{{#Wiki_filter:_ _ - - - - _ _ _
  ,(,..
JUN I 71988
                                                                                                            )
1
    . In Reply Refer To.
Docket:  50-192/0L88-01 l
University of Texas                                                                                  -l College of Engineering                                                                                '
Department of Mechanical Engineering Nuclear Engineering Program ATTN:    Dale E. Klein, Director Nuclear Engineering Laboratory Austin, Texas 78712 Gentlemen:
 
==SUBJECT:==
OPERATOR LICENSING EXAMINATIONS AT UNIVERSITY OF TEXAS In a telephone conversation between Messrs. Thomas Bauer, Reactor Supervisor, and David Graves, Operator Licensing Examiner, arrangements were made for the administration of operator license examinations at the University of Texas during the week of September 12, 1988.
In order for NRC to meet the above schedule, it will be necessary for you to furnish the approved reference material, listed in Enclosure 1, "Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations,"
to the extent it is available at your facility, by July 11, 1988. Any delay in receiving properly bound and indexed reference material may result in a delay in administering the examinations. Examinations are scheduled far in advance; there is considerable planning required to utilize the limited examiner manpower and to meet the examination dates requested by the various facility licensees.
Therefore, missing the July 11, 1988, deadline, even by a few days, may result in a long delay, because it may not be possible to reschedule examinations for                        ;
other facility licensees. Mr. Bauer has-been advised of our reference material requirements.
The facility management is responsible for providing adequate' space and accommodations in order to conduct the written examinations properly.
Enclosure 2, "Administration of Reactor / Senior Reactor Operator Licensing Written Examinations," describes NRC requirements for conducting these                                l examinations. Mr. Bauer has also been informed of these requirements.                                '
Enclosure 2 also contains the "Rules and Guidance" that will be in effect during the administration of the written examination. The facility management is responsible for ensuring that all license candidates are aware of these rules.
The facility staff review of the written examination will be conducted in accordance with the specifications in Enclosure 3, "Requirements for Facility Review of Written Examination." Mr. Bauer has been informed of these requirements.
RIV:0LS*              C:0LS*        0:DRS*              D:DRP DGraves              JPellet      JLMilhoan            LJCal  n                                  ;
88
        / /88                / /88        / /88              g/
      *previously concurred I            i      ;
j 8806230133880$Q92 PDR ADOCK OS0W                                                              i                  i
 
University of Texas                                Reactor operator and senior reactor operator license applications for all candidates should be submitted at least 60 days before the first scheduled examination date so that the NRC will be able to review the training and experience of the candidates, process medical certifications, and issue examiner assignments. If copies of the applications are not received at least 30 days before the examination date, it is likely that a postponement will be necessary. All training and qualification requirements must be met by_ each candidate prior to application _ submittal.
Until December 31, 1988, in order to allow you to modify your training program se that all training is completed prior to submission of an application, you are permitted to request an exemption of this certification requirement. This can be done by lining through the language in Item 19.b on the application, NRC Form 398, concerning completion of licensee requirements and by referencing a separate attachment to the application containing the following language:
The applicant has not yet successfully completed the licensee requirements to be licensed as an Operator / Senior Operator. However, he/she will have completed them prior to the examination. Upon com;,letion of the requirements, a certification to that effect will be provided as a further addendum to this application      In the interim, it is requested, pursuant to 10 CFR 55.11, that the ap licant be exempted from this requirement, as contained in 10 CFR 55.31(a) 4).
Printed Name and Signature-Training        Tr~1nted Name and Signature-Senior Coordinator                                Management Representative on Site Once the applicant completes the training requirements, an addendum to NRC Form 398 is required. This addendum must be received prior to the examination        ,
date. The format and content of this addendum should read as follows:                l Addendum to NRC Form 398 Application of Facility Name Printed Name and Signature-Training          Printed Name and Signature-Senior i Coordinator                                  Management Representative on Site  l l
1 i
l 1
 
  .                    _        _=                                                                          .
University of Texas                                      This is to certify that                        has successfully completed the licensee requirement for licensing, as ' required under 10 CFR 55.31(a)(4).
This request for information was approved by the Office of Management and Budget under Clearance No. 3150-0101, which expires May 31, 1989. Comments on-burden and duplication moy be directef to the Office of Management and Budget.
Reports Management Room 3208, New Executive Office Building, Washington, DC 20503.
Thank you for your consideration in this matter.            If you have any questions regarding the examination procedures and requirements, please contact Section, at (817)860-8159 or Messrs.
David N. Graves, Operator Licensing Examiner, at (817)860-8168.
John  L. Pellet,  Chief, Operator Licensing Sincerely,
                                                  . Original signed By L J. Callan L. J. Callan, Director Division of Reactor Projects
 
