| {{#Wiki_filter:}} | | {{#Wiki_filter:May 21, 2021 MEMORANDUM TO: File FROM: Michael L. Marshall, Jr., Senior Project Manager /RA/ |
| | Plant Licensing Branch l Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation |
| | |
| | ==SUBJECT:== |
| | CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 - |
| | DRAFT REQUEST FOR ADDITIONAL INFORMATION RELATED TO RELIEF REQUEST CISI-03-01 CONCERNING CONTAINMENT UNBONDED POST-TENSIONING SYSTEM INSERVICE INSPECTION REQUIREMENTS (EPID L-2020-LLR-0135) |
| | By {{letter dated|date=October 6, 2020|text=letter dated October 6, 2020}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20280A508), Exelon Generation Company, LLC (Exelon, the licensee) submitted a relief request associated with the third containment inservice inspection interval for the Calvert Cliffs Nuclear Power Plant, Units 1 and 2. Exelons proposed alternatives from the following applicable American Society of Mechanical Engineers (ASME) |
| | Boiler and Pressure Vessel Code, Section XI, Subsection IWL requirements: |
| | Accept the dates used during the first containment in-service inspection interval (September 9, 2001, for Unit 1 and September 9, 2002, for Unit 2) to establish scheduling for future examinations in accordance with IWL-2421. |
| | Extend the interval between post-tensioning system examination and tests and detailed visual examination of concrete adjacent to tendon bearing plates from 5 years to 10 years. |
| | Eliminate the requirement for sample wire removal and testing and the associated need for tendon de-tensioning/re-tensioning. |
| | Reduce the number of corrosion protection medium chemical tests. |
| | The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided in the relief request and determined that additional information was needed to complete its review. |
| | The enclosed draft request for additional information (RAI) was sent to the licensee by e-mail on March 25, 2021. A clarification call was held on April 6, 2021, during which Exelon indicated it believes information that may address the concern already has been provided to the NRC. |
| | CONTACT: Jonathan Rowley, NRR/DORL 301-415-4053 |
| | |
| | Exelon directed the NRC staff to letters dated September 21, 2001 (ADAMS Accession No. ML012530249), September 18, 2014 (ADAMS Accession No. ML14265A219), and July 16, 2015 (ADAMS Accession No. ML15154A661). Upon review of those letters and the associated references, the NRC staff technical reviewer determined that enough information was already accessible to address the concern and that the RAI does not need to be formally issued. |
| | Docket Nos. 50-317 and 50-318 |
| | |
| | ==Enclosure:== |
| | |
| | Draft Request for Additional Information |
| | |
| | REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST CISI-03-01 CONCERNING CONTAINMENT UNBONDED POST-TENSIONING SYSTEM INSERVICE INSPECTION REQUIREMENTS EXELON GENERATION COMPANY, LLC CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-317 AND 50-318 Pursuant to the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.55a, Calvert Cliffs Nuclear Power Plant, Units 1 and 2, are currently required to examine the post-tensioning system every 5 years in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code), Section XI, Subsection IWL. On October 6, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20280A508), Exelon submitted to the U.S. Nuclear Regulatory Commission proposed alternative examination requirements on the basis that the alternative actions will provide an acceptable level of quality and safety pursuant to 10 CFR 50.55a(z)(1). Pursuant to 10 CFR 50.55a(z)(1), alternatives to codes and standards requirements may be used when authorized prior to implementation if it is demonstrated that the proposed alternatives would provide an acceptable level of quality and safety. Excerpts from the proposed alternative include the following: |
| | : 1. Extend the interval between post-tensioning system examinations and tests and detailed visual examination of concrete adjacent to tendon bearing plates from 5 years to 10 years. |
| | : 2. Eliminate the requirement for sample wire removal and testing and the associated need for tendon de-tensioning/re-tensioning. |
| | : 3. Reduce the number of corrosion protection medium (CPM) chemical tests. |
