{{#Wiki_filter:ES-301 | {{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1 | ||
Facility: Davis Besse Nuclear Power Station Date of Examination: 2/5/2018 to 2/16/2018 | |||
Examination Level RO SRO Operating Test Number DB NRC 2018 | |||
Administrative Type Describe activity to be performed Topic Code* | |||
(See Note) | (See Note) | ||
Conduct of | |||
Conduct of 2.1.37 (4.3) | |||
Operations Knowledge of procedures, guidelines, or limitations associated with D, R reactivity management. | Operations Knowledge of procedures, guidelines, or limitations associated with D, R reactivity management. | ||
(RO A 1.1) | (RO A 1.1) | ||
Perform a Calculation for Shutdown Value (JPM-259) | Perform a Calculation for Shutdown Value (JPM-259) | ||
Conduct of | |||
Conduct of 2.1.43 (4.1) | |||
Operations Ability to use procedures to determine the effects on reactivity of plant D, R changes, such as reactor coolant system temperature, secondary plant, (RO A 1.2) fuel depletion, etc. | Operations Ability to use procedures to determine the effects on reactivity of plant D, R changes, such as reactor coolant system temperature, secondary plant, (RO A 1.2) fuel depletion, etc. | ||
1/M Approach to Criticality (JPM-276) | 1/M Approach to Criticality (JPM-276) | ||
Equipment | |||
Control D, R | Equipment 2.2.13 (4.1) | ||
Control D, R Knowledge of tagging and clearance procedures. | |||
(RO A 2) | (RO A 2) | ||
Review a Safety Clearance for CC210 with eSOMs Unavailable (Peer Check) (JPM-TBD) | Review a Safety Clearance for CC210 with eSOMs Unavailable (Peer Check) (JPM-TBD) | ||
Radiation Control | |||
Ability to comply with radiation work permit requirements during normal or | Radiation Control 2.3.7 (3.5) | ||
(RO A 3) N, R Ability to comply with radiation work permit requirements during normal or abnormal conditions. | |||
Stay Time Calculation (JPM-New) | Stay Time Calculation (JPM-New) | ||
Emergency Plan (RO A 4) | |||
Emergency Plan | |||
(N)ew or (M)odified from bank (> 1) | |||
(RO A 4) NOT EVALUATED | |||
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics (which would require all 5 items). | |||
* Type Codes & Criteria (C)ontrol Room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes) | |||
(N)ew or (M)odified from bank ( > 1) | |||
(P)revious 2 exams (< 1; randomly selected) | (P)revious 2 exams (< 1; randomly selected) | ||
ES-301 | NUREG-1021, Revision 1 1 FENOC Facsimile Rev 1 ES-301 Administrative Topics Outline Form ES-301-1 | ||
Facility: Davis Besse Nuclear Power Station Date of Examination: 2/5/2018 to 2/16/2018 | |||
Examination Level RO SRO Operating Test Number: DB NRC 2018 | |||
Administrative Type Describe activity to be performed Topic Code* | |||
(See Note) | (See Note) | ||
Conduct of | |||
Conduct of 2.1.37 (4.6) | |||
Operations Knowledge of procedures, guidelines, or limitations associated with D, R reactivity management. | Operations Knowledge of procedures, guidelines, or limitations associated with D, R reactivity management. | ||
(SRO A 1.1) | (SRO A 1.1) | ||
Review a Shutdown Value Calculation (JPM-262) | Review a Shutdown Value Calculation (JPM-262) | ||
Conduct of | |||
Conduct of 2.1.31 (4.3) | |||
Operations Ability to locate control room switches, controls, and indications, and to N, R determine that they correctly reflect the desired plant lineup. | Operations Ability to locate control room switches, controls, and indications, and to N, R determine that they correctly reflect the desired plant lineup. | ||
(SRO A 1.2) | (SRO A 1.2) | ||
Review Miscellaneous Instrument Daily Checks per DB-OP-03007 (JPM-New) | Review Miscellaneous Instrument Daily Checks per DB-OP-03007 (JPM-New) | ||
Equipment Control | |||
Knowledge of the process for managing maintenance activities during | Equipment Control 2.2.18 (3.9) | ||
(SRO A 2) N, R Knowledge of the process for managing maintenance activities during shutdown operations, such as risk assessments, work prioritization, etc. | |||
Perform Shutdown Safety Assessment (JPM-New) | Perform Shutdown Safety Assessment (JPM-New) | ||
Radiation Control | |||
(SRO A 3) | Radiation Control 2.3.4 (3.7) | ||
Emergency Dose Authorization (JPM-280) | |||