==Enclosures:==
: 1. Reference Material Requirements
: 2. Written Exam Administration Requirements and NRC Rules and Guidelines for License Examinations
: 3. Facility Review Requirements cc w/ enclosures:                                                                                        ,
University of Texas                                                                                      1 College of Engineerin Department of Mechanical Engineering Nuclear Engineering Program ATTN:    Tom L. Bauer, Supervisor Reactor Operations Nuclear Reactor Laboratories Austin, Texas      78712 Texas Radiation Control Director DMB-IE45 bec:
R. Martin                                  Inspector (s)                                              :
C:RPSB-DRSS                                A. Adams, NRR Project Manager DRP                                        Lisa Shea, RM/ALF RIV File                                    MIS Coordinator DRS                                        D. Graves R. L. Bangart, DRSS                        C:FRPS R. Hall-DRSS                                RPSB-DRSS G. F. Sanborn, E0                          J. Pellet
 
ENCLOSURE 1 REFERENCE MATERIAL REQUIREMENTS FOR REACTOR / SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS
: 1. Existing learning objectives and lesson plans (including training manuals, plant orientation manual, system descriptions, reactor theory, thermodynamics,etc.).                                                        i Training materials should include all substantive written material used for preparing candidates for initial R0 and SR0 licensing. The written material should be inclusive of learning objectives and the details presented during lecture rather than be in the form of outlines.
Training materials should be identified by plant and unit, bound, and        i indexed. Failure to provide complete, properly bound and indexed reference  )
material will result in canceling and rescheduling of the examinations.
Training materials which include the following should be provided:
System descriptions, including descriptions of all operationally relevant flow paths, components, controls and instrumentation.
System training material should draw parallels to the actual procedures used for operating the applicable system.
Complete and operationally useful descriptions of all safety system interactions and, where available, B0P system interactions under emergency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure.
Training material used to clarify and strengthen understanding of emergency operating procedures.                                        <
l Comprehensive theory material that includes fundamentals in the area  j of theory of reactor operation, thermodynamics, heat transfer, and    i fluid flow, as well as specific applications to actual in-plant        j components. For example, mechanical theory material should include  ;
pump theory as well as descriptions of how these principles actually apply to major plant pumps and the system in which they are installed (i.e., reactor coolant pumps, all ECCS pumps, recirculation pumps, feedwater, and emergency feedwater pumps). Reactor theory material should include descriptions that draw explicit ties between the fundamental and actual operating limits followed in the plant (e.g.,
reactor theory material should contain explanations of how principles relate to the actual curves used by operators to verify shutdown margin or calculate an ECP).
: 2. Procedure Index (alphabetical by subject).
: 3. All administrative procedures (as applicable to reactor operation or safety).
: 4. All integrated plant procedures (normal or general operating procedures).
 
                                                                        -2_
: 5. Emergency procedures (emergency instructions, abnormal, or special procedures).
: 6. Standing orders (important orders that are safety-related and may supersede the regular procedures).
: 7. Fuel handling and core loading procedures (initial core loading procedure,~whenappropriate).
: 8. Radiation protection manual (radiation protection manual or procedures).
: 9. Emergency plan implementing procedures.
: 10. Technical Specifications.
: 11. System operating procedures.
: 12. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams.
: 13. Technical data book and/or plant curve information as used by operators, and facility precautions, limitations, and set points (PLS) for the facility.
: 14. Questions and answers that the facility licensee has prepared (voluntary by facility licensee).
: 15. The following on the plant reference simulation facility:
: a. List of all readily available initialization points.
: b. List of all preset malfunctions with a clear identification number.-
The list should include cause and effect information. Specifically for each malfunction, a concise descript1on of the expected result, or range of results, that will occur upon implementation should be provided. Additionally, an indication of which annunciators are to be initially expected should be given,
: c. A description of simulator failure capabilities for valves, breakers, e                                          indicators, and alarms,
: d. Where the capability exists, an explanation of the ability to vary the severity of a particular malfunction'should be provided, i.e.,
the ability to vary the size of a given LOCA or steam leak, or the ability to cause a slow failure of a component such as a feed pump, turbine generator, or major valve (e.g., drifting shut of a main feedwater control valve),
: e. An indication of modeling conditions or problems that may impact the examination.
____________.___________m_              _ . _ _ _ _ _ _ _ _
: f. Identification of unknown Performance Test Failures not yet completed.
: g. Identification of significant differences'between the simulator and the control room.
: h. Copies of facility licensee-generated scenarios that ~ expose the-candidates to situations of degraded pressure control (PWR), degraded heat (BWR)removal    capability luntary may be provided    (vo(PWR  byand BWR),
facility    and containment challenges licensee).
i.. Simulator instructor's manual (voluntary by facility licensee).
J. Description of the scenarios used for the training class (voluntary by facility licensee).
: 16. Additional material required by the examiners to develop examinations that meet the requirements of these standards and regulations.
The above reference material should be approved; final issued, and so marked.
If a plant has not finalized some of the material, the chief examiner .is responsible for ensuring that the most complete, up-to-date material is available and that agreement has been reached with the facility licensee for limiting changes before the administration of the examination. All procedures and reference material should be bound or IN THE FORM VSED BY THE CONTROL ROOM OPERATORS, WITH appropriate INDEXES or TABLES OF CONTENTS so that they can be used efficiently.
1 1
l 1
l l
j
 
