MONTHYEARML22010A0502022-01-0707 January 2022 Comment (274) E-mail Regarding Point Beach Draft SEIS ML22010A0452022-01-0606 January 2022 Comment (270) E-mail Regarding Point Beach Draft SEIS ML22010A0492022-01-0606 January 2022 Comment (273) E-mail Regarding Point Beach Draft SEIS ML22010A0462022-01-0606 January 2022 Comment (271) E-mail Regarding Point Beach Draft SEIS ML22010A0482022-01-0606 January 2022 Comment (272) E-mail Regarding Point Beach Draft SEIS ML22006A2442022-01-0505 January 2022 Comment (227) E-mail Regarding Point Beach Draft SEIS ML22006A2452022-01-0505 January 2022 Comment (228) E-mail Regarding Point Beach Draft SEIS ML22006A2472022-01-0505 January 2022 Comment (230) E-mail Regarding Point Beach Draft SEIS ML22006A2462022-01-0505 January 2022 Comment (229) E-mail Regarding Point Beach Draft SEIS ML22006A1932022-01-0404 January 2022 Comment (201) E-mail Regarding Point Beach Draft SEIS ML22006A2582022-01-0404 January 2022 Comment (233) E-mail Regarding Point Beach Draft SEIS ML22006A3392022-01-0404 January 2022 Comment (267) E-mail Regarding Point Beach Draft SEIS ML22006A2532022-01-0404 January 2022 Comment (231) E-mail Regarding Point Beach Draft SEIS ML22006A3372022-01-0404 January 2022 Comment (266) E-mail Regarding Point Beach Draft SEIS ML22006A2552022-01-0404 January 2022 Comment (232) E-mail Regarding Point Beach Draft SEIS ML22018A0812022-01-0404 January 2022 Comment (276) E-mail Regarding Point Beach Draft SEIS ML22006A0882022-01-0303 January 2022 Comment (152) E-mail Regarding Point Beach Draft SEIS ML22006A2032022-01-0303 January 2022 Comment (204) E-mail Regarding Point Beach Draft SEIS ML22006A1102022-01-0303 January 2022 Comment (164) E-mail Regarding Point Beach Draft SEIS ML22004A3732022-01-0303 January 2022 Comment (42) of Jorge De Cecco on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22006A1022022-01-0303 January 2022 Comment (159) E-mail Regarding Point Beach Draft SEIS ML22004A3752022-01-0303 January 2022 Comment (43) of Mary Able on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22006A1012022-01-0303 January 2022 Comment (158) E-mail Regarding Point Beach Draft SEIS ML22004A3772022-01-0303 January 2022 Comment (45) of Ann Behrmann on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Nexteraenergy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22006A3362022-01-0303 January 2022 Comment (265) E-mail Regarding Point Beach Draft SEIS ML22004A3782022-01-0303 January 2022 Comment (46) of Kevin Kamps on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22006A1032022-01-0303 January 2022 Comment (160) E-mail Regarding Point Beach Draft SEIS ML22004A3702022-01-0303 January 2022 Comment (40) of Kelsey Saari on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22018A0802022-01-0303 January 2022 Comment (275) E-mail Regarding Point Beach Draft SEIS ML22004A3712022-01-0303 January 2022 Comment (41) on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22006A1042022-01-0303 January 2022 Comment (161) E-mail Regarding Point Beach Draft SEIS ML22006A0932022-01-0303 January 2022 Comment (156) E-mail Regarding Point Beach Draft SEIS ML22006A2052022-01-0303 January 2022 Comment (206) E-mail Regarding Point Beach Draft SEIS ML22006A0902022-01-0303 January 2022 Comment (154) E-mail Regarding Point Beach Draft SEIS ML22006A0892022-01-0303 January 2022 Comment (153) E-mail Regarding Point Beach Draft SEIS ML22006A0962022-01-0303 January 2022 Comment (157) E-mail Regarding Point Beach Draft SEIS ML22006A2002022-01-0303 January 2022 Comment (203) E-mail Regarding Point Beach Draft SEIS ML22004A3592022-01-0303 January 2022 Comment (30) of Henry Berkowitz on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22004A3762022-01-0303 January 2022 Comment (44) of Wendy Fast on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Nexteraenergy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22006A0912022-01-0303 