Emergency Plan | (SRO A 3) M, P, R Knowledge of radiation exposure limits under normal or emergency conditions. | ||
Knowledge of the emergency action level thresholds and classifications. | |||
Emergency Dose Authorization (JPM -280) | |||
Emergency Plan D, R 2.4.44 (4.4) | |||
(SRO A 4) Knowledge of the emergency action level thresholds and classifications. | |||
Determine the Off-Site PAR (JPM150) | Determine the Off-Site PAR (JPM150) | ||
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics (which would require all 5 items). | NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics (which would require all 5 items). | ||
* Type Codes & Criteria (C)ontrol Room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes) | |||
(N)ew or (M)odified from bank (> 1) | (N)ew or (M)odified from bank ( > 1) | ||
(P)revious 2 exams (< 1; randomly selected) | (P)revious 2 exams (< 1; randomly selected) | ||
NUREG-1021, Revision | |||
NUREG-1021, Revision 1 1 FENOC Facsimile Rev 1}} |
Latest revision as of 10:24, 16 November 2024
ML22186A198 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 11/08/2017 |
From: | Randy Baker NRC/RGN-III/DRS/OLB |
To: | |
Baker R | |
Shared Package | |
ML17068A445 | List: |
References | |
L-17-281 | |
Download: ML22186A198 (2) | |
Text
ES-301 Administrative Topics Outline Form ES-301-1
Facility: Davis Besse Nuclear Power Station Date of Examination: 2/5/2018 to 2/16/2018
Examination Level RO SRO Operating Test Number DB NRC 2018
Administrative Type Describe activity to be performed Topic Code*
(See Note)
Conduct of 2.1.37 (4.3)
Operations Knowledge of procedures, guidelines, or limitations associated with D, R reactivity management.
(RO A 1.1)
Perform a Calculation for Shutdown Value (JPM-259)
Conduct of 2.1.43 (4.1)
Operations Ability to use procedures to determine the effects on reactivity of plant D, R changes, such as reactor coolant system temperature, secondary plant, (RO A 1.2) fuel depletion, etc.
1/M Approach to Criticality (JPM-276)
Equipment 2.2.13 (4.1)
Control D, R Knowledge of tagging and clearance procedures.
(RO A 2)
Review a Safety Clearance for CC210 with eSOMs Unavailable (Peer Check) (JPM-TBD)
Radiation Control 2.3.7 (3.5)
(RO A 3) N, R Ability to comply with radiation work permit requirements during normal or abnormal conditions.
Stay Time Calculation (JPM-New)
(RO A 4) NOT EVALUATED
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics (which would require all 5 items).
- Type Codes & Criteria (C)ontrol Room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( > 1)
(P)revious 2 exams (< 1; randomly selected)
NUREG-1021, Revision 1 1 FENOC Facsimile Rev 1 ES-301 Administrative Topics Outline Form ES-301-1
Facility: Davis Besse Nuclear Power Station Date of Examination: 2/5/2018 to 2/16/2018
Examination Level RO SRO Operating Test Number: DB NRC 2018
Administrative Type Describe activity to be performed Topic Code*
(See Note)
Conduct of 2.1.37 (4.6)
Operations Knowledge of procedures, guidelines, or limitations associated with D, R reactivity management.
(SRO A 1.1)
Review a Shutdown Value Calculation (JPM-262)
Conduct of 2.1.31 (4.3)
Operations Ability to locate control room switches, controls, and indications, and to N, R determine that they correctly reflect the desired plant lineup.
(SRO A 1.2)
Review Miscellaneous Instrument Daily Checks per DB-OP-03007 (JPM-New)
Equipment Control 2.2.18 (3.9)
(SRO A 2) N, R Knowledge of the process for managing maintenance activities during shutdown operations, such as risk assessments, work prioritization, etc.
Perform Shutdown Safety Assessment (JPM-New)
Radiation Control 2.3.4 (3.7)
(SRO A 3) M, P, R Knowledge of radiation exposure limits under normal or emergency conditions.
Emergency Dose Authorization (JPM -280)
Emergency Plan D, R 2.4.44 (4.4)
(SRO A 4) Knowledge of the emergency action level thresholds and classifications.
Determine the Off-Site PAR (JPM150)
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics (which would require all 5 items).
- Type Codes & Criteria (C)ontrol Room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( > 1)
(P)revious 2 exams (< 1; randomly selected)
NUREG-1021, Revision 1 1 FENOC Facsimile Rev 1