.. c.
El; CLOSURE 2 Part I - REQUIREMENTS FOR ADMINISTRATION OF WRITTEN EXAMINATIONS
: 1. A single room shall be provided for completing the written examination.
The loct.tfon of this room and supporting restroom facilities shall be such as to prevent contact with all other facility licensee and/or contractor personnel during the duration of the written examination. If necessary, the facility licensee should make arrangerrents for use of a suitable room at a local school, motel, or other building.      Obtaining this room is the respensibility of the facility licensee.
: 2. Minimum spacing is required to ensure examination integrity as determined      ;
by the chief examiner. Minimum spacing should be one candidate per table,      )
with a 3-foot space between tables. No wall charts, models, or other training materials shall be present in the examination room.                    i l
: 3. Suitable arrangements shall be made by the facility licensee if the            i candidates are to have lunch, coffee, or other refreshments. These arrangements shall comply with Item 1 above. These arrangements shall be reviewed by the chief examiner and/or proctor.
: 4. The facility licensee shall provide pads of 8 1/2- by 11-in. lined paper      1 in unopened packages for each candidate's use in completing the                !
examination. The examiner shall distribute these pads to the candidates.
The facility licensee shall provide unmarked steam tables for candidate        l use as requested by the chief examiner. When requested by the chief examiner, the facility licensee shall also prepare copies of large documents (i.e., Technical Specifications, Emergency Plan Implementing Procedures, Emergency Operating Procedures, etc.) for use by the              j candidates. Such requests will normally be made known to the facility          i licensee the working day prior to the written examination. All other          !
reference material needed to complete the examination shall be furnished      !
by the examiner. Candidates may bring pens, pencils, nonprogramable            !
calculators, or slide rules into the examinatiori room. No other equipment I or reference material shall be allowed.
: 5. Only black ink or dark pencils should be used for writing answers to            ,
questions.                                                                    I l
l i
I I
 
Part II - NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination, the following rules apply:
: 1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
: 2. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contact with anyone outside the examination room to avoid even the appearance or possibility of cheating.
: 3. Use black ink or dark pencil only to facilitate legible reproductions.
: 4. Print your name in the blank provided on the cover sheet of the examination.
: 5. Fill in the date on the cover sheet of the examination (if necessary).
: 6. Use only the paper provided for answers.
: 7. Print your name in the upper, right-hand corner of the first page of each section of the answer sheet.
: 8. Consecutively number each answer sheet, write 'End of Category " as appropriate, start each category on a new page, write on only one side of the paper, and write "Last Page" on the last answer sheet.
: 9. Number each answer as to category and number, for example, 1.4, 6.3, etc.
: 10. Skip at least three lines between each answer.
: 11. Separate answer sheets from pad and place finished answer sheets face down on your desk or table.
: 12. Use abbreviations only if they are commonly used in facility literature.
: 13. The point value for each question is indicated in parentheses after the question and can be used as a guide for the depth of answer required.
: 14. Show all calculations, methods, or assumptions used to obtain an answer to mathematical problems whether indicated in the question or not.
: 15. Partial credit may be given. Therefore, ANSWER ALL PARTS OF THE QUESTION.
DO NOT LEAVE ANY ANSWER BLANK.
: 16. If parts of the examination are not clear as to intent, ask questions of the examiner only.
: 17. You must sign the statement on the cover sheet that indicates that the work is your own and you have not received or been given assistance in
 
