health Physics Drill Report
April 22, 2016
Palo Verde Nuclear Generating Station After Action
Report/Improvement Plan, Exercise Date -
November 16, 2016, Radiological Emergency
Preparedness Program (REPP)
February 9,
2017
240-02787
JF/MA
1602 IPZ Exercise - ERO Green Team (March 2016)
March 25, 2016
Palo Verde Nuclear Generating Station After Action
Report/Improvement Plan, Exercise Date -
November 16, 2016, Radiological Emergency
Preparedness Program (REPP)
February 9,
2017
Level 3 Evaluation Report 18-02668-002
March 22, 2018


On March 2, 2018, the inspector provided a debrief for the emergency preparedness program inspection to Mr. M. McLaughlin, Vice President, Operations Support, and other members of the licensee staff. On March 29, 2018, the inspector communicated the inspection results telephonically to Mr. T. Weber, Acting Director, Nuclear Regulatory Affairs, and other members of the licensee staff.
Work Orders (WOs)
4782667
4783959/0
4787729/0
4787847/0
4836236
4836263/0
4860832/0
4862234/0
4862502/0
4885361/0
4889725/0
4896971/0
4901070
4916668/0
4918303/0
4918455/0
4937577/0
4947802/0


On April 11, 2018, the inspector presented the quarterly resident's inspection results to Mr. J. Cadogan, Senior Vice President, Site Operations, and other members of the licensee staff.
Section 1EP6: Drill Evaluation
Procedures
Number
Title
Revision
EP-0900
Emergency Response Organization (ERO) Position
Checklists
EP-0901
Classifications


Attachment 1 SUPPLEMENTAL INFORMATION DOCUMENTS REVIEWED Section 1R04: Equipment Alignment Procedures Number Title Revision 40ST-9AF07 Auxiliary Feedwater Pump AFA
Condition Reports (CRs)
-P01 Monthly Valve Alignment 6 40ST-9SI13 LPSI and CS System Alignment Verification 33 Condition Reports (CRs)
18-02352
16-17321 17-03027 Drawings Number Title Revision 03-M-HJP-001 P&I Diagram Control Building HVAC 14 03-M-HJP-002 P&I Diagram Control Building HVAC 14 03-M-SIP-001 P&I Diagram Safety Injection & Shutdown Cooling System 49 03-P-SIF-0207 Auxiliary Building Isometric Safety Injection System LPSI & Cont. Spray Discharge 6 03-P-SIF-0201 Auxiliary Building Isometric Safety Injection System ESF Pump Suction Lines 7 Miscellaneous Number Title Revision STM-30D System Training Manual Volume 30D: Control Building HVAC System (HJ)
18-02503
6 Section 1R05: Fire Protection Procedures Number Title Revision 14FT-9FP70 Appendix R & Former Tech Spec Penetration Seal Surveillance 13 A1-2 Condition Reports (CRs)
18-02655
17-03870 18-00999 Miscellaneous Number Title Revision/Date PVNGS Pre
-Fire Strategies Manual 26 13-MM-0650 Fire Protection & Spray System Sub 007 13-MS-A083 NFPA Code Applicability and Conformance Review 007 4834415 Fire Safety Component Condition Record November 3, 2016 4834430 Fire Safety Component Condition Record November 3, 2016 4843902 Fire Safety Component Condition Record December 6, 2016 Unit 3 Tamper/Vital/Security Tour
- Post 31 February 7, 2018 4971714 Open Door/Hatch/Floor Plug Permit January 29, 20 18 4971687 Open Door/Hatch/Floor Plug Permit January 29, 2018 Section 1R07: Heat Sink Performance Procedures Number Title Revision 73DP-9ZZ21 Heat Exchanger Visual Inspection 6 73DP-9ZZ11 Heat Exchanger Program 15 Condition Reports (CRs)
18-03133 18-03138 18-03139 Work Orders (WOs) 4591574 4591575 4667054 4667055 4667098 Section 1R11: Licensed Operator Requalification Program and Licensed Operator Performance Procedures Number Title Revision 40OP-9MB01 Main Generation and Excitation 63 40DP-9OP02 Conduct of Operations 72 A1-3 Procedures Number Title Revision 40AL-9RK6A Panel B06A Alarm Responses 18 Condition Reports (CRs)
18-02797 18-02593 18-03215 Miscellaneous Number Title Date Current Alarm Status Report February 16, 20 18 Section 1R12: Maintenance Effectiveness Procedures Number Title Revision 32MT-9ZZ74 Molded Case Circuit Breaker Test 48 30DP-9WP04 Post-Maintenance Testing Development 19 Condition Reports (CRs)
17-08025-005 17-08025 17-16497 Work Orders (WOs) 4925959 4925966 4925967 4925969 4685719 4788985 Section 1R13: Maintenance Risk Assessments and Emergent Work Control Procedures Number Title Revision 40DP-9AP21 Protected Equipment 7 70DP-0RA05 Assessment and Management of Risk when Performing Maintenance in Modes 1 and 2 23 40MT-9ZZ01 Operations Maintenance Activities 5 40DP-9RS01 Operations Department Online Nuclear Risk Management Mode 1 and 2 4
A1-4 Condition Reports (CRs)
18-00249 185-00136 18-00336 18-02544 Miscellaneous Number Title Date Scheduler's Evaluation for PV Unit 1 January 4, 2018 Scheduler's Evaluation for PV Unit 1 February 23, 2018 Scheduler's Evaluation for PV Unit 3 February 1, 2018 Scheduler's Evaluation for PV Unit 2 March 19, 2018 Unit 3 Archived Operator Logs January 29, 2018
- February 4, 2018 Section 1R15: Operability Determinations and Functionality Assessments Procedures Number Title Revision 40ST-9ZZm1 Operations Mode 1 Surveillance Logs 71 40AL-9RK6A Panel B06A Alarm Responses 18 74DP-9CY04 Systems Chemistry Specifications 94 Condition Reports (CRs)
17-18475 12-01397 17-17856 13-01198 18-03127 17-16393 18-03215 18-03291 18-02839 18-01610 18-02334 3127427 18-02468 18-03980 Miscellaneous Number Title Revision/Date 03-E-SGF-023 Control Wiring Diagram Main Steam Isolation Valves 11 18-02334-003 Engineering Evaluation February 15, 20 18 4428056 Adverse CRDR July 19, 2013 EQ Program Manual 26 A1-5 Section 1R18: Plant Modifications Condition Reports (CRs)
18-04116 Work Orders (WOs) 4989102 Miscellaneous Number Title Date DEC-01035 Design Equivalent Change April 12, 2017 Section 1R19: Post
-Maintenance Testing Procedures Number Title Revision 40OP-9CH12 Refueling Water Tank (RWT) Operations 41 32MT-9ZZ13 Testing and Calibration of 121FC66K01A Time Overcurrent Relays 4 32MT-9ZZ17 Testing and Calibration of 12PJC11AV1A Instantaneous Overcurrent Relays 4 40OP-9EW02 Essential Cooling Water System (EW) Train B 26 40ST-9DG01 Diesel Generator A Test 49 73ST-9DG08 Class 1E Diesel Generator Load Reject 24 Hour Rated Load and Hot Start Test Train B 13 40ST-9DG02 Diesel Generator B Test 54 Condition Reports (CRs)
18-00136 18-00197 18-01931 18-00210 18-00290 18-00336 18-00377 18-00346 18-04731 18-04732 Work Orders (WOs) 4964492 4822983 4981967 4726747 4821113 4847651 4965079 4972486 4847637 A1-6 Drawings Number Title Revision 01-E-DGB-007 Elementary Diagram: Diesel Engine Control 15 01-E-DGF-007 Control Wiring Diagram: Diesel Engine 13 13-M018-00141 Control Schematic (Starting Sequence Control)
25 Miscellaneous Number Title Revision/Date 18-00210-004 Engineering Evaluation: EDG 1A Unexpected Cooldown during Surveillance Run 1/5/2018 January 8, 2018 Section 1R20: Refueling and Other Outage Activities Procedures Number Title Revision 40OP-9MB01 Main Generation and Excitation 63 Section 1R22: Surveillance Testing Procedures Number Title Revision 73DP-9CL02 Containment Leakage Rate Testing Program 33 73ST-9XI20 Atmospheric Dump Valves
- Inservice Test 47 73ST-9SI06 Containment Spray Pumps and Check valves
- Inservice Test 42 73ST-9DF01 Diesel Fuel Oil Transfer Pumps
- Inservice Test 34 40DP-9OP06 Operations Department Repetitive Task Program 130 73ST-9SI06 Containment Spray Pumps and Check Valves
- Inservice Test 42 Condition Reports (CRs)
16-15793 18-03304 18-01314 18-03825 Work Orders (WOs) 4822921 4840032 4843076 4843390 A1-7 Miscellaneous Number Title Revision/Date 13-JC-SI-0215 Containment Spray Pump Discharge Flow Indication Loops Uncertainty Calculation 18 18-01314-002 Engineering Evaluation: ADV 178 Fast Stroke Time January 26, 2018 18-03304-002 Engineering Evaluation: SR 3.0.3 Evaluation for SB-200, 202, and 205 March 2, 2018 Section 1EP2: Alert and Notification System Testing Miscellaneous Documents Number Title Date ID/Letter Number:
240-02802 Palo Verde Nuclear Generating Station Alert and Notification System (ANS) FEMA 350 Report
- May 2017 May 26, 2017 Palo Verde Nuclear Generating Station, Alert and Notification System (ANS), FEMA 350 Report May 2017 Palo Verde Nuclear Generating Station Siren Operating Manual November 2015 January 4, 2018 Letter from FEMA Region IX to Director, Division of Emergency Management, State of Arizona September 19, 2017 State of Arizona/Maricopa County Offsite Emergency Response Plan, Palo Verde Nuclear Generating Station November 2017 The Maricopa County Sheriff's Office Emergency Response to Palo Verde Nuclear Generating Station August 2016 Work Orders (WOs) 474965/0 Section 1EP3: Emergency Response Organization Staffing and Augmentation Procedures Number Title Revision EP-0902 Notifications 10 EP-0901 Classifications 10 40AL-9RK7C Panel B07C Alarm Responses 15 40AO-9ZZ21 Acts of Nature 37 79IS-9SM01 Analysis of Seismic Event 27 A1-8 Miscellaneous Documents Number Title Date 240-02799 JF/MA 2017 1st Quarter - Emergency Preparedness Augmentation Drill Report March 21, 2017 240-02803 CS/MA 2017 2nd Quarter - Emergency Preparedness Augmentation Drill Report June 6, 2017 240-02797 2017 3rd Quarter
- Emergency Preparedness Augmentation Drill Report (After Hours)
July 25, 2017 240-02808 2017 3rd Quarter
- Emergency Preparedness Augmentation Drill Repo rt September 6, 2017 240-02817 CS/ma 2017 4th Quarter - Emergency Preparedness Augmentation Drill Report December 13, 2017 240-02790 JF/MA 2016 2nd Quarter - Emergency Preparedness Augmentation Drill Report June 23, 2016 240-02791 JF/MA 2016 3rd Quarter - Emergency Preparedness Augmentation Drill Report August 3, 2016 240-02798 December 5, 2016, Alert Event Report January 17, 2017 Section 1EP4: Emergency Action Level and Emergency Plan Changes Procedure Number Title Revision 16DP-0EP22 Emergency Plan Maintenance 11, 12 Miscellaneous Documents Number Title Date Evaluation Tracking Number 2017-001E Replace the Meteorological Instrumentation and Data Transmission System (MDTS)
August 8, 2017 Evaluation Tracking Number 2017-003E EP-0900, Rev. 16 August 17, 2017 Evaluation Tracking Number 2017-004E EP-0901, Rev. 10 August 21, 2017 Screening Tracking Number 2017-002S 74RM-9EF42, Radiation Monitor Alarm Setpoint Determination, Rev. 30 April 16, 2017 Screening Tracking Number 2017-022S Procedure EP
-0901, Classifications, Added New EALs form EPLAN R60, Revise PV Proc Format August 20, 2017


A1-9 Miscellaneous Documents Number Title Date Screening Tracking Number 2017-014S EP-905, Revision 9, Protective Actions June 7, 2017 Screening Tracking Number 2017-023S DMWO 3452940 Palo Verde Nuclear Generating Station Radio Replacement Project September 8, 2017 Screening Tracking Number 2017-029S 40AO-9ZZ18 R018 Fire Outside Control Room September 26, 2017 EPM Tracking Number 2015-006S DEC-00720 Allow Solar
Section 2RS2: Occupational ALARA Planning and Controls
-Charged Offsite Sirens to Replace AC
Procedures
-Charged Offsite Sirens February 18, 2015 Section 1EP5: Maintenance of Emergency Preparedness Procedures Number Title Revision 01DP-0AP12 Condition Reporting Process 28 01DP-0AP12-01 Condition Reporting Process Administrative Guide 4 EP-0905 Protective Actions 9 EP-0902 Notifications 8, 9, 10 16DP-0EP31 Emergency Preparedness Equipment Out
Number
-of-Service 9 16DP-0EP27 Emergency Preparedness Equipment Testing 10 16DP-0EP28 Emergency Facility/Kit Inventories and Inspections 5 Condition Reports (CRs)
Title
16-08461 16-09213 16-11134 16-11930 16-12640 16-13501 16-14593 16-14934 16-16710 17-02188 17-03147 17-03149 17-03202 17-03605 17-03721 17-03736 17-03826 17-03828 17-03829 17-03884 17-04633 17-06893 17-08328 17-10906 17-10949 17-11437 17-13663 17-14927 17-15449 17-15797 17-15884 17-16771 17-17091 17-17218 17-17739 17-18443 18-03244 A1-10 Miscellaneous Documents Number Title Revision/Date KLD TR-983 Palo Verde Nuclear Generating Station, 2017 Population Update Analysis December 7, 2017 KLD TR-895 Palo Verde Nuclear Generating Station, 2016 Population Update Analysis December 8, 2016 Updated Review of Palo Verde Nuclear Generating Station Emergency Plan 2016 Letters of Agreement September 29, 2016 Letter # 240
Revision
-02819 2017 Review of Palo Verde Nuclear Generating Station Emergency Plan Letters of Agreement December 26, 2017 NAD Audit 2016
75DP-0RP03
-010 Nuclear Assurance Department (NAD) Audit Plan and Report, 2016
ALARA Program Overview
-010, Emergency Preparedness December 14, 2016 Palo Verde Nuclear Generating Station After Action Report/Improvement Plan, Exercise Date
75DP-0RP06
- June 1, 2017, Radiological Emergency Preparedness Program August 18
ALARA Committee
, 2017 ID: 240-02806 2017 Onsite Contaminated Injury/Health Physics Drill Report (Revised)
75DP-0RP08
June 23, 2017 ID: 240-02816 2017 Health Physics Drill Report (November 2017)
Managing Radiological Risk
December 12, 2017 ID: 240-02818 1709 ERO Mini Drill
75RP-9RP02
- ERO Blue Team (December 2017)
Radiation Work Permits
December 21, 2017 NAD Audit 2017
75RP-9RP25
-008 Nuclear Assurance Department (NAD) Audit Plan and Report, 2017
Temporary Shielding
-008, Emergency Preparedness January 25, 2018 240-02812 CS/MA 1704 and 1705 ERO Mini Drills
75TD-9RP02
- ERO White Team and Green Team (June and July 2017)
ALARA Work Planning
October 18, 2017 240-02813 CS/MA 1706 ERO Mini Drill
- ERO Gold Team (July 2017)
October 18, 2017 240-02814 TW/MA 1707 ERO Mini Drill
- ERO Red Team (August 2017) Revision 1 October 18, 2017 Emergency Response Facility Telephone Book, 1st Quarter Edition 2018 January 1, 2018 240-02801 JF/MA 1702 IPZ Evaluated Exercise
- ERO White Team (March 2017)
April 6, 2017 240-02797 JF/MA 1608 ERO Mini Drill
- ERO Red Team (December 2016)
January 4, 2017 240-02792 JF/MA 1604 and 1605 ERO Drills September 14, 2016 240-02793 JF/MA 1606 ERO Mini Drill
- ERO Green Team (September 2016)
October 4, 2016 A1-11 Miscellaneous Documents Number Title Revision/Date 240-02795 JF/MA 1609 Off-Hours Drive-in Augmentation Drill
- (November 2016)
December 2, 2016 240-02796 2016 Health Physics Drill Report (November 2016)
December 7, 2016 Evaluation Report 16
-11134 Evaluate Adding STSC ENS Communicator Duties to STSC Communicator September 7, 2016 17-11437-002 Actual Event Investigation, Unit 3 Ammonia Sight glass Break September 28, 2017 17-13663-001 Actual Event Investigation, Unit 2 Loss of Annunciators October 11, 2017 Level 4 Evaluation Report 17
-15797-001 Default Values Used in Dose Assessment November 30, 2017 Document No.


