ML20199G133: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 2: Line 2:
| number = ML20199G133
| number = ML20199G133
| issue date = 03/25/1985
| issue date = 03/25/1985
| title = Responds to 850308 Ltr Re Inconsistencies Between Three Mechanical/Piping Ssers & Three Related Qa/Qc Ssers.Subj Matter Concerning AQ-7 Will Be Covered Under AQW-30 in Mech 2
| title = Responds to Re Inconsistencies Between Three Mechanical/Piping Ssers & Three Related Qa/Qc Ssers.Subj Matter Concerning AQ-7 Will Be Covered Under AQW-30 in Mech 2
| author name = Shao L
| author name = Shao L
| author affiliation = NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
| author affiliation = NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
Line 12: Line 12:
| case reference number = FOIA-85-59
| case reference number = FOIA-85-59
| document report number = NUDOCS 8606250093
| document report number = NUDOCS 8606250093
| title reference date = 03-08-1985
| package number = ML20197J178
| package number = ML20197J178
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE

Revision as of 02:11, 8 December 2021

Responds to Re Inconsistencies Between Three Mechanical/Piping Ssers & Three Related Qa/Qc Ssers.Subj Matter Concerning AQ-7 Will Be Covered Under AQW-30 in Mech 2
ML20199G133
Person / Time
Site: Comanche Peak, 05000000
Issue date: 03/25/1985
From: Shao L
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
To: Scinto J
NRC
Shared Package
ML20197J178 List: ... further results
References
FOIA-85-59 NUDOCS 8606250093
Download: ML20199G133 (1)


Text

j

~

. .e lj *. .. es caro

/

+ o 3

8 g

o UNITED STATES NUCLEAR REGULATORY COMMISSION GAL -

. 3 ,E WASHINGTON, D. C. 20555

[

\*****$' .

MAR 2 51985 i  :

q NOTE T0: Joe Scinto FROM: L. Shao, Group Leader, Civil / Mechanical Groups -

Comanche Peak Technical Review Team

SUBJECT:

CONSISTENCY BETWEEN MECHANICAL AND QA/QC SSER i

4

) In your note to me and Herb Livermore on 3/8/85, you pointed out some

inconsistencies between three Mechanical / Piping SSERs and three related

{ QA/QC SSERs. The following is our response:

1. Mech 2 (AQW 30) vs QA/QC AQ 7 5

After discussion with QA/QC, we both concluded that the subject matter related to AQ-7 will be covered under AQW-30 in Mech 2.

2. Mech 43 vs QA/QC 8 4 The subject matter on liner plate has been discussed and resolved in j such a way that we refer all QA/QC aspects to QA/QC 8 and they refer a all mechanical / piping aspects to Mech 43. As for what kind of picture to represent TRT as a whole, I think it has to be decided by Noonan.
3. Mech 10 vs QA/QC AQ 61 We found that these two SSERs do not address the same subject matter.

J Mech 10 relates to a gouge in pipe and QA/QC AQ 61 relates to gouges

[ in a structure member. They even have different allegers.

1 h Dr. Hou in our Group has discussed with Herb Livermore and Herb agreed with

( above resolutions.

k t

L. C. Shao, <roup Leader Civil / Mechanical Groups Comanche Peak Technical Review Team cc: D. Eisenhut

)!. V. Noonon i

6 -

laulam S. ou m

-R. C. Tang P. Chen c r kN hofj3 860611 GARDE 85-59 PDR I -

I _ .- % - -

__ ._ _._ __