ML23303A218: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:November 6, 2023 | {{#Wiki_filter:November 6, 2023 LICENSEE: | ||
Wolf Creek Nuclear Operating Corporation FACILITY: | |||
LICENSEE: Wolf Creek Nuclear Operating Corporation | Wolf Creek Generating Station, Unit 1 | ||
FACILITY: Wolf Creek Generating Station, Unit 1 | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF OCTOBER 16, 2023, PRE-SUBMITTAL TELECONFERENCE WITH WOLF CREEK NUCLEAR OPERATING CORPORATION REGARDING A LICENSE AMENDMENT REQUEST TO ADOPT TSTF-505 FOR WOLF CREEK GENERATING STATION, UNIT 1 (EPID L-2023-LRM-0076) | OF OCTOBER 16, 2023, PRE-SUBMITTAL TELECONFERENCE WITH WOLF CREEK NUCLEAR OPERATING CORPORATION REGARDING A LICENSE AMENDMENT REQUEST TO ADOPT TSTF-505 FOR WOLF CREEK GENERATING STATION, UNIT 1 (EPID L-2023-LRM-0076) | ||
On October 16, 2023, an Observation public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Wolf Creek Nuclear Operating Corporation (the licensee). The purpose of the pre-submittal teleconference was to discuss preliminary information regarding the licensees planned submission of a license amendment request (LAR) for Wolf Creek Generating Station, Unit 1 (Wolf Creek), to adopt Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF [Risk-Informed TSTF] Initiative 4b (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18183A493). The NRC issued a model safety evaluation (SE) approving TSTF-505, Revision 2, on November 21, 2018 (ML18269A041). The licensees presentation slides are available in ADAMS at Accession No. ML23275A171. The meeting notice and agenda dated October 5, 2023, are available in ADAMS at Accession No. ML23278A026. A list of attendees is enclosed. | |||
On October 16, 2023, an Observation public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and | During the meeting, the licensee indicated that the proposed risk-informed completion time (RICT) methodology would be based on Nuclear Energy Institute (NEI) 06-09, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (RMTS) | ||
Guidelines. The NRC staff issued a model SE approving NEI 06-09 on May 17, 2007 (ML071200238). The licensee indicated that the proposed RICT would apply to 50 Wolf Creek technical specification (TS) required actions. The RICT would not apply to shutdown conditions because the licensee has not developed a shutdown probabilistic risk assessment (PRA) model for Wolf Creek. The proposed LAR would also include adoption of TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time From Discovery of Failure to Meet an LCO | |||
During the meeting, the licensee indicated that the proposed risk-informed completion time (RICT) methodology would be based on Nuclear Energy Institute (NEI) 06-09, Risk-Informed Technical Specifications Initiative 4b, | |||
Guidelines. The NRC staff issued a model SE approving NEI 06-09 on May 17, 2007 (ML071200238). The licensee indicated that the proposed RICT would apply to 50 Wolf Creek technical specification (TS) required actions. The RICT would not apply to shutdown conditions because the licensee has not developed a shutdown probabilistic risk assessment (PRA) model for Wolf Creek. The proposed LAR would also include adoption of TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time | |||
[Limiting Condition for Operation]. The NRC issued a model SE approving TSTF-439, Revision 2, on January 11, 2006 (ML060120272). The licensee indicated that TSTF-439 affected 10 Wolf Creek TS required actions. | [Limiting Condition for Operation]. The NRC issued a model SE approving TSTF-439, Revision 2, on January 11, 2006 (ML060120272). The licensee indicated that TSTF-439 affected 10 Wolf Creek TS required actions. | ||
