Correction to Amendment No. 315 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-425, Revision 3
ML19127A299
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/15/2019
From: Thomas Wengert
Plant Licensing Branch IV
To:
Entergy Operations
Wengert T 415-4037
References
EPID L-2018-LLA-0047
Download: ML19127A299 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 May 15, 2,)19 ANO Site Vice President Arkansas Nuclear One Entergy Operations, Inc.

N-TSB-58 1448 S.R. 333 Russellville, AR 72802

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT 2 - CORRECTION TO AMENDMENT NO. 315 RE: ADOPTION OF TECHNICAL SPECIFICATIONS TASK FORCE (TSTF) TRAVELER TSTF-425, REVISION 3 (EPID L-2018-LLA-0047)

Dear Sir or Madam:

By letter dated April 23, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML190636948), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 315 to Renewed Facility Operating License No. NPF-6 for Arkansas Nuclear One, Unit 2 (AN0-2). The amendment was issued in response to your application dated February 6, 2018, as supplemented by letters dated March 26, September 7, and November 16, 2018.

The amendment revised the AN0-2 operating license and technical specifications by relocating certain surveillance frequencies to a licensee-controlled program, consistent with the NRC-approved Technical Specifications Task Force (TSTF) Improved Standard Technical Specifications Traveler TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control - RITSTF [Risk-Informed TSTF] Initiative 5b."

Subsequent to issuance of the license amendment, the NRC staff identified an error on new issued license page 6. Specifically, paragraphs 2.C.(3)(e), 2.C.(3)(f), and 2.C.(3)(g), on page 6 were mistakenly renumbered 2.C.(3)(f), 2.C.(3)(g), and 2.C.(3){h), respectively.

The NRC staff determined that the errors were inadvertently introduced during the preparation of the license amendment and are entirely typographical in nature. The corrections do not change any of the conclusions in the safety evaluation associated with the amendment and do not affect the associated notice to the public.

The enclosure to this letter contains the corrected license page 6. Please replace the corresponding page issued by Amendment No. 315 for Arkansas Nuclear One, Unit 2.

We regret any inconvenience this may have caused. If you have any questions, please contact me at (301) 415-4037 or by e-mail at Thomas.Wengert@nrc.gov.

Docket No. 50-368

Enclosure:

Corrected Renewed Facility Operating License Page 6 to Amendment No. 315 cc: Listserv Sincerely,

~i.f~

Thomas J. Wengert, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

ENCLOSURE CORRECTED LICENSE PAGE 6 FOR AMENDMENT NO. 315 ENTERGY OPERATIONS, INC.

ARKANSAS NUCLEAR ONE, UNIT 2 ENTERGY OPERATIONS, INC.

DOCKET NO. 50-368

6 Transition License Conditions

1. Before achieving full compliance with 10 CFR 50.48(c), as specified by 2. below, risk-informed changes to the Entergy Operations, Inc. fire protection program may not be made without prior NRC review and approval unless the change has been demonstrated to have no more than a minimal risk impact, as described in 2. above.
2. The licensee shall implement the modifications to its facility, as described in Table S-1, "Plant Modifications," Attachment 2, of Entergy Operations, Inc. letter 2CAN101601, dated October 27, 2016, prior to startup from the second refueling outage following issuance of the Safety Evaluation. The licensee shall maintain appropriate compensatory measures in place until completion of the modifications.
3. The licensee shall complete the implementation items as listed in Table S-2, "Implementation Items," Attachment, of Entergy Operations, Inc. letter 2CAN091402, dated September 24, 2014, within six months after issuance of the Safety Evaluation.

(c)

Less Than Four Reactor Coolant Pump Operation EOI shall not operate the reactor in operational Modes 1 and 2 with fewer than four reactor coolant pumps in operation, except as allowed by Special Test Exception 3.1 0.3 of the facility Technical Specifications.

(d)

Surveillance Frequency Control Program 2.C.(3)(e) 2.C.(3)(f) 2.C.(3)(g) 2.C.(3)(h)

(i) 2.C.(3)0) 2.C.(3)(k)

The licensee shall implement the items listed in Table 2 of the enclosure to Entergy letter 2CAN 111801, dated November 16, 2018, prior to implementation of the Surveillance Frequency Control Program.

Deleted per Amendment 300, 2/18/15.

Deleted per Amendment 24, 6/19/81.

Deleted per Amendment 93, 4/25/89.

Deleted per Amendment 29, (3/4/82) and its correction letter, (3/15/82).

Containment Radiation Monitor AP&L shall, prior to July 31, 1980 submit for Commission review and approval documentation which establishes the adequacy of the qualifications of the containment radiation monitors located inside the containment and shall complete the installation and testing of these instruments to demonstrate that they meet the operability requirements of Technical Specification No. 3.3.3.6.

Deleted per Amendment 7, 12/1/78.

Deleted per Amendment 12, 6/12/79 and Amendment 31, 5/12/82.

Renewed License No. NPF-6 Amendment No. 300, JOO, 315

ML19127A299 OFFICE NRR/D0RL/LPL4/PM NRR/D0RL/LPL4/LA NAME TWengert PBlechman DATE 05/14/19 05/14/19 NRR/D0RL/LPL4/BC RPascarelli 05/15/19