500599510 Master Agreement Between Arizona Public Service Company and Westinghouse Electric Company LLC for Goods and Services (Effective January 29, 2016 to December 31, 2018)
Audits and Self-Assessments
0 Palo Verde Nuclear Generating Station After Action Report/Improvement Plan, Exercise Dates
Title
- March 7-8, 2017, Radiological Emergency Preparedness Program (REPP) May 26, 2017 240-02789 JF/TW 2016 Health Physics Drill Report (Re
Date
-Demonstration)
PVGS Integrated Performance Assessment Report Radiation
June 9, 2016 240-02788 JF/MA 2016 Contaminated Injury/Health Physics Drill Report April 22, 2016 Palo Verde Nuclear Generating Station After Action Report/Improvement Plan, Exercise Date
Protection 2nd Quarter 2017
- November 16, 2016, Radiological Emergency Preparedness Program (REPP)
September 14, 2017
February 9, 2017 240-02787 JF/MA 1602 IPZ Exercise
2016 Annual ALARA/Management Evaluation Report
- ERO Green Team (March 2016)
June 23, 2017
March 25, 2016 Palo Verde Nuclear Generating Station After Action Report/Improvement Plan, Exercise Date
2016 Annual Radiation Protection Program Summary Report
- November 16, 2016, Radiological Emergency Preparedness Program (REPP)
July 27, 2017  
February 9, 2017 Level 3 Evaluation Report 18
-02668-002 March 22, 2018


A1-12 Work Orders (WOs)
Condition Reports (CRs)
4782667 4783959/0 4787729/0 4787847/0 4836236 4836263/0 4860832/0 4862234/0 4862502/0 4885361/0 4889725/0 4896971/0 4901070 4916668/0 4918303/0 4918455/0 4937577/0 4947802/0 Section 1EP6: Drill Evaluation Procedures Number Title Revision EP-0900 Emergency Response Organization (ERO) Position Checklists 16 EP-0901 Classifications 10 Condition Reports (CRs)
17-15502
18-02352 18-02503 18-02655 Section 2RS2: Occupational ALARA Planning and Controls Procedures Number Title Revision 75DP-0RP03 ALARA Program Overview 06 75DP-0RP06 ALARA Committee 07 75DP-0RP08 Managing Radiological Risk 02 75RP-9RP02 Radiation Work Permits 31 75RP-9RP25 Temporary Shielding 14 75TD-9RP02 ALARA Work Planning 11 Audits and Self
17-15529
-Assessments Title Date PVGS Integrated Performance Assessment Report Radiation Protection 2nd Quarter 2017 September 14, 2017 2016 Annual ALARA/Management Evaluation Report June 23, 2017 2016 Annual Radiation Protection Program Summary Report July 27, 2017
17-15802
17-16741
17-17944
17-18180
18-01890


A1-13 Condition Reports (CRs)
Radiation Work Permits/ALARA Reviews
17-15502 17-15529 17-15802 17-16741 17-17944 17-18180 18-01890 Radiation Work Permits/ALARA Reviews Number Title RWP 2017-9-1016 RMC Operations and Routine Tasks RWP 2018-1-1523 Temporary Mat Insulation Fiber Inspection RWP 2017-3002 Reactor Destack/Restack RWP 2017-3015 Cavity Decontamination RWP 2017-3039 10-Year In-Service Inspection Vessel Miscellaneous Title Date ALARA 5-Year Plan 2015
Number
- 2019 November 2015 1R20 Radiological Safety Summary In Perspective November 7, 2017 2R20 Radiological Safety Summary In Perspective May 9, 2017 3R19 Radiological Safety Summary In Perspective November 10, 2016 Section 2RS4 : Occupational Dose Assessment Procedures Number Title Revision 75DP-0RP01 RP Program Overview 11 75DP-0RP06 Managing Radiological Risk 2 75RP-9ME23 Exposure Evaluation for Lost, Damaged, or Suspect Dosimetry, and Anticipated EPD Dose Rate Alarm 12 75RP-9ME24 Dosimetry Processing, Evaluation, and Documentation 5 75RP-9ME25 TLD Reader Calibration and Response Check 6 75RP-9RP03 Bioassay Analysis 10 75RP-9RP05 Contamination Dose Evaluation 7 75RP-9RP16 Special Dosimetry 24 75RP-9QE21 Calibration of Self
Title
-Indicating Dosimeters 13 A1-14 Procedures Number Title Revision 75RP-9QE26 Operation and Verification of the Merlin Gerin Model CDM
RWP 2017-9-1016
-21 Calibrator 10 Audits and Self
RMC Operations and Routine Tasks
-Assessments Title Date 2016 Annual ALARA/Management Evaluation Report June 23, 2017 2016 Annual Radiation Protection Program Summary Report July 27, 2017 Condition Reports (CRs)
RWP 2018-1-1523
17-14033 17-14127 17-14527 17-15700 18-01423 Self-Reading Dosimeter Calibration Records Number Title Date 837097 Self-Reading Dosimeter September 8, 2017 836204 Self-Reading Dosimeter September 9, 2017 833059 Self-Reading Dosimeter September 30, 2017 810641 Self-Reading Dosimeter gamma/neutron December 12, 2017 810633 Self-Reading Dosimeter gamma/neutron December 12, 2017 810552 Self-Reading Dosimeter gamma/neutron December 13, 2017 Miscellaneous Number Title Date 2017 Multi-Pack TLD Results 2017 100536 NVLAP Accreditation Report April 8, 2016 100536 NVLAP Proficiency Testing Results
Temporary Mat Insulation Fiber Inspection
- TLD May 2, 2016 100536 NVLAP Proficiency Testing Results
RWP 2017-3002
-EPD August 5, 2016 100536 NVLAP Accreditation Report February 15, 2018 2017 Unit 1 Dry Active Waste December 1, 2017 2017 Unit 2 Dry Active Waste May 18, 2017 2016 Unit 3 Dry Active Waste December 22, 2016 25116 Intake Dose Assessment April 21, 2016
Reactor Destack/Restack
RWP 2017-3015
Cavity Decontamination
RWP 2017-3039
10-Year In-Service Inspection Vessel  


A1-15 Miscellaneous Number Title Date 47194 Personnel Dosimetry Processing Report November 15, 2017 Section 4OA1: Performance Indicator Verification Miscellaneous Number Title Date 2016-002-01 Licensee Event Report June 27, 2017 2017-001-00 June 27, 2017 June 14, 2017 Palo Verde Plant Computer PI ProcessBook Palo Verde Control Room Logs (1/1/17
Miscellaneous
- 12/31/17)
Title
Section 4OA2: Problem Identification and Resolution Procedures Number Title Revision 40ST-9DG01 Diesel Generator A Test 49 Condition Reports (CRs)
Date
17-15901 18-03517 17-15838 17-11155 17-09750 16-03783 Section 4OA3:
ALARA 5-Year Plan 2015 - 2019
Follow-up of Events and Notices of Enforcement Discretion Condition Reports (CRs)
November 2015
18-02544 18-02688 18-02664 18-02605 18-02716 Attachment 2 The following items are requested for the Occupational Radiation Safety Inspection at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 February 12 to 16, 2018 Integrated Report 2018001 Inspection areas are listed in the attachments below.
1R20 Radiological Safety Summary In Perspective
November 7, 2017
2R20 Radiological Safety Summary In Perspective
May 9, 2017
3R19 Radiological Safety Summary In Perspective
November 10, 2016
Section 2RS4 : Occupational Dose Assessment
Procedures
Number
Title
Revision
75DP-0RP01
RP Program Overview
75DP-0RP06
Managing Radiological Risk
75RP-9ME23
Exposure Evaluation for Lost, Damaged, or Suspect
Dosimetry, and Anticipated EPD Dose Rate Alarm
75RP-9ME24
Dosimetry Processing, Evaluation, and Documentation
75RP-9ME25
TLD Reader Calibration and Response Check
75RP-9RP03
Bioassay Analysis
75RP-9RP05
Contamination Dose Evaluation
75RP-9RP16
Special Dosimetry
75RP-9QE21
Calibration of Self-Indicating Dosimeters


Please provide the requested information on or before January 26, 2018.
Procedures
Number
Title
Revision
75RP-9QE26
Operation and Verification of the Merlin Gerin Model CDM-
Calibrator


Please submit this information using the same lettering system as below. For example, all contacts and phone numbers for Inspection Procedure 71124.0 1 should be in a file/folder titled
Audits and Self-Assessments
"1- A," applicable organization charts in file/folder "
Title
1- B," etc. If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at least 30 days later than the onsite inspection dates, so the inspectors will have access to the information while writing the report.
Date
2016 Annual ALARA/Management Evaluation Report
June 23, 2017
2016 Annual Radiation Protection Program Summary Report
July 27, 2017
Condition Reports (CRs)
17-14033
17-14127
17-14527
17-15700
18-01423
Self-Reading Dosimeter Calibration Records
Number
Title
Date
837097
Self-Reading Dosimeter
September 8, 2017
836204
Self-Reading Dosimeter
September 9, 2017
833059
Self-Reading Dosimeter
September 30, 2017
810641
Self-Reading Dosimeter gamma/neutron
December 12, 2017
810633
Self-Reading Dosimeter gamma/neutron
December 12, 2017
810552
Self-Reading Dosimeter gamma/neutron
December 13, 2017
Miscellaneous
Number
Title
Date
2017
Multi-Pack TLD Results
2017
100536
NVLAP Accreditation Report
April 8, 2016
100536
NVLAP Proficiency Testing Results - TLD
May 2, 2016
100536
NVLAP Proficiency Testing Results-EPD
August 5, 2016
100536
NVLAP Accreditation Report
February 15, 2018
2017
Unit 1 Dry Active Waste
December 1, 2017
2017
Unit 2 Dry Active Waste
May 18, 2017
2016
Unit 3 Dry Active Waste
December 22, 2016
25116
Intake Dose Assessment
April 21, 2016


In addition to the corrective action document lists provided for each inspection procedure listed below, please provide updated lists of corrective action documents at the entrance meeting. The dates for these lists should range from the end dates of the original lists to the day of the entrance meeting.
Miscellaneous
Number
Title
Date
47194
Personnel Dosimetry Processing Report
November 15, 2017
Section 4OA1: Performance Indicator Verification
Miscellaneous
Number
Title
Date
2016-002-01
Licensee Event Report
June 27, 2017
2017-001-00
June 27, 2017
June 14, 2017
Palo Verde Plant Computer PI ProcessBook


If more than one inspection procedure is to be conducted and the information requests appear to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which file the information can be found.
Palo Verde Control Room Logs (1/1/17 - 12/31/17)


If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or louis.carson@nrc.gov
Section 4OA2: Problem Identification and Resolution
. PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150
Procedures
-0011.
Number
Title
Revision
40ST-9DG01
Diesel Generator A Test


A2-2 2. Occupational ALARA Planning and Controls (71124.02)
Condition Reports (CRs)
Date of Last Inspection:
17-15901
October 20, 2017 A. List of contacts and telephone numbers for ALARA program personnel B. Applicable organization charts C. Copies of audits, self
18-03517
-assessments, and LERs, written since date of last inspection
17-15838
, focusing on ALARA D. Procedure index for ALARA Program E. Please provide specific procedures related to the following areas noted below. Additional Specific Procedures may be requested by number after the inspector reviews the procedure indexes.
17-11155
17-09750
16-03783


1. ALARA Program 2. ALARA Committee 3. Radiation Work Permit Preparation F. A summary list of corrective action documents (including corporate and sub
Section 4OA3: Follow-up of Events and Notices of Enforcement Discretion
-tiered systems) written since date of last inspection, related to the ALARA program. In addition to ALARA, the summary should also address Radiation Work Permit violations, Electronic Dosimeter Alarms, and RWP Dose Estimates NOTE: The lists should indicate the significance level of each issue and the search criteria used. Please provide in document formats which are "searchable" so that the inspector can perform word searches.
Condition Reports (CRs)
18-02544
18-02688
18-02664
18-02605
18-02716


G. List of work activities greater than 1 rem, since date of last inspection, Include original dose estimate and actual dose.
The following items are requested for the
Occupational Radiation Safety Inspection
at Palo Verde Nuclear Generating Station, Units 1, 2, and 3
February 12 to 16, 2018
Integrated Report 2018001
Inspection areas are listed in the attachments below.
Please provide the requested information on or before January 26, 2018.
Please submit this information using the same lettering system as below. For example, all
contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled
1-A, applicable organization charts in file/folder 1-B, etc.
If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at
least 30 days later than the onsite inspection dates, so the inspectors will have access to the
information while writing the report.
In addition to the corrective action document lists provided for each inspection procedure listed
below, please provide updated lists of corrective action documents at the entrance meeting.
The dates for these lists should range from the end dates of the original lists to the day of the
entrance meeting.
If more than one inspection procedure is to be conducted and the information requests appear
to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which
file the information can be found.
If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or
louis.carson@nrc.gov.  


H. Site dose totals and 3
PAPERWORK REDUCTION ACT STATEMENT
-year rolling averages for the past 3 years (based on dose of record) I. Outline of source term reduction strategy J. If available, provide a copy of the ALARA outage report for the most recently completed outages for each unit K. Please provide your most recent Annual ALARA Report.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget,
control number 3150-0011.  


