Category:Letter
MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 IR 05000313/20244042024-08-29029 August 2024 Cybersecurity Inspection Report 05000313/2024404 and 05000368/2024404 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information ML24128A2472024-05-0808 May 2024 Project Manager Assignment IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20243012024-02-27027 February 2024 NRC Initial Operator Licensing Examination Approval 05000313/2024301 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation ML23209A6022023-08-0909 August 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 ML23208A2132023-08-0303 August 2023 Regulatory Audit Summary Concerning Review of License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23188A1732023-07-12012 July 2023 Request for Withholding Information from Public Disclosure ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements 2024-09-09
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23020A9362023-01-27027 January 2023 Audit Plan to Support Review of License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML22263A1912022-12-0909 December 2022 Issuance of Amendment No. 278 Revision to Technical Specifications 3.4.12 and 3.4.13 Based on Revised Dose Calculations (EPID L-2021-LLA-0181) - Non-Proprietary ML22291A2392022-10-28028 October 2022 Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI (EPID L-2021-LLA-0181) Letter ML22165A2442022-07-19019 July 2022 Issuance of Amendment No. 331 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22138A4312022-06-23023 June 2022 Issuance of Amendment No. 277 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22039A2822022-03-15015 March 2022 Issuance of Amendment Nos. 274 and 328 One-Time Change to Support Proactive Upgrade of the Emergency Cooling Pond Supply Piping ML21225A0552021-12-17017 December 2021 Issuance of Amendment No. 327 Addition of Technical Specification Limiting Condition for Operation 3.0.6 and Adoption of Safety Function Determination Program ML21341B2262021-12-13013 December 2021 Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specifications 3.4.12 and 3.4.13 Based on Revised Dose Calculations ML21313A0082021-12-0808 December 2021 Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21320A2122021-11-17017 November 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request Concerning Revised Dose Calculations ML21281A2542021-10-15015 October 2021 Audit Meeting Agenda & Audit Questions for LAR to Adopt 10 CFR 50.69,Risk-Informed Categorization and Treatment of Structures, System, and Components for Nuclear Power Reactors (EPIDs L-2021-LLA-0105, L-2021-LLA-0106 ML21208A4492021-09-20020 September 2021 Issuance of Amendment No. 325 Revise Loss of Voltage Relay Allowable Values and Number of Degraded Voltage Channels ML21088A4332021-04-14014 April 2021 Issuance of Amendment No. 324 Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML21027A4282021-03-23023 March 2021 Issuance of Amendment No. 272 Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent ML21040A5132021-03-10010 March 2021 Issuance of Amendment No. 271 Revision to Loss of Voltage Relay Allowable Values ML20351A1532021-02-0808 February 2021 Issuance of Amendment No. 323 Technical Specification Deletions, Additions, and Relocations NUREG-1432, Issuance of Amendment No. 322 Technical Specification Changes Related to Revised Fuel Handling Accident Analysis and Adoption of Technical Specification Improvements Consistent with NUREG-14322020-10-30030 October 2020 Issuance of Amendment No. 322 Technical Specification Changes Related to Revised Fuel Handling Accident Analysis and Adoption of Technical Specification Improvements Consistent with NUREG-1432 ML20135H1412020-06-30030 June 2020 Issuance of Amendment Nos. 269 and 321 Request to Incorporate the Tornado Missile Risk Evaluator Into the Licensing Basis ML20160A1472020-06-30030 June 2020 Issuance of Amendment No. 270 to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20087L8032020-04-0808 April 2020 Issuance of Amendment No. 320 to Revise Control Element Assembly Drop Times ML19231A2972020-01-29029 January 2020 Issuance of Amendment No. 318 Addition of Technical Specification Actions to Address Inoperability of the Containment Building Sump ML19269B6722019-10-22022 October 2019 Issuance of Amendment Nos. 267 and 317 to Extend Implementation Dates for Amendment Nos. 263 and 314, Revision to Emergency Action Level Scheme ML19220A9382019-09-27027 September 2019 Issuance of Amendment No. 266 Adoption of Technical Specifications Task Force Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19098A9552019-05-22022 May 2019 Issuance of Amendment No. 264 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-425, Revision 3 ML19127A2992019-05-15015 May 2019 Correction to Amendment No. 315 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-425, Revision 3 ML19063B9482019-04-23023 April 