January 2022 Comment (155) E-mail Regarding Point Beach Draft SEIS ML22006A1072022-01-0303 January 2022 Comment (162) E-mail Regarding Point Beach Draft SEIS ML22006A2062022-01-0303 January 2022 Comment (207) E-mail Regarding Point Beach Draft SEIS ML22006A1082022-01-0303 January 2022 Comment (163) E-mail Regarding Point Beach Draft SEIS ML22006A2042022-01-0303 January 2022 Comment (205) E-mail Regarding Point Beach Draft SEIS ML22006A1962022-01-0303 January 2022 Comment (202) E-mail Regarding Point Beach Draft SEIS ML22006A2072022-01-0202 January 2022 Comment (208) E-mail Regarding Point Beach Draft SEIS ML22004A3692022-01-0202 January 2022 Comment (39) of Christopher Lish on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Nexteraenergy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22006A1112022-01-0202 January 2022 Comment (165) E-mail Regarding Point Beach Draft SEIS ML22004A3682022-01-0202 January 2022 Comment (38) of Bonita Staas on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML22006A2182022-01-0202 January 2022 Comment (209) E-mail Regarding Point Beach Draft SEIS 2022-01-07
[Table view] |
Text
1/4/22, 4:18 PM blob:https://www.fdms.gov/3854375b-7c9e-43a6-bfa6-6af757610291 blob:https://www.fdms.gov/3854375b-7c9e-43a6-bfa6-6af757610291 1/1 PUBLIC SUBMISSION As of: 1/4/22 4:18 PM Received: January 03, 2022 Status: Pending_Post Tracking No. kxz-2b18-s4ay Comments Due: January 03, 2022 Submission Type: Web Docket: NRC-2020-0277 Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Comment On: NRC-2020-0277-0194 NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Units 1 and 2 Document: NRC-2020-0277-DRAFT-0237 Comment on FR Doc # 2021-24407 Submitter Information Email:contact@cleanwateractioncouncil.org Government Agency Type:Regional
Government Agency:Clean Water Action Council of NE WI General Comment I am commenting on behalf of over 250 members of Clean Water Action Council of Northeastern Wisconsin who live within 50 miles of the Point Beach Nuclear Power Reactors. Many or our members live even closer to the reactors in Kewaunee and Manitowoc counties.
We are very concerned about the condition of the reactors regarding embrittlement, especially due to the proximity of the plant to member residences. We agree with expert Mr. Arnie Gundersens comments to NRC regarding the threat from a 20-year extension:
However, in a seriously embrittled reactor like Point Beach, when that cool water is injected and comes in direct contact with the hot reactor vessel, it can cause Pressurized Thermal Shock (PTS). After this, the 8-inch thick steel reactor vessel may crack from PTS, causing it to break open and release massive radioactivity into the surrounding area and the environment. The sudden breach of the nuclear power reactor would dramatically increase the pressure inside the containment causing this last radiation barrier to fail also. Should this event occur, the Nuclear Regulatory Commission (NRC) has estimated that it will cause at least 7,000 cancer deaths and $112 Billion in todays dollars in property damage.
We believe the EIS does not adequately assess the risk to human health and the local environment in the event of a nuclear accident nor does it contain adequate plans for responding to such an accident.
We are also concerned with impact of another 20 years of using water from Lake Michigan for cooling the reactors. It is known that climate change is causing the average water temperature to rise. The heated wastewater will further impact health of the lake ecosystem in the Two Rivers area. We believe the EIS did not include this concern.
In consideration of the above concerns, and the continued decreasing cost and increasing viability of solar energy, we ask the 20-year extension not be granted.