| ==SUBJECT:== | | ==SUBJECT:== |
| WNP-2 SHIELDING WALL DEFERRAL - SER SUPPLEMENT, AMENDMENT TO LICENSING CONDITION PLANT NAME: WNP-2 LICENSING STAGE: OL DOCKET NUMBER: 50-397 RESPONSIBLE BRANCH / PROJECT MANAGER: LB #2; R. Auluck, PM REQUESTED COMPLETION DATE: October 19, 1984 DESCRIPTION OF RESPONSE: SSER, License Condition Change REVIEW STATUS: Con.ple te The Radiological Assessment Branch has reviewed the licensee's August 15, September 7, and October 10, 1984 letters concerning their request to amend Licensing Condition 2.C(11), shield wall deferral. The licensee request:, further deferring construction of several shield walls at WNP-2 until ongoing ALARA reviews dictate the need for additional shielding. | | WNP-2 SHIELDING WALL DEFERRAL - SER SUPPLEMENT, AMENDMENT TO LICENSING CONDITION PLANT NAME: WNP-2 LICENSING STAGE: OL DOCKET NUMBER: 50-397 RESPONSIBLE BRANCH / PROJECT MANAGER: LB #2; R. Auluck, PM REQUESTED COMPLETION DATE: October 19, 1984 DESCRIPTION OF RESPONSE: SSER, License Condition Change REVIEW STATUS: Con.ple te The Radiological Assessment Branch has reviewed the licensee's August 15, September 7, and {{letter dated|date=October 10, 1984|text=October 10, 1984 letter}}s concerning their request to amend Licensing Condition 2.C(11), shield wall deferral. The licensee request:, further deferring construction of several shield walls at WNP-2 until ongoing ALARA reviews dictate the need for additional shielding. |
| Enclosed are cur SSER input and amended license conditions dealing . | | Enclosed are cur SSER input and amended license conditions dealing . |
| with these deferred shield walls at WNP-2. The license condition states that the Licensee shall complete canstruction of the deferred shield walls and window as identified in Attachment 3, as amended by this license amend-ment and as dictated by ongoing ALARA reviews identifying the need for additional shielding. | | with these deferred shield walls at WNP-2. The license condition states that the Licensee shall complete canstruction of the deferred shield walls and window as identified in Attachment 3, as amended by this license amend-ment and as dictated by ongoing ALARA reviews identifying the need for additional shielding. |
Line 80: |
Line 80: |
| ' WNP-2 DEFERRED SHIELDING WALLS | | ' WNP-2 DEFERRED SHIELDING WALLS |
| __ AMENDMENT TO LICENSE CONDITION 2.C(11) | | __ AMENDMENT TO LICENSE CONDITION 2.C(11) |
| License Condition 2.C(11) applies to the deferral of seven (7) block shield walls and one (1) leaded glass window in the WNP-2 radwaste building and two (2) bicck shield walls in the WNP-2 turbine building. The locations of these shielding walls are described in the August 15, 1984 letter from G. Sorensen, WPSS, to A. Schwencer, NRC. The Licensee has committed to comp,lete construction of three of these shield walls within the one year period after issuance of the WNP-2 operating license, as dictated by the original license condition. The Licensee shall complete construction of the remaining deferred shield walls and window as identified in Attachment 3, as amended by this license amendment and as dictated by ongoing ALARA reviews identifying the need for additional shielding. | | License Condition 2.C(11) applies to the deferral of seven (7) block shield walls and one (1) leaded glass window in the WNP-2 radwaste building and two (2) bicck shield walls in the WNP-2 turbine building. The locations of these shielding walls are described in the {{letter dated|date=August 15, 1984|text=August 15, 1984 letter}} from G. Sorensen, WPSS, to A. Schwencer, NRC. The Licensee has committed to comp,lete construction of three of these shield walls within the one year period after issuance of the WNP-2 operating license, as dictated by the original license condition. The Licensee shall complete construction of the remaining deferred shield walls and window as identified in Attachment 3, as amended by this license amendment and as dictated by ongoing ALARA reviews identifying the need for additional shielding. |