2019 Issuance of Amendment No. 315 Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3 ML18337A2472019-01-17017 January 2019 Issuance of Amendment Nos. 263 and 314 Revision to Emergency Action Level Scheme ML18317A3822018-12-19019 December 2018 Issuance of Amendment No. 313, Revise Technical Specification 3.3.3.6, Post-Accident Instrumentation ML18306A5132018-11-30030 November 2018 Issuance of Conforming Amendment Nos. 262, 312 and 215 Transfers of Renewed Facility Operating Licenses ML18298A0122018-11-27027 November 2018 Issuance of Amendment No. 311 Updating the Reactor Coolant System Pressure Temperature Limits ML18260A3392018-10-24024 October 2018 Issuance of Amendment No. 261 Revision to Technical Specification Bases Related to Emergency Feedwater Turbine-Driven Pump Steam Supply Valves ML18115A2822018-06-19019 June 2018 Issuance of Amendment No. 260 Technical Specification Changes Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-412 Revision 3 (CAC No. MG0009; EPID L-2017-LLA-0267) ML18134A2532018-06-19019 June 2018 Issuance of Amendment No. 310 Technical Specification Changes to Provide Actions for Emergency Feedwater Pump Inoperability Consistent with NUREG-1432, Revision 4 (CAC No. MG0016; EPID L-2017-LLA-0268) ML18051A5892018-02-26026 February 2018 Issuance of Amendment No. 309 to Adopt TSTF-427, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability (CAC No. MG0131; EPID L-2017-LLA-0302) ML18033A1752018-02-26026 February 2018 Issuance of Amendment No. 259 to Adopt TSTF-427, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability (CAC No. MG0132; EPID L-2017-LLA-0301) ML18011A0642018-01-18018 January 2018 Issuance of Amendment No. 308 to Exclude Exercise of Control Element Assembly 4 with Respect to Surveillance Requirement 4.1.3.1.2 for the Remainder of Cycle 26 (Exigent Circumstances) ML17235A5192017-10-10010 October 2017 Issuance of Amendment No. 258 Revision of Steam Generator Technical Specifications to Reflect Adoption of TSTF-510 (CAC MF9653; EPID L-2017-LLA-0221) ML17251A2112017-10-10010 October 2017 Issuance of Amendment No. 307 Revision of Steam Generator Technical Specifications to Reflect Adoption of Technical Specifications Task Force Traveler TSTF-510 (CAC MF9654; EPID L-2017-LLA-0222) ML17096A2352017-05-12012 May 2017 Issuance of Amendment No. 306 Request to Revise the National Fire Protection Association (NFPA) Standard 805 Modifications ML16215A3712017-03-29029 March 2017 Issuance of Amendment No. 305 to Adopt Technical Specifications Task Force Traveler TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing... ML16165A4232017-03-10010 March 2017 Issuance of Amendment No. 257 Adoption of Technical Specifications Task Force Traveler TSTF-545, Revision 3, ML16267A1392016-12-29029 December 2016 Issuance of Amendment Revise Technical Specfications to Adopt TSTF-426, to Revise or Add Actions to Preclude Entry Into Lco 3.0.3 Ritstf Initiative 6b & 6c ML16223A4812016-10-0707 October 2016 Issuance of Amendment No. 256 Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) (Cac No. MF3419) 2024-06-25
[Table view] Category:Safety Evaluation
MONTHYEARML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements ML23166B0902023-06-21021 June 2023 Request for Relief ANO1 ISI 036 Regarding Volumetric Examination Requirements ML23142A1062023-05-24024 May 2023 Authorization and Safety Evaluation for Alternative Request No. ANO1-ISI-035 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML22342B1602023-01-10010 January 2023 Requests for Relief ANO2-ISI-023, -024, -025, -026, -027, and -028 to Permit Reduction of Inspection Area Due to Interference (EPIDs L-2022-LLR-0022,-0023, -0024, -0025, -0026, and -0027) ML22263A1912022-12-0909 December 2022 Issuance of Amendment No. 278 Revision to Technical Specifications 3.4.12 and 3.4.13 Based on Revised Dose Calculations (EPID L-2021-LLA-0181) - Non-Proprietary ML22236A5452022-08-26026 August 2022 Correction to Issuance of Amendment No. 331 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22138A4312022-06-23023 June 2022 Issuance of Amendment No. 277 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22039A2822022-03-15015 March 2022 Issuance of Amendment Nos. 274 and 328 One-Time Change to Support Proactive Upgrade of the Emergency Cooling Pond Supply Piping ML22007A3172022-01-18018 January 2022 1, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML21225A0552021-12-17017 December 2021 Issuance of Amendment No. 327 Addition of Technical Specification Limiting Condition for Operation 3.0.6 and Adoption of Safety Function Determination Program ML21341B2262021-12-13013 December 2021 Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specifications 3.4.12 and 3.4.13 Based on Revised Dose Calculations ML21313A0082021-12-0808 December 2021 Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21208A4492021-09-20020 September 2021 Issuance of Amendment No. 