ML20244C838: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IA-84-743, Lists Addl Actions to Be Taken to Assure Continuity in Review & Resolution of Allegations Re Design of Small Bore Piping]]
{{Adams
| number = ML20244C838
| issue date = 02/09/1984
| title = Lists Addl Actions to Be Taken to Assure Continuity in Review & Resolution of Allegations Re Design of Small Bore Piping
| author name = Dircks W
| author affiliation = NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
| addressee name = Martin J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| docket = 05000275, 05000323
| license number =
| contact person =
| case reference number = FOIA-84-743, FOIA-84-744, FOIA-84-776
| document report number = NUDOCS 8402150553
| package number = ML20235X756
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| page count = 2
}}
 
=Text=
{{#Wiki_filter:____ _ _ _ _ _ _ _            _ _ _ _ - _ _
                                                                                                                  * ' [ T RL -
          ..[u ps ucuy% .                                    '
                                                                .            UNITED STATES yN 3 y. I . p,              -
NUCLEAR REGULATORY COMMISSION 4-J              p                j                                WASHINGTON, D. C. 20555
            %....+#
4                                                                    FEB      9 1984 MEMORANDUM FOR:                  John B. Martin, Regional Administrator Region V-j l                                FROM:                          William J. Dircks-Executive. Director for Operations                                                .
 
==SUBJECT:==
DIABLO CANYON                                                                        )
1 In order to assure continuity in the review and_ resolution of                  ..
l allegations pertaining to the design of small bore piping at Diablo                                                ]
Canyon, the following additional actions will be taken:
: 1. Overall direction of ali matters pertaining to-the revier and l
inspection efforts necessary to pursue allegations pertaining to                                            ,
small bore piping design at Diablo Canyon is assigned to NRR.                Mr.                          !
James P. Knight, Assistant Director for Components and Structures Engineering, Division of Engineering, NRP., has been assigned                                              j responsibility for completion of this effort.
: 2. All Regicnal and Headquarters personnel assigned to the review and                                        l l
inspection activities associated with resolution of small bore piping allegations at Diablo Canyon will-report directly to Mr.                                            i Knight for the period of time necessary-to accomplish final                                                l resolution of the small bore piping allegations. The tasks assigned by Mr. Knight and the schedules set for those assignments will take priority over all other assignments.
: 3.  .The inspection and review effort now under way will be augmented by the addition of senior personnel from Regions I,11 and Ill. Their assignment will be reassessed on Februar 4 if the task is not completed by then.                          /      .
(4 William J. Dircks Executive Director for Operations cc:    See next page i
si TE ' , eg W - 2_.
W                    __            __ - _ - _
c,
 
g,.  .
g g . " ';
1
                                                                                                                                            .-j I
cc:  T. E. Murley.
        -                              J. P; 0 'Reilly  ,
                                                          '                                              i
                                      ~J. G. Keppler
* S. D._Ebneter-A. R. Herdt                                                                      -
W.~S. Little H. R. Denton
                                      .R. H..Vollmer D. G..Eisenhut J. P. Knight l
T. M. Novak..
G. W. Knighton                                                                                        .3
                                      -R. J. Bosnak-                                                                                        .
                                      -$'{f3fGNerMng .
4
__ _ . _ . _ _ . . . . _ _ _ __ .._ _ _ . _ _ _ _ _ _ .__ _ _ _ . _ _ _ i____ _}}

Latest revision as of 04:22, 4 August 2021

Lists Addl Actions to Be Taken to Assure Continuity in Review & Resolution of Allegations Re Design of Small Bore Piping
ML20244C838
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/09/1984
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20235X756 List:
References
FOIA-84-743, FOIA-84-744, FOIA-84-776 NUDOCS 8402150553
Download: ML20244C838 (2)


Text

____ _ _ _ _ _ _ _ _ _ _ _ - _ _

  • ' [ T RL -

..[u ps ucuy% . '

. UNITED STATES yN 3 y. I . p, -

NUCLEAR REGULATORY COMMISSION 4-J p j WASHINGTON, D. C. 20555

%....+#

4 FEB 9 1984 MEMORANDUM FOR: John B. Martin, Regional Administrator Region V-j l FROM: William J. Dircks-Executive. Director for Operations .

SUBJECT:

DIABLO CANYON )

1 In order to assure continuity in the review and_ resolution of ..

l allegations pertaining to the design of small bore piping at Diablo ]

Canyon, the following additional actions will be taken:

1. Overall direction of ali matters pertaining to-the revier and l

inspection efforts necessary to pursue allegations pertaining to ,

small bore piping design at Diablo Canyon is assigned to NRR. Mr.  !

James P. Knight, Assistant Director for Components and Structures Engineering, Division of Engineering, NRP., has been assigned j responsibility for completion of this effort.

2. All Regicnal and Headquarters personnel assigned to the review and l l

inspection activities associated with resolution of small bore piping allegations at Diablo Canyon will-report directly to Mr. i Knight for the period of time necessary-to accomplish final l resolution of the small bore piping allegations. The tasks assigned by Mr. Knight and the schedules set for those assignments will take priority over all other assignments.

3. .The inspection and review effort now under way will be augmented by the addition of senior personnel from Regions I,11 and Ill. Their assignment will be reassessed on Februar 4 if the task is not completed by then. / .

(4 William J. Dircks Executive Director for Operations cc: See next page i

si TE ' , eg W - 2_.

W __ __ - _ - _

c,

g,. .

g g . " ';

1

.-j I

cc: T. E. Murley.

- J. P; 0 'Reilly ,

' i

~J. G. Keppler

  • S. D._Ebneter-A. R. Herdt -

W.~S. Little H. R. Denton

.R. H..Vollmer D. G..Eisenhut J. P. Knight l

T. M. Novak..

G. W. Knighton .3

-R. J. Bosnak- .

-$'{f3fGNerMng .

4

__ _ . _ . _ _ . . . . _ _ _ __ .._ _ _ . _ _ _ _ _ _ .__ _ _ _ . _ _ _ i____ _