A2-3 4. Occupational Dose Assessment (Inspection Procedure 71124.04)
2.
Occupational ALARA Planning and Controls (71124.02)
Date of Last Inspection:
Date of Last Inspection:
January 22, 2016 A. List of contacts and telephone numbers for the following areas:
October 20, 2017
1. Dose Assessment personnel B. Applicable organization charts C. Audits, self
A.
-assessments, vendor or NUPIC audits of contractor support, and LERs written since date of last inspection, related to:
List of contacts and telephone numbers for ALARA program personnel
1. Occupational Dose Assessment D. Procedure indexes for the following areas:
B.
1. Occupational Dose Assessment E. Please provide specific procedures related to the following areas noted below. Additional Specific Procedures will be requested by number after the inspector reviews the procedure indexes.
Applicable organization charts
C.
Copies of audits, self-assessments, and LERs, written since date of last inspection,
focusing on ALARA
D.
Procedure index for ALARA Program
E.
Please provide specific procedures related to the following areas noted below.
Additional Specific Procedures may be requested by number after the inspector reviews
the procedure indexes.
1. ALARA Program
2. ALARA Committee
3. Radiation Work Permit Preparation
F.
A summary list of corrective action documents (including corporate and sub-tiered
systems) written since date of last inspection, related to the ALARA program. In addition
to ALARA, the summary should also address Radiation Work Permit violations,
Electronic Dosimeter Alarms, and RWP Dose Estimates
NOTE: The lists should indicate the significance level of each issue and the search
criteria used. Please provide in document formats which are searchable so that
the inspector can perform word searches.
G.
List of work activities greater than 1 rem, since date of last inspection,
Include original dose estimate and actual dose.
H.
Site dose totals and 3-year rolling averages for the past 3 years (based on dose of
record)
I.
Outline of source term reduction strategy
J.
If available, provide a copy of the ALARA outage report for the most recently completed
outages for each unit
K.
Please provide your most recent Annual ALARA Report.  


1. Radiation Protection Program 2. Radiation Protection Conduct of Operations 3. Personnel Dosimetry Program 4. Radiological Posting and Warning Devices 5. Air Sample Analysis 6. Performance of High Exposure Work 7. Declared Pregnant Worker 8. Bioassay Program F. List of corrective action documents (including corporate and sub
4. Occupational Dose Assessment (Inspection Procedure 71124.04)
-tiered systems) written since date of last inspection, associated with:
Date of Last Inspection:
January 22, 2016
A.
List of contacts and telephone numbers for the following areas:
1. Dose Assessment personnel
B.
Applicable organization charts
C.
Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs
written since date of last inspection, related to:
1. Occupational Dose Assessment
D.
Procedure indexes for the following areas:
1. Occupational Dose Assessment
E.
Please provide specific procedures related to the following areas noted below.
Additional Specific Procedures will be requested by number after the inspector reviews
the procedure indexes.
1. Radiation Protection Program
2. Radiation Protection Conduct of Operations
3. Personnel Dosimetry Program
4. Radiological Posting and Warning Devices
5. Air Sample Analysis
6. Performance of High Exposure Work
7. Declared Pregnant Worker
8. Bioassay Program
F.
List of corrective action documents (including corporate and sub-tiered systems) written
since date of last inspection, associated with:
1. National Voluntary Laboratory Accreditation Program (NVLAP)
1. National Voluntary Laboratory Accreditation Program (NVLAP)
2. Dosimetry (TLD/OSL, etc.) problems 3. Electronic alarming dosimeters 4. Bioassays or internally deposited radionuclides or internal dose 5. Neutron dose NOTE: The lists should indicate the significance level of each issue and the search criteria used. Please provide in document formats which are "searchable" so that the inspector can perform word searches.
2. Dosimetry (TLD/OSL, etc.) problems
3. Electronic alarming dosimeters
4. Bioassays or internally deposited radionuclides or internal dose
5. Neutron dose
NOTE: The lists should indicate the significance level of each issue and the search
criteria used. Please provide in document formats which are searchable so that
the inspector can perform word searches.
G.
List of positive whole body counts since date of last inspection, names redacted if
desired
H.
Part 61 analyses/scaling factors
I.
The most recent National Voluntary Laboratory Accreditation Program (NVLAP)
accreditation report or, if dosimetry is provided by a vendor, the vendors most recent
results
ML18127A004
SUNSI Review:
ADAMS:
Non-Publicly Available
Non-Sensitive
Keyword:
By: JDixon
Yes No
Publicly Available
Sensitive
NRC-002
OFFICE
DRP/SRI
DRP/RI
DRP/RI
C:DRS/EB1
C:DRS/EB2
C:DRS/OB
NAME
CPeabody
DReinert
DYou
TFarnholtz
JDrake
VGaddy
SIGNATURE
/RA/
/RA/
/RA/
/RA/
/RA/
/RA/
DATE
4/30/18
5/1/2018
5/1/18
04/30/2018
4/30/18
4/30/18
OFFICE
C:DRS/PS2
TL:IPAT
C:DRP/D
 
NAME
HGepford
GGeorge
GMiller


G. List of positive whole body counts since date of last inspection, names redacted if desired H. Part 61 analyses/scaling factors I. The most recent National Voluntary Laboratory Accreditation Program (NVLAP) accreditation report or, if dosimetry is provided by a vendor, the vendor's most recent results
SIGNATURE
/RA/
/RA/
/RA/  


ML18127A004 SUNSI Review:
DATE
ADAMS: Non-Publicly Available Non-Sensitive Keyword:
4/30/18
By: JDixon Yes No Publicly Available Sensitive NRC-002 OFFICE DRP/SRI DRP/RI DRP/RI C:DRS/EB1 C:DRS/EB2 C:DRS/OB NAME CPeabody DReinert DYou TFarnholtz JDrake VGaddy SIGNATURE
4/30/2018
/RA/ /RA/ /RA/ /RA/ /RA/ /RA/ DATE 4/30/18 5/1/2018 5/1/18 04/30/2018 4/30/18 4/30/18 OFFICE C:DRS/PS2 TL:IPAT C:DRP/D NAME HGepford GGeorge GMiller SIGNATURE
5/7/18
/RA/ /RA/ /RA/ DATE 4/30/18 4/30/2018 5/7/18
}}
}}

Latest revision as of 22:52, 5 January 2025

NRC Integrated Inspection Report 05000528/2018001, 05000529/2018001, and 05000530/2018001
ML18127A004
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/07/2018
From: Geoffrey Miller
NRC/RGN-IV/DRP/RPB-D
To: Bement R
Arizona Public Service Co
Miller G
References
IR 2018001
Download: ML18127A004 (32)


Text

May 7, 2018

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000528/2018001, 05000529/2018001, AND 05000530/2018001

Dear Mr. Bement:

On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Palo Verde Nuclear Generating Station Units 1, 2, and 3. On April 11, 2018, the NRC inspectors discussed the results of this inspection with Mr. Jack Cadogan and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented one finding of very low safety significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the Palo Verde Nuclear Generating Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the Palo Verde Nuclear Generating Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Geoffrey B. Miller, Chief Project Branch D Division of Reactor Projects

Docket Nos. 50-528, 50-529, 50-530 License Nos. NPF-41, NPF-51, NPF-74

Enclosure:

Inspection Report 05000528/2018001, 05000529/2018001, 05000530/2018001 w/ Attachment:

1. Supplemental Information 2. O

Inspection Report

Docket Numbers:

05000528, 05000529, 05000530

License Numbers:

NPF-41, NPF-51, NPF-74

Report Numbers:

05000528/2018001, 05000529/2018001, and 05000530/2018001

Enterprise Identifier: I-2018-001-0013

Licensee:

Arizona Public Service Company

Facility:

Palo Verde Nuclear Generating Station

Location:

5801 South Wintersburg Road, Tonopah, AZ 85354

Inspection Dates:

January 1, 2018 to March 31, 2018

Inspectors:

C. Peabody, Senior Resident Inspector

D. Reinert, PhD, Resident Inspector

D. You, Resident Inspector

L. Carson, Senior Health Physicist

S. Hedger, Emergency Preparedness Inspector

Approved By:

Geoffrey B. Miller, Chief, Project Branch D, Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station,

Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

NRC and self-revealed findings, violations, and additional items are summarized in the table below.

List of Findings and Violations

Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone Significance Cross-cutting Aspect Report Section Mitigating Systems Green NCV 05000528/2018001-01 Closed

[H.12] - Human Performance, Avoid Complacency 71111.12 -

Maintenance Effectiveness The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50,

Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A.

Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.

PLANT STATUS

Unit 1 began the inspection period at rated thermal power. On February 15, 2018, the unit automatically tripped from full power when a control system failure caused a loss of generator field excitation. The unit was restarted on February 19, 2018, and remained at or near rated thermal power for the remainder of the inspection period.

Units 2 and 3 operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1 containment spray system B on January 4, 2018
(2) Unit 2 auxiliary feedwater system A on January 30, 2018
(3) Unit 3 control building heating ventilation and air conditioning B on March 16, 2018

Complete Walkdown (1 Sample)

The inspectors evaluated system configurations during a complete walkdown of the Unit 3 containment spray system on January 18, 2018.

71111.05AQ - Fire Protection Annual/Quarterly

Quarterly Inspection (5 Samples)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Unit 3 main turbine operating deck and bearings area, Fire Zones 9 and 10, on January 4, 2018
(2) Unit 2 control room, Fire Zone 17, on January 19, 2018
(3) Unit 2 containment spray pump A room and adjacent corridor, Fire Zones 30A and 88A, on January 23, 2018
(4) Unit 1 high pressure safety injection pump B room, Fire Zone 31B on February 2, 2018
(5) Unit 3 vital switchgear room A, Fire Zone 5A, on February 8, 2018

71111.07 - Heat Sink Performance

Heat Sink (1 Sample)

The inspectors evaluated Unit 1 diesel generator A lube oil and jacket water heat exchanger performance on February 21, 2018.

71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance

Operator Requalification (1 Sample)

The inspectors observed and evaluated risk informed completion time program and 10 CFR 50.69 program classroom training on January 31, 2018.

Operator Performance (1 Sample)

The inspectors observed and evaluated operator performance synchronizing the Unit 1 main generator to the grid following a reactor trip caused by a fault in the main generator excitation system on February 19, 2018.

The inspectors observed and evaluated operator response to Unit 3 loss of A channel indication for main steam and feedwater isolation valves, MSIV-170, 171, 180, 181, and FWIV-174, 177, on February 27, 2018.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness (2 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Reach rod operator gear box maintenance on safety injection valves SI-184 and SI-185 in Units 2 and 3
(2) Diesel fuel oil transfer pump predictive engineering cable testing

71111.13 - Maintenance Risk Assessments and Emergent Work Control

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Unit 1 elevated risk due to failure of emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 on January 4, 2018
(2) Unit 1 emergent risk due to diesel generator A unexpectedly shutdown during a surveillance run on January 5, 2018
(3) Unit 3 elevated risk due to planned maintenance on containment spray pump A atmospheric dump valves SG-179A and SG-184A, and low pressure safety injection valve SI-687 January 29, 2018 through February 4, 2018
(4) Unit 1 elevated risk due to diesel generator A super outage on February 26, 2018
(5) Unit 2 elevated risk due to diesel generator B super outage on March 19, 2018

71111.15 - Operability Determinations and Functionality Assessments

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Unit 2 abnormal trend for containment sump level transmitter, RDL-411, on January 3, 2018
(2) Unit 1 essential spray pond A pressure relief valves lifting during pump starts on January 25, 2018
(3) Unit 3 containment spray discharge to shutdown cooling heat exchanger valve, SI-685, failed to re-open during breaker maintenance on January 31, 2018
(4) Unit 1 diesel generator B fuel oil leak from cylinder 8L fuel oil jerk pump on February 13, 2018
(5) Unit 1 calculated qualified life of safety injection combined header isolation valves, SI-660 and SI-659, on February 23, 2018
(6) Unit 3 loss of indication of the train A main steam isolation valves and feedwater isolation valves (MSIV-170, 171, 180, 181 and FWIV-174, 177) on February 27, 2018
(7) Unit 1 auxiliary feedwater bypass motor operated valves SG-138A and SG-139A T-drains on March 6, 2018
(8) Unit 1 essential cooling water pump A oil samples appear to contain metal or debris on March 7, 2018
(9) Unit 2 steam generator sodium concentration increase on March 12, 2018

71111.18 - Plant Modifications

The inspectors evaluated the following temporary or permanent modifications:

(1) Unit 1 480V electrical breaker for containment spray to low pressure safety cross-connect valve, SI-696, replacement with General Electrical model Spectra breaker per Design Equivalent Change 01035 on March 15, 2018

71111.19 - Post Maintenance Testing

The inspectors evaluated the following post maintenance tests:

(1) Unit 1 emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 following limit switch adjustment on January 4, 2018
(2) Unit 1 diesel generator A cooldown relay, power supply, and test hand switch replacement following an unplanned cooldown during a monthly surveillance run on January 9, 2018
(3) Unit 3 containment spray pump A test following breaker maintenance on February 6, 2018
(4) Unit 3 30-volt power supply replacement for lost indication to main steam isolation valves on February 28, 2018
(5) Unit 2 essential cooling water pump A test and flow balance following planned maintenance to calibrate motor overcurrent relays and replace a high discharge pressure switch on March 20, 2018
(6) Unit 2 diesel generator A emergency mode simulated engineered safeguards features fast start test following online maintenance outage on March 23, 2018

71111.20 - Refueling and Other Outage Activities

The inspectors evaluated activities from February 15 - 19, 2018, for the Unit 1 forced outage due to an unplanned reactor trip caused by a fault in the main generator excitation circuitry.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Routine

(1) Unit 1 diesel fuel oil transfer pump A inservice test on January 24, 2018
(2) Unit 1 atmospheric dump valve 178 stroke time testing on February 9, 2018
(3) Unit 2 containment leakage type B and C testing, SR 3.0.3 entry for missed surveillance on February 28, 2018
(4) Unit 3 diesel fuel oil transfer pump A inservice test on March 7, 2018
(5) Unit 3, essential chiller A vibration analysis on March 8, 2018
(6) Unit 1 containment spray pump B inservice test on March 22, 2018

In-service (1 Sample)

(1) Unit 2 containment spray pump A inservice test on March 1, 2018

71114.02 - Alert and Notification System Testing

The inspectors evaluated the maintenance and testing of the alert and notification system between May 1, 2016 - February 20, 2018.

71114.03 - Emergency Response Organization Staffing and Augmentation System

The inspectors evaluated the readiness of the Emergency Response Organization between May 1, 2016 - February 20, 2018. Inspectors also evaluated the licensees ability to staff their emergency response facilities in accordance with emergency plan commitments.

71114.04 - Emergency Action Level and Emergency Plan Changes

The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and practices between May 1, 2016 - February 20, 2018. The evaluation reviewed screenings and evaluations documenting the implementation of this process. The review of the change process documentation does not constitute NRC approval.

71114.05 - Maintenance of Emergency Preparedness

The inspectors evaluated the maintenance of the emergency preparedness program between May 1, 2016 - February 20, 2018. The evaluation reviewed activations of the emergency plan, the conduct of drills and exercises, licensee audits and assessments, and the maintenance of equipment important to emergency preparedness.