| | Request for Additional Information ASME Code, Section XI, Subsection IWL, requires prestressing wires to be removed for corrosion examinations and testing for their yield strength, ultimate tensile strength, elongation, and testing for CPM and free water samples. The relief request stated that many of the prestressing wires had been degraded due to corrosion. The relief request indicated that the prestressing wires in Unit 1 (47) and Unit 2 (46) had been severely degraded due to corrosion in the period from 1991 to 1997. The relief request did not describe the severity of the corroded wires and their reduced yield strength and ultimate tensile strength and reduced ductility. |
| | Although the relief request does contain some corrosion test data, there is no test data specifically on those corroded prestressing wires. Describe: |
| | (a) the severity of the corrosion of these wires, (b) the yield strength, ultimate tensile strength, elongation, of these degraded wires, and (c) test results of CPM and free water samples related to these corroded wires. |
| | Enclosure |
| | |
| | ML21130A038 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/PM NRR/DORL/LPL1/LAiT NAME JRowley MMarshall KEntz DATE 05/07/2021 05/13/2021 05/10/2021 OFFICE NRR/DORL/LPL1/LA NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME JBurkhardt JDanna MMarshall DATE 05/12/2021 05/19/2021 05/21/2021}} |
Letter Sequence Draft RAI |
---|
EPID:L-2020-LLR-0135, Submittal of Relief Request CISI-03-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements (Open) |
|
MONTHYEARML20280A5082020-10-0606 October 2020 Submittal of Relief Request CISI-03-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements Project stage: Request ML21130A0382021-05-21021 May 2021 Memo to File - Draft Request for Additional Information Relief Request CISI-03-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements Project stage: Draft RAI ML21190A0042021-09-0202 September 2021 Proposed Alternative to the Requirements of the ASME Section XI, Subsection Iwl Concerning Unbound Post-Tensioning Systems Project stage: Other 2021-05-21
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML23156A6752023-06-20020 June 2023 Request for Withholding Information from Public Disclosure for Proposed Alternative to the Requirements for Repair/Replacement of Saltwater System Buried Piping ML22195A0252023-01-0303 January 2023 Authorization and Safety Evaluation for Alternative Request No. ISI-05-016 RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.2022-09-20020 September 2022 Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. ML22105A4052022-05-0202 May 2022 Authorization and Safety Evaluation for Proposed Alternative No. ISI-05-019 ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21190A0042021-09-0202 September 2021 Proposed Alternative to the Requirements of the ASME Section XI, Subsection Iwl Concerning Unbound Post-Tensioning Systems ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21130A0382021-05-21021 May 2021 Memo to File - Draft Request for Additional Information Relief Request CISI-03-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML20275A1022020-11-0404 November 2020 Proposed Alternative I4r-07 to the Requirements of the American Society of Mechanical Engineers Code ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20196L7242020-07-14014 July 2020 Acceptance of Relief Requests Associated with Inservice Inspection Impracticality ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20099D9552020-04-17017 April 2020 Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations RS-20-020, Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)2020-02-28028 February 2020 Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi) ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19168A1172019-07-29029 July 2019 Issuance of Relief Request 15R-03 Use of ASME Code N-513-4 ML19196A1232019-07-19019 July 2019 Issuance of Relief Request 15R-04 Use of Encoded Phased Array Ultrasonic Examination Techniques ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19136A2162019-05-30030 May 2019 Use of a Provision in a Later Edition of the ASME Code ML19106A0032019-04-15015 April 2019 Submittal of Relief Requests Associated with the Fifth Inservice Inspection (ISI) Interval JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds2019-02-15015 February 2019 Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds JAFP-18-0052, Proposed Alternative to Utilize Code Case