| m s 7 7 | | m s 7 7 |
| m 4 | | m 4 |
|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20205N9871999-04-14014 April 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990308-11 ML20203G0081999-02-12012 February 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 981102-06 ML20211M5671997-10-0303 October 1997 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910 ML20149D7851997-07-14014 July 1997 Notification of Significant Licensee Meeting W/Util on 970731 in Arlington,Tx to Discuss Case Studies (Response Time & Reactor Feedwater Pump Trip Test) & Common Themes ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134P5931997-02-21021 February 1997 Forwards Order Imposing Civil Monetary Penalty for Transmittal to Ofc of Fr for Publication.W/O Encl ML20132F5421996-12-19019 December 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11 ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20203B9891995-11-20020 November 1995 Discusses OI Rept 4-95-032 Re Alleged False Statements by Fire Watches to NRC Inspectors.Oe Will Consider Matter Closed from Enforcement Perspective Unless Different View Received within 3 Wks of Date of This Memo ML20211M6231994-11-30030 November 1994 Provides Info to Commission on Status of Rulemaking Activities Re Power Reactor Decommissioning Cost Issues,Per 930714 SRM ML20236L5631994-08-10010 August 1994 Responds to Former Region V 930422 Request for NRR Evaluation of WPPSS Practices Associated W/Testing RHR Sys While Aligned in SPC Mode ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20247G1561989-05-15015 May 1989 Forwards Director'S Decision 89-03 in Response to 2.206 Petition Re BWR Stability.Petition Filed by Hiatt on Behalf of Ocre Expressing Concerns Re 890309 Power Oscillattion Event & Requested Action W/Respect to All BWRs ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20147E3621988-02-28028 February 1988 Summary of 880223 Operating Reactors Events Meeting 88-008. List of Attendees,Tabulation of long-term Followup Assignments to Be Completed & Summary of Reactor Scrams Encl ML20195G7981987-07-31031 July 1987 Partially Deleted Memo Forwarding SALP Rept & Recommendations Re NRC Actions for Plant.W/O Encl IR 05000397/19870061987-07-0101 July 1987 Forwards Draft SALP Rept 50-397/87-06 for Feb-May 1987 for Review.Comments Requested at SALP Board Meeting Schedule for 870707 in Region V.Update of Tables 1-4 Included in Draft. W/O Rept ML20236B1451987-06-18018 June 1987 Forwards Response to DF Kirsch 870507 Memo Requesting Performance Analysis Info for Input to Facility SALP Rept. Review Results Provided in Encl.Encl Withheld ML20214M1381987-05-26026 May 1987 Provides Enforcement Guidance to Regions for Issues Re Control Room Habitability/Control Room Emergency Ventilation Sys Deficiencies.Summary of Plants Reviewed & Documents Describing Findings Encl ML20195G7931987-05-12012 May 1987 Forwards Insp & LER Data Tables for Use in Preparing Performance Analyses for Salp,Per DF Kirsch 870507 Memo. Tables Subj to Review & Comment Until SALP Process Complete. W/O Encls ML20214A0311987-05-12012 May 1987 Notifies of 870514 Briefing on Licensing & Operational Status of Plants Assigned to Project Directorate V,Including Diablo Canyon,Palo Verde,Rancho Seco,San Onfore,Trojan & WPPSS 2 ML20212M8601987-03-0909 March 1987 Forwards SER Re Concerns Identified in Plant Fire Protection Program,As Described in FSAR Through Amend 33.Concerns Resolved Except for Listed Items,Including Adequacy of Safe Shutdown Procedures.Review Excluded Amend 37 Items ML20154A2831986-12-13013 December 1986 Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985 ML20215G1361986-10-14014 October 1986 Summary of 861006 Operating Reactor Events Meeting 86-35 Re Events Since Last Meeting on 860929.