ML20205T237: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IA-84-742, Confirms That Lead Responsibility for Reviewing Licensee Response to Items in 840418 Order Modifying License DPR-76 Assigned to NRR]]
{{Adams
| number = ML20205T237
| issue date = 04/24/1984
| title = Confirms That Lead Responsibility for Reviewing Licensee Response to Items in 840418 Order Modifying License DPR-76 Assigned to NRR
| author name = Bishop T
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| addressee name = Eisenhut D
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000275
| license number =
| contact person =
| case reference number = FOIA-84-741, FOIA-84-742
| document report number = NUDOCS 8704070246
| package number = ML20204G686
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| page count = 1
}}
 
=Text=
{{#Wiki_filter:-
t,
[,. .. .,  '
e
                                          )                    UNITED STATES
: 2. %fl w r
[*..
NUCLEAR REGULATORY COMMISSION                  ..      A
    ,.                    ...j                                    REGION V 0,              4                        1450 MARIA LANE. SUITE 210
                  %,'b'      ,o#                      WA LNUT CRE E K. CALIFORNI A 94596 April 24, 1984 MEMORANDUM FOR:    D. G. Eisenhutf'51iecEoT," Division of Licensing NRR i
FROM:        .
T. W. Bishop, Director, Division of Reactor Safety and Projects, Region V
 
==REFERENCE:==
ORDER TO MODIFY FACILITY OPERATING LICENSE NO. DPR-76 (DIABLO CANYON NUCLEAR POWER PLANT, UNIT 1);
DATE: April 18, 1984                                      ---
 
==SUBJECT:==
 
CONFIRMATION OF UNDERSTANDING MGARDING LEAD RESPONSIBILITY The referenced order sets forth License Condition 2.C.(11) amending the license, consisting of seven major items which must be resolved by the licensee.
Region V has reviewed these itetas and de.termined that the responsibility for evaluation of the licensee's report and resolution of these issues
          \            properly belongs to NRR. This understanding was also confirmed during a telephone discussion between D. Kirsch, of my staff, and G. Knighton, of your staff. on April 23, 1984.
Should your understanding differ from that of Region V, please contact me immediately.
C),10.1 - J T. W. Bishop Director Division of Reactor Safety and Projects
    ''s,.              cc:  J. B. Martin, RV g                      B. H. Faulkenberry, RV H. Canter, RV G. Knighton, LB3, DOL, NRR d Schierling, PM, DOL, NRR x
                                                                        /
i 8704070246 860402 PDR    FOIA                                                                              I DEVINE84-741        PDR
                                                                                                        *GA}}

Latest revision as of 15:45, 6 December 2021

Confirms That Lead Responsibility for Reviewing Licensee Response to Items in 840418 Order Modifying License DPR-76 Assigned to NRR
ML20205T237
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 04/24/1984
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20204G686 List:
References
FOIA-84-741, FOIA-84-742 NUDOCS 8704070246
Download: ML20205T237 (1)


Text

-

t,

[,. .. ., '

e

) UNITED STATES

2. %fl w r

[*..

NUCLEAR REGULATORY COMMISSION .. A

,. ...j REGION V 0, 4 1450 MARIA LANE. SUITE 210

%,'b' ,o# WA LNUT CRE E K. CALIFORNI A 94596 April 24, 1984 MEMORANDUM FOR: D. G. Eisenhutf'51iecEoT," Division of Licensing NRR i

FROM: .

T. W. Bishop, Director, Division of Reactor Safety and Projects, Region V

REFERENCE:

ORDER TO MODIFY FACILITY OPERATING LICENSE NO. DPR-76 (DIABLO CANYON NUCLEAR POWER PLANT, UNIT 1);

DATE: April 18, 1984 ---

SUBJECT:

CONFIRMATION OF UNDERSTANDING MGARDING LEAD RESPONSIBILITY The referenced order sets forth License Condition 2.C.(11) amending the license, consisting of seven major items which must be resolved by the licensee.

Region V has reviewed these itetas and de.termined that the responsibility for evaluation of the licensee's report and resolution of these issues

\ properly belongs to NRR. This understanding was also confirmed during a telephone discussion between D. Kirsch, of my staff, and G. Knighton, of your staff. on April 23, 1984.

Should your understanding differ from that of Region V, please contact me immediately.

C),10.1 - J T. W. Bishop Director Division of Reactor Safety and Projects

s,. cc: J. B. Martin, RV g B. H. Faulkenberry, RV H. Canter, RV G. Knighton, LB3, DOL, NRR d Schierling, PM, DOL, NRR x

/

i 8704070246 860402 PDR FOIA I DEVINE84-741 PDR

  • GA