71114.06 - Drill Evaluation

Emergency Planning Drill (1 Sample)

The inspectors evaluated a full-scale emergency preparedness drill on February 13,

RADIATION SAFETY

71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls

Radiological Work Planning (1 Sample)

The inspectors evaluated the licensees radiological work planning by reviewing the following activities:

(1) RWP 2017-9-1016, RMC Operations and Routine Tasks
(2) RWP 2018-1-1523, Temporary Mat Insulation Fiber Inspection
(3) RWP 2017-3002, Reactor Destack/Restack
(4) RWP 2017-3015, Cavity Decontamination
(5) RWP 2017-3039, 10-Year In-Service Inspection Vessel

Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)

The inspectors evaluated dose estimates and exposure tracking.

71124.04 - Occupational Dose Assessment

Source Term Characterization (1 Sample)

The inspectors evaluated the licensees source term characterization.

External Dosimetry (1 Sample)

The inspectors evaluated the licensees external dosimetry program.

Internal Dosimetry (1 Sample)

The inspectors evaluated the licensees internal dosimetry program.

Special Dosimetric Situations (1 Sample)

The inspectors evaluated the licensees performance for special dosimetric situations.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

(1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (January 1, 2017 - December 31, 2017)
(2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (January 1, 2017 - December 31, 2017)
(3) IE04: Unplanned Scrams with Complications (USwC) Sample (January 1, 2017 - December 31, 2017)
(4) MS05: Safety System Functional Failures (SSFFs) Sample (April 1, 2017 - December 31, 2017)
(5) EP01: Drill/Exercise Performance (DEP) Sample (January 1, 2017 - December 31, 2017)
(6) EP02: Emergency Response Organization (ERO) Drill Participation Sample (January 1, 2017 - December 31, 2017)
(7) EP03: Alert and Notification System (ANS) Reliability Sample (January 1, 2017 - December 31, 2017)

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Multiple failures of diesel generator underfrequency protective relay on March 26, 2018

71153 - Follow-up of Events and Notices of Enforcement Discretion Events

The inspectors evaluated the Unit 1 reactor trip following a loss of main generator excitation and licensees response on February 15 - 16,

INSPECTION RESULTS

Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone Significance Cross-cutting Aspect Report Section Mitigating Systems Green NCV 05000528/2018001-01 Closed

[H.12] -

Human Performance, Avoid Complacency

71111.12 - Maintenance

Effectiveness The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A.

Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.

Description:

On November 12, 2017, the licensee was conducting a 24-hour surveillance test run of Unit 1 diesel generator (EDG) A. The EDG was fully loaded at 10:19 a.m. which began the 24-hour test period. At 10:53 a.m., control room operators received a fuel oil transfer pump A inoperable equipment status alarm. The diesel fuel oil transfer pump A did not start on a diesel fuel oil day tank low level signal. Operators manually unloaded and stopped the EDG a few minutes later and declared the Unit 1 EDG A inoperable due to its inability to run for its design basis mission time and began troubleshooting the failed fuel oil transfer pump.

Licensee electricians took electrical resistance readings across the connections in the motor control center for the fuel oil transfer pump breaker. The electricians identified that the direct cause of the transfer pump failure was a high variable resistance secondary stab connection in the motor control center cubicle. The electricians removed the breaker and cleaned and adjusted the connection. Electricians reinstalled the breaker and confirmed an acceptable as left connection resistance of less than 0.2 ohms. The diesel fuel oil transfer pump was successfully retested with a 20 minute functional run and the Unit 1 EDG A was declared operable following the successful completion of the 24-hour surveillance run on November 14, 2017.

The licensees apparent cause investigation determined that the diesel fuel oil transfer pump breaker had been removed from service for periodic predictive maintenance on November 9, 2017, under work order 4685719. During this maintenance activity licensee engineers disconnected the diesel fuel oil transfer pump motor power and control cables for megger testing. Cable lug screw connections attach each of these cables to the secondary stab connections on the movable motor breaker and the stationary motor control center chassis.

Cable connections on the secondary stab connections are removed for testing, and then following testing, the cables are re-landed onto the secondary stabs of the breaker and motor control center chassis. The licensees work planners had not recognized the possibility that removing and re-landing the cables on the lug screw connections had the potential to disturb the motor control center secondary stab connections.

The post-maintenance test associated with the cable testing was a momentary start of the diesel fuel oil transfer pump. The transfer pumps control switch was held in the start position for only a few seconds. The licensees apparent cause investigation identified that nonintrusive as-left quantitative resistance checks could have been used to assess the integrity of the secondary stab connections. The licensee performs similar checks when performing individual breaker cubicle preventative maintenance tasks that actively remove and re-test the individual motor control center bucket. Such a check was the method used by the electricians to initially diagnose the breaker failure. However, no such quantitative resistance check was specified in the cable testing work order.

The post-maintenance test was not written in accordance with station procedure 30DP-9WP04, Post-Maintenance Testing Development, Revision 19, Step 4.1.1, which states, in part, that the post-maintenance test shall ensure that equipment performs its intended function when returned to service following maintenance, that a new deficiency has not been created, and that the equipment will function as designed for safe and reliable plant operation.

The act of de-terminating and re-terminating the diesel fuel oil transfer pump cable for testing created new failure deficiency by disturbing electrical continuity and creating a high resistance condition at the secondary stab connection that impacted EDG operability. The post-maintenance test following the cable testing maintenance was not adequate to ensure that a new deficiency had not been created.

Corrective Action: The licensee has taken corrective action to revise the work instructions for performing future cable testing to include quantitative resistance retests when re-terminating motor control center secondary stab connections. As an interim measure, the inspectors confirmed that all safety-related 480V electrical breakers that have been subject to this cable testing have performed satisfactorily during subsequent diesel generator surveillance testing.

Corrective Action Reference: Condition Report 17-16497

Performance Assessment:

Performance Deficiency: The licensees failure to prescribe appropriate retest activities following predictive maintenance on diesel fuel oil transfer pump cables is a performance deficiency.

Screening: The performance deficiency is more-than-minor and a finding because it is associated with the equipment performance attribute of the mitigating systems cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, on November 9, 2017, the licensee performed cable testing that disturbed the power cables for the Unit 1 diesel fuel oil transfer pump A. Without an appropriate post-maintenance test, this activity rendered the Unit 1 diesel generator A inoperable.

Significance: The inspectors performed the initial significance determination using NRC Inspection Manual Chapter 0609, Appendix A, Significance Determination Process for Findings at Power, Exhibit 2, Mitigating Systems Screening Questions and determined that the finding was of very low safety significance (Green) because the finding did not represent an actual loss of safety function of a single train for greater that its technical specification allowed outage time.

Cross-cutting Aspect: The finding has a cross-cutting aspect in the area of human performance associated with the avoid complacency aspect. Specifically, licensee work planners did not consider potential undesired consequences associated with disturbing the power cables leads, instead relying on past successful tests [H.12].

Enforcement:

Violation: Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, requires, in part, that activities affecting quality be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and be accomplished in accordance with these instructions, procedures, or drawings.

Contrary to the above, on November 9, 2017, the licensee performed maintenance on the Unit 1 diesel fuel oil transfer pump A, an activity affecting quality to which Appendix B applies, without documented instructions, procedures, or drawings of a type appropriate to the circumstances. Specifically, work order 4685719 did not include appropriate testing to ensure the maintenance was successful and the pump was returned to service, and as a result, the Unit 1 diesel generator A was rendered inoperable from November 9, 2017 to November 14, 2017.

Disposition: This violation is being treated as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On February 16, 2018, the inspector presented the radiation safety inspection results to Ms. M. Lacal, Senior Vice President, Regulatory and Oversight, and other members of the licensee staff.

On March 2, 2018, the inspector provided a debrief for the emergency preparedness program inspection to Mr. M. McLaughlin, Vice President, Operations Support, and other members of the licensee staff. On March 29, 2018, the inspector communicated the inspection results telephonically to Mr. T. Weber, Acting Director, Nuclear Regulatory Affairs, and other members of the licensee staff.

On April 11, 2018, the inspector presented the quarterly residents inspection results to Mr. J. Cadogan, Senior Vice President, Site Operations, and other members of the licensee staff.

SUPPLEMENTAL INFORMATION

DOCUMENTS REVIEWED

Section 1R04: Equipment Alignment

Procedures

Number

Title

Revision

40ST-9AF07

Auxiliary Feedwater Pump AFA-P01 Monthly Valve

Alignment

40ST-9SI13

LPSI and CS System Alignment Verification

Condition Reports (CRs)

16-17321

17-03027

Drawings

Number

Title

Revision

03-M-HJP-001

P&I Diagram Control Building HVAC

03-M-HJP-002

P&I Diagram Control Building HVAC

03-M-SIP-001

P&I Diagram Safety Injection & Shutdown Cooling System

03-P-SIF-0207

Auxiliary Building Isometric Safety Injection System LPSI &

Cont. Spray Discharge

03-P-SIF-0201

Auxiliary Building Isometric Safety Injection System ESF

Pump Suction Lines

Miscellaneous

Number

Title

Revision

STM-30D

System Training Manual Volume 30D: Control Building

HVAC System (HJ)

Section 1R05: Fire Protection

Procedures

Number

Title

Revision

14FT-9FP70

Appendix R & Former Tech Spec Penetration Seal Surveillance

Condition Reports (CRs)

17-03870

18-00999

Miscellaneous

Number

Title

Revision/Date

PVNGS Pre-Fire Strategies Manual

13-MM-0650

Fire Protection & Spray System Sub

007

13-MS-A083

NFPA Code Applicability and Conformance Review

007

4834415

Fire Safety Component Condition Record

November 3, 2016

4834430

Fire Safety Component Condition Record

November 3, 2016

4843902

Fire Safety Component Condition Record

December 6, 2016

Unit 3 Tamper/Vital/Security Tour - Post 31

February 7, 2018

4971714

Open Door/Hatch/Floor Plug Permit

January 29, 2018

4971687

Open Door/Hatch/Floor Plug Permit

January 29, 2018

Section 1R07: Heat Sink Performance

Procedures

Number

Title

Revision

73DP-9ZZ21

Heat Exchanger Visual Inspection

73DP-9ZZ11

Heat Exchanger Program

Condition Reports (CRs)

18-03133

18-03138

18-03139

Work Orders (WOs)

4591574

4591575

4667054

4667055

4667098

Section 1R11: Licensed Operator Requalification Program and Licensed Operator

Performance

Procedures

Number

Title

Revision

40OP-9MB01

Main Generation and Excitation

40DP-9OP02

Conduct of Operations

Procedures

Number

Title

Revision

40AL-9RK6A

Panel B06A Alarm Responses

Condition Reports (CRs)

18-02797

18-02593

18-03215

Miscellaneous

Number

Title

Date

Current Alarm Status Report

February 16, 2018

Section 1R12: Maintenance Effectiveness

Procedures

Number

Title

Revision

2MT-9ZZ74

Molded Case Circuit Breaker Test

30DP-9WP04

Post-Maintenance Testing Development

Condition Reports (CRs)

17-08025-005

17-08025

17-16497

Work Orders (WOs)

25959

25966

25967

25969

4685719

4788985

Section 1R13: Maintenance Risk Assessments and Emergent Work Control

Procedures

Number

Title

Revision

40DP-9AP21

Protected Equipment

70DP-0RA05

Assessment and Management of Risk when Performing

Maintenance in Modes 1 and 2

40MT-9ZZ01

Operations Maintenance Activities

40DP-9RS01

Operations Department Online Nuclear Risk Management

Mode 1 and 2

Condition Reports (CRs)

18-00249

185-00136

18-00336

18-02544

Miscellaneous

Number

Title

Date

Schedulers Evaluation for PV Unit 1

January 4, 2018

Schedulers Evaluation for PV Unit 1

February 23, 2018

Schedulers Evaluation for PV Unit 3

February 1, 2018

Schedulers Evaluation for PV Unit 2

March 19, 2018

Unit 3

Archived Operator Logs

January 29, 2018 -

February 4, 2018

Section 1R15: Operability Determinations and Functionality Assessments

Procedures

Number

Title

Revision

40ST-9ZZm1

Operations Mode 1 Surveillance Logs

40AL-9RK6A

Panel B06A Alarm Responses

74DP-9CY04

Systems Chemistry Specifications

Condition Reports (CRs)

17-18475

2-01397

17-17856

13-01198

18-03127

17-16393

18-03215

18-03291

18-02839

18-01610

18-02334

27427

18-02468

18-03980

Miscellaneous

Number

Title

Revision/Date

03-E-SGF-023

Control Wiring Diagram Main Steam Isolation Valves

18-02334-003

Engineering Evaluation

February 15, 2018

28056

Adverse CRDR

July 19, 2013

EQ Program Manual

Section 1R18: Plant Modifications

Condition Reports (CRs)

18-04116

Work Orders (WOs)

4989102

Miscellaneous

Number

Title

Date

DEC-01035

Design Equivalent Change

April 12, 2017

Section 1R19: Post-Maintenance Testing

Procedures

Number

Title

Revision

40OP-9CH12

Refueling Water Tank (RWT) Operations

2MT-9ZZ13

Testing and Calibration of 121FC66K01A Time Overcurrent

Relays

2MT-9ZZ17

Testing and Calibration of 12PJC11AV1A Instantaneous

Overcurrent Relays

40OP-9EW02

Essential Cooling Water System (EW) Train B

40ST-9DG01

Diesel Generator A Test

73ST-9DG08

Class 1E Diesel Generator Load Reject 24 Hour Rated Load

and Hot Start Test Train B

40ST-9DG02

Diesel Generator B Test

Condition Reports (CRs)

18-00136

18-00197

18-01931

18-00210

18-00290

18-00336

18-00377

18-00346

18-04731

18-04732

Work Orders (WOs)

4964492

22983

4981967

26747

21113

4847651

4965079

4972486

4847637

Drawings

Number

Title

Revision

01-E-DGB-007

Elementary Diagram: Diesel Engine Control

01-E-DGF-007

Control Wiring Diagram: Diesel Engine

13-M018-00141

Control Schematic (Starting Sequence Control)

Miscellaneous

Number

Title

Revision/Date

18-00210-004

Engineering Evaluation: EDG 1A Unexpected Cooldown

during Surveillance Run 1/5/2018

January 8, 2018

Section 1R20: Refueling and Other Outage Activities

Procedures

Number

Title

Revision

40OP-9MB01

Main Generation and Excitation

Section 1R22: Surveillance Testing

Procedures

Number

Title

Revision

73DP-9CL02

Containment Leakage Rate Testing Program

73ST-9XI20

Atmospheric Dump Valves - Inservice Test

73ST-9SI06

Containment Spray Pumps and Check valves - Inservice

Test

73ST-9DF01

Diesel Fuel Oil Transfer Pumps - Inservice Test

40DP-9OP06

Operations Department Repetitive Task Program

130

73ST-9SI06

Containment Spray Pumps and Check Valves-Inservice

Test

Condition Reports (CRs)

16-15793

18-03304

18-01314

18-03825

Work Orders (WOs)

22921

4840032

4843076

4843390

Miscellaneous

Number

Title

Revision/Date

13-JC-SI-0215

Containment Spray Pump Discharge Flow Indication

Loops Uncertainty Calculation

18-01314-002

Engineering Evaluation: ADV 178 Fast Stroke Time

January 26, 2018

18-03304-002

Engineering Evaluation: SR 3.0.3 Evaluation for

SB-200, 202, and 205

March 2, 2018

Section 1EP2: Alert and Notification System Testing

Miscellaneous Documents

Number

Title

Date

ID/Letter

Number:

240-02802

Palo Verde Nuclear Generating Station Alert and

Notification System (ANS) FEMA 350 Report -

May 2017

May 26, 2017

Palo Verde Nuclear Generating Station, Alert and

Notification System (ANS), FEMA 350 Report

May 2017

Palo Verde Nuclear Generating Station Siren Operating

Manual

November 2015

January 4, 2018

Letter from FEMA Region IX to Director, Division of

Emergency Management, State of Arizona

September 19,

2017

State of Arizona/Maricopa County Offsite Emergency

Response Plan, Palo Verde Nuclear Generating Station

November 2017

The Maricopa County Sheriffs Office Emergency

Response to Palo Verde Nuclear Generating Station

August 2016

Work Orders (WOs)

474965/0

Section 1EP3: Emergency Response Organization Staffing and Augmentation

Procedures

Number

Title

Revision

EP-0902

Notifications

EP-0901

Classifications

40AL-9RK7C

Panel B07C Alarm Responses

40AO-9ZZ21

Acts of Nature

79IS-9SM01

Analysis of Seismic Event

Miscellaneous Documents

Number

Title

Date

240-02799

JF/MA

2017 1st Quarter - Emergency Preparedness

Augmentation Drill Report

March 21, 2017

240-02803

CS/MA

2017 2nd Quarter - Emergency Preparedness

Augmentation Drill Report

June 6, 2017

240-02797

2017 3rd Quarter - Emergency Preparedness

Augmentation Drill Report (After Hours)

July 25, 2017

240-02808

2017 3rd Quarter - Emergency Preparedness

Augmentation Drill Report

September 6, 2017

240-02817

CS/ma

2017 4th Quarter - Emergency Preparedness

Augmentation Drill Report

December 13,

2017

240-02790

JF/MA

2016 2nd Quarter - Emergency Preparedness

Augmentation Drill Report

June 23, 2016

240-02791

JF/MA

2016 3rd Quarter - Emergency Preparedness

Augmentation Drill Report

August 3, 2016

240-02798

December 5, 2016, Alert Event Report

January 17, 2017

Section 1EP4: Emergency Action Level and Emergency Plan Changes

Procedure

Number

Title

Revision

16DP-0EP22

Emergency Plan Maintenance

11, 12

Miscellaneous Documents

Number

Title

Date

Evaluation

Tracking Number

2017-001E

Replace the Meteorological Instrumentation and Data

Transmission System (MDTS)

August 8, 2017

Evaluation

Tracking Number

2017-003E

EP-0900, Rev. 16

August 17, 2017

Evaluation

Tracking Number

2017-004E

EP-0901, Rev. 10

August 21, 2017

Screening

Tracking Number

2017-002S

74RM-9EF42, Radiation Monitor Alarm Setpoint

Determination, Rev. 30

April 16, 2017

Screening

Tracking Number

2017-022S

Procedure EP-0901, Classifications, Added New EALs

form EPLAN R60, Revise PV Proc Format

August 20, 2017

Miscellaneous Documents

Number

Title

Date

Screening

Tracking Number

2017-014S

EP-905, Revision 9, Protective Actions

June 7, 2017

Screening

Tracking Number

2017-023S

DMWO 3452940 Palo Verde Nuclear Generating

Station Radio Replacement Project

September 8,

2017

Screening

Tracking Number

2017-029S

40AO-9ZZ18 R018 Fire Outside Control Room

September 26,

2017

EPM Tracking

Number

2015-006S

DEC-00720 Allow Solar-Charged Offsite Sirens to

Replace AC-Charged Offsite Sirens

February 18,

2015

Section 1EP5: Maintenance of Emergency Preparedness

Procedures

Number

Title

Revision

01DP-0AP12

Condition Reporting Process

01DP-0AP12-01

Condition Reporting Process Administrative Guide

EP-0905

Protective Actions

EP-0902

Notifications

8, 9, 10

16DP-0EP31

Emergency Preparedness Equipment Out-of-Service

16DP-0EP27

Emergency Preparedness Equipment Testing

16DP-0EP28

Emergency Facility/Kit Inventories and Inspections

Condition Reports (CRs)

16-08461

16-09213

16-11134

16-11930

16-12640

16-13501

16-14593

16-14934

16-16710

17-02188

17-03147

17-03149

17-03202

17-03605

17-03721

17-03736

17-03826

17-03828

17-03829

17-03884

17-04633

17-06893

17-08328

17-10906

17-10949

17-11437

17-13663

17-14927

17-15449

17-15797

17-15884

17-16771

17-17091

17-17218

17-17739

17-18443

18-03244

Miscellaneous Documents

Number

Title

Revision/Date

KLD TR-983

Palo Verde Nuclear Generating Station,

2017 Population Update Analysis

December 7,

2017

KLD TR-895

Palo Verde Nuclear Generating Station,

2016 Population Update Analysis

December 8,

2016

Updated Review of Palo Verde Nuclear Generating

Station Emergency Plan 2016 Letters of Agreement

September 29,

2016

Letter # 240-

2819

2017 Review of Palo Verde Nuclear Generating Station

Emergency Plan Letters of Agreement

December 26,

2017

NAD Audit 2016-

010

Nuclear Assurance Department (NAD) Audit Plan and

Report, 2016-010, Emergency Preparedness

December 14,

2016

Palo Verde Nuclear Generating Station After Action

Report/Improvement Plan, Exercise Date - June 1,

2017, Radiological Emergency Preparedness Program

August 18,

2017

ID: 240-02806

2017 Onsite Contaminated Injury/Health Physics Drill

Report (Revised)

June 23, 2017

ID: 240-02816

2017 Health Physics Drill Report (November 2017)

December 12,

2017

ID: 240-02818

1709 ERO Mini Drill - ERO Blue Team

(December 2017)

December 21,

2017

NAD Audit 2017-

008

Nuclear Assurance Department (NAD) Audit Plan and

Report, 2017-008, Emergency Preparedness

January 25,

2018

240-02812

CS/MA

1704 and 1705 ERO Mini Drills - ERO White Team and

Green Team (June and July 2017)

October 18,

2017

240-02813

CS/MA

1706 ERO Mini Drill - ERO Gold Team (July 2017)

October 18,

2017

240-02814

TW/MA

1707 ERO Mini Drill - ERO Red Team (August 2017)

Revision 1

October 18,

2017

Emergency Response Facility Telephone Book,

1st Quarter Edition 2018

January 1,

2018

240-02801

JF/MA

1702 IPZ Evaluated Exercise - ERO White Team

(March 2017)

April 6, 2017

240-02797

JF/MA

1608 ERO Mini Drill - ERO Red Team

(December 2016)

January 4,

2017

240-02792

JF/MA

1604 and 1605 ERO Drills

September 14,

2016

240-02793

JF/MA

1606 ERO Mini Drill - ERO Green Team

(September 2016)

October 4,

2016

Miscellaneous Documents

Number

Title

Revision/Date

240-02795

JF/MA

1609 Off-Hours Drive-in Augmentation Drill -

(November 2016)

December 2,

2016

240-02796

2016 Health Physics Drill Report (November 2016)

December 7,

2016

Evaluation

Report 16-11134

Evaluate Adding STSC ENS Communicator Duties to

STSC Communicator

September 7,

2016

17-11437-002

Actual Event Investigation, Unit 3 Ammonia Sight glass

Break

September 28,

2017

17-13663-001

Actual Event Investigation, Unit 2 Loss of Annunciators

October 11,

2017

Level 4

Evaluation

Report 17-

15797-001

Default Values Used in Dose Assessment

November 30,

2017

Document No.

500599510

Master Agreement Between Arizona Public Service

Company and Westinghouse Electric Company LLC for

Goods and Services (Effective January 29, 2016 to

December 31, 2018)

Palo Verde Nuclear Generating Station After Action

Report/Improvement Plan, Exercise Dates - March 7-8,

2017, Radiological Emergency Preparedness Program

(REPP)

May 26, 2017

240-02789

JF/TW

2016 Health Physics Drill Report (Re-Demonstration)

June 9, 2016

240-02788

JF/MA

2016 Contaminated Injury/Health Physics Drill Report

April 22, 2016

Palo Verde Nuclear Generating Station After Action

Report/Improvement Plan, Exercise Date -

November 16, 2016, Radiological Emergency

Preparedness Program (REPP)

February 9,

2017

240-02787

JF/MA

1602 IPZ Exercise - ERO Green Team (March 2016)

March 25, 2016

Palo Verde Nuclear Generating Station After Action

Report/Improvement Plan, Exercise Date -

November 16, 2016, Radiological Emergency

Preparedness Program (REPP)

February 9,

2017

Level 3 Evaluation Report 18-02668-002

March 22, 2018

Work Orders (WOs)

4782667

4783959/0

4787729/0

4787847/0

4836236

4836263/0

4860832/0

4862234/0

4862502/0

4885361/0

4889725/0

4896971/0

4901070

4916668/0

4918303/0

4918455/0

4937577/0

4947802/0

Section 1EP6: Drill Evaluation

Procedures

Number

Title

Revision

EP-0900

Emergency Response Organization (ERO) Position

Checklists

EP-0901

Classifications

Condition Reports (CRs)

18-02352

18-02503

18-02655

Section 2RS2: Occupational ALARA Planning and Controls

Procedures

Number

Title

Revision

75DP-0RP03

ALARA Program Overview

75DP-0RP06

ALARA Committee

75DP-0RP08

Managing Radiological Risk

75RP-9RP02

Radiation Work Permits

75RP-9RP25

Temporary Shielding

75TD-9RP02

ALARA Work Planning

Audits and Self-Assessments

Title

Date

PVGS Integrated Performance Assessment Report Radiation

Protection 2nd Quarter 2017

September 14, 2017

2016 Annual ALARA/Management Evaluation Report

June 23, 2017

2016 Annual Radiation Protection Program Summary Report

July 27, 2017

Condition Reports (CRs)

17-15502

17-15529

17-15802

17-16741

17-17944

17-18180

18-01890

Radiation Work Permits/ALARA Reviews

Number

Title

RWP 2017-9-1016

RMC Operations and Routine Tasks

RWP 2018-1-1523

Temporary Mat Insulation Fiber Inspection

RWP 2017-3002

Reactor Destack/Restack

RWP 2017-3015

Cavity Decontamination

RWP 2017-3039

10-Year In-Service Inspection Vessel

Miscellaneous

Title

Date

ALARA 5-Year Plan 2015 - 2019

November 2015

1R20 Radiological Safety Summary In Perspective

November 7, 2017

2R20 Radiological Safety Summary In Perspective

May 9, 2017

3R19 Radiological Safety Summary In Perspective

November 10, 2016

Section 2RS4 : Occupational Dose Assessment

Procedures

Number

Title

Revision

75DP-0RP01

RP Program Overview

75DP-0RP06

Managing Radiological Risk

75RP-9ME23

Exposure Evaluation for Lost, Damaged, or Suspect

Dosimetry, and Anticipated EPD Dose Rate Alarm

75RP-9ME24

Dosimetry Processing, Evaluation, and Documentation

75RP-9ME25

TLD Reader Calibration and Response Check

75RP-9RP03

Bioassay Analysis

75RP-9RP05

Contamination Dose Evaluation

75RP-9RP16

Special Dosimetry

75RP-9QE21

Calibration of Self-Indicating Dosimeters

Procedures

Number

Title

Revision

75RP-9QE26

Operation and Verification of the Merlin Gerin Model CDM-

Calibrator

Audits and Self-Assessments

Title

Date

2016 Annual ALARA/Management Evaluation Report

June 23, 2017

2016 Annual Radiation Protection Program Summary Report

July 27, 2017

Condition Reports (CRs)

17-14033

17-14127

17-14527

17-15700

18-01423

Self-Reading Dosimeter Calibration Records

Number

Title

Date

837097

Self-Reading Dosimeter

September 8, 2017

836204

Self-Reading Dosimeter

September 9, 2017

833059

Self-Reading Dosimeter

September 30, 2017

810641

Self-Reading Dosimeter gamma/neutron

December 12, 2017

810633

Self-Reading Dosimeter gamma/neutron

December 12, 2017

810552

Self-Reading Dosimeter gamma/neutron

December 13, 2017

Miscellaneous

Number

Title

Date

2017

Multi-Pack TLD Results

2017

100536

NVLAP Accreditation Report

April 8, 2016

100536

NVLAP Proficiency Testing Results - TLD

May 2, 2016

100536

NVLAP Proficiency Testing Results-EPD

August 5, 2016

100536

NVLAP Accreditation Report

February 15, 2018

2017

Unit 1 Dry Active Waste

December 1, 2017

2017

Unit 2 Dry Active Waste

May 18, 2017

2016

Unit 3 Dry Active Waste

December 22, 2016

25116

Intake Dose Assessment

April 21, 2016

Miscellaneous

Number

Title

Date

47194

Personnel Dosimetry Processing Report

November 15, 2017

Section 4OA1: Performance Indicator Verification

Miscellaneous

Number

Title

Date

2016-002-01

Licensee Event Report

June 27, 2017

2017-001-00

June 27, 2017

June 14, 2017

Palo Verde Plant Computer PI ProcessBook

Palo Verde Control Room Logs (1/1/17 - 12/31/17)

Section 4OA2: Problem Identification and Resolution

Procedures

Number

Title

Revision

40ST-9DG01

Diesel Generator A Test

Condition Reports (CRs)

17-15901

18-03517

17-15838

17-11155

17-09750

16-03783

Section 4OA3: Follow-up of Events and Notices of Enforcement Discretion

Condition Reports (CRs)

18-02544

18-02688

18-02664

18-02605

18-02716

The following items are requested for the

Occupational Radiation Safety Inspection

at Palo Verde Nuclear Generating Station, Units 1, 2, and 3

February 12 to 16, 2018

Integrated Report 2018001

Inspection areas are listed in the attachments below.

Please provide the requested information on or before January 26, 2018.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled

1-A, applicable organization charts in file/folder 1-B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the onsite inspection dates, so the inspectors will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or

louis.carson@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

2.

Occupational ALARA Planning and Controls (71124.02)

Date of Last Inspection:

October 20, 2017

A.

List of contacts and telephone numbers for ALARA program personnel

B.

Applicable organization charts

C.

Copies of audits, self-assessments, and LERs, written since date of last inspection,

focusing on ALARA

D.

Procedure index for ALARA Program

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures may be requested by number after the inspector reviews

the procedure indexes.

1. ALARA Program

2. ALARA Committee

3. Radiation Work Permit Preparation

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection, related to the ALARA program. In addition

to ALARA, the summary should also address Radiation Work Permit violations,

Electronic Dosimeter Alarms, and RWP Dose Estimates

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

List of work activities greater than 1 rem, since date of last inspection,

Include original dose estimate and actual dose.

H.

Site dose totals and 3-year rolling averages for the past 3 years (based on dose of

record)

I.

Outline of source term reduction strategy

J.

If available, provide a copy of the ALARA outage report for the most recently completed

outages for each unit

K.

Please provide your most recent Annual ALARA Report.