                      -    < . .        -          ...                        .sa -      s.--                            -      . - . >            -      u~ ,
l
              .,- e.
l l
i completing the examination.        This must be done after the examination has been completed.
: 18. When you complete your examination, you shall:                                                                                                  ,
: a.        Assemble your examination as follows:
(1) Exam questions on top.
(2) Exam aids - figures, tables, etc.
1 (3) Answer pages including figures which are a part of the answer.                                                                  '
: b.        Turn in your copy of the examination and all pages used to answer the.
examination questions,
: c.        Turn in all scrap paper and the balance of the paper that you did not use for answering the questions.                                                                                                    I
: d.        Leave the examination area, as defined by the examiner.                                      If after leaving, you are found in this area while the examination is still in                                                              ,
progress, your license may be denied or revoked.                                      .
W
      - - , -- ,              ,  -,.._.._y -. .,    ,  ,  ~.,.,,-,,--,,,n,.      , , , . - , , __ _ , , . . - .,, ,.,-p.e  ,,,,,,..,.,,,.,-,e u,. y .-me    ,
 
ENCLOSURE 3 REQUIREMENTS FOR FACILITY REVIEW 0F WRITTEN EXAMINATIONS
: 1. There shall be no review of the written examination by the facility licensee staff before or during the administration of the examination.
Following the administration of.the written examination, the facility licensee staff shall be provided a marked-up copy of the examination and the answer key.
: 2. The facility licensee will have five (5) working days from the date the written examination is given to submit formal comments. The formal comments will be approved by the highest level of corporate management for plant operations, e.g., Vice President for Nuclear Operations, and submitted to the Region IV office with a copy to the Section Chief for Operator.
Licensing. Comments not submitted within five (5) working days will be incorporated into the grading process on a case-by-case basis as determined by the Section Chief. No grading will be done until the formal comments are received and resolved. If the formal comments are not received by the deadline, the final examination results may be delayed            ;
several weeks, since the grading may have to be rescheduled for a later time.
: 3. The following information shall be provided for each individual comment:
: a. NRC question number,
: b. Facility licensee comment.
: c. Copy of supporting documentation (the reference may be cited if the document is held by the Operator Licensing Section).
NOTES:      1. No change to the examination will be made without submittal of, or proper reference to, complete, current, and approved reference material.
: 2. Comments made without a clear, concise facility licensee recommendation will not be addressed.
                                -            . w -}}

Latest revision as of 19:18, 16 December 2020

Confirms Telcon Arrangements for Administration of Operator Licensing Exams at Facility During Wk of 880912.Mtg Requested to Furnish Approved Ref Matl Listed in Encl Before 880711 Deadline
ML20195D492
Person / Time
Site: 05000192
Issue date: 06/17/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Klein D
TEXAS, UNIV. OF, AUSTIN, TX
References
NUDOCS 8806230133
Download: ML20195D492 (10)


Text

_ _ - - - - _ _ _

,(,..

JUN I 71988

)

1

. In Reply Refer To.

Docket: 50-192/0L88-01 l

University of Texas -l College of Engineering '

Department of Mechanical Engineering Nuclear Engineering Program ATTN: Dale E. Klein, Director Nuclear Engineering Laboratory Austin, Texas 78712 Gentlemen:

SUBJECT:

OPERATOR LICENSING EXAMINATIONS AT UNIVERSITY OF TEXAS In a telephone conversation between Messrs. Thomas Bauer, Reactor Supervisor, and David Graves, Operator Licensing Examiner, arrangements were made for the administration of operator license examinations at the University of Texas during the week of September 12, 1988.

In order for NRC to meet the above schedule, it will be necessary for you to furnish the approved reference material, listed in Enclosure 1, "Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations,"

to the extent it is available at your facility, by July 11, 1988. Any delay in receiving properly bound and indexed reference material may result in a delay in administering the examinations. Examinations are scheduled far in advance; there is considerable planning required to utilize the limited examiner manpower and to meet the examination dates requested by the various facility licensees.

Therefore, missing the July 11, 1988, deadline, even by a few days, may result in a long delay, because it may not be possible to reschedule examinations for  ;

other facility licensees. Mr. Bauer has-been advised of our reference material requirements.