N-8792018-05-30030 May 2018 Proposed Alternative to Utilize Code Case N-879 JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-8802018-05-30030 May 2018 Proposed Alternative to Utilize Code Cases N-878 and N-880 ML17297A5242017-11-0606 November 2017 R. E. Ginna - Request for Use of a Portion of a Later Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (CAC Nos. MG0079-MG0083; EPID L-2017-LLR-0061) ML17228A7082017-08-21021 August 2017 Acceptance of Requested Licensing Action Relief Requests GV-RR-01, RC-RR-01, and SI-RR-01 ML17170A0132017-06-26026 June 2017 Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) ML16337A1902016-12-19019 December 2016 Relief Request RR-ISI-4-11 for Dissimilar Metal Butt Weld Examinations ML16230A2372016-09-0606 September 2016 Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) ML16138A0212016-05-19019 May 2016 Proposed Alternative to Use Code Case N-789 (CAC Nos. MF7018-MF7022) ML16033A4082016-02-11011 February 2016 Relief Request for Dissimilar Metal Butt Weld Examinations ML15327A3672015-12-0707 December 2015 Relief Request for Extension of Volumteric Examination Interval for Reactor Vessel Heads with Alloy 690 Nozzles ML15201A0672015-07-13013 July 2015 Relief Request for Extension of Volumetric Examination Interval for Reactor Vessel Heads with Alloy 690 Nozzles ML14246A0692014-12-19019 December 2014 Relief Request RR-ISI-04-08, Revision 1, Request for Relief Using Alternative Repair for Buried Saltwater Piping (Tac Nos. MF3413 and MF3414) ML14279A5652014-11-0606 November 2014 Relief Request RR-ISI-04-09 Regarding Saltwater System Piping Repair ML14247A5552014-09-24024 September 2014 Relief Request IST-RR-01 Regarding the Frequency of Inservice Testing Requirements of the Pumps and Valves ML13297A2932013-11-13013 November 2013 Relief Request RR-ISI-04-08 Regarding Mitigating of Buried Saltwater Piping Degradation ML13051A7402013-02-18018 February 2013 Response to Request for Additional Information - Relief Request RR-ISI-04-07A, Dissimilar Metal Butt Welds Baseline Examinations ML12164A3722012-06-0707 June 2012 Relief Request Dissimilar Metal Butt Welds Baseline Examinations (RR-ISI-04-07A) ML12009A0732011-12-29029 December 2011 Relief Requests for Dissimilar Metal Butt Welds Baseline Inspections (RR-ISI-04-06 & ISI-04-07) ML1109104462011-04-26026 April 2011 Third 10-Year Interval Inservice Inspection (ISI) Program Plan Requests for Relief ISI-24, ISI-25, ISI-26, and ISI-27, for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 ML1014100602010-05-18018 May 2010 Request for Approval of Alternate (Relief Request) for Dissimilar Metal Weld Repairs (ISI-04-05) ML0930300522009-11-0909 November 2009 Relief Request ISI-022 & ISI-023 to Extend Reactor Vessel and Reactor Vessel Internal Weld Examinations-Calvert Cliffs Nuclear Power Plant, Unit 1 ML0905401222009-02-24024 February 2009 Acceptance Review of Relief Requests ISI-04-01 Through ISI-04-04-Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 ML0905400622009-02-18018 February 2009 Request to Extend the Inservice Inspection Interval for Reactor Vessel Weld Examinations - Relief Requests (ISI-022 and ISI-023) ML0712300902007-04-27027 April 2007 Part 21 Interim Report, Dresser Investigation File No. 2007-02, Interim Reporting of a Potential Defect Involving Power Actuated Pressure Relief Valves Supplied to Calvert Cliffs, Fort Calhoun and Oconee Plants NOC-AE-06002031, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations2006-06-14014 June 2006 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations ML0611102322006-05-11011 May 2006 Relief Request, Use Alternative Techniques for Repair of Welded Nozzles 2024-07-23
[Table view] Category:Memoranda
MONTHYEARML21333A2412021-11-24024 November 2021 Level 1 FEMA Finding Successfully re-demonstrated on November 23, 2021 ML21277A2472021-11-0505 November 2021 Notification of Significant Licensing Action - Proposed Issuance of Order Approving the Transfer of Licenses for Which a Hearing Has Been Requested - Exelon Generation Company, LLC; Et. Al ML21130A0382021-05-21021 May 2021 Memo to File - Draft Request for Additional Information Relief Request CISI-03-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML21067A0922021-04-20020 April 2021 Documentation of Decision by NRC Staff That EPRI Report 3002012988, Alternative Approaches for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization, Meets