ML20149F367: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20149F367
| number = ML20149F367
| issue date = 08/05/1994
| issue date = 08/05/1994
| title = Requests Addl Info on Final Termination Survey of L-77 Research Reactor & Response to Orise Rept,Per 940415 Ltr
| title = Requests Addl Info on Final Termination Survey of L-77 Research Reactor & Response to Orise Rept,Per
| author name = Collins S
| author name = Collins S
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9408100104
| document report number = NUDOCS 9408100104
| title reference date = 04-15-1994
| package number = ML20149F370
| package number = ML20149F370
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
Line 25: Line 26:


==SUBJECT:==
==SUBJECT:==
REQUEST FOR ADDITIONAL INFORMATION ON FINAL TERMINATION SURVEY OF THE                        j L-77 RESEARCH REACTOR This concerns your letter dated April 15, 1994, and the enclosed report on the                        l final termination survey of the L-77 research reactor located on your campus.                        <
REQUEST FOR ADDITIONAL INFORMATION ON FINAL TERMINATION SURVEY OF THE                        j L-77 RESEARCH REACTOR This concerns your {{letter dated|date=April 15, 1994|text=letter dated April 15, 1994}}, and the enclosed report on the                        l final termination survey of the L-77 research reactor located on your campus.                        <
A technical review of the survey report was initiated by the NRC's contract                          ;
A technical review of the survey report was initiated by the NRC's contract                          ;
support laboratory, Oak Ridge Institute for Science and Education (0 RISE).
support laboratory, Oak Ridge Institute for Science and Education (0 RISE).

Latest revision as of 16:16, 11 December 2021

Requests Addl Info on Final Termination Survey of L-77 Research Reactor & Response to Orise Rept,Per
ML20149F367
Person / Time
Site: 05000262
Issue date: 08/05/1994
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andersen D
Brigham Young University, PROVO, UT
Shared Package
ML20149F370 List:
References
NUDOCS 9408100104
Download: ML20149F367 (4)


Text

i l

ga orco, UNIVED SVAVES t WUCLEAR REGULATORY COMMISSION

[ iif

. j REcioaav 611 RY AN PLAZA DRIVE, SulTE 400 o, [ AR LINGTON, T E X AS 760118064 0 P

..... AUG - 51994 l Docket: 50-262 License: R-109 l Brigham Young University ,

ATTN: Dr. Dee F. Andersen i Administrative Vice President l' B-307 - AFC Provo, Utah 84602 l I

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ON FINAL TERMINATION SURVEY OF THE j L-77 RESEARCH REACTOR This concerns your letter dated April 15, 1994, and the enclosed report on the l final termination survey of the L-77 research reactor located on your campus. <

A technical review of the survey report was initiated by the NRC's contract  ;

support laboratory, Oak Ridge Institute for Science and Education (0 RISE).

Enclosed is the letter and attached comments dated July 25, 1994, summarizing the initial ORISE review of your survey report. l We have reviewed the ORISE report, and the questions and comments provided were the subject of a telephone conversation held July 25, 1994, between Mr. Edwin F. Jackson of vour organization, and Dr. D. Blair Spitzberg of my staff. During this conversation, we discussed the need for additional information to address the ORISE comments and questions. We request that you provide this office your response to the ORISE report and the additional information requested therein, so that we can continue our review.

Should you have any questions concerning this letter, please contact Dr. Spitzberg at (817) 860-8191.

Sincerely,

, W Samuel J. Collins, Director Division of Radiation Safety and Safeguards

Enclosure:

o ,.., e a C# Es C % %w 9408100104 940805 PDR ADCCK 05000262 j' P PDR * , t

Brigham Young University cc w/ enclosure:

Brigham Young University College of Physical and Mathematical Sciences ATTN: Dr. Gary L. Jensen Facility Chief 378 EFC Provo, Utah 84602 Brigham Young University ATTN: E. F. Jackson Campus Safety Officer Bldg. CRWH Provo, Utah 84602 Brigham Young University ATTN: Fred W. Nelson, Director Campus Safety Officer Bldg. CRWH Provo, Utah 84602 Radiation Control "rogram Director Bureau of Radiation Control Department of Health P.O. Box 16690 Salt Lake City, Utah 84116-0609 ORISE ATTN: Wade C. Adams i Health Physics / Project Leader i P.O. Box 117 '

Oak Ridge, Tenner,see 37831-0117 I

t I

i t

Brigham Young University bcc to DMB (IE01) bcc:

L. J. Callan, RA D. B. Spitzberg, RIB MIS Coordinator RIV File RIB File (Hodges)

Lisa Shea, RM/ALF (MS 4503)

A. Adams, NRR Project Manager (MS 11 B20)

J. L. Caldwell, NRR (MS 10 022) 1 RIV: RIB W e C: RIB k ,DD:DRSS D:DRSS((/

DBSpitzberg:nh . BMurray O kAScar[o SJColdid 7 P /94 $ /\ /94 -//F/94 f// /[4

f l

Brigham Young University rbec to DMB (IE01) bcc: l L. J. Callan, RA D. B. Spitzberg, RIB MIS Coordinator RIV File RIB File (Hodges)

Lisa Shea, RM/ALF (MS 4503)

A. Adams, NRR Project Manager (MS 11 B20)

J. L. Caldwell, NRR (MS 10 D22) 1 f

RIV: RIB W e C: RIB h ,DD:DRSS [ D:DRSS((/

DBSpitzberg:nh , BMurray hkAScardo SJColdh 7 jvfg4  % /g /94 _//ff /94

,f_ ff jg'4

_