4. Occupational Dose Assessment (Inspection Procedure 71124.04)

Date of Last Inspection:

January 22, 2016

A.

List of contacts and telephone numbers for the following areas:

1. Dose Assessment personnel

B.

Applicable organization charts

C.

Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since date of last inspection, related to:

1. Occupational Dose Assessment

D.

Procedure indexes for the following areas:

1. Occupational Dose Assessment

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Radiation Protection Program

2. Radiation Protection Conduct of Operations

3. Personnel Dosimetry Program

4. Radiological Posting and Warning Devices

5. Air Sample Analysis

6. Performance of High Exposure Work

7. Declared Pregnant Worker

8. Bioassay Program

F.

List of corrective action documents (including corporate and sub-tiered systems) written

since date of last inspection, associated with:

1. National Voluntary Laboratory Accreditation Program (NVLAP)

2. Dosimetry (TLD/OSL, etc.) problems

3. Electronic alarming dosimeters

4. Bioassays or internally deposited radionuclides or internal dose

5. Neutron dose

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

List of positive whole body counts since date of last inspection, names redacted if

desired

H.

Part 61 analyses/scaling factors

I.

The most recent National Voluntary Laboratory Accreditation Program (NVLAP)

accreditation report or, if dosimetry is provided by a vendor, the vendors most recent

results

ML18127A004

SUNSI Review:

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: JDixon

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

DRP/SRI

DRP/RI

DRP/RI

C:DRS/EB1

C:DRS/EB2

C:DRS/OB

NAME

CPeabody

DReinert

DYou

TFarnholtz

JDrake

VGaddy

SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

/RA/

DATE

4/30/18

5/1/2018

5/1/18

04/30/2018

4/30/18

4/30/18

OFFICE

C:DRS/PS2

TL:IPAT

C:DRP/D

NAME

HGepford

GGeorge

GMiller

SIGNATURE

/RA/

/RA/

/RA/

DATE

4/30/18

4/30/2018

5/7/18

May 7, 2018

Mr. Robert Bement

Executive Vice President, Nuclear/CNO

Mail Station 7602

Arizona Public Service Company

P.O. Box 52034

Phoenix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION - NRC INTEGRATED

INSPECTION REPORT 05000528/2018001, 05000529/2018001, AND

05000530/2018001

Dear Mr. Bement:

On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection

at your Palo Verde Nuclear Generating Station Units 1, 2, and 3. On April 11, 2018, the NRC

inspectors discussed the results of this inspection with Mr. Jack Cadogan and other members of

your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented one finding of very low safety significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a

non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within

days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with

copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the

NRC resident inspector at the Palo Verde Nuclear Generating Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a

response within 30 days of the date of this inspection report, with the basis for your

disagreement, to the

U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the

NRC resident inspector at the Palo Verde Nuclear Generating Station.

R. Bement

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Sincerely,

/RA/

Geoffrey

B. Miller, Chief

Project Branch D

Division of Reactor Projects

Docket Nos. 50-528, 50-529, 50-530

License Nos. NPF-41, NPF-51, NPF-74

Enclosure:

Inspection Report 05000528/2018001,

05000529/2018001, 05000530/2018001

w/ Attachment:

1. Supplemental Information

2. Occupational Radiation Safety

Inspection Item Request

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Numbers:

05000528, 05000529, 05000530

License Numbers:

NPF-41, NPF-51, NPF-74

Report Numbers:

05000528/2018001, 05000529/2018001, and 05000530/2018001

Enterprise Identifier: I-2018-001-0013

Licensee:

Arizona Public Service Company

Facility:

Palo Verde Nuclear Generating Station

Location:

5801 South Wintersburg Road, Tonopah, AZ 85354

Inspection Dates:

January 1, 2018 to March 31, 2018

Inspectors:

C. Peabody, Senior Resident Inspector
D. Reinert, PhD, Resident Inspector
D. You, Resident Inspector
L. Carson, Senior Health Physicist
S. Hedger, Emergency Preparedness Inspector

Approved By:

Geoffrey

B. Miller, Chief, Project Branch D, Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station,

Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight

Process is the NRCs program for overseeing the safe operation of commercial nuclear power

reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

NRC and self-revealed findings, violations, and additional items are summarized in the table

below.

List of Findings and Violations

Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump

Cornerstone

Significance

Cross-cutting Aspect Report

Section

Mitigating

Systems

Green

NCV 05000528/2018001-01

Closed

[H.12] - Human

Performance, Avoid

Complacency

71111.12 -

Maintenance

Effectiveness

The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50,

Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe

appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A.

Specifically, following power cable maintenance on November 9, 2017, the instructions for

conducting a post-maintenance test for the transfer pump were inadequate to detect a high

resistance connection in the associated motor control center.

PLANT STATUS

Unit 1 began the inspection period at rated thermal power. On February 15, 2018, the unit

automatically tripped from full power when a control system failure caused a loss of generator

field excitation. The unit was restarted on February 19, 2018, and remained at or near rated

thermal power for the remainder of the inspection period.

Units 2 and 3 operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors performed plant status activities described in

IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem

Identification and Resolution. The inspectors reviewed selected procedures and records,

observed activities, and interviewed personnel to assess licensee performance and compliance

with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following

systems/trains:

(1) Unit 1 containment spray system B on January 4, 2018

(2) Unit 2 auxiliary feedwater system A on January 30, 2018

(3) Unit 3 control building heating ventilation and air conditioning B on March 16, 2018

Complete Walkdown (1 Sample)

The inspectors evaluated system configurations during a complete walkdown of the Unit 3

containment spray system on January 18, 2018.

71111.05AQ - Fire Protection Annual/Quarterly

Quarterly Inspection (5 Samples)

The inspectors evaluated fire protection program implementation in the following selected

areas:

(1) Unit 3 main turbine operating deck and bearings area, Fire Zones 9 and 10, on

January 4, 2018

(2) Unit 2 control room, Fire Zone 17, on January 19, 2018

(3) Unit 2 containment spray pump A room and adjacent corridor, Fire Zones 30A and 88A,

on January 23, 2018

(4) Unit 1 high pressure safety injection pump B room, Fire Zone 31B on February 2, 2018

(5) Unit 3 vital switchgear room A, Fire Zone 5A, on February 8, 2018

71111.07 - Heat Sink Performance

Heat Sink (1 Sample)

The inspectors evaluated Unit 1 diesel generator A lube oil and jacket water heat exchanger

performance on February 21, 2018.

71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance

Operator Requalification (1 Sample)

The inspectors observed and evaluated risk informed completion time program and

CFR 50.69 program classroom training on January 31, 2018.

Operator Performance (1 Sample)

The inspectors observed and evaluated operator performance synchronizing the Unit 1 main

generator to the grid following a reactor trip caused by a fault in the main generator

excitation system on February 19, 2018.

The inspectors observed and evaluated operator response to Unit 3 loss of A channel

indication for main steam and feedwater isolation valves, MSIV-170, 171, 180, 181, and

FWIV-174, 177, on February 27, 2018.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness (2 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated

with the following equipment and/or safety significant functions:

(1) Reach rod operator gear box maintenance on safety injection valves SI-184 and SI-185

in Units 2 and 3

(2) Diesel fuel oil transfer pump predictive engineering cable testing

71111.13 - Maintenance Risk Assessments and Emergent Work Control (5 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent

work activities:

(1) Unit 1 elevated risk due to failure of emergency core cooling system A combined

minimum flow recirculation valve SIA-UV660 on January 4, 2018

(2) Unit 1 emergent risk due to diesel generator A unexpectedly shutdown during a

surveillance run on January 5, 2018

(3) Unit 3 elevated risk due to planned maintenance on containment spray pump A

atmospheric dump valves SG-179A and SG-184A, and low pressure safety injection

valve SI-687 January 29, 2018 through February 4, 2018

(4) Unit 1 elevated risk due to diesel generator A super outage on February 26, 2018

(5) Unit 2 elevated risk due to diesel generator B super outage on March 19, 2018

71111.15 - Operability Determinations and Functionality Assessments (9 Samples)

The inspectors evaluated the following operability determinations and functionality

assessments:

(1) Unit 2 abnormal trend for containment sump level transmitter, RDL-411, on

January 3, 2018

(2) Unit 1 essential spray pond A pressure relief valves lifting during pump starts on

January 25, 2018

(3) Unit 3 containment spray discharge to shutdown cooling heat exchanger valve, SI-685,

failed to re-open during breaker maintenance on January 31, 2018

(4) Unit 1 diesel generator B fuel oil leak from cylinder 8L fuel oil jerk pump on

February 13, 2018

(5) Unit 1 calculated qualified life of safety injection combined header isolation valves,

SI-660 and SI-659, on February 23, 2018

(6) Unit 3 loss of indication of the train A main steam isolation valves and feedwater

isolation valves (MSIV-170, 171, 180, 181 and FWIV-174, 177) on February 27, 2018

(7) Unit 1 auxiliary feedwater bypass motor operated valves SG-138A and SG-139A

T-drains on March 6, 2018

(8) Unit 1 essential cooling water pump A oil samples appear to contain metal or debris on

March 7, 2018

(9) Unit 2 steam generator sodium concentration increase on March 12, 2018

71111.18 - Plant Modifications (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Unit 1 480V electrical breaker for containment spray to low pressure safety cross-

connect valve, SI-696, replacement with General Electrical model Spectra breaker per

Design Equivalent Change 01035 on March 15, 2018

71111.19 - Post Maintenance Testing (6 Samples)

The inspectors evaluated the following post maintenance tests:

(1) Unit 1 emergency core cooling system A combined minimum flow recirculation valve

SIA-UV660 following limit switch adjustment on January 4, 2018

(2) Unit 1 diesel generator A cooldown relay, power supply, and test hand switch

replacement following an unplanned cooldown during a monthly surveillance run on

January 9, 2018

(3) Unit 3 containment spray pump A test following breaker maintenance on

February 6, 2018

(4) Unit 3 30-volt power supply replacement for lost indication to main steam isolation valves

on February 28, 2018

(5) Unit 2 essential cooling water pump A test and flow balance following planned

maintenance to calibrate motor overcurrent relays and replace a high discharge

pressure switch on March 20, 2018

(6) Unit 2 diesel generator A emergency mode simulated engineered safeguards features

fast start test following online maintenance outage on March 23, 2018

71111.20 - Refueling and Other Outage Activities (1 Sample)

The inspectors evaluated activities from February 15 - 19, 2018, for the Unit 1 forced

outage due to an unplanned reactor trip caused by a fault in the main generator excitation

circuitry.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Routine (6 Samples)

(1) Unit 1 diesel fuel oil transfer pump A inservice test on January 24, 2018

(2) Unit 1 atmospheric dump valve 178 stroke time testing on February 9, 2018

(3) Unit 2 containment leakage type B and C testing, SR 3.0.3 entry for missed

surveillance on February 28, 2018

(4) Unit 3 diesel fuel oil transfer pump A inservice test on March 7, 2018

(5) Unit 3, essential chiller A vibration analysis on March 8, 2018

(6) Unit 1 containment spray pump B inservice test on March 22, 2018

In-service (1 Sample)

(1) Unit 2 containment spray pump A inservice test on March 1, 2018

71114.02 - Alert and Notification System Testing (1 Sample)

The inspectors evaluated the maintenance and testing of the alert and notification system

between May 1, 2016 - February 20, 2018.

71114.03 - Emergency Response Organization Staffing and Augmentation System (1 Sample)

The inspectors evaluated the readiness of the Emergency Response Organization between

May 1, 2016 - February 20, 2018. Inspectors also evaluated the licensees ability to staff

their emergency response facilities in accordance with emergency plan commitments.

71114.04 - Emergency Action Level and Emergency Plan Changes (1 Sample)

The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and

practices between May 1, 2016 - February 20, 2018. The evaluation reviewed

screenings and evaluations documenting the implementation of this process. The review

of the change process documentation does not constitute NRC approval.

71114.05 - Maintenance of Emergency Preparedness (1 Sample)

The inspectors evaluated the maintenance of the emergency preparedness program

between May 1, 2016 - February 20, 2018. The evaluation reviewed activations of the

emergency plan, the conduct of drills and exercises, licensee audits and assessments,

and the maintenance of equipment important to emergency preparedness.

71114.06 - Drill Evaluation

Emergency Planning Drill (1 Sample)

The inspectors evaluated a full-scale emergency preparedness drill on February 13, 2018.

RADIATION SAFETY

71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls

Radiological Work Planning (1 Sample)

The inspectors evaluated the licensees radiological work planning by reviewing the

following activities:

(1) RWP 2017-9-1016, RMC Operations and Routine Tasks

(2) RWP 2018-1-1523, Temporary Mat Insulation Fiber Inspection

(3) RWP 2017-3002, Reactor Destack/Restack

(4) RWP 2017-3015, Cavity Decontamination

(5) RWP 2017-3039, 10-Year In-Service Inspection Vessel

Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)

The inspectors evaluated dose estimates and exposure tracking.

71124.04 - Occupational Dose Assessment

Source Term Characterization (1 Sample)

The inspectors evaluated the licensees source term characterization.

External Dosimetry (1 Sample)

The inspectors evaluated the licensees external dosimetry program.

Internal Dosimetry (1 Sample)

The inspectors evaluated the licensees internal dosimetry program.

Special Dosimetric Situations (1 Sample)

The inspectors evaluated the licensees performance for special dosimetric situations.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification (15 Samples)

The inspectors verified licensee performance indicators submittals listed below:

(1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (January 1, 2017 -

December 31, 2017)

(2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (January 1, 2017 -

December 31, 2017)

(3) IE04: Unplanned Scrams with Complications (USwC) Sample (January 1, 2017 -

December 31, 2017)

(4) MS05: Safety System Functional Failures (SSFFs) Sample (April 1, 2017 -

December 31, 2017)

(5) EP01: Drill/Exercise Performance (DEP) Sample (January 1, 2017 - December 31,

2017)

(6) EP02: Emergency Response Organization (ERO) Drill Participation Sample (January 1,

2017 - December 31, 2017)

(7) EP03: Alert and Notification System (ANS) Reliability Sample (January 1, 2017 -

December 31, 2017)

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program

related to the following issues:

(1) Multiple failures of diesel generator underfrequency protective relay on March 26, 2018

71153 - Follow-up of Events and Notices of Enforcement Discretion

Events (1 Sample)

The inspectors evaluated the Unit 1 reactor trip following a loss of main generator excitation

and licensees response on February 15 - 16, 2018.

INSPECTION RESULTS

Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump

Cornerstone

Significance

Cross-cutting

Aspect

Report

Section

Mitigating

Systems

Green

NCV 05000528/2018001-01

Closed

[H.12] -

Human

Performance,

Avoid

Complacency

71111.12 -

Maintenance

Effectiveness

The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50,

Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe

appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A.

Specifically, following power cable maintenance on November 9, 2017, the instructions for

conducting a post-maintenance test for the transfer pump were inadequate to detect a high

resistance connection in the associated motor control center.