Criteria for a Federal Record ML20212L5772020-11-20020 November 2020 Memo to File: Environmental Assessment-Finding of No Significant Impact and NRC Financial Analysis for Constellation and Exelon Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Calvert Cliffs Nuclear Pow ML19298C9722019-10-31031 October 2019 50.69 Apla SE Input L-2018-LLA-0482 ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML16075A4562016-04-12012 April 2016 February 24, 2016, Summary of Meeting with Exelon Generation Company, LLC, to Discuss the Flaw Indication in the Calvert Cliffs Unit 1 Pressurizer Safety Valve Dissimilar Metal Weld ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML14363A0452014-12-29029 December 2014 Safety Evaluation Close-out Letter for Calvert Cliffs Nuclear Power Plant and Independent Spent Fuel Storage Installation with Enclosure ML14055A2132014-02-25025 February 2014 Summary of Telephone Conference Regarding the Verbal Authorization of Relief Request RR-ISI-04-08, Revision 1 ML14003A0242014-01-10010 January 2014 Summary of Telephone Conference Regarding the Verbal Authorization of Relief Request RR-ISI-04-09 ML13304B4032013-11-0101 November 2013 Notice of Forthcoming Meeting with Constellation Energy Nuclear Group, LLC, ML13267A2852013-09-25025 September 2013 Interim Staff Evaluation and Request for Additional Information - Calvert Cliffs Nuclear Plant, Unites 1 and 2 Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13226A0902013-08-14014 August 2013 Notice of Forthcoming Meeting with Constellation Energy Nuclear Group, LLC ML13214A3532013-08-0606 August 2013 Notice of Forthcoming Pre-Application Meeting with Constellation Energy Nuclear Group, LLC (MF2516 and MF2517) ML13045A1822013-02-19019 February 2013 March 20, 2013, Notice of Forthcoming Teleconference with Calvert Cliffs and Nrc/Nrr Staff to Have Additional Discussions of Licensees'S Proposed Path for Resolution of Generic Letter 2004-02 ML13050A5112013-02-19019 February 2013 MC4672-3 Corrected Notice -Public Meeting on March 20, 2013 Re-GL2004-02 ML13196A2202012-06-0606 June 2012 Memo from B. Balsam, NRR and D. Logan, NRR to J. Susco, NRR on Summary of Section 7 Consultation Activities Related to the National Marine Fisheries Service'S Final Rule to List the Atlantic Sturgeon ML12136A5672012-05-17017 May 2012 Summary of Meeting with Constellation Energy to Discuss the Constellation Apparent Violation of NRC Regulations at Title 10 of the Code of Federal Regulations Part 50.9 ML12107A5052012-04-16016 April 2012 Forthcoming Category 1 Public Meeting with Constellation Energy Nuclear Group, LLC to Discuss Preliminary Enforcement ML12073A2912012-03-13013 March 2012 Notice of Public Meeting with Constellation Energy Nuclear Group, LLC Regarding NRCs Assessment of Safety Performance at Calvert Cliffs Nuclear Power Plant ML1131102432011-10-24024 October 2011 October 14, 2011, Summary of License Amendment Request (LAR) No. 10 Pre-Application Meeting with Calvert Cliffs Nuclear Power Plant, LLC, (TAC No. L24576) ML1113206252011-05-17017 May 2011 Notice of Forthcoming Closed Meeting with Calvert Cliffs Nuclear Power Plant, LLC and Areva to Discuss Transition to Areva Fuel ML1011903842010-05-0606 May 2010 Notice of Forthcoming Conference Call with Calvert Cliffs to Discuss Supplemental Responses to Generic Ltr. 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors ML0909705822009-04-0707 April 2009 Phone Call Summary with Licensees and Alion Science and Technology on April 2, 2009 to Address NRC Staff Position on Chemical Effects Refinements ML0903701402009-02-0606 February 2009 Probabilistic Assessment of Flaw in Support of Calvert Cliffs Unit 2 Relief Request ISI-020 ML0833102772008-10-24024 October 2008 DHS, Calvert Cliffs Consultation Report ML0809200582008-04-18018 April 2008 Summary of Phone Call with Licensees Concerning Sump Strainer Head Loss Testing ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0706400412007-03-0606 March 2007 Commitment Lists for Renewed Operating License (ROL) Plants with No Commitment Appendix Attached to Its ROL Sers/Nuregs for Use with IP-71003 ML0617805592006-07-10010 July 2006 Revised Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. ML0611101672006-04-21021 April 2006 Results of PTS Analysis of Calvert Cliffs Unit 1 to Post as Public Documents Into ADAMS ML0525007022005-09-20020 September 2005 Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. ML0524101502005-08-30030 August 2005 Summary of Telephone Conference on March 7, 2005, Regarding Steam Generator Tube Inspections, Calvert Cliffs Nuclear Power Plant, Unit No. 2 ML0503901492005-02-23023 February 2005 Response to Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections ML0433501182004-12-0303 December 2004 Reactor Oversight Process Midcycle Self - Assessment Performance Metrics ML0336403322004-01-0606 January 2004 Correction of License Authority Files ML0332900462003-12-11011 December 2003 Review of Revision 32 to the Updated Final Safety Analysis Report (UFSAR) ML0327205272003-10-21021 October 2003 Plan and Schedule for Implementation of Staff Position on the Station Blackout (SBO) Issue ML0314906662003-06-0303 June 2003 Summary of Meeting Held on May 13, 2003, Between the U.S. Nuclear Regulatory Commission (NRC) Staff and Calvert Cliffs Nuclear Power Plant, Inc., the Elimination of Offsite Review Committees ML0310705002003-04-17017 April 2003 Basf, Radioactive Waste Manifests, Princeton and Ewing Sites, Dtd January 2001 to September 2002 ML0308404632003-04-0101 April 2003 Closure of TAC Nos. MB2437 and MB2438 ML0307205722003-03-26026 March 2003 Telephone Conversation with Representatives of Calvert Cliffs Nuclear Power Plant, Inc., Concerning the Licensee'S Ongoing Reactor Pressure Vessel Head Inspection Program ML0228801162002-10-15015 October 2002 Evaluation of the Risk Assessment Information Provided by Calvert Cliffs Nuclear Power Plant in Support of Its Request to Decrease the Surveillance Testing Interval for Verifying Boron Concentration in the Safety Injection Tanks from Once E ML0215803662002-06-0606 June 2002 Memo to R. Bellamy, RGN-I from: M. Tokar Subject: Region I Independent Spent Fuel Storage Installation Inspection Plans Attachment: Sfpo Comments to Region I Integrated Inspection Plans ML0210603052002-05-24024 May 2002 Reply to Licensee'S Response to Order for Interim Safeguards and Security Compensatory Measures ML0209101702002-04-0404 April 2002 Documentation of Conference Call to Calvert Cliffs Nuclear Power Plant, Unit No. 1 and 2 on March 26, 2002, Regarding Reactor Vessel Head Inspection Activities 2021-05-21
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24012A0492024-01-11011 January 2024 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML23219A1662023-08-16016 August 2023 Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary ML23160A0222023-06-0606 June 2023 NRR E-mail Capture - Calvert Cliffs - Long Term Coupon Surveillance Program RAI ML23156A0102023-06-0404 June 2023 NRR E-mail Capture - Calvert Cliffs - RAI License Amendment Request for Emergency Desiel Generator ML22179A2112022-06-28028 June 2022 Notification of Conduct of a Fire Protection Team Inspection ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22091A2392022-04-0101 April 2022 NRR E-mail Capture - Calvert Cliffs - Formal RAI for Proposed Alternative for Examinations of Certain Pressurizer Welds ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML21287A0322021-10-13013 October 2021 Request for Additional Information Re Proposed Alternative for Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML21287A0932021-10-0505 October 2021 Request for Additional Information: Calvert Cliffs 1 & 2 LAR to Revise Spent Fuel Pool Cooling - Shutdown Cooling Systems Licensing Basis (EPID L-2021-LLA-0112) (Email) ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21187A2232021-07-29029 July 2021 Temporary Instruction 2515/194 Inspection Documentation Request ML21180A1562021-06-28028 June 2021 Request for Additional Information Regarding License Amendment Request Concerning Containment Sump ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21130A0382021-05-21021 May 2021 Memo to File - Draft Request for Additional Information Relief Request CISI-03-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21053A3142021-02-22022 February 2021 Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000317/2021010 and 05000318/2021010 ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML20275A0032020-09-30030 September 2020 Request for Additional Information Regarding Alternative Request Re Inservice Inspection Impracticality (L-2020-LLR-0089) ML20167A2532020-06-15015 June 2020 Second Request for Additional Information Regarding License Amendment Request