The licensee has assessed its PRA model against the American Society of Mechanical Engineers (ASME)/American Nuclear Society (ANS) PRA Standard RA-Sa-2009 and Regulatory Guide 1.200, Revision 2, An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities, dated March 2009 (ML090410014). The licensee indicated that its seismic-induced fire PRA was under peer review and would be addressed in the LAR. The licensees goal would be no open facts and observations (F&O) and any remaining F&Os would be dispositioned in the LAR. | |||
The licensee has assessed its PRA model against the American Society of Mechanical Engineers (ASME)/American Nuclear | |||
The NRC staff discussed the importance of lessons learned from past precedence, for example, resolving the issue of joint human error probability. The NRC staff also discussed the purpose of the NRC staffs regulatory audit. The NRC staff noted that the Wolf Creek TSFT-505 audit would be late compared with a typical review schedule, because the licensee could support the audit after the completion of the spring 2024 outage. The NRC staff commented that the licensee should consider supplementing its LAR after the audit instead of waiting for the NRC staffs request for additional information, thus saving time in the review process. | The NRC staff discussed the importance of lessons learned from past precedence, for example, resolving the issue of joint human error probability. The NRC staff also discussed the purpose of the NRC staffs regulatory audit. The NRC staff noted that the Wolf Creek TSFT-505 audit would be late compared with a typical review schedule, because the licensee could support the audit after the completion of the spring 2024 outage. The NRC staff commented that the licensee should consider supplementing its LAR after the audit instead of waiting for the NRC staffs request for additional information, thus saving time in the review process. | ||
The licensee indicated that it planned to submit the TSTF-505 LAR in November 2023. | The licensee indicated that it planned to submit the TSTF-505 LAR in November 2023. | ||
No regulatory decisions were made at the meeting. | No regulatory decisions were made at the meeting. | ||
Please direct any inquiries to me at 301-415-3168 or by email at Samson.Lee@nrc.gov. | |||
Please direct any inquiries to me at 301-415-3168 or by email at Samson.Lee@nrc.gov. | /RA/ | ||
Samson S. Lee, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-482 | |||
Samson S. Lee, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |||
Docket No. 50-482 | |||
==Enclosure:== | ==Enclosure:== | ||
List of Attendees | List of Attendees cc: Listserv | ||
cc: Listserv | |||
Contractors to Wolf Creek Nuclear Operating Corporation Steve Wideman - Consultant to Wolf Creek Bruce Morgen - EPM Risk Services Casey Weiser - EPM Risk Services Carroll Trull - EPM Risk Services Travis Weber - EPM Risk Services Bill Victor - Excel Services | Enclosure LIST OF ATTENDEES OCTOBER 16, 2023, PRE-SUBMITTAL TELECONFERENCE REGARDING TSTF-505, REVISION 2, PROVIDE RISK-INFORMED EXTENDED COMPLETIONS TIMES - | ||
RITSTF [RISK-INFORMED TSTF] INITIATIVE 4b LICENSE AMENDMENT REQUEST WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION, UNIT 1 U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation Gurjendra Bedi -DEX,1 Mechanical Engineering and Inservice Testing Branch Edmund Kleeh - DEX, Electrical Engineering Branch Hang Vu - DEX, Instrumentation and Controls Branch Samson Lee - Division of Operating Reactor Licensing, Plant Licensing Branch IV Robert Pascarelli - Branch Chief, DRA,2 APLA3 Adrienne Brown - DRA, APLA Malcolm Patterson - DRA, APLA Naeem Iqbal - DRA, APLB4 Charles Moulton - DRA, APLB Steven Alferink - DRA, PRA Licensing Branch C Brian Wittick - Branch Chief, DSS,5 SCPB6 David Nold - DSS, SCPB Noushin Amini - DSS, SNSB7 Santosh Bhatt - DSS, SNSB Andrea Russell - DSS, STSB8 Khadijah West - DSS, STSB 1 Division of Engineering and External Hazards 2 Division of Risk Assessment 3 Probabilistic Risk Assessment (PRA) Licensing Branch A 4 PRA Licensing Branch B 5 Division of Safety Systems 6 Containment and Plant Systems Branch 7 Nuclear Systems Performance Branch 8 Technical Specifications Branch Wolf Creek Nuclear Operating Corporation Jaime McCoy - Site Vice President Mike Boyce - Vice President of Engineering Dustin Hamman - Director Nuclear and Regulatory Affairs Frank Galati - Senior Manager Nuclear Engineering Jeff Suter - Engineering Manager (Presenter) | |||