Description: On November 12, 2017, the licensee was conducting a 24-hour surveillance test

run of Unit 1 diesel generator (EDG) A. The EDG was fully loaded at 10:19 a.m. which began

the 24-hour test period. At 10:53 a.m., control room operators received a fuel oil transfer

pump A inoperable equipment status alarm. The diesel fuel oil transfer pump A did not start

on a diesel fuel oil day tank low level signal. Operators manually unloaded and stopped the

EDG a few minutes later and declared the Unit 1 EDG A inoperable due to its inability to run

for its design basis mission time and began troubleshooting the failed fuel oil transfer pump.

Licensee electricians took electrical resistance readings across the connections in the motor

control center for the fuel oil transfer pump breaker. The electricians identified that the direct

cause of the transfer pump failure was a high variable resistance secondary stab connection

in the motor control center cubicle. The electricians removed the breaker and cleaned and

adjusted the connection. Electricians reinstalled the breaker and confirmed an acceptable as

left connection resistance of less than 0.2 ohms. The diesel fuel oil transfer pump was

successfully retested with a 20 minute functional run and the Unit 1 EDG A was declared

operable following the successful completion of the 24-hour surveillance run on November

14, 2017.

The licensees apparent cause investigation determined that the diesel fuel oil transfer pump

breaker had been removed from service for periodic predictive maintenance on November 9,

2017, under work order 4685719. During this maintenance activity licensee engineers

disconnected the diesel fuel oil transfer pump motor power and control cables for megger

testing. Cable lug screw connections attach each of these cables to the secondary stab

connections on the movable motor breaker and the stationary motor control center chassis.

Cable connections on the secondary stab connections are removed for testing, and then

following testing, the cables are re-landed onto the secondary stabs of the breaker and motor

control center chassis. The licensees work planners had not recognized the possibility that

removing and re-landing the cables on the lug screw connections had the potential to disturb

the motor control center secondary stab connections.

The post-maintenance test associated with the cable testing was a momentary start of the

diesel fuel oil transfer pump. The transfer pumps control switch was held in the start position

for only a few seconds. The licensees apparent cause investigation identified that

nonintrusive as-left quantitative resistance checks could have been used to assess the

integrity of the secondary stab connections. The licensee performs similar checks when

performing individual breaker cubicle preventative maintenance tasks that actively remove

and re-test the individual motor control center bucket. Such a check was the method used by

the electricians to initially diagnose the breaker failure. However, no such quantitative

resistance check was specified in the cable testing work order.

The post-maintenance test was not written in accordance with station procedure 30DP-

9WP04, Post-Maintenance Testing Development, Revision 19, Step 4.1.1, which states, in

part, that the post-maintenance test shall ensure that equipment performs its intended

function when returned to service following maintenance, that a new deficiency has not been

created, and that the equipment will function as designed for safe and reliable plant operation.

The act of de-terminating and re-terminating the diesel fuel oil transfer pump cable for testing

created new failure deficiency by disturbing electrical continuity and creating a high resistance

condition at the secondary stab connection that impacted EDG operability. The post-

maintenance test following the cable testing maintenance was not adequate to ensure that a

new deficiency had not been created.

Corrective Action: The licensee has taken corrective action to revise the work instructions for

performing future cable testing to include quantitative resistance retests when re-terminating

motor control center secondary stab connections. As an interim measure, the inspectors

confirmed that all safety-related 480V electrical breakers that have been subject to this cable

testing have performed satisfactorily during subsequent diesel generator surveillance testing.

Corrective Action Reference: Condition Report 17-16497

Performance Assessment:

Performance Deficiency: The licensees failure to prescribe appropriate retest activities

following predictive maintenance on diesel fuel oil transfer pump cables is a performance

deficiency.

Screening: The performance deficiency is more-than-minor and a finding because it is

associated with the equipment performance attribute of the mitigating systems cornerstone

objective to ensure the availability, reliability, and capability of systems that respond to

initiating events to prevent undesirable consequences. Specifically, on November 9, 2017,

the licensee performed cable testing that disturbed the power cables for the Unit 1 diesel fuel

oil transfer pump

A. Without an appropriate post-maintenance test, this activity rendered the

Unit 1 diesel generator A inoperable.

Significance: The inspectors performed the initial significance determination using NRC

Inspection Manual Chapter 0609, Appendix A, Significance Determination Process for

Findings at Power, Exhibit 2, Mitigating Systems Screening Questions and determined that

the finding was of very low safety significance (Green) because the finding did not represent

an actual loss of safety function of a single train for greater that its technical specification

allowed outage time.

Cross-cutting Aspect: The finding has a cross-cutting aspect in the area of human

performance associated with the avoid complacency aspect. Specifically, licensee work

planners did not consider potential undesired consequences associated with disturbing the

power cables leads, instead relying on past successful tests [H.12].

Enforcement:

Violation: Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and

Drawings, requires, in part, that activities affecting quality be prescribed by documented

instructions, procedures, or drawings, of a type appropriate to the circumstances and be

accomplished in accordance with these instructions, procedures, or drawings.

Contrary to the above, on November 9, 2017, the licensee performed maintenance on the

Unit 1 diesel fuel oil transfer pump A, an activity affecting quality to which Appendix B applies,

without documented instructions, procedures, or drawings of a type appropriate to the

circumstances. Specifically, work order 4685719 did not include appropriate testing to ensure

the maintenance was successful and the pump was returned to service, and as a result, the

Unit 1 diesel generator A was rendered inoperable from November 9, 2017 to November 14,

2017.

Disposition: This violation is being treated as a non-cited violation consistent with Section

2.3.2.a of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On February 16, 2018, the inspector presented the radiation safety inspection results to

Ms.

M. Lacal, Senior Vice President, Regulatory and Oversight, and other members of the

licensee staff.

On March 2, 2018, the inspector provided a debrief for the emergency preparedness program

inspection to Mr.

M. McLaughlin, Vice President, Operations Support, and other members of the

licensee staff. On March 29, 2018, the inspector communicated the inspection results

telephonically to Mr.

T. Weber, Acting Director, Nuclear Regulatory Affairs, and other members

of the licensee staff.

On April 11, 2018, the inspector presented the quarterly residents inspection results to

Mr.

J. Cadogan, Senior Vice President, Site Operations, and other members of the licensee

staff.

SUPPLEMENTAL INFORMATION

DOCUMENTS REVIEWED

Section 1R04: Equipment Alignment

Procedures

Number

Title

Revision

40ST-9AF07

Auxiliary Feedwater Pump AFA-P01 Monthly Valve

Alignment

40ST-9SI13

LPSI and CS System Alignment Verification

Condition Reports (CRs)

16-17321

17-03027

Drawings

Number

Title

Revision

03-M-HJP-001

P&I Diagram Control Building HVAC

03-M-HJP-002

P&I Diagram Control Building HVAC

03-M-SIP-001

P&I Diagram Safety Injection & Shutdown Cooling System

03-P-SIF-0207

Auxiliary Building Isometric Safety Injection System LPSI &

Cont. Spray Discharge

03-P-SIF-0201

Auxiliary Building Isometric Safety Injection System ESF

Pump Suction Lines

Miscellaneous

Number

Title

Revision

STM-30D

System Training Manual Volume 30D: Control Building

HVAC System (HJ)

Section 1R05: Fire Protection

Procedures

Number

Title

Revision

14FT-9FP70

Appendix R & Former Tech Spec Penetration Seal Surveillance

Condition Reports (CRs)

17-03870

18-00999

Miscellaneous

Number

Title

Revision/Date

PVNGS Pre-Fire Strategies Manual

13-MM-0650

Fire Protection & Spray System Sub

007

13-MS-A083

NFPA Code Applicability and Conformance Review

007

4834415

Fire Safety Component Condition Record

November 3, 2016

4834430

Fire Safety Component Condition Record

November 3, 2016

4843902

Fire Safety Component Condition Record

December 6, 2016

Unit 3 Tamper/Vital/Security Tour - Post 31

February 7, 2018

4971714

Open Door/Hatch/Floor Plug Permit

January 29, 2018

4971687

Open Door/Hatch/Floor Plug Permit

January 29, 2018

Section 1R07: Heat Sink Performance

Procedures

Number

Title

Revision

73DP-9ZZ21

Heat Exchanger Visual Inspection

73DP-9ZZ11

Heat Exchanger Program

Condition Reports (CRs)

18-03133

18-03138

18-03139

Work Orders (WOs)

4591574

4591575

4667054

4667055

4667098

Section 1R11: Licensed Operator Requalification Program and Licensed Operator

Performance

Procedures

Number

Title

Revision

40OP-9MB01

Main Generation and Excitation

40DP-9OP02

Conduct of Operations

Procedures

Number

Title

Revision

40AL-9RK6A

Panel B06A Alarm Responses

Condition Reports (CRs)

18-02797

18-02593

18-03215

Miscellaneous

Number

Title

Date

Current Alarm Status Report

February 16, 2018

Section 1R12: Maintenance Effectiveness

Procedures

Number

Title

Revision

2MT-9ZZ74

Molded Case Circuit Breaker Test

30DP-9WP04

Post-Maintenance Testing Development

Condition Reports (CRs)

17-08025-005

17-08025

17-16497

Work Orders (WOs)

25959

25966

25967

25969

4685719

4788985

Section 1R13: Maintenance Risk Assessments and Emergent Work Control

Procedures

Number

Title

Revision

40DP-9AP21

Protected Equipment

70DP-0RA05

Assessment and Management of Risk when Performing

Maintenance in Modes 1 and 2

40MT-9ZZ01

Operations Maintenance Activities

40DP-9RS01

Operations Department Online Nuclear Risk Management

Mode 1 and 2

Condition Reports (CRs)

18-00249

185-00136

18-00336

18-02544

Miscellaneous

Number

Title

Date

Schedulers Evaluation for PV Unit 1

January 4, 2018

Schedulers Evaluation for PV Unit 1

February 23, 2018

Schedulers Evaluation for PV Unit 3

February 1, 2018

Schedulers Evaluation for PV Unit 2

March 19, 2018

Unit 3

Archived Operator Logs

January 29, 2018 -

February 4, 2018

Section 1R15: Operability Determinations and Functionality Assessments

Procedures

Number

Title

Revision

40ST-9ZZm1

Operations Mode 1 Surveillance Logs

40AL-9RK6A

Panel B06A Alarm Responses

74DP-9CY04

Systems Chemistry Specifications

Condition Reports (CRs)

17-18475

2-01397

17-17856

13-01198

18-03127

17-16393

18-03215

18-03291

18-02839

18-01610

18-02334

27427

18-02468

18-03980

Miscellaneous

Number

Title

Revision/Date

03-E-SGF-023

Control Wiring Diagram Main Steam Isolation Valves

18-02334-003

Engineering Evaluation

February 15, 2018

28056

Adverse CRDR

July 19, 2013

EQ Program Manual

Section 1R18: Plant Modifications

Condition Reports (CRs)

18-04116

Work Orders (WOs)

4989102

Miscellaneous

Number

Title

Date

DEC-01035

Design Equivalent Change

April 12, 2017

Section 1R19: Post-Maintenance Testing

Procedures

Number

Title

Revision

40OP-9CH12

Refueling Water Tank (RWT) Operations

2MT-9ZZ13

Testing and Calibration of 121FC66K01A Time Overcurrent

Relays

2MT-9ZZ17

Testing and Calibration of 12PJC11AV1A Instantaneous

Overcurrent Relays

40OP-9EW02

Essential Cooling Water System (EW) Train B

40ST-9DG01

Diesel Generator A Test

73ST-9DG08

Class 1E Diesel Generator Load Reject 24 Hour Rated Load

and Hot Start Test Train B

40ST-9DG02

Diesel Generator B Test

Condition Reports (CRs)

18-00136

18-00197

18-01931

18-00210

18-00290

18-00336

18-00377

18-00346

18-04731

18-04732

Work Orders (WOs)

4964492

22983

4981967

26747

21113

4847651

4965079

4972486

4847637

Drawings

Number

Title

Revision

01-E-DGB-007

Elementary Diagram: Diesel Engine Control

01-E-DGF-007

Control Wiring Diagram: Diesel Engine

13-M018-00141

Control Schematic (Starting Sequence Control)

Miscellaneous

Number

Title

Revision/Date

18-00210-004

Engineering Evaluation: EDG 1A Unexpected Cooldown

during Surveillance Run 1/5/2018

January 8, 2018

Section 1R20: Refueling and Other Outage Activities

Procedures

Number

Title

Revision

40OP-9MB01

Main Generation and Excitation

Section 1R22: Surveillance Testing

Procedures

Number

Title

Revision

73DP-9CL02

Containment Leakage Rate Testing Program

73ST-9XI20

Atmospheric Dump Valves - Inservice Test

73ST-9SI06

Containment Spray Pumps and Check valves - Inservice

Test

73ST-9DF01

Diesel Fuel Oil Transfer Pumps - Inservice Test

40DP-9OP06

Operations Department Repetitive Task Program

130

73ST-9SI06

Containment Spray Pumps and Check Valves-Inservice

Test

Condition Reports (CRs)

16-15793

18-03304

18-01314

18-03825

Work Orders (WOs)

22921

4840032

4843076

4843390

Miscellaneous

Number

Title

Revision/Date

13-JC-SI-0215

Containment Spray Pump Discharge Flow Indication

Loops Uncertainty Calculation

18-01314-002

Engineering Evaluation: ADV 178 Fast Stroke Time

January 26, 2018

18-03304-002

Engineering Evaluation: SR 3.0.3 Evaluation for

SB-200, 202, and 205

March 2, 2018

Section 1EP2: Alert and Notification System Testing

Miscellaneous Documents

Number

Title

Date

ID/Letter

Number:

240-02802

Palo Verde Nuclear Generating Station Alert and

Notification System (ANS) FEMA 350 Report -

May 2017

May 26, 2017

Palo Verde Nuclear Generating Station, Alert and

Notification System (ANS), FEMA 350 Report

May 2017

Palo Verde Nuclear Generating Station Siren Operating

Manual

November 2015

January 4, 2018

Letter from FEMA Region IX to Director, Division of

Emergency Management, State of Arizona

September 19,

2017

State of Arizona/Maricopa County Offsite Emergency

Response Plan, Palo Verde Nuclear Generating Station

November 2017

The Maricopa County Sheriffs Office Emergency

Response to Palo Verde Nuclear Generating Station

August 2016

Work Orders (WOs)

474965/0

Section 1EP3: Emergency Response Organization Staffing and Augmentation

Procedures

Number

Title

Revision

EP-0902

Notifications

EP-0901

Classifications

40AL-9RK7C

Panel B07C Alarm Responses

40AO-9ZZ21

Acts of Nature

79IS-9SM01

Analysis of Seismic Event

Miscellaneous Documents

Number

Title

Date

240-02799

JF/MA

2017 1st Quarter - Emergency Preparedness

Augmentation Drill Report

March 21, 2017

240-02803

CS/MA

2017 2nd Quarter - Emergency Preparedness

Augmentation Drill Report

June 6, 2017

240-02797

2017 3rd Quarter - Emergency Preparedness

Augmentation Drill Report (After Hours)

