ML22186A202
| ML22186A202 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 11/08/2017 |
| From: | Randy Baker NRC/RGN-III/DRS/OLB |
| To: | |
| Baker R | |
| Shared Package | |
| ML17068A445 | List: |
| References | |
| L-17-281 | |
| Download: ML22186A202 (4) | |
Text
ES-301 Transient and Event Checklist Form ES-301-5 NUREG-1021, Revision 11 Page 1 of 4 FENOC Facsimile Rev. 1 Facility Davis Besse Nuclear Power Station Date of Exam 2/5/2018 to 2/16/2018 Operating Test No DB NRC 2018 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R I U
M A
S T
E R
RX 1,
1 6,
6, 5,
5, 5,
1 1
0 NOR 2,
2, 1,
1, 1,
1, 1,
1 1
1 I/C 3,5,7, 9,
5,7,9, 3,6, 3,5,8, 3,8, 2,4,5, 2,4,6, 8,
3,6,8, 2,4, 2,3,4, 7,
2,4, 3,7, 4
4 2
MAJ 8,
8, 8,
7, 7,
7, 7
7 7
6 6
6 2
2 1
TS 4,6, 2,4, 3,5, 1,5, 0
2 2
RO-1 RX 5,
1 1
1 0
NOR 2,
1 1
1 1
I/C 3,6, 2,4,5, 3,6,8, 8
4 4
2 MAJ 8,
7, 7
3 2
2 1
TS 0
0 2
2 RO-2 RX 1
1 1
1 0
NOR 1,
1 1
1 1
I/C 5,7,9, 2,4,5, 2,4, 8
4 4
2 MAJ 8,
7, 7
3 2
2 1
TS 0
0 2
2 RO-3 RX 5,
1 1
1 0
NOR 2,
1 1
1 1
I/C 3,6, 3,6,8, 5
4 4
2 MAJ 8,
7 2
2 2
1 TS 0
0 2
2 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 NUREG-1021, Revision 11 Page 2 of 4 FENOC Facsimile Rev. 1 Facility Davis Besse Nuclear Power Station Date of Exam 2/5/2018 to 2/16/2018 Operating Test No DB NRC 2018 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R I U
RO-4 RX 5,
1 1
1 0
NOR 2,
1, 2
1 1
1 I/C 3,6, 3,6,8, 3,7, 7
4 4
2 MAJ 8,
7 6
3 2
2 1
TS 0
0 2
2 RO-5 RX 5,
1 1
1 0
NOR 1,
1 1
1 1
I/C 2,4,5, 2,4, 2,4, 7
4 4
2 MAJ 7,
7 6
3 2
2 1
TS 0
0 2
2
ES-301 Transient and Event Checklist Form ES-301-5 NUREG-1021, Revision 11 Page 3 of 4 FENOC Facsimile Rev. 1 Facility Davis Besse Nuclear Power Station Date of Exam 2/5/2018 to 2/16/2018 Operating Test No DB NRC 2018 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R I U
SRO-I -1 RX 1,
6, 5,
3 1
1 0
NOR 2,
1, 1,
3 1
1 1
I/C 3,5,7, 9,
3,8, 2,4,6, 8,
10 4
4 2
MAJ 8,
7, 7
3 2
2 1
TS 4,6, 3,5, 4
0 2
2 SRO-I -2 RX 1
6, 2
1 1
0 NOR 1,
1, 2
1 1
1 I/C 5,7,9, 3,5,8, 2,4, 8
4 4
2 MAJ 8,
7, 7
3 2
2 1
TS 2,4, 2
0 2
2 SRO-I -3 RX 1,
6, 5,
3 1
1 0
NOR 2,
1, 1,
3 1
1 1
I/C 3,5,7, 9,
3,8, 2,4,6, 8,
10 4
4 2
MAJ 8,
7, 7
3 2
2 1
TS 4,6, 3,5, 4
0 2
2 SRO-I -4 RX 1,
6, 2
1 1
0 NOR 2,
1, 2
1 1
1 I/C 3,5,7, 9,
3,8, 2,3,4, 7,
10 4
4 2
MAJ 8,
7, 6
3 2
2 1
TS 4,6, 1,5, 4
0 2
2 SRO-I -5 RX 1
6, 5,
3 1
1 0
NOR 1,
1, 2
1 1
1 I/C 5,7,9, 3,5,8, 2,4,6, 8,
10 4
4 2
MAJ 8,
7, 7
3 2
2 1
TS 2,4, 3,5, 4
0 2
2
ES-301 Transient and Event Checklist Form ES-301-5 NUREG-1021, Revision 11 Page 4 of 4 FENOC Facsimile Rev. 1 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.