David Vu - Lead Engineer Nuclear Engineering/PRA Lu Huang - Lead Engineer Nuclear Engineering/PRA Paul Nguyen - Nuclear Engineer Colby Thordsen - Licensing Engineer Jason Knust - Lead Engineer Licensing Nathan Lee - Lead Engineer Licensing/Acting Manager of Licensing Contractors to Wolf Creek Nuclear Operating Corporation Steve Wideman - Consultant to Wolf Creek Bruce Morgen - EPM Risk Services Casey Weiser - EPM Risk Services Carroll Trull - EPM Risk Services Travis Weber - EPM Risk Services Bill Victor - Excel Services | |||
ML23303A215 (Package) | ML23303A215 (Package) | ||
ML23278A026 (Meeting Notice) | ML23278A026 (Meeting Notice) | ||
ML23275A171 (Meeting Slides) | ML23275A171 (Meeting Slides) | ||
ML23303A218 (Meeting Summary) *concurrence by email NRC-001 OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA* NRR/DORL/LPL4/BC* NRR/DORL/LPL4/PM* | ML23303A218 (Meeting Summary) | ||
*concurrence by email NRC-001 OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA* NRR/DORL/LPL4/BC* NRR/DORL/LPL4/PM* | |||
NAME SLee PBlechman JDixon-Herrity SLee DATE 10/30/2023 10/31/2023 11/6/2023 11/6/2023}} | NAME SLee PBlechman JDixon-Herrity SLee DATE 10/30/2023 10/31/2023 11/6/2023 11/6/2023}} |
Latest revision as of 08:04, 25 November 2024
ML23303A218 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 11/06/2023 |
From: | Samson Lee NRC/NRR/DORL/LPL4 |
To: | Wolf Creek |
References | |
EPID L-2023-LRM-0076 | |
Download: ML23303A218 (1) | |
Text
November 6, 2023 LICENSEE:
Wolf Creek Nuclear Operating Corporation FACILITY:
Wolf Creek Generating Station, Unit 1
SUBJECT:
SUMMARY
OF OCTOBER 16, 2023, PRE-SUBMITTAL TELECONFERENCE WITH WOLF CREEK NUCLEAR OPERATING CORPORATION REGARDING A LICENSE AMENDMENT REQUEST TO ADOPT TSTF-505 FOR WOLF CREEK GENERATING STATION, UNIT 1 (EPID L-2023-LRM-0076)
On October 16, 2023, an Observation public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Wolf Creek Nuclear Operating Corporation (the licensee). The purpose of the pre-submittal teleconference was to discuss preliminary information regarding the licensees planned submission of a license amendment request (LAR) for Wolf Creek Generating Station, Unit 1 (Wolf Creek), to adopt Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF [Risk-Informed TSTF] Initiative 4b (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18183A493). The NRC issued a model safety evaluation (SE) approving TSTF-505, Revision 2, on November 21, 2018 (ML18269A041). The licensees presentation slides are available in ADAMS at Accession No. ML23275A171. The meeting notice and agenda dated October 5, 2023, are available in ADAMS at Accession No. ML23278A026. A list of attendees is enclosed.
During the meeting, the licensee indicated that the proposed risk-informed completion time (RICT) methodology would be based on Nuclear Energy Institute (NEI) 06-09, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (RMTS)
Guidelines. The NRC staff issued a model SE approving NEI 06-09 on May 17, 2007 (ML071200238). The licensee indicated that the proposed RICT would apply to 50 Wolf Creek technical specification (TS) required actions. The RICT would not apply to shutdown conditions because the licensee has not developed a shutdown probabilistic risk assessment (PRA) model for Wolf Creek. The proposed LAR would also include adoption of TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time From Discovery of Failure to Meet an LCO
[Limiting Condition for Operation]. The NRC issued a model SE approving TSTF-439, Revision 2, on January 11, 2006 (ML060120272). The licensee indicated that TSTF-439 affected 10 Wolf Creek TS required actions.