325 Revise Loss of Voltage Relay Allowable Values and Number of Degraded Voltage Channels ML21132A2792021-05-19019 May 2021 Request for Approval of Change to the Entergy Quality Assurance Program Manual ML21088A4332021-04-14014 April 2021 Issuance of Amendment No. 324 Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML21027A4282021-03-23023 March 2021 Issuance of Amendment No. 272 Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent ML21040A5132021-03-10010 March 2021 Issuance of Amendment No. 271 Revision to Loss of Voltage Relay Allowable Values ML20351A1532021-02-0808 February 2021 Issuance of Amendment No. 323 Technical Specification Deletions, Additions, and Relocations ML20288A8242020-11-16016 November 2020 Regulatory Audit Summary Concerning License Amendment Request to Replace the Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent NUREG-1432, Issuance of Amendment No. 322 Technical Specification Changes Related to Revised Fuel Handling Accident Analysis and Adoption of Technical Specification Improvements Consistent with NUREG-14322020-10-30030 October 2020 Issuance of Amendment No. 322 Technical Specification Changes Related to Revised Fuel Handling Accident Analysis and Adoption of Technical Specification Improvements Consistent with NUREG-1432 ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI ML20160A1472020-06-30030 June 2020 Issuance of Amendment No. 270 to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20135H1412020-06-30030 June 2020 Issuance of Amendment Nos. 269 and 321 Request to Incorporate the Tornado Missile Risk Evaluator Into the Licensing Basis ML20121A1932020-05-0606 May 2020 Alternative Requests for the Fifth 10 Year Interval Inservice Testing of Low Pressure Safety Injection Pumps and Service Water Valves ML20107J3172020-04-23023 April 2020 Relief Request ANO1-ISI-033 Related to ASME Code Case N-729-4 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML20087L8032020-04-0808 April 2020 Issuance of Amendment No. 320 to Revise Control Element Assembly Drop Times ML20083J9682020-03-26026 March 2020 Approval of Request for Alternative ANO 2-PT-002 End-of-Internal System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping ML19231A2972020-01-29029 January 2020 Issuance of Amendment No. 318 Addition of Technical Specification Actions to Address Inoperability of the Containment Building Sump ML19220A9382019-09-27027 September 2019 Issuance of Amendment No. 266 Adoption of Technical Specifications Task Force Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19184A5542019-07-15015 July 2019 Request for Relief ANO1-ISI-032 from the ASME Code Section XI Visual Examination Requirements for the Fourth 10-Year Inservice Inspection Interval ML19156A4002019-06-11011 June 2019 Request for Alternative ANO2-ISI-021 to Permit Continued Application of the 2007 Edition Through the 2008 Addenda of ASME Code ML19098A9552019-05-22022 May 2019 Issuance of Amendment No. 264 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-425, Revision 3 ML19063B9482019-04-23023 April 2019 Issuance of Amendment No. 315 Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3 ML18337A2472019-01-17017 January 2019 Issuance of Amendment Nos. 263 and 314 Revision to Emergency Action Level Scheme ML18346A3142019-01-0707 January 2019 Relief Nos. ANO1-ISI-027, -028, -029, -030, and -031 from ASME Code, Section XI, Examination Requirements for Fourth 10-Year Inservice Inspection Interval (EPID L-2018-LLR-0063, -0064, -0065, -0066, -0067) ML18317A3822018-12-19019 December 2018 Issuance of Amendment No. 313, Revise Technical Specification 3.3.3.6, Post-Accident Instrumentation ML18298A0122018-11-27027 November 2018 Issuance of Amendment No. 311 Updating the Reactor Coolant System Pressure Temperature Limits ML18260A3392018-10-24024 October 2018 Issuance of Amendment No. 261 Revision to Technical Specification Bases Related to Emergency Feedwater Turbine-Driven Pump Steam Supply Valves ML18192A1042018-08-15015 August 2018 Alternative to Examination of Reactor Pressure Vessel Flange Threads ML18173A0192018-06-27027 June 2018 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule (CAC MG0244; EPID L-2017-LLL-0020) 2024-06-25
[Table view] Category:Technical Specifications