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Attendance List & Viewgraphs Encl ML20215F2751986-10-0606 October 1986 Forwards Action Timetable Re Coordinated Approach to Resolution of Fire Protection Issues at Facility ML20209A8611986-09-0202 September 1986 Forwards Matls Needed to Complete Assignment During Emergency Preparedness Exercise on 860916-19.W/o Encl IR 05000397/19860121986-08-25025 August 1986 Notification of 860828 Meeting W/Util in Walnut Creek,Ca to Discuss Apparent Violations Involving Equipment Qualification (50-397/86-12),Region V Team Insp 50-397/86-11 & Control of Combustible Matls ML20204G4051986-08-0404 August 1986 Notification of 860909 Meeting W/Utils in Bethesda,Md to Discuss Nrc/Util Living Schedules,Util Performance,Legal Considerations,Tech Spec Improvements & Severe Accident Policy/Degraded Core Programs.Proposed Agenda Encl ML20207J2451986-07-16016 July 1986 Forwards Request for Addl Info Re Util Application to Amend Tech Spec 4.6.4.1 Concerning Drywell Vacuum Breakers,For Transmittal to Licensee.Receipt of Info After 860731 Will Require Rev to 860831 Anticipated Review Completion Date ML20058K6041986-07-0303 July 1986 Informs of Telcon on Status of EA-86-110 Re Health Physics/ Emergency Planning & EA-86-070 Re Fire Protection ML20203B0881986-07-0202 July 1986 Forwards SALP Rept for Feb 1985 - Jan 1986,for Review.Salp Board Rated Licensee Performance Category 1 in Area of Outages & Category 2 in All Other Areas Except Fire Protection.W/O Encls ML20236Y1311986-04-25025 April 1986 Forwards List of Primary Containment Isolation Valves & Valve P&ID Locations as Referenced in Util 860117 & 0218 Request for Amend to License NPF-21 ML20198D7151986-04-24024 April 1986 Forwards Insp Rept 50-397/86-05,notice of Violation & Enforcement History,For Consideration & Action.Civil Penalty Unwarranted Since Fire Watches Immediately Posted & Safety Significance of Fire Loadings Limited ML17278A7091986-04-16016 April 1986 Advises That Deletion of Technical Memo 1227 Overlooked During Issuance of Amend 31 to Fsar.Memo Deleted as Result of Incorporation of Scn 83-135 Into Amend ML20195G7731986-03-14014 March 1986 Forwards Draft SALP Rept for Feb 1985 - Jan 1986,for Review & Comment at 860319 Meeting at Region V.Updated Tables 1 & 4 Also Encl.W/O Encl ML20154K1511986-03-0303 March 1986 Notifies That SALP Board 860312 Meeting Rescheduled for 860319 at Region V.Deviation from Instruction 0701 to Permit a Toth Attendance at B&W Training Course on 860303-15 in Best Interest of SALP Process ML20199D1311986-02-19019 February 1986 Informs That Proposed Recirculation Pump Vibration Testing Plan Acceptable,Based on Licensee Testing Procedure & Supporting Stress Analysis ML20203B1101986-02-13013 February 1986 Forwards Assessment of Lers,Including Results for Input Into SALP Rept for Feb 1985 - Jan 1986.LERs of Above Average Quality ML20195G7801986-02-0909 February 1986 Forwards Data Tables for Use in Preparing Performance Analysis for Salp.Insp Results & LERs Occurring During Last Month of SALP May Not Be Included in Tables.Tables Subject to Review & Comment Until SALP Process Completed.W/O Encl ML20215N3041986-01-30030 January 1986 Provides Summary of Review of Past Experience as Related to Handling of Nonradiological Issues.State of Wa