The licensee has assessed its PRA model against the American Society of Mechanical Engineers (ASME)/American Nuclear Society (ANS) PRA Standard RA-Sa-2009 and Regulatory Guide 1.200, Revision 2, An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities, dated March 2009 (ML090410014). The licensee indicated that its seismic-induced fire PRA was under peer review and would be addressed in the LAR. The licensees goal would be no open facts and observations (F&O) and any remaining F&Os would be dispositioned in the LAR.
The NRC staff discussed the importance of lessons learned from past precedence, for example, resolving the issue of joint human error probability. The NRC staff also discussed the purpose of the NRC staffs regulatory audit. The NRC staff noted that the Wolf Creek TSFT-505 audit would be late compared with a typical review schedule, because the licensee could support the audit after the completion of the spring 2024 outage. The NRC staff commented that the licensee should consider supplementing its LAR after the audit instead of waiting for the NRC staffs request for additional information, thus saving time in the review process.
The licensee indicated that it planned to submit the TSTF-505 LAR in November 2023.
No regulatory decisions were made at the meeting.
Please direct any inquiries to me at 301-415-3168 or by email at Samson.Lee@nrc.gov.
/RA/
Samson S. Lee, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-482
Enclosure:
List of Attendees cc: Listserv
Enclosure LIST OF ATTENDEES OCTOBER 16, 2023, PRE-SUBMITTAL TELECONFERENCE REGARDING TSTF-505, REVISION 2, PROVIDE RISK-INFORMED EXTENDED COMPLETIONS TIMES -
RITSTF [RISK-INFORMED TSTF] INITIATIVE 4b LICENSE AMENDMENT REQUEST WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION, UNIT 1 U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation Gurjendra Bedi -DEX,1 Mechanical Engineering and Inservice Testing Branch Edmund Kleeh - DEX, Electrical Engineering Branch Hang Vu - DEX, Instrumentation and Controls Branch Samson Lee - Division of Operating Reactor Licensing, Plant Licensing Branch IV Robert Pascarelli - Branch Chief, DRA,2 APLA3 Adrienne Brown - DRA, APLA Malcolm Patterson - DRA, APLA Naeem Iqbal - DRA, APLB4 Charles Moulton - DRA, APLB Steven Alferink - DRA, PRA Licensing Branch C Brian Wittick - Branch Chief, DSS,5 SCPB6 David Nold - DSS, SCPB Noushin Amini - DSS, SNSB7 Santosh Bhatt - DSS, SNSB Andrea Russell - DSS, STSB8 Khadijah West - DSS, STSB 1 Division of Engineering and External Hazards 2 Division of Risk Assessment 3 Probabilistic Risk Assessment (PRA) Licensing Branch A 4 PRA Licensing Branch B 5 Division of Safety Systems 6 Containment and Plant Systems Branch 7 Nuclear Systems Performance Branch 8 Technical Specifications Branch Wolf Creek Nuclear Operating Corporation Jaime McCoy - Site Vice President Mike Boyce - Vice President of Engineering Dustin Hamman - Director Nuclear and Regulatory Affairs Frank Galati - Senior Manager Nuclear Engineering Jeff Suter - Engineering Manager (Presenter)
David Vu - Lead Engineer Nuclear Engineering/PRA Lu Huang - Lead Engineer Nuclear Engineering/PRA Paul Nguyen - Nuclear Engineer Colby Thordsen - Licensing Engineer Jason Knust - Lead Engineer Licensing Nathan Lee - Lead Engineer Licensing/Acting Manager of Licensing Contractors to Wolf Creek Nuclear Operating Corporation Steve Wideman - Consultant to Wolf Creek Bruce Morgen - EPM Risk Services Casey Weiser - EPM Risk Services Carroll Trull - EPM Risk Services Travis Weber - EPM Risk Services Bill Victor - Excel Services
ML23303A215 (Package)
ML23278A026 (Meeting Notice)
ML23275A171 (Meeting Slides)
ML23303A218 (Meeting Summary)
- concurrence by email NRC-001 OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA* NRR/DORL/LPL4/BC* NRR/DORL/LPL4/PM*
NAME SLee PBlechman JDixon-Herrity SLee DATE 10/30/2023 10/31/2023 11/6/2023 11/6/2023