ML17266A398: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17266A398
| number = ML17266A398
| issue date = 01/29/1981
| issue date = 01/29/1981
| title = LER 80-071/03L-0:on 801231,During Operation at 100% Power, Vol Control Tank Inadvertently Diluted,Leading to RCS Dilution,Increasing Power Above Tech Specs Limit.Caused by Failed Crosby Relief Valve V2173 on Acid Pump Discharge
| title = LER 80-071/03L-0:on 801231,during Operation at 100% Power, Vol Control Tank Inadvertently Diluted,Leading to RCS Dilution,Increasing Power Above Tech Specs Limit.Caused by Failed Crosby Relief Valve V2173 on Acid Pump Discharge
| author name = PACE P L
| author name = PACE P L
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.

Revision as of 01:38, 27 February 2018

LER 80-071/03L-0:on 801231,during Operation at 100% Power, Vol Control Tank Inadvertently Diluted,Leading to RCS Dilution,Increasing Power Above Tech Specs Limit.Caused by Failed Crosby Relief Valve V2173 on Acid Pump Discharge
ML17266A398
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/29/1981
From: PACE P L
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17209A641 List:
References
LER-80-071-03L, LER-80-71-3L, NUDOCS 8102180653
Download: ML17266A398 (3)