Concerning Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML20157A0782020-06-0505 June 2020 Request for Additional Information Regarding License Amendment Request Concerning Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H0132020-05-14014 May 2020 IP 71111.17T (50.59) List of Documents Request ML20083F5892020-03-21021 March 2020 Request for Additional Information Regarding License Amendment Request Concerning Reactor Coolant Pump Flywheel Inspection Program ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19261B2202019-09-18018 September 2019 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML19155A1612019-06-11011 June 2019 Changes to Draft Request for Additional Information Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Systems, Structures and Components ML19155A1272019-06-0404 June 2019 Request for Additional Information Regarding Request to Adopt 10 CFR 50.69 Risk Informed Categorization and Treatment of Systems, Structures, and Components ML19070A0192019-03-11011 March 2019 Request for Additional Information Regarding Exemption Request from 10CFR50.46(A)(1) to Support Resolution of GSI-191 ML19025A1202019-01-24024 January 2019 NRR E-mail Capture - Calvert Cliffs, Fitzpatrick, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Response Organization Staffing ML18347A3972018-12-13013 December 2018 Request for Additional Information Regarding Relocation of Emergency Operation Facility ML18138A1372018-05-22022 May 2018 Plants, Units 1 and 2 - Request for Additional Information Regarding Risk Informed Technical Specification Completion Times (CAC Nos. MF7415 and MF7416; EPID L-2016-LLA-0001) ML18128A3842018-05-0808 May 2018 Plants, Units 1 and 2 - Draft Request for Additional Information Regarding Risk-Informed Technical Specification Completion Times (CAC Nos. MF7415 and MF7416; EPID L-2016-LLA-0001) ML18102A2372018-04-12012 April 2018 NRR E-mail Capture - Calvert Cliffs, Ginna, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Schemes (EPID-L-2017-LLA-0237) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17345A0912018-01-19019 January 2018 Plants, Units 1 and 2 - Request for Additional Information Regarding Alternative Request SI-RR-01, Rev. 0 (CAC Nos. MG0068 and MG0069; EPID L-2017-LLR-0078) ML17346A9092017-12-21021 December 2017 Request for Additional Information Regarding Risk-Informed Technical Specification Completion Times (CAC Nos. MF7415 and MF7416; EPID L-2016-LLA-0001) ML17331B1342017-12-12012 December 2017 2, and R.E. Ginna Nuclear Power Plant - Request for Additional Information - Regarding ML17304A9412017-11-13013 November 2017 Request for Additional Information Regarding Risk-Informed Technical Specification Completion Times (CAC Nos. MF7415 and MF7416; EPID L-2016-LLA-0001) ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17075A0152017-03-16016 March 2017 E-mail from R. Guzman to E. Villar - Calvert Cliffs Unit Nos. 1 and 2 - Request for Additional Information License Amendment Request - Control Room Emergency Ventilation System ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML16222A1252016-08-0909 August 2016 Request for Additional Information - Relief Request No. RR-ISI-04-11, 2016/08/08 E-mail from R.Guzman to T.Loomis ML15299A2792015-11-0303 November 2015 Request for Additional Information Regarding Relief Request for Dissimilar Metal Butt Welds 2024-07-12
[Table view] |
Text
May 21, 2021 MEMORANDUM TO: File FROM: Michael L. Marshall, Jr., Senior Project Manager /RA/
Plant Licensing Branch l Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 -
DRAFT REQUEST FOR ADDITIONAL INFORMATION RELATED TO RELIEF REQUEST CISI-03-01 CONCERNING CONTAINMENT UNBONDED POST-TENSIONING SYSTEM INSERVICE INSPECTION REQUIREMENTS (EPID L-2020-LLR-0135)
By letter dated October 6, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20280A508), Exelon Generation Company, LLC (Exelon, the licensee) submitted a relief request associated with the third containment inservice inspection interval for the Calvert Cliffs Nuclear Power Plant, Units 1 and 2. Exelons proposed alternatives from the following applicable American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel Code,Section XI, Subsection IWL requirements:
Accept the dates used during the first containment in-service inspection interval (September 9, 2001, for Unit 1 and September 9, 2002, for Unit 2) to establish scheduling for future examinations in accordance with IWL-2421.