MONTHYEARML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21208A4492021-09-20020 September 2021 Issuance of Amendment No. 325 Revise Loss of Voltage Relay Allowable Values and Number of Degraded Voltage Channels ML21088A4332021-04-14014 April 2021 Issuance of Amendment No. 324 Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML21027A4282021-03-23023 March 2021 Issuance of Amendment No. 272 Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent 1CAN022102, Supplement Related to License Amendment Request to Replace the Reactor Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate2021-02-22022 February 2021 Supplement Related to License Amendment Request to Replace the Reactor Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate ML20160A1472020-06-30030 June 2020 Issuance of Amendment No. 270 to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20135H1412020-06-30030 June 2020 Issuance of Amendment Nos. 269 and 321 Request to Incorporate the Tornado Missile Risk Evaluator Into the Licensing Basis ML19232A3792019-09-19019 September 2019 Correction to Issuance of Amendment No. 264 Adoption of Technical Specifications Task Force Traveler TSTF-425, Revision 3 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML17251A2112017-10-10010 October 2017 Issuance of Amendment No. 307 Revision of Steam Generator Technical Specifications to Reflect Adoption of Technical Specifications Task Force Traveler TSTF-510 (CAC MF9654; EPID L-2017-LLA-0222) ML16165A4232017-03-10010 March 2017 Issuance of Amendment No. 257 Adoption of Technical Specifications Task Force Traveler TSTF-545, Revision 3, ML16027A1092016-02-24024 February 2016 Issuance of Amendment Nos. 255 and 303 Cyber Security Plan Implementation Schedule (CAC Nos. MF6258 and MF6259) ML15096A3812015-04-29029 April 2015 Issuance of Amendment No. 302, Revise Technical Specification Surveillance Requirement 4.1.3.1.2 Note to Eliminate Movement of Control Element Assembly 18 for Remainder of Operating Cycle 24 ML15068A3192015-03-31031 March 2015 Issuance of Amendment No. 301, Request to Adopt Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186) ML15023A1472015-03-0303 March 2015 Issuance of Amendment No. 253, Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441) ML14356A2272015-02-18018 February 2015 Issuance of Amendment No. 300, Request to Adopt National Fire Protection Association Standard NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants ML15014A0712015-02-0303 February 2015 Issuance of Amendment No. 252, Request to Revise Technical Specification 5.5.16, Reactor Building Leakage Rate Testing Program, to Extend Type a Test Frequency to 15 Years ML14350B2852015-01-22022 January 2015 Issuance of Amendment No. 299, Revise Technical Specification 6.5.16, Containment Leakage Rate Testing Program, for Requirements for Containment Building Emergency Escape Air Lock Doors ML14254A1332014-11-24024 November 2014 Issuance of Amendment No. 250, Adoption of Technical Specifications Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 1CAN111401, Arkansas Nuclear One, Unit 1, License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2014-11-21021 November 2014 Arkansas Nuclear One, Unit 1, License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits 1CAN111401, License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2014-11-21021 November 2014 License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits 1CAN101407, Clarifications to Response to Request for Additional Information Associated with Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-10-28028 October 2014 Clarifications to Response to Request for Additional Information Associated with Technical Specification Change to Extend the Type a Test Frequency to 15 Years 1CAN031401, License Amendment Request - Revised Pages Extend the Type a Test Frequency to 15 Years2014-03-11011 March 2014 License Amendment Request - Revised Pages Extend the Type a Test Frequency to 15 Years 1CAN121302, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2013-12-20020 December 2013 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years 1CAN081302, Response to Request for Additional Information, Adoption of Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360.2013-08-28028 August 2013 Response to Request for Additional Information, Adoption of Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360. 2CAN061302, License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712013-06-18018 June 2013 License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 1CAN061301, License Amendment Request, Revision to Technical Specification 2.1.1.1 Reactor Core Safety Limits2013-06-11011 June 2013 License Amendment Request, Revision to Technical Specification 2.1.1.1 Reactor Core Safety Limits 2CAN011301, License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-500, Revision 2 DC Electrical Rewrite - Update to TSTF-3602013-01-28028 January 2013 License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-500, Revision 2 DC Electrical Rewrite - Update to TSTF-360 1CAN011304, License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-500, Revision 2 DC Electrical Rewrite - Update to TSTF-360.2013-01-28028 January 2013 License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-500, Revision 2 DC Electrical Rewrite - Update to TSTF-360. CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications 1CAN061201, License Amendment Request Technical Specification Change Associated with Main Feedwater Valves2012-06-19019 June 2012 License Amendment Request Technical Specification Change