ML21050A159: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[NRC-2020-0277, Comment (29) of Philip Ratcliff on Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2]]
{{Adams
| number = ML21050A159
| issue date = 02/19/2021
| title = Comment (29) of Philip Ratcliff on Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2
| author name = Ratcliff P
| author affiliation = - No Known Affiliation
| addressee name =
| addressee affiliation = NRC/ADM
| docket = 05000266, 05000301
| license number =
| contact person =
| case reference number = 86FR7747 00029, NRC-2020-0277
| document type = General FR Notice Comment Letter
| page count = 1
}}
 
=Text=
{{#Wiki_filter:2/19/2021                                        blob:https://www.fdms.gov/423cd8c5-fa4d-479e-ab38-79311848e750 SUNI Review Complete Template=ADM-013        As of: 2/19/21 9:09 AM E-RIDS=ADM-03            Received: February 19, 2021 PUBLIC SUBMISSION                                                ADD: Phyllis Clark, Bill Rogers, Mary Neely Status: Pending_Post Tracking No. klb-ymwl-woxf Comment (29)
Publication Comments Due: March 03, 2021 Date:2/1/2021            Submission Type: Web Citation: 86 FR 7747 Docket: NRC-2020-0277 Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Comment On: NRC-2020-0277-0001 Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Document: NRC-2020-0277-DRAFT-0033 Comment on FR Doc # 2021-02001 Submitter Information Name: Philip Ratcliff Address:
Salem, OR, 97302 Email: skazz999W@hotmail.com Phone: 5039744858 General Comment Point Beach Unit 2 has the worst-embrittled reactor pressure vessel of any pressurized water reactor in the country. Decades of additional neutron radiation bombardment will only increase the risk of a pressurized thermal shock, through-wall fracture, core meltdown, and catastrophic release of hazardous radioactivity.
blob:https://www.fdms.gov/423cd8c5-fa4d-479e-ab38-79311848e750                                                                  1/1}}

Latest revision as of 19:10, 20 January 2022

Comment (29) of Philip Ratcliff on Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2
ML21050A159
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/19/2021
From: Ratcliff P
- No Known Affiliation
To:
Office of Administration
References
86FR7747 00029, NRC-2020-0277
Download: ML21050A159 (1)


Text

2/19/2021 blob:https://www.fdms.gov/423cd8c5-fa4d-479e-ab38-79311848e750 SUNI Review Complete Template=ADM-013 As of: 2/19/21 9:09 AM E-RIDS=ADM-03 Received: February 19, 2021 PUBLIC SUBMISSION ADD: Phyllis Clark, Bill Rogers, Mary Neely Status: Pending_Post Tracking No. klb-ymwl-woxf Comment (29)

Publication Comments Due: March 03, 2021 Date:2/1/2021 Submission Type: Web Citation: 86 FR 7747 Docket: NRC-2020-0277 Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Comment On: NRC-2020-0277-0001 Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Document: NRC-2020-0277-DRAFT-0033 Comment on FR Doc # 2021-02001 Submitter Information Name: Philip Ratcliff Address:

Salem, OR, 97302 Email: skazz999W@hotmail.com Phone: 5039744858 General Comment Point Beach Unit 2 has the worst-embrittled reactor pressure vessel of any pressurized water reactor in the country. Decades of additional neutron radiation bombardment will only increase the risk of a pressurized thermal shock, through-wall fracture, core meltdown, and catastrophic release of hazardous radioactivity.

blob:https://www.fdms.gov/423cd8c5-fa4d-479e-ab38-79311848e750 1/1