Extend the interval between post-tensioning system examination and tests and detailed visual examination of concrete adjacent to tendon bearing plates from 5 years to 10 years.
Eliminate the requirement for sample wire removal and testing and the associated need for tendon de-tensioning/re-tensioning.
Reduce the number of corrosion protection medium chemical tests.
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided in the relief request and determined that additional information was needed to complete its review.
The enclosed draft request for additional information (RAI) was sent to the licensee by e-mail on March 25, 2021. A clarification call was held on April 6, 2021, during which Exelon indicated it believes information that may address the concern already has been provided to the NRC.
CONTACT: Jonathan Rowley, NRR/DORL 301-415-4053
Exelon directed the NRC staff to letters dated September 21, 2001 (ADAMS Accession No. ML012530249), September 18, 2014 (ADAMS Accession No. ML14265A219), and July 16, 2015 (ADAMS Accession No. ML15154A661). Upon review of those letters and the associated references, the NRC staff technical reviewer determined that enough information was already accessible to address the concern and that the RAI does not need to be formally issued.
Docket Nos. 50-317 and 50-318
Enclosure:
Draft Request for Additional Information
REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST CISI-03-01 CONCERNING CONTAINMENT UNBONDED POST-TENSIONING SYSTEM INSERVICE INSPECTION REQUIREMENTS EXELON GENERATION COMPANY, LLC CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-317 AND 50-318 Pursuant to the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.55a, Calvert Cliffs Nuclear Power Plant, Units 1 and 2, are currently required to examine the post-tensioning system every 5 years in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI, Subsection IWL. On October 6, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20280A508), Exelon submitted to the U.S. Nuclear Regulatory Commission proposed alternative examination requirements on the basis that the alternative actions will provide an acceptable level of quality and safety pursuant to 10 CFR 50.55a(z)(1). Pursuant to 10 CFR 50.55a(z)(1), alternatives to codes and standards requirements may be used when authorized prior to implementation if it is demonstrated that the proposed alternatives would provide an acceptable level of quality and safety. Excerpts from the proposed alternative include the following:
- 1. Extend the interval between post-tensioning system examinations and tests and detailed visual examination of concrete adjacent to tendon bearing plates from 5 years to 10 years.
- 2. Eliminate the requirement for sample wire removal and testing and the associated need for tendon de-tensioning/re-tensioning.
- 3. Reduce the number of corrosion protection medium (CPM) chemical tests.
Request for Additional Information ASME Code,Section XI, Subsection IWL, requires prestressing wires to be removed for corrosion examinations and testing for their yield strength, ultimate tensile strength, elongation, and testing for CPM and free water samples. The relief request stated that many of the prestressing wires had been degraded due to corrosion. The relief request indicated that the prestressing wires in Unit 1 (47) and Unit 2 (46) had been severely degraded due to corrosion in the period from 1991 to 1997. The relief request did not describe the severity of the corroded wires and their reduced yield strength and ultimate tensile strength and reduced ductility.
Although the relief request does contain some corrosion test data, there is no test data specifically on those corroded prestressing wires. Describe:
(a) the severity of the corrosion of these wires, (b) the yield strength, ultimate tensile strength, elongation, of these degraded wires, and (c) test results of CPM and free water samples related to these corroded wires.
Enclosure
ML21130A038 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/PM NRR/DORL/LPL1/LAiT NAME JRowley MMarshall KEntz DATE 05/07/2021 05/13/2021 05/10/2021 OFFICE NRR/DORL/LPL1/LA NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME JBurkhardt JDanna MMarshall DATE 05/12/2021 05/19/2021 05/21/2021