Associated with Main Feedwater Valves 1CAN081001, License Amendment Request, Technical Specification Change Associated with Main Feedwater Isolation Valves2010-08-24024 August 2010 License Amendment Request, Technical Specification Change Associated with Main Feedwater Isolation Valves 2CAN051001, Response to Request for Additional Information Associated with Core Operating Limits Report References2010-05-17017 May 2010 Response to Request for Additional Information Associated with Core Operating Limits Report References 1CAN021004, Response to Request for Additional Information, Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.2010-02-28028 February 2010 Response to Request for Additional Information, Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. ML0931305282009-12-23023 December 2009 License Amendment No. 241, Modified Technical Specification 3.4.9, Pressurizer, to Delete Low Pressurizer Level Limit ML0930601322009-12-23023 December 2009 License Amendment No. 240, Revised Administrative Changes to Technical Specification 5.5.8, Inservice Testing Program, to Adopt TSTF-479-A and TSTF-497-A 1CAN080901, Changes to Reflect Revision to 10 CFR 50.55a Technical Change Travelers - TSTF-479-A and TSTF-497-A2009-08-0505 August 2009 Changes to Reflect Revision to 10 CFR 50.55a Technical Change Travelers - TSTF-479-A and TSTF-497-A 2CAN030901, License Amendment Request, Technical Specification Change to Modify the Mode of Applicability for Emergency Feedwater Actuation Signal2009-03-0202 March 2009 License Amendment Request, Technical Specification Change to Modify the Mode of Applicability for Emergency Feedwater Actuation Signal 1CAN020901, License Amendment Request, Technical Specification Change to Adopt Low Pressure Air Lock Seal Test2009-02-16016 February 2009 License Amendment Request, Technical Specification Change to Adopt Low Pressure Air Lock Seal Test ML0814000372008-09-0808 September 2008 Technical Specifications for Amendment No. 282 Technical Specification Task Force TSTF-490, Rev 0, Deletion of E Bar Definition and Revision to RCS Specific Activity. ML0812203132008-08-28028 August 2008 Tech Spec Pages for Amendment No. 281 Technical Specification Task Force Change TSTF-359, Increased Flexibility in Mode Restraints. ML0823801472008-08-21021 August 2008 License Amendment Request, Technical Specification Change to Extend Integrated Leak Rate Test Interval One-Time ML0814004492008-07-23023 July 2008 Tech Spec Pages for Amendment No. 280 Reactor Coolant System Relocation to TRM (Tac MD8313) 1CAN070803, License Amendment Request Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers2008-07-21021 July 2008 License Amendment Request Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers 1CAN070804, License Amendment Request Regarding Technical Specification Changes Associated with Adoption of TSTF-3592008-07-21021 July 2008 License Amendment Request Regarding Technical Specification Changes Associated with Adoption of TSTF-359 2CAN070805, License Amendment Request Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers and Relocate TS 3.7.8 to the TRM2008-07-21021 July 2008 License Amendment Request Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers and Relocate TS 3.7.8 to the TRM 2024-03-14
[Table view] |
Text
April 14, 2021 ANO Site Vice President Arkansas Nuclear One Entergy Operations, Inc.
N-TSB-58 1448 S.R. 333 Russellville, AR 72802
SUBJECT:
ARKANSAS NUCLEAR ONE, UNIT 2 - ISSUANCE OF AMENDMENT NO. 324 RE: ADOPTION OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER, TSTF-569, REVISION 2, REVISE RESPONSE TIME TESTING DEFINITION (EPID L-2020-LLA-0213)
Dear Sir or Madam:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 324 to Renewed Facility Operating License No. NPF-6 for Arkansas Nuclear One, Unit 2 (ANO-2). The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated September 24, 2020.
The amendment revises the ANO-2 TSs to adopt Technical Specifications Task Force (TSTF) traveler TSTF-569, Revision 2, Revise Response Time Testing Definition.
A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions monthly Federal Register notice.
Sincerely,
/RA/
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-368
Enclosures:
- 1. Amendment No. 324 to NPF-6
- 2. Safety Evaluation cc: Listserv
ENTERGY OPERATIONS, INC.
DOCKET NO. 50-368 ARKANSAS NUCLEAR ONE, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 324 Renewed License No. NPF-6
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Entergy Operations, Inc. (the licensee), dated September 24, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-6 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 324, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications
- 3. This amendment is effective as of its date of issuance and shall be implemented within 90 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Jennifer L. Digitally signed by Jennifer L.