Notified by NRC of Industrial Safety Concerns at Facility.Dm Kunihiro 851213 Memo to State of Wa Encl ML20151Q9751986-01-29029 January 1986 Requests Identification of Div Contact for Regional Insp Team Leaders to Arrange NRR Alternative Shutdown & Fire Protection Reviewer Technical Assistance on region-based post-fire Safe Shutdown Insps.Schedule of Insps Submitted ML20149M8611986-01-24024 January 1986 Discusses 851202-06 Observation of Seven INPO Members & Two Industry Peer Evaluators During Conduct of Site Visit to Evaluate Three Training Programs at Plant.Significant Milestones Toward Accreditation of Training Programs Listed ML20198H2291986-01-22022 January 1986 Requests Date & Subj of Application for OL Issued on 840413.Info Needed to Complete Review of 850318 Transmittal of License Fee Data & Assessment of Fees & Contractual Costs Through 841222 ML20198G8771986-01-16016 January 1986 Forwards Brief Description & Evaluation of Util 850911 Proposed Tech Spec Change to Revise Composition of Corporate Nuclear Safety Review Board.Proposed Change Acceptable ML20198G8291986-01-0606 January 1986 Forwards Draft Response to 850718 Memo Re Inspector Feedback /Request for Technical Assistance on NUREG-0737,Item II.F.1.Response Based on Review of Util Position on Iodine plate-out ML20141E9281985-12-26026 December 1985 Recommends Survey of Plants Re Licensee Review of Preservice Insp Rept & Submittal of Relief Requests.Relief Requests from Preservice Insp Should Be Submitted Before Issuance of OL & Plant Startup to Permit NRC Review 1999-04-14
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20205N9871999-04-14014 April 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990308-11 ML20203G0081999-02-12012 February 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 981102-06 ML20211M5671997-10-0303 October 1997 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910 ML20149D7851997-07-14014 July 1997 Notification of Significant Licensee Meeting W/Util on 970731 in Arlington,Tx to Discuss Case Studies (Response Time & Reactor Feedwater Pump Trip Test) & Common Themes ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134P5931997-02-21021 February 1997 Forwards Order Imposing Civil Monetary Penalty for Transmittal to Ofc of Fr for Publication.W/O Encl ML20132F5421996-12-19019 December 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11 ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20203B9891995-11-20020 November 1995 Discusses OI Rept 4-95-032 Re Alleged False Statements by Fire Watches to NRC Inspectors.Oe Will Consider Matter Closed from Enforcement Perspective Unless Different View Received within 3 Wks of Date of This Memo ML20211M6231994-11-30030 November 1994 Provides Info to Commission on Status of Rulemaking Activities Re Power Reactor Decommissioning Cost Issues,Per 930714 SRM ML20236L5631994-08-10010 August 1994 Responds to Former Region V 930422 Request for NRR Evaluation of WPPSS Practices Associated W/Testing RHR Sys While Aligned in SPC Mode ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20247G1561989-05-15015 May 1989 Forwards Director'S Decision 89-03 in Response to 2.206 Petition Re BWR Stability.Petition Filed by Hiatt on Behalf of Ocre Expressing Concerns Re 890309 Power Oscillattion Event & Requested Action W/Respect to All BWRs ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20147E3621988-02-28028 February 1988 Summary of 880223 Operating Reactors Events Meeting 88-008. List of Attendees,Tabulation of long-term Followup Assignments to Be Completed & Summary of Reactor Scrams Encl ML20195G7981987-07-31031 July 1987 Partially Deleted Memo Forwarding SALP Rept & Recommendations Re NRC Actions for Plant.W/O Encl