July 25, 2017

240-02808

2017 3rd Quarter - Emergency Preparedness

Augmentation Drill Report

September 6, 2017

240-02817

CS/ma

2017 4th Quarter - Emergency Preparedness

Augmentation Drill Report

December 13,

2017

240-02790

JF/MA

2016 2nd Quarter - Emergency Preparedness

Augmentation Drill Report

June 23, 2016

240-02791

JF/MA

2016 3rd Quarter - Emergency Preparedness

Augmentation Drill Report

August 3, 2016

240-02798

December 5, 2016, Alert Event Report

January 17, 2017

Section 1EP4: Emergency Action Level and Emergency Plan Changes

Procedure

Number

Title

Revision

16DP-0EP22

Emergency Plan Maintenance

11, 12

Miscellaneous Documents

Number

Title

Date

Evaluation

Tracking Number

2017-001E

Replace the Meteorological Instrumentation and Data

Transmission System (MDTS)

August 8, 2017

Evaluation

Tracking Number

2017-003E

EP-0900, Rev. 16

August 17, 2017

Evaluation

Tracking Number

2017-004E

EP-0901, Rev. 10

August 21, 2017

Screening

Tracking Number

2017-002S

74RM-9EF42, Radiation Monitor Alarm Setpoint

Determination, Rev. 30

April 16, 2017

Screening

Tracking Number

2017-022S

Procedure EP-0901, Classifications, Added New EALs

form EPLAN R60, Revise PV Proc Format

August 20, 2017

Miscellaneous Documents

Number

Title

Date

Screening

Tracking Number

2017-014S

EP-905, Revision 9, Protective Actions

June 7, 2017

Screening

Tracking Number

2017-023S

DMWO 3452940 Palo Verde Nuclear Generating

Station Radio Replacement Project

September 8,

2017

Screening

Tracking Number

2017-029S

40AO-9ZZ18 R018 Fire Outside Control Room

September 26,

2017

EPM Tracking

Number

2015-006S

DEC-00720 Allow Solar-Charged Offsite Sirens to

Replace AC-Charged Offsite Sirens

February 18,

2015

Section 1EP5: Maintenance of Emergency Preparedness

Procedures

Number

Title

Revision

01DP-0AP12

Condition Reporting Process

01DP-0AP12-01

Condition Reporting Process Administrative Guide

EP-0905

Protective Actions

EP-0902

Notifications

8, 9, 10

16DP-0EP31

Emergency Preparedness Equipment Out-of-Service

16DP-0EP27

Emergency Preparedness Equipment Testing

16DP-0EP28

Emergency Facility/Kit Inventories and Inspections

Condition Reports (CRs)

16-08461

16-09213

16-11134

16-11930

16-12640

16-13501

16-14593

16-14934

16-16710

17-02188

17-03147

17-03149

17-03202

17-03605

17-03721

17-03736

17-03826

17-03828

17-03829

17-03884

17-04633

17-06893

17-08328

17-10906

17-10949

17-11437

17-13663

17-14927

17-15449

17-15797

17-15884

17-16771

17-17091

17-17218

17-17739

17-18443

18-03244

Miscellaneous Documents

Number

Title

Revision/Date

KLD TR-983

Palo Verde Nuclear Generating Station,

2017 Population Update Analysis

December 7,

2017

KLD TR-895

Palo Verde Nuclear Generating Station,

2016 Population Update Analysis

December 8,

2016

Updated Review of Palo Verde Nuclear Generating

Station Emergency Plan 2016 Letters of Agreement

September 29,

2016

Letter # 240-

2819

2017 Review of Palo Verde Nuclear Generating Station

Emergency Plan Letters of Agreement

December 26,

2017

NAD Audit 2016-

010

Nuclear Assurance Department (NAD) Audit Plan and

Report, 2016-010, Emergency Preparedness

December 14,

2016

Palo Verde Nuclear Generating Station After Action

Report/Improvement Plan, Exercise Date - June 1,

2017, Radiological Emergency Preparedness Program

August 18,

2017

ID: 240-02806

2017 Onsite Contaminated Injury/Health Physics Drill

Report (Revised)

June 23, 2017

ID: 240-02816

2017 Health Physics Drill Report (November 2017)

December 12,

2017

ID: 240-02818

1709 ERO Mini Drill - ERO Blue Team

(December 2017)

December 21,

2017

NAD Audit 2017-

008

Nuclear Assurance Department (NAD) Audit Plan and

Report, 2017-008, Emergency Preparedness

January 25,

2018

240-02812

CS/MA

1704 and 1705 ERO Mini Drills - ERO White Team and

Green Team (June and July 2017)

October 18,

2017

240-02813

CS/MA

1706 ERO Mini Drill - ERO Gold Team (July 2017)

October 18,

2017

240-02814

TW/MA

1707 ERO Mini Drill - ERO Red Team (August 2017)

Revision 1

October 18,

2017

Emergency Response Facility Telephone Book,

1st Quarter Edition 2018

January 1,

2018

240-02801

JF/MA

1702 IPZ Evaluated Exercise - ERO White Team

(March 2017)

April 6, 2017

240-02797

JF/MA

1608 ERO Mini Drill - ERO Red Team

(December 2016)

January 4,

2017

240-02792

JF/MA

1604 and 1605 ERO Drills

September 14,

2016

240-02793

JF/MA

1606 ERO Mini Drill - ERO Green Team

(September 2016)

October 4,

2016

Miscellaneous Documents

Number

Title

Revision/Date

240-02795

JF/MA

1609 Off-Hours Drive-in Augmentation Drill -

(November 2016)

December 2,

2016

240-02796

2016 Health Physics Drill Report (November 2016)

December 7,

2016

Evaluation

Report 16-11134

Evaluate Adding STSC ENS Communicator Duties to

STSC Communicator

September 7,

2016

17-11437-002

Actual Event Investigation, Unit 3 Ammonia Sight glass

Break

September 28,

2017

17-13663-001

Actual Event Investigation, Unit 2 Loss of Annunciators

October 11,

2017

Level 4

Evaluation

Report 17-

15797-001

Default Values Used in Dose Assessment

November 30,

2017

Document No.

500599510

Master Agreement Between Arizona Public Service

Company and Westinghouse Electric Company LLC for

Goods and Services (Effective January 29, 2016 to

December 31, 2018)

Palo Verde Nuclear Generating Station After Action

Report/Improvement Plan, Exercise Dates - March 7-8,

2017, Radiological Emergency Preparedness Program

(REPP)

May 26, 2017

240-02789

JF/TW

2016 Health Physics Drill Report (Re-Demonstration)

June 9, 2016

240-02788

JF/MA

2016 Contaminated Injury/Health Physics Drill Report

April 22, 2016

Palo Verde Nuclear Generating Station After Action

Report/Improvement Plan, Exercise Date -

November 16, 2016, Radiological Emergency

Preparedness Program (REPP)

February 9,

2017

240-02787

JF/MA

1602 IPZ Exercise - ERO Green Team (March 2016)

March 25, 2016

Palo Verde Nuclear Generating Station After Action

Report/Improvement Plan, Exercise Date -

November 16, 2016, Radiological Emergency

Preparedness Program (REPP)

February 9,

2017

Level 3 Evaluation Report 18-02668-002

March 22, 2018

Work Orders (WOs)

4782667

4783959/0

4787729/0

4787847/0

4836236

4836263/0

4860832/0

4862234/0

4862502/0

4885361/0

4889725/0

4896971/0

4901070

4916668/0

4918303/0

4918455/0

4937577/0

4947802/0

Section 1EP6: Drill Evaluation

Procedures

Number

Title

Revision

EP-0900

Emergency Response Organization (ERO) Position

Checklists

EP-0901

Classifications

Condition Reports (CRs)

18-02352

18-02503

18-02655

Section 2RS2: Occupational ALARA Planning and Controls

Procedures

Number

Title

Revision

75DP-0RP03

ALARA Program Overview

75DP-0RP06

ALARA Committee

75DP-0RP08

Managing Radiological Risk

75RP-9RP02

Radiation Work Permits

75RP-9RP25

Temporary Shielding

75TD-9RP02

ALARA Work Planning

Audits and Self-Assessments

Title

Date

PVGS Integrated Performance Assessment Report Radiation

Protection 2nd Quarter 2017

September 14, 2017

2016 Annual ALARA/Management Evaluation Report

June 23, 2017

2016 Annual Radiation Protection Program Summary Report

July 27, 2017

Condition Reports (CRs)

17-15502

17-15529

17-15802

17-16741

17-17944

17-18180

18-01890

Radiation Work Permits/ALARA Reviews

Number

Title

RWP 2017-9-1016

RMC Operations and Routine Tasks

RWP 2018-1-1523

Temporary Mat Insulation Fiber Inspection

RWP 2017-3002

Reactor Destack/Restack

RWP 2017-3015

Cavity Decontamination

RWP 2017-3039

10-Year In-Service Inspection Vessel

Miscellaneous

Title

Date

ALARA 5-Year Plan 2015 - 2019

November 2015

1R20 Radiological Safety Summary In Perspective

November 7, 2017

2R20 Radiological Safety Summary In Perspective

May 9, 2017

3R19 Radiological Safety Summary In Perspective

November 10, 2016

Section 2RS4 : Occupational Dose Assessment

Procedures

Number

Title

Revision

75DP-0RP01

RP Program Overview

75DP-0RP06

Managing Radiological Risk

75RP-9ME23

Exposure Evaluation for Lost, Damaged, or Suspect

Dosimetry, and Anticipated EPD Dose Rate Alarm

75RP-9ME24

Dosimetry Processing, Evaluation, and Documentation

75RP-9ME25

TLD Reader Calibration and Response Check

75RP-9RP03

Bioassay Analysis

75RP-9RP05

Contamination Dose Evaluation

75RP-9RP16

Special Dosimetry

75RP-9QE21

Calibration of Self-Indicating Dosimeters

Procedures

Number

Title

Revision

75RP-9QE26

Operation and Verification of the Merlin Gerin Model CDM-

Calibrator

Audits and Self-Assessments

Title

Date

2016 Annual ALARA/Management Evaluation Report

June 23, 2017

2016 Annual Radiation Protection Program Summary Report

July 27, 2017

Condition Reports (CRs)

17-14033

17-14127

17-14527

17-15700

18-01423

Self-Reading Dosimeter Calibration Records

Number

Title

Date

837097

Self-Reading Dosimeter

September 8, 2017

836204

Self-Reading Dosimeter

September 9, 2017

833059

Self-Reading Dosimeter

September 30, 2017

810641

Self-Reading Dosimeter gamma/neutron

December 12, 2017

810633

Self-Reading Dosimeter gamma/neutron

December 12, 2017

810552

Self-Reading Dosimeter gamma/neutron

December 13, 2017

Miscellaneous

Number

Title

Date

2017

Multi-Pack TLD Results

2017

100536

NVLAP Accreditation Report

April 8, 2016

100536

NVLAP Proficiency Testing Results - TLD

May 2, 2016

100536

NVLAP Proficiency Testing Results-EPD

August 5, 2016

100536

NVLAP Accreditation Report

February 15, 2018

2017

Unit 1 Dry Active Waste

December 1, 2017

2017

Unit 2 Dry Active Waste

May 18, 2017

2016

Unit 3 Dry Active Waste

December 22, 2016

25116

Intake Dose Assessment

April 21, 2016

Miscellaneous

Number

Title

Date

47194

Personnel Dosimetry Processing Report

November 15, 2017

Section 4OA1: Performance Indicator Verification

Miscellaneous

Number

Title

Date

2016-002-01

Licensee Event Report

June 27, 2017

2017-001-00

June 27, 2017

June 14, 2017

Palo Verde Plant Computer PI ProcessBook

Palo Verde Control Room Logs (1/1/17 - 12/31/17)

Section 4OA2: Problem Identification and Resolution

Procedures

Number

Title

Revision

40ST-9DG01

Diesel Generator A Test

Condition Reports (CRs)

17-15901

18-03517

17-15838

17-11155

17-09750

16-03783

Section 4OA3: Follow-up of Events and Notices of Enforcement Discretion

Condition Reports (CRs)

18-02544

18-02688

18-02664

18-02605

18-02716

The following items are requested for the

Occupational Radiation Safety Inspection

at Palo Verde Nuclear Generating Station, Units 1, 2, and 3

February 12 to 16, 2018

Integrated Report 2018001

Inspection areas are listed in the attachments below.

Please provide the requested information on or before January 26, 2018.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled

1-A, applicable organization charts in file/folder 1-B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the onsite inspection dates, so the inspectors will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or

louis.carson@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

2.

Occupational ALARA Planning and Controls (71124.02)

Date of Last Inspection:

October 20, 2017

A.

List of contacts and telephone numbers for ALARA program personnel

B.

Applicable organization charts

C.

Copies of audits, self-assessments, and LERs, written since date of last inspection,

focusing on ALARA

D.

Procedure index for ALARA Program

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures may be requested by number after the inspector reviews

the procedure indexes.

1. ALARA Program

2. ALARA Committee

3. Radiation Work Permit Preparation

F.

A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection, related to the ALARA program. In addition

to ALARA, the summary should also address Radiation Work Permit violations,

Electronic Dosimeter Alarms, and RWP Dose Estimates

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

List of work activities greater than 1 rem, since date of last inspection,

Include original dose estimate and actual dose.

H.

Site dose totals and 3-year rolling averages for the past 3 years (based on dose of

record)

I.

Outline of source term reduction strategy

J.

If available, provide a copy of the ALARA outage report for the most recently completed

outages for each unit

K.

Please provide your most recent Annual ALARA Report.

4. Occupational Dose Assessment (Inspection Procedure 71124.04)

Date of Last Inspection:

January 22, 2016

A.

List of contacts and telephone numbers for the following areas:

1. Dose Assessment personnel

B.

Applicable organization charts

C.

Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since date of last inspection, related to:

1. Occupational Dose Assessment

D.

Procedure indexes for the following areas:

1. Occupational Dose Assessment

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Radiation Protection Program

2. Radiation Protection Conduct of Operations

3. Personnel Dosimetry Program

4. Radiological Posting and Warning Devices

5. Air Sample Analysis

6. Performance of High Exposure Work

7. Declared Pregnant Worker

8. Bioassay Program

F.

List of corrective action documents (including corporate and sub-tiered systems) written

since date of last inspection, associated with:

1. National Voluntary Laboratory Accreditation Program (NVLAP)

2. Dosimetry (TLD/OSL, etc.) problems

3. Electronic alarming dosimeters

4. Bioassays or internally deposited radionuclides or internal dose

5. Neutron dose

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G.

List of positive whole body counts since date of last inspection, names redacted if

desired

H.

Part 61 analyses/scaling factors

I.

The most recent National Voluntary Laboratory Accreditation Program (NVLAP)

accreditation report or, if dosimetry is provided by a vendor, the vendors most recent

results

ML18127A004

SUNSI Review:

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: JDixon

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

DRP/SRI

DRP/RI

DRP/RI

C:DRS/EB1

C:DRS/EB2

C:DRS/OB

NAME

CPeabody

DReinert

DYou

TFarnholtz

JDrake

VGaddy

SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

/RA/

DATE

4/30/18

5/1/2018

5/1/18

04/30/2018

4/30/18

4/30/18

OFFICE

C:DRS/PS2

TL:IPAT

C:DRP/D

NAME

HGepford

GGeorge

GMiller

SIGNATURE

/RA/

/RA/

/RA/

DATE

4/30/18

4/30/2018

5/7/18