Dixon-Herrity Dixon-Herrity Date: 2021.04.14 15:40:08 -04'00' Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to Renewed Facility Operating License No. NPF-6 and the Technical Specifications Date of Issuance: April 14, 2021
ATTACHMENT TO LICENSE AMENDMENT NO. 324 RENEWED FACILITY OPERATING LICENSE NO. NPF-6 ARKANSAS NUCLEAR ONE, UNIT 2 DOCKET NO. 50-368 Replace the following pages of Renewed Facility Operating License No. NPF-6 and the Appendix A, Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Renewed Facility Operating License REMOVE INSERT Technical Specifications REMOVE INSERT 1-5 1-5 1-6 1-6
3 (4) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) EOI, pursuant to the Act and 10 CFR Parts 30 and 70 to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed license shall be deemed to contain and is subject to conditions specified in the following Commission regulations in 10 CFR Chapter I; Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level EOI is authorized to operate the facility at steady state reactor core power levels not in excess of 3026 megawatts thermal. Prior to attaining this power level EOI shall comply with the conditions in Paragraph 2.C.(3).
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 324, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications.
Exemptive 2nd paragraph of 2.C.2 deleted per Amendment 20, 3/3/81.
(3) Additional Conditions The matters specified in the following conditions shall be completed to the satisfaction of the Commission within the stated time periods following issuance of the renewed license or within the operational restrictions indicated.
The removal of these conditions shall be made by an amendment to the renewed license supported by a favorable evaluation by the Commission.
2.C.(3)(a) Deleted per Amendment 24, 6/19/81.
Renewed License No. NPF-6 Amendment No. 324
DEFINITIONS AXIAL SHAPE INDEX 1.22 The AXIAL SHAPE INDEX shall be the power generated in the lower half of the core less the power generated in the upper half of the core divided by the sum of these powers.
REACTOR TRIP SYSTEM RESPONSE TIME 1.23 The REACTOR TRIP SYSTEM RESPONSE TIME shall be the time interval from when the monitored parameter exceeds its trip setpoint at the channel sensor until electrical power is interrupted to the CEA drive mechanism. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and methodology for verification have been previously reviewed and approved by the NRC, or the components have been evaluated in accordance with an NRC approved methodology.
ENGINEERED SAFETY FEATURE RESPONSE TIME 1.24 The ENGINEERED SAFETY FEATURE RESPONSE TIME shall be that time interval from when the monitored parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge pressures reach their required values, etc.). Times shall include diesel generator starting and sequence loading delays where applicable. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured.
In lieu of measurement, response time may be verified for selected components provided that the components and methodology for verification have been previously reviewed and approved by the NRC, or the components have been evaluated in accordance with an NRC approved methodology.
PHYSICS TESTS 1.25 PHYSICS TESTS shall be those tests performed to measure the fundamental nuclear characteristics of the reactor core and related instrumentation and 1) described in Chapter 14.0 of the FSAR, 2) authorized under the provisions of 10 CFR 50.59, or
- 3) otherwise approved by the Commission.
SOFTWARE 1.26 The digital computer SOFTWARE for the reactor protection system shall be the program codes including their associated data, documentation and procedures.
PLANAR RADIAL PEAKING FACTOR Fxy 1.27 The PLANAR RADIAL PEAKING FACTOR is the ratio of the peak to plane average power density of the individual fuel rods in a given horizontal plane, excluding the effects of azimuthal tilt.
ARKANSAS - UNIT 2 1-5 Amendment No. 24,60,157,193,239,324
DEFINITIONS LIQUID RADWASTE TREATMENT SYSTEM 1.28 A LIQUID RADWASTE TREATMENT SYSTEM is a system designed and installed to reduce radioactive liquid effluents from the unit. This is accomplished by providing for holdup, filtration, and/or demineralization of radioactive liquid effluents prior to their release to the environment.
MEMBER(S) OF THE PUBLIC 1.29 MEMBER(S) OF THE PUBLIC shall include all persons who are not occupationally associated with the plant. This category does not include employees of the utility, its contractors or vendors. Also excluded from this category are persons who enter the site to service equipment or to make deliveries. This category does include persons who use portions of the site for recreational, occupational or other purposes not associated with the plant.
PURGE - PURGING 1.30 PURGE or PURGING is the controlled process of discharging air or gas from a confinement to reduce airborne radioactive concentrations in such a manner that replacement air or gas is required to purify the confinement.
EXCLUSION AREA 1.31 The EXCLUSION AREA is that area surrounding ANO within a minimum radius of
.65 miles of the reactor buildings and controlled to the extent necessary by the licensee for purposes of protection of individuals from exposure to radiation and radioactive materials.
UNRESTRICTED AREA 1.32 An UNRESTRICTED AREA shall be any area at or beyond the exclusion area boundary.