IR 05000397/19870061987-07-0101 July 1987 Forwards Draft SALP Rept 50-397/87-06 for Feb-May 1987 for Review.Comments Requested at SALP Board Meeting Schedule for 870707 in Region V.Update of Tables 1-4 Included in Draft. W/O Rept ML20236B1451987-06-18018 June 1987 Forwards Response to DF Kirsch 870507 Memo Requesting Performance Analysis Info for Input to Facility SALP Rept. Review Results Provided in Encl.Encl Withheld ML20214M1381987-05-26026 May 1987 Provides Enforcement Guidance to Regions for Issues Re Control Room Habitability/Control Room Emergency Ventilation Sys Deficiencies.Summary of Plants Reviewed & Documents Describing Findings Encl ML20195G7931987-05-12012 May 1987 Forwards Insp & LER Data Tables for Use in Preparing Performance Analyses for Salp,Per DF Kirsch 870507 Memo. Tables Subj to Review & Comment Until SALP Process Complete. W/O Encls ML20214A0311987-05-12012 May 1987 Notifies of 870514 Briefing on Licensing & Operational Status of Plants Assigned to Project Directorate V,Including Diablo Canyon,Palo Verde,Rancho Seco,San Onfore,Trojan & WPPSS 2 ML20212M8601987-03-0909 March 1987 Forwards SER Re Concerns Identified in Plant Fire Protection Program,As Described in FSAR Through Amend 33.Concerns Resolved Except for Listed Items,Including Adequacy of Safe Shutdown Procedures.Review Excluded Amend 37 Items ML20154A2831986-12-13013 December 1986 Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985 ML20215G1361986-10-14014 October 1986 Summary of 861006 Operating Reactor Events Meeting 86-35 Re Events Since Last Meeting on 860929.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Attendance List & Viewgraphs Encl ML20215F2751986-10-0606 October 1986 Forwards Action Timetable Re Coordinated Approach to Resolution of Fire Protection Issues at Facility ML20209A8611986-09-0202 September 1986 Forwards Matls Needed to Complete Assignment During Emergency Preparedness Exercise on 860916-19.W/o Encl IR 05000397/19860121986-08-25025 August 1986 Notification of 860828 Meeting W/Util in Walnut Creek,Ca to Discuss Apparent Violations Involving Equipment Qualification (50-397/86-12),Region V Team Insp 50-397/86-11 & Control of Combustible Matls ML20204G4051986-08-0404 August 1986 Notification of 860909 Meeting W/Utils in Bethesda,Md to Discuss Nrc/Util Living Schedules,Util Performance,Legal Considerations,Tech Spec Improvements & Severe Accident Policy/Degraded Core Programs.Proposed Agenda Encl ML20207J2451986-07-16016 July 1986 Forwards Request for Addl Info Re Util Application to Amend Tech Spec 4.6.4.1 Concerning Drywell Vacuum Breakers,For Transmittal to Licensee.Receipt of Info After 860731 Will Require Rev to 860831 Anticipated Review Completion Date ML20058K6041986-07-0303 July 1986 Informs of Telcon on Status of EA-86-110 Re Health Physics/ Emergency Planning & EA-86-070 Re Fire Protection ML20203B0881986-07-0202 July 1986 Forwards SALP Rept for Feb 1985 - Jan 1986,for Review.Salp Board Rated Licensee Performance Category 1 in Area of Outages & Category 2 in All Other Areas Except Fire Protection.W/O Encls ML20236Y1311986-04-25025 April 1986 Forwards List of Primary Containment Isolation Valves & Valve P&ID Locations as Referenced in Util 860117 & 0218 Request for Amend to License NPF-21 ML20198D7151986-04-24024 April 1986 Forwards Insp Rept 50-397/86-05,notice of Violation & Enforcement History,For Consideration & Action.Civil Penalty Unwarranted Since Fire Watches Immediately Posted & Safety Significance of Fire Loadings Limited ML17278A7091986-04-16016 April 1986 Advises That Deletion of Technical Memo 1227 Overlooked During Issuance of Amend 31 to Fsar.Memo Deleted as Result of Incorporation of Scn 83-135 Into Amend