ML24226A445: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 23: Line 23:


==Dear Mathew Snider:==
==Dear Mathew Snider:==
On July 18, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at American Centrifuge Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
On July 18, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at American Centrifuge Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No violations of more than minor significance were identified during this inspection.
No violations of more than minor significance were identified during this inspection.
Line 31: Line 30:


==Enclosure:==
==Enclosure:==
As stated cc w/o encl: Distribution via LISTSERV Signed by Williams, Robert on 08/15/24}}
As stated cc w/o encl: Distribution via LISTSERV Signed by Williams, Robert on 08/15/24}}

Latest revision as of 07:33, 4 October 2024

American Centrifuge Plant Material Control and Accounting Program Inspection Report 07007004/2024404 Public Cover Letter
ML24226A445
Person / Time
Site: 07007004
Issue date: 08/15/2024
From: Robert Williams
NRC/RGN-II/DFFI
To: Snider M
American Centrifuge Operating
References
IR 2024404
Download: ML24226A445 (2)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Mathew Snider General Manager/Operations Manager American Centrifuge Operating, LLC 3930 U.S. Route 23 South P.O. Box 628 Mail Stop 7560 Piketon, OH 45661

SUBJECT:

AMERICAN CENTRIFUGE PLANT - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 07007004/2024404

Dear Mathew Snider:

On July 18, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at American Centrifuge Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No violations of more than minor significance were identified during this inspection.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.August 15, 2024 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION M. Snider 2 Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATIONThe enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, Robert E. Williams, Jr., Chief Projects Branch 1 Division of Fuel Facility Inspection Docket No. 07007004 License No. SNM-2011

Enclosure:

As stated cc w/o encl: Distribution via LISTSERV Signed by Williams, Robert on 08/15/24