| title = Responds to 850308 Ltr Re Inconsistencies Between Three Mechanical/Piping Ssers & Three Related Qa/Qc Ssers.Subj Matter Concerning AQ-7 Will Be Covered Under AQW-30 in Mech 2
| title = Responds to Re Inconsistencies Between Three Mechanical/Piping Ssers & Three Related Qa/Qc Ssers.Subj Matter Concerning AQ-7 Will Be Covered Under AQW-30 in Mech 2
| author name = Shao L
| author name = Shao L
| author affiliation = NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
| author affiliation = NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
Line 12: Line 12:
| case reference number = FOIA-85-59
| case reference number = FOIA-85-59
| document report number = NUDOCS 8606250093
| document report number = NUDOCS 8606250093
| title reference date = 03-08-1985
| package number = ML20197J178
| package number = ML20197J178
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
Line 19: Line 20:
=Text=
=Text=
{{#Wiki_filter:j
{{#Wiki_filter:j
                                                                                          ~
~
                                                                                                                      . .e lj    *. ..      es caro
.e l
                                                                                                        /
/
              +           o 3
es caro j
8 g
3
o UNITED STATES NUCLEAR REGULATORY COMMISSION GAL  -
+
    ;.      3               ,E                         WASHINGTON, D. C. 20555
o UNITED STATES GAL g
8 NUCLEAR REGULATORY COMMISSION o
3
,E WASHINGTON, D. C. 20555
\\*****$'
[
[
            \*****$'                                    .
MAR 2 51985 i
MAR 2 51985 i                                       :
q NOTE T0:
q NOTE T0:           Joe Scinto FROM:             L. Shao, Group Leader, Civil / Mechanical Groups       -
Joe Scinto FROM:
Comanche Peak Technical Review Team
L. Shao, Group Leader, Civil / Mechanical Groups Comanche Peak Technical Review Team


==SUBJECT:==
==SUBJECT:==
CONSISTENCY BETWEEN MECHANICAL AND QA/QC SSER i
CONSISTENCY BETWEEN MECHANICAL AND QA/QC SSER i
4
4
)                       In your note to me and Herb Livermore on 3/8/85, you pointed out some
)
;                      inconsistencies between three Mechanical / Piping SSERs and three related
In your note to me and Herb Livermore on 3/8/85, you pointed out some inconsistencies between three Mechanical / Piping SSERs and three related
{                       QA/QC SSERs. The following is our response:
{
: 1. Mech 2 (AQW 30) vs QA/QC AQ 7 5
QA/QC SSERs. The following is our response:
1.
Mech 2 (AQW 30) vs QA/QC AQ 7 5
After discussion with QA/QC, we both concluded that the subject matter related to AQ-7 will be covered under AQW-30 in Mech 2.
After discussion with QA/QC, we both concluded that the subject matter related to AQ-7 will be covered under AQW-30 in Mech 2.
: 2. Mech 43 vs QA/QC 8 4                             The subject matter on liner plate has been discussed and resolved in j                           such a way that we refer all QA/QC aspects to QA/QC 8 and they refer a                           all mechanical / piping aspects to Mech 43. As for what kind of picture to represent TRT as a whole, I think it has to be decided by Noonan.
2.
: 3. Mech 10 vs QA/QC AQ 61 We found that these two SSERs do not address the same subject matter.
Mech 43 vs QA/QC 8 4
J                             Mech 10 relates to a gouge in pipe and QA/QC AQ 61 relates to gouges
The subject matter on liner plate has been discussed and resolved in j
[                             in a structure member. They even have different allegers.
such a way that we refer all QA/QC aspects to QA/QC 8 and they refer a
1 h                       Dr. Hou in our Group has discussed with Herb Livermore and Herb agreed with
all mechanical / piping aspects to Mech 43. As for what kind of picture to represent TRT as a whole, I think it has to be decided by Noonan.
(                       above resolutions.
3.
Mech 10 vs QA/QC AQ 61 We found that these two SSERs do not address the same subject matter.
J Mech 10 relates to a gouge in pipe and QA/QC AQ 61 relates to gouges
[
in a structure member.
They even have different allegers.
1 h
Dr. Hou in our Group has discussed with Herb Livermore and Herb agreed with
(
above resolutions.
k t
k t
L. C. Shao, <roup Leader Civil / Mechanical Groups Comanche Peak Technical Review Team cc:     D. Eisenhut
L. C. Shao, <roup Leader Civil / Mechanical Groups Comanche Peak Technical Review Team
)!.                              V. Noonon i
)!.
6               -
cc:
laulam S. ou m
D. Eisenhut V. Noonon i
;                            -R. C. Tang P. Chen c r          kN       hofj3 860611 GARDE 85-59               PDR I                                   -
laulam m 6
I _ .- % -                    -
S.
__    ._ _._ __}}
ou
-R. C. Tang P. Chen kN hofj3 860611 c r GARDE 85-59 PDR I
I.- % -
.}}

Latest revision as of 07:37, 10 December 2024

Responds to Re Inconsistencies Between Three Mechanical/Piping Ssers & Three Related Qa/Qc Ssers.Subj Matter Concerning AQ-7 Will Be Covered Under AQW-30 in Mech 2
ML20199G133
Person / Time
Site: Comanche Peak, 05000000
Issue date: 03/25/1985
From: Shao L
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
To: Scinto J
NRC
Shared Package
ML20197J178 List: ... further results
References
FOIA-85-59 NUDOCS 8606250093
Download: ML20199G133 (1)


Text

j

~

.e l

/

es caro j

3

+

o UNITED STATES GAL g

8 NUCLEAR REGULATORY COMMISSION o

3

,E WASHINGTON, D. C. 20555

\\*****$'

[

MAR 2 51985 i

q NOTE T0:

Joe Scinto FROM:

L. Shao, Group Leader, Civil / Mechanical Groups Comanche Peak Technical Review Team

SUBJECT:

CONSISTENCY BETWEEN MECHANICAL AND QA/QC SSER i

4

)

In your note to me and Herb Livermore on 3/8/85, you pointed out some inconsistencies between three Mechanical / Piping SSERs and three related

{

QA/QC SSERs. The following is our response:

1.

Mech 2 (AQW 30) vs QA/QC AQ 7 5

After discussion with QA/QC, we both concluded that the subject matter related to AQ-7 will be covered under AQW-30 in Mech 2.

2.

Mech 43 vs QA/QC 8 4

The subject matter on liner plate has been discussed and resolved in j

such a way that we refer all QA/QC aspects to QA/QC 8 and they refer a

all mechanical / piping aspects to Mech 43. As for what kind of picture to represent TRT as a whole, I think it has to be decided by Noonan.

3.

Mech 10 vs QA/QC AQ 61 We found that these two SSERs do not address the same subject matter.

J Mech 10 relates to a gouge in pipe and QA/QC AQ 61 relates to gouges

[

in a structure member.

They even have different allegers.

1 h

Dr. Hou in our Group has discussed with Herb Livermore and Herb agreed with

(

above resolutions.

k t

L. C. Shao, <roup Leader Civil / Mechanical Groups Comanche Peak Technical Review Team

)!.

cc:

D. Eisenhut V. Noonon i

laulam m 6

S.

ou

-R. C. Tang P. Chen kN hofj3 860611 c r GARDE 85-59 PDR I

I.- % -

.