ML20195G7731986-03-14014 March 1986 Forwards Draft SALP Rept for Feb 1985 - Jan 1986,for Review & Comment at 860319 Meeting at Region V.Updated Tables 1 & 4 Also Encl.W/O Encl ML20154K1511986-03-0303 March 1986 Notifies That SALP Board 860312 Meeting Rescheduled for 860319 at Region V.Deviation from Instruction 0701 to Permit a Toth Attendance at B&W Training Course on 860303-15 in Best Interest of SALP Process ML20199D1311986-02-19019 February 1986 Informs That Proposed Recirculation Pump Vibration Testing Plan Acceptable,Based on Licensee Testing Procedure & Supporting Stress Analysis ML20203B1101986-02-13013 February 1986 Forwards Assessment of Lers,Including Results for Input Into SALP Rept for Feb 1985 - Jan 1986.LERs of Above Average Quality ML20195G7801986-02-0909 February 1986 Forwards Data Tables for Use in Preparing Performance Analysis for Salp.Insp Results & LERs Occurring During Last Month of SALP May Not Be Included in Tables.Tables Subject to Review & Comment Until SALP Process Completed.W/O Encl ML20215N3041986-01-30030 January 1986 Provides Summary of Review of Past Experience as Related to Handling of Nonradiological Issues.State of Wa Notified by NRC of Industrial Safety Concerns at Facility.Dm Kunihiro 851213 Memo to State of Wa Encl ML20151Q9751986-01-29029 January 1986 Requests Identification of Div Contact for Regional Insp Team Leaders to Arrange NRR Alternative Shutdown & Fire Protection Reviewer Technical Assistance on region-based post-fire Safe Shutdown Insps.Schedule of Insps Submitted ML20149M8611986-01-24024 January 1986 Discusses 851202-06 Observation of Seven INPO Members & Two Industry Peer Evaluators During Conduct of Site Visit to Evaluate Three Training Programs at Plant.Significant Milestones Toward Accreditation of Training Programs Listed ML20198H2291986-01-22022 January 1986 Requests Date & Subj of Application for OL Issued on 840413.Info Needed to Complete Review of 850318 Transmittal of License Fee Data & Assessment of Fees & Contractual Costs Through 841222 ML20198G8771986-01-16016 January 1986 Forwards Brief Description & Evaluation of Util 850911 Proposed Tech Spec Change to Revise Composition of Corporate Nuclear Safety Review Board.Proposed Change Acceptable ML20198G8291986-01-0606 January 1986 Forwards Draft Response to 850718 Memo Re Inspector Feedback /Request for Technical Assistance on NUREG-0737,Item II.F.1.Response Based on Review of Util Position on Iodine plate-out ML20141E9281985-12-26026 December 1985 Recommends Survey of Plants Re Licensee Review of Preservice Insp Rept & Submittal of Relief Requests.Relief Requests from Preservice Insp Should Be Submitted Before Issuance of OL & Plant Startup to Permit NRC Review 1999-04-14
[Table view] |
Text
.
&' *:W .d T 'i kA Y ? )
DISTRICLTION
$~
CentraT Fi les Docket flo: 50-397 RAB Reading File AD/RP Reading File OCT 15 EB4 MEMORANDUM FOR: Thomas M. Novak, Assistant Director for Licensing, DL FROM: Daniel R. Muller, Assistant Director
- for Radiation Protection, DSI
SUBJECT:
WNP-2 SHIELDING WALL DEFERRAL - SER SUPPLEMENT, AMENDMENT TO LICENSING CONDITION PLANT NAME: WNP-2 LICENSING STAGE: OL DOCKET NUMBER: 50-397 RESPONSIBLE BRANCH / PROJECT MANAGER: LB #2; R. Auluck, PM REQUESTED COMPLETION DATE: October 19, 1984 DESCRIPTION OF RESPONSE: SSER, License Condition Change REVIEW STATUS: Con.ple te The Radiological Assessment Branch has reviewed the licensee's August 15, September 7, and October 10, 1984 letters concerning their request to amend Licensing Condition 2.C(11), shield wall deferral. The licensee request:, further deferring construction of several shield walls at WNP-2 until ongoing ALARA reviews dictate the need for additional shielding.
