Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23156A67520 June 2023Request for Withholding Information from Public Disclosure for Proposed Alternative to the Requirements for Repair/Replacement of Saltwater System Buried Piping
ML22195A0253 January 2023Authorization and Safety Evaluation for Alternative Request No. ISI-05-016Probabilistic Risk Assessment
RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.20 September 2022Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.Non-Destructive Examination
Scaffolding
ML22105A4052 May 2022Authorization and Safety Evaluation for Proposed Alternative No. ISI-05-019VT-2
ML21280A07827 October 2021Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148)Incorporated by reference
ML21230A2063 September 2021Proposed Alternative to Use ASME OM Code Case OMN-28Incorporated by reference
ML21190A0042 September 2021Proposed Alternative to the Requirements of the ASME Section XI, Subsection Iwl Concerning Unbound Post-Tensioning SystemsIncorporated by reference
ML21216A2205 August 2021Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining BoltingCoatings
Nondestructive Examination
Incorporated by reference
ML21130A03821 May 2021Memo to File - Draft Request for Additional Information Relief Request CISI-03-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements
ML20275A1024 November 2020Proposed Alternative I4r-07 to the Requirements of the American Society of Mechanical Engineers CodeIncorporated by reference
ML20269A20030 September 2020Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117Incorporated by reference
ML20196L72414 July 2020Acceptance of Relief Requests Associated with Inservice Inspection Impracticality
ML20188A2646 July 2020Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional InformationIncorporated by reference
ML20113F04130 April 2020Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19)Incorporated by reference
Pandemic
Coronavirus
COVID-19
ML20099D95517 April 2020Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive ExaminationsNon-Destructive Examination
Incorporated by reference
RS-20-020, Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)28 February 2020Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)Power-Operated Valves
ML19269C53427 September 2019Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination TechniquesIncorporated by reference
ML19168A11729 July 2019Issuance of Relief Request 15R-03 Use of ASME Code N-513-4Through-Wall Leak
ML19196A12319 July 2019Issuance of Relief Request 15R-04 Use of Encoded Phased Array Ultrasonic Examination TechniquesHydrostatic
Incorporated by reference
Dissimilar Metal Weld
ML19161A2574 June 2019BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019Incorporated by reference
ML19136A21630 May 2019Use of a Provision in a Later Edition of the ASME CodeIncorporated by reference
ML19106A00315 April 2019Submittal of Relief Requests Associated with the Fifth Inservice Inspection (ISI) IntervalHydrostatic
Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds15 February 2019Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping WeldsDissimilar Metal Weld
JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-88030 May 2018Proposed Alternative to Utilize Code Cases N-878 and N-880Nondestructive Examination
JAFP-18-0052, Proposed Alternative to Utilize Code Case N-87930 May 2018Proposed Alternative to Utilize Code Case N-879Nondestructive Examination
ML17297A5246 November 2017R. E. Ginna - Request for Use of a Portion of a Later Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (CAC Nos. MG0079-MG0083; EPID L-2017-LLR-0061)Incorporated by reference
ML17228A70821 August 2017Acceptance of Requested Licensing Action Relief Requests GV-RR-01, RC-RR-01, and SI-RR-01
ML17170A01326 June 2017Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548)
ML16337A19019 December 2016Relief Request RR-ISI-4-11 for Dissimilar Metal Butt Weld ExaminationsBoric Acid
Nondestructive Examination
Dissimilar Metal Weld
ML16230A2376 September 2016Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322)Incorporated by reference
Through-Wall Leak
ML16138A02119 May 2016Proposed Alternative to Use Code Case N-789 (CAC Nos. MF7018-MF7022)Liquid penetrant
ML16033A40811 February 2016Relief Request for Dissimilar Metal Butt Weld ExaminationsNondestructive Examination
Dissimilar Metal Weld
ML15327A3677 December 2015Relief Request for Extension of Volumteric Examination Interval for Reactor Vessel Heads with Alloy 690 NozzlesBoric Acid
VT-2
ML15201A06713 July 2015Relief Request for Extension of Volumetric Examination Interval for Reactor Vessel Heads with Alloy 690 NozzlesBoric Acid
Non-Destructive Examination
VT-2
Through-Wall Leak
Dissimilar Metal Weld
ML14246A06919 December 2014Relief Request RR-ISI-04-08, Revision 1, Request for Relief Using Alternative Repair for Buried Saltwater Piping (Tac Nos. MF3413 and MF3414)Through-Wall Leak
ML14279A5656 November 2014Relief Request RR-ISI-04-09 Regarding Saltwater System Piping RepairCoatings
Operating Basis Earthquake
Nondestructive Examination
VT-2
Incorporated by reference
Design basis earthquake
Through-Wall Leak
ML14247A55524 September 2014Relief Request IST-RR-01 Regarding the Frequency of Inservice Testing Requirements of the Pumps and ValvesIncorporated by reference
Grace period
ML13297A29313 November 2013Relief Request RR-ISI-04-08 Regarding Mitigating of Buried Saltwater Piping DegradationUltimate heat sink
Commercial Grade Dedication
Nondestructive Examination
VT-2
ML13051A74018 February 2013Response to Request for Additional Information - Relief Request RR-ISI-04-07A, Dissimilar Metal Butt Welds Baseline ExaminationsDissimilar Metal Weld
ML12164A3727 June 2012Relief Request Dissimilar Metal Butt Welds Baseline Examinations (RR-ISI-04-07A)Boric Acid
Weld Overlay
Incorporated by reference
Stress corrosion cracking
Dissimilar Metal Weld
DM weld
ML12009A07329 December 2011Relief Requests for Dissimilar Metal Butt Welds Baseline Inspections (RR-ISI-04-06 & ISI-04-07)Weld Overlay
Incorporated by reference
Stress corrosion cracking
Dissimilar Metal Weld
DM weld
ML11091044626 April 2011Third 10-Year Interval Inservice Inspection (ISI) Program Plan Requests for Relief ISI-24, ISI-25, ISI-26, and ISI-27, for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML10141006018 May 2010Request for Approval of Alternate (Relief Request) for Dissimilar Metal Weld Repairs (ISI-04-05)Weld Overlay
Hydrostatic
Nondestructive Examination
Finite Element Analysis
Stress corrosion cracking
Liquid penetrant
Dissimilar Metal Weld
ML0930300529 November 2009Relief Request ISI-022 & ISI-023 to Extend Reactor Vessel and Reactor Vessel Internal Weld Examinations-Calvert Cliffs Nuclear Power Plant, Unit 1Incorporated by reference
ML09054012224 February 2009Acceptance Review of Relief Requests ISI-04-01 Through ISI-04-04-Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2
ML09054006218 February 2009Request to Extend the Inservice Inspection Interval for Reactor Vessel Weld Examinations - Relief Requests (ISI-022 and ISI-023)Probabilistic Risk Assessment
ML07123009027 April 2007Part 21 Interim Report, Dresser Investigation File No. 2007-02, Interim Reporting of a Potential Defect Involving Power Actuated Pressure Relief Valves Supplied to Calvert Cliffs, Fort Calhoun and Oconee Plants
NOC-AE-06002031, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations14 June 2006Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic ExaminationsNon-Destructive Examination
Hydrostatic
Nondestructive Examination
ML06111023211 May 2006Relief Request, Use Alternative Techniques for Repair of Welded NozzlesVT-2
ML0602400858 February 2006Relief Request for Underwater Welding of Heated Junction Thermocouple Holders, Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (TAC Nos. MC8572 and MC8573)Non-Destructive Examination