ML17266A276: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17266A276
| number = ML17266A276
| issue date = 09/30/1980
| issue date = 09/30/1980
| title = LER 80-049/03L-0:on 800904,During Full Power Operation, Control Element Assembly 21 Dropped to Full Insertion. Caused by Faulty 15-volt Power Supply.Power Supply Replaced & Redundant Supplies Are Being Installed
| title = LER 80-049/03L-0:on 800904,during Full Power Operation, Control Element Assembly 21 Dropped to Full Insertion. Caused by Faulty 15-volt Power Supply.Power Supply Replaced & Redundant Supplies Are Being Installed
| author name = PACE P L
| author name = PACE P L
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.

Revision as of 00:41, 27 February 2018

LER 80-049/03L-0:on 800904,during Full Power Operation, Control Element Assembly 21 Dropped to Full Insertion. Caused by Faulty 15-volt Power Supply.Power Supply Replaced & Redundant Supplies Are Being Installed
ML17266A276
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/30/1980
From: PACE P L
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17209A220 List:
References
LER-80-049-03L, LER-80-49-3L, NUDOCS 8010100322
Download: ML17266A276 (3)