Enclosed are cur SSER input and amended license conditions dealing .
with these deferred shield walls at WNP-2. The license condition states that the Licensee shall complete canstruction of the deferred shield walls and window as identified in Attachment 3, as amended by this license amend-ment and as dictated by ongoing ALARA reviews identifying the need for additional shielding.
.lThis review was performed by C. Hinson, RPS/RAB. Our SALP input is attached.
c rc,at s t s .1 L'y ,
% Daniel R. Mulict 8411030489841015)(fl Danici R. Muller, Assistant Director
%& ADOCK 05000g9 7 for Radiation Protection
--74 j Jivision of Systems Integration 4 d
Enclosure:
I As stated I cc: R. Bernero F. Congel R. Auluck -
A. Schwencer ,) --
- 0. Lynch '
\ s C.H1nsorg; j o"c h DSI.;,RM., .. d ... 0 [.B . .
. 0SI.;RAB... Uhi 0SI: RP ,, ,, ,,,,,,,,,,, ,,,,,,, ,, , ,,,,, ,,,,,,,
FJCongel DRf
->j cm '.>.sgg .. 9 . '.i
" > i . . .I. W.I. 2di . . .l.W (h M. . . l .19/. G/F. .19/.
. .../.?. 81. . . ...... . ... . - - .. - - - . . - . . - -
m e . c w m e ,0 .e. o m OFFICIAL RECORD COPY
i WNP-2 DEFERRED SHIELDING WALLS '
SAFETY EVALUATION INPUT-2 Prior to the issuance of the WNP-2 operating license, the licensee requested and was granted a temporary deferral of construction of several concrete block shielding walls and a leaded glass viewing window at WNP-2. The resulting license condition stated that the Licensee must complete construc-tion of all deferred shield walls and window within one year after issuance of the WNP-2 operating license, or prior to operation of the permanent solid radioactive waste solidification system at WNP-2, whichever occurs first.
The nine shield wall locations are described in Attachment 3 of the August 15, 1984 memo from the G. Sorensen, WPPSS, to A. Schwencer, NRC. The Licensee has agreed to install the shield walls described in items 1, 2, and 4 of Attachment 3 prior to the expiration of the one year period following issuance of the WNP-2 Operating License. However, the Licen:ee has requested to amend the current license condition to further defer the construction oftheremainingshieldwallsandwindow(describedinitems3,and5 through 9) until prior to operation of the permanent solid radioactive waste solidification system at WNP-2, or when an ALARA review identifies tne need for additional shielding.
i L
The Supply System has reviewed the requested amendment per 10 CFR 50.59 and 50-92 and has determined that no significant hazard or unreviewed safety question will result from the deferral of the subject shield walls and window. Further, this deferral will not:
- 1) Involve a significant increase in the probability or consequences of an accident previously evaluated; or
- 2) Create the possibility of a new or different kind of accident from any accident previously evaluated, or
- 3) Involve a significant reduction in a margin of safety. '
The bases for these statements is that the original design anticipated radiation sources in the solid radwaste system and condenser tube access areas requiring shielding for protection of personnel in adjacent areas.
Since, at present, there is no schedule for installation of the permanent solid radwaste solidification system at WNP-2, the source originally anti-cipated is non-existent.
The shield walls described in items 4 through 8 and the shield window in item 9 were all originally designed to shield portions of the permanent j radwaste solidification sytem at WNP-2. Since this system has yet to be l
,,-,--, w ,_ - ,_ w ,-..--_ -.-__-.--n--._, --,-_.-,,...,~-__-,,._+.m,--_ _ . . _ _, - = _ + - . -- - . - , , -
installed, the Licensee requests deferral of construction of these walls and window (with the exception of item 4, which will be installed on schedule). The Licensee will monitor radiation levels in these areas during the Power Ascension Test Programs in order to establish a base case. These areas will then be routinely monitored during comercial operation with periodic'ALARA reviews performed to ensure personnel exposures are minimized. ALARA reviews will also be initiated per approved plant procedures upon significant radiation level increases.