CORE OPERATING LIMITS REPORT 1.33 The CORE OPERATING LIMITS REPORT is the ANO-2 specific document that provides core operating limits for the current operating reload cycle. These cycle-specific core operating limits shall be determined for each reload cycle in accordance with Technical Specification 6.6.5. Plant operation within these operating limits is addressed in individual specifications.
INSERVICE TESTING PROGRAM 1.34 The INSERVICE TESTING PROGRAM is the licensee program that fulfills the requirements of 10 CFR 50.55a(f).
ARKANSAS - UNIT 2 1-6 Amendment No. 60,149,157,193,239, 255,305,
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 324 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-6 ENTERGY OPERATIONS, INC.
ARKANSAS NUCLEAR ONE, UNIT 2 DOCKET NO. 50-368
1.0 INTRODUCTION
By application dated September 24, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20268B898), Entergy Operations, Inc. (the licensee),
requested changes to the technical specifications (TSs) for Arkansas Nuclear One, Unit 2 (ANO-2). The proposed changes would revise TS definitions for engineered safety feature response time and reactor trip system response time that are referenced in surveillance requirements (SRs), hereafter referred to as response time testing (RTT).
The proposed changes are based on Technical Specifications Task Force (TSTF) traveler TSTF-569, Revision 2, Revise Response Time Testing Definition, dated June 25, 2019 (ADAMS Accession No. ML19176A034). The U.S. Nuclear Regulatory Commission (NRC or the Commission) issued a final safety evaluation approving TSTF-569, Revision 2, on August 14, 2019 (ADAMS Accession No. ML19176A191). The description of the generic changes and their justification are contained in these two documents.
2.0 REGULATORY EVALUATION
2.1 Description of Response Time Testing The reactor trip system initiates a unit shutdown, based on the values of selected unit parameters, to protect against violating the core fuel design limits and the reactor coolant system pressure boundary during anticipated operational occurrences and to assist the engineered safety feature actuation systems (ESFAS) in mitigating accidents. The ESFAS initiates necessary safety systems, based on the values of selected unit parameters, to protect against violating core design limits and the reactor coolant system pressure boundary, and to mitigate accidents.
The RTT verifies that the individual channel or train actuation response times are less than or equal to the maximum values assumed in the accident analyses. The RTT acceptance criteria are under licensee control. Individual component response times are not modeled in the Enclosure 2
accident analyses. The analyses model the overall or total elapsed time, from the point at which the parameter exceeds the trip setpoint value at the sensor to the point at which the equipment reaches the required functional state (e.g., control and shutdown rods fully inserted in the reactor core).
2.2 Proposed Changes to the Technical Specifications ANO-2 Limiting Condition for Operation (LCO) 3.3.1.1 requires the instrumentation for each Functional Unit in TS Table 3.3-1, Reactor Protective Instrumentation, to be OPERABLE, and SR 4.3.1.1.3 requires the licensee to verify that REACTOR TRIP SYSTEM RESPONSE TIMES are within limits for each reactor trip function. Similarly, ANO-2 LCO 3.3.2.1 requires the ESFAS instrumentation for each Functional Unit in TS Table 3.3-3, Engineered Safety Feature Actuation System Instrumentation, to be OPERABLE. To assure the LCO is met, SR 4.3.2.1.3 requires the licensee to verify that ENGINEERED SAFETY FEATURE RESPONSE TIMES are within limits for each ESFAS function. Sections 1.23 and 1.24 of the TSs define REACTOR TRIP SYSTEM RESPONSE TIME, and ENGINEERED SAFETY FEATURE RESPONSE TIME, respectively. The definitions state acceptable means to measure each response time and provide an alternative that may be used [i]n lieu of measurement.
In the application, the licensee stated that it requests adoption of NRC-approved TSTF-569.
The only revision of TSTF-569 that is NRC-approved is Revision 2. As described in Section 1, Summary Description, of Revision 2 of TSTF-569:
The proposed change revises the definitions to eliminate the requirement for prior NRC review and approval of the response time verification of similar components, while retaining the requirement for the verification to be performed using the methodology contained in Attachment 1, titled, Methodology to Eliminate Pressure Sensor and Protection Channel (for Westinghouse Plants only) Response Time Testing. The proposed change will permit licensees to verify the response time of similar component types using the methodology contained in Attachment 1, without obtaining prior NRC approval for each component.
The application stated that the licensee concluded that the justifications presented in TSTF-569 and the safety evaluation prepared by the NRC staff are applicable to ANO-2 and provide the justification for the amendment request. The application identified the requested variations from the TS changes described in TSTF-569 or the applicable parts of the NRC staffs safety evaluation (e.g., definition titles and wording and minor administrative differences).