The Licensee has comitted to construct these deferred shield walls, whenever the dose rate at the shield wall location exceeds the radia-tion dose rate for which the area was zoned.
The two deferred shield wall locations not associated with the solid radwaste system are described in items 2 and 3 of Attachment 3. These are on the east and west ends of the condenser access areas. These walls were deferred because the Licensee's ALARA review showed that principal radiation sources are nut in line of sight with these two locations. The Licensee has been using a locked gate for each location in place of the shield wall to control entry to the high radiation zone. The Licensee has performed ALARA reviews on both of these areas during startup to evaluate the need for these shield walls. The dose-rate criteria for const,ruction of these walls is 2.5 mrem /hr at the locked gate location. Based on the results of these ALARA surveys, the Licensee has determined the need to construct the shield wall at the east end of the condenser. This wall
?
will be constructed prior to the expiration of the one year period fol-lowing issuance of the WNp-2 Operating License. The Licensee will con- .
tinue to monitor the dose rates at the gate location at the west end of the condenser and will construct that shield wall if future dose rates at the gate location exceed 2.5 mrem /hr.
The Licensee has performed ALARA reviews of each of the nine temporary shielding wall deferral areas and has determined that these deferrals will have no appreciable effect on personnel exposures. The Licensee has stated that in no case following a LOCA accident will workers be required to enter areas in the vicinity of the deferred shielding to mitigate the course of the accident.
If the ongoing ALARA reviews determine that the deferred walls should be built, the block shield walls can be erected quickly, and, in all cases, will be erected for each cubicle prior to component operation. The' Licensee shall ensure that personnel doses are minimized during construc-tion of the deferred shield walls. This can be accomplished by draining /
flushing adjacent radioactive components, and using temporary shielding when necessary.
0 The staff has reviewed the Licensee's request to complete construction of the deferred shield walls and window as dictated by ongoing ALARA reviews identifying the need for additional shielding. Based on the reasons t.
described above, and on the fact that these shield wall deferrals would have no appreciable effect on personnel exposures, the staff finds the Licensee's request acceptable.
Prior to operation of the permanent radwaste solidification system at WNP-2, the Licensee ash'll construct all deferred shield walls to cubicles which will house radioactive components (this includes installation of the leaded glass viewing window).
~
~
' WNP-2 DEFERRED SHIELDING WALLS
__ AMENDMENT TO LICENSE CONDITION 2.C(11)
License Condition 2.C(11) applies to the deferral of seven (7) block shield walls and one (1) leaded glass window in the WNP-2 radwaste building and two (2) bicck shield walls in the WNP-2 turbine building. The locations of these shielding walls are described in the August 15, 1984 letter from G. Sorensen, WPSS, to A. Schwencer, NRC. The Licensee has committed to comp,lete construction of three of these shield walls within the one year period after issuance of the WNP-2 operating license, as dictated by the original license condition. The Licensee shall complete construction of the remaining deferred shield walls and window as identified in Attachment 3, as amended by this license amendment and as dictated by ongoing ALARA reviews identifying the need for additional shielding.
m s 7 7
m 4
%p._
' ptANT: WNP-2 A. Functional Areas.: Licensi g Activities
- 1. Management involvement in assuring quality.
Response to staff questions were timely and thorough.
O Rating:2
- 2. Approach to resolution of technical issues from a safety standpoint.
Resolution of staff questions were viable and responsive to staff concerns.
Rating: 1
- 3. Responsive to NRC initiatives.
Licensee responded quickly and adequately to staff request.
Rating:1 Staffing (including management).
~
4.
Not reviewed .
Rating:
N/A Y ----- - - -
' - 5. Reporting and analysis of reportable events.
. Not reviewed Rating: N/A
- 6. Training and qualification effectiveness.
Not reviewed Rating: N/A
- 7. Overall Rating for Licensing Activity Functional Area: _
B. Other Functional Areas (e.g. radiological controls, refueling) 1.
"^
S 6
Rating:
~~
- 2. N/A Rating:
_