2.3 Applicable Regulatory Requirements and Guidance Under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.90, Application for amendment of license, construction permit, or early site permit, whenever a holder of a license wishes to amend the license, including TSs in the license, an application for amendment must be filed, fully describing the changes desired. Under 10 CFR 50.92(a), determinations on whether to grant an applied-for license amendment are to be guided by the considerations that govern the issuance of initial licenses to the extent applicable and appropriate. Both the common standards for licenses in 10 CFR 50.40(a), and those specifically for issuance of operating licenses in 10 CFR 50.57(a)(3), provide that there must be reasonable assurance that
the activities at issue will not endanger the health and safety of the public, and that the applicant will comply with the Commissions regulations.
The licensees request involves adding an option used to satisfy SRs. As described in 10 CFR 50.36(c),
Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
3.0 TECHNICAL EVALUATION
The NRC staff reviewed the request by comparing the licensees proposal against the changes described in TSTF-569, Revision 2. In particular, the NRC staff assessed whether or how the variations identified by the licensee affect the applicability of NRC-approved TSTF-569. To make this assessment, the NRC staff compared ANO-2s design and existing TSs with the design and TSs presumed in TSTF-569. As explained below, the NRC staff concluded that the design and license (including TSs) were sufficient to justify the licensees reliance on the NRC staffs safety evaluation of TSTF-569 as justification for adopting TSTF-569 in the ANO-2 license.
TSTF-569 is designed to make changes to NUREG-1432, Revision 4.0, Standard Technical Specifications, Combustion Engineering Plants, April 2012, Volume 1, Specifications (ADAMS Accession No. ML12102A165), and Volume 2, Bases (ADAMS Accession No. ML12102A169).
The TSs for ANO-2 are based on the NUREG-0212, Revision 0, of the Combustion Engineering Plant standard TSs (issued March 1977). The NRC staff compared the TSs assumed in TSTF-569 with the current TSs for ANO-2. The NRC staff did not identify any material differences in the relevant TSs.
The TSTF-569 traveler is written for a plant design based on the General Design Criteria (GDC) in Appendix A to 10 CFR Part 50 that establish minimum requirements for the principal design criteria for water-cooled nuclear power plants similar in design and location to plants for which construction permits have been issued by the Commission. However, as stated in ANO-2 Safety Analysis Report (SAR) Section 3.1 (ADAMS Accession No. ML20294A315), ANO-2 was designed to comply with the Proposed General Design Criteria for Nuclear Power Plant Construction Permits, published by the Atomic Energy Commission in the Federal Register (FR) on July 11, 1967 (32 FR 10213) (i.e., prior to the GDC being published in Appendix A to 10 CFR Part 50). Sections 3.1.1 through 3.1.6 of the ANO-2 SAR provide a comparison with the Atomic Energy Commission GDC published as Appendix A to 10 CFR Part 50 in 1971. The NRC staff compared the design assumptions used in the evaluation of TSTF-569 with the design of ANO-2. The NRC staff did not identify anything unique in the design of ANO-2 that would preclude the licensees reliance on the NRC staffs evaluation of TSTF-569.
For the reasons stated in the NRC staffs safety evaluation for TSTF-569, the staff found that the methodology contained in TSTF-569, Revision 2, Attachment 1, provides a consistent, clear, and concise framework for determining that replacement components will operate at a level equivalent to that of the components being replaced. As such, using that methodology will assure that the necessary quality of the components is maintained and that the LCOs will be met. Accordingly, approving the incorporation of that methodology into the licensing basis, and amending the TSs to allow usage of the approved methodology, coupled with approving the
aspect of the license amendment request to use the methodology in the TSTF-569, Revision 2, methodology, results in TSs that meet 10 CFR 50.36(c)(3) by assuring that performing SRs 4.3.1.1.3 and 4.3.2.1.3 will assure that associated aspects of LCOs 3.3.1.1 and 3.3.2.1 will be met.
4.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Arkansas State official was notified of the proposed issuance of the amendment on March 23, 2021. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes SRs.
The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration published in the Federal Register on December 1, 2020 (85 FR 77274), and there has been no public comment on such finding. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: K. West Date: April 14, 2021
ML21088A433 *by e-mail OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA* NRR/DSS/STSB/BC*
NAME TWengert PBlechman VCusumano DATE 4/9/2021 3/30/2021 3/26/2021 OFFICE NRR/DORL/LPL4/BC* NRR/DORL/LPL4/PM NAME JDixon-Herrity TWengert DATE 04/14/2021 04/14/2021