The facility management is responsible for providing adequate' space and accommodations in order to conduct the written examinations properly.

Enclosure 2, "Administration of Reactor / Senior Reactor Operator Licensing Written Examinations," describes NRC requirements for conducting these l examinations. Mr. Bauer has also been informed of these requirements. '

Enclosure 2 also contains the "Rules and Guidance" that will be in effect during the administration of the written examination. The facility management is responsible for ensuring that all license candidates are aware of these rules.

The facility staff review of the written examination will be conducted in accordance with the specifications in Enclosure 3, "Requirements for Facility Review of Written Examination." Mr. Bauer has been informed of these requirements.

RIV:0LS* C:0LS* 0:DRS* D:DRP DGraves JPellet JLMilhoan LJCal n  ;

88

/ /88 / /88 / /88 g/

  • previously concurred I i  ;

j 8806230133880$Q92 PDR ADOCK OS0W i i

University of Texas Reactor operator and senior reactor operator license applications for all candidates should be submitted at least 60 days before the first scheduled examination date so that the NRC will be able to review the training and experience of the candidates, process medical certifications, and issue examiner assignments. If copies of the applications are not received at least 30 days before the examination date, it is likely that a postponement will be necessary. All training and qualification requirements must be met by_ each candidate prior to application _ submittal.

Until December 31, 1988, in order to allow you to modify your training program se that all training is completed prior to submission of an application, you are permitted to request an exemption of this certification requirement. This can be done by lining through the language in Item 19.b on the application, NRC Form 398, concerning completion of licensee requirements and by referencing a separate attachment to the application containing the following language:

The applicant has not yet successfully completed the licensee requirements to be licensed as an Operator / Senior Operator. However, he/she will have completed them prior to the examination. Upon com;,letion of the requirements, a certification to that effect will be provided as a further addendum to this application In the interim, it is requested, pursuant to 10 CFR 55.11, that the ap licant be exempted from this requirement, as contained in 10 CFR 55.31(a) 4).

Printed Name and Signature-Training Tr~1nted Name and Signature-Senior Coordinator Management Representative on Site Once the applicant completes the training requirements, an addendum to NRC Form 398 is required. This addendum must be received prior to the examination ,

date. The format and content of this addendum should read as follows: l Addendum to NRC Form 398 Application of Facility Name Printed Name and Signature-Training Printed Name and Signature-Senior i Coordinator Management Representative on Site l l

1 i

l 1

. _ _= .

University of Texas This is to certify that has successfully completed the licensee requirement for licensing, as ' required under 10 CFR 55.31(a)(4).

This request for information was approved by the Office of Management and Budget under Clearance No. 3150-0101, which expires May 31, 1989. Comments on-burden and duplication moy be directef to the Office of Management and Budget.

Reports Management Room 3208, New Executive Office Building, Washington, DC 20503.

Thank you for your consideration in this matter. If you have any questions regarding the examination procedures and requirements, please contact Section, at (817)860-8159 or Messrs.

David N. Graves, Operator Licensing Examiner, at (817)860-8168.

John L. Pellet, Chief, Operator Licensing Sincerely,

. Original signed By L J. Callan L. J. Callan, Director Division of Reactor Projects

Enclosures:

1. Reference Material Requirements
2. Written Exam Administration Requirements and NRC Rules and Guidelines for License Examinations
3. Facility Review Requirements cc w/ enclosures: ,

University of Texas 1 College of Engineerin Department of Mechanical Engineering Nuclear Engineering Program ATTN: Tom L. Bauer, Supervisor Reactor Operations Nuclear Reactor Laboratories Austin, Texas 78712 Texas Radiation Control Director DMB-IE45 bec:

R. Martin Inspector (s)  :

C:RPSB-DRSS A. Adams, NRR Project Manager DRP Lisa Shea, RM/ALF RIV File MIS Coordinator DRS D. Graves R. L. Bangart, DRSS C:FRPS R. Hall-DRSS RPSB-DRSS G. F. Sanborn, E0 J. Pellet

ENCLOSURE 1 REFERENCE MATERIAL REQUIREMENTS FOR REACTOR / SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS

1. Existing learning objectives and lesson plans (including training manuals, plant orientation manual, system descriptions, reactor theory, thermodynamics,etc.). i Training materials should include all substantive written material used for preparing candidates for initial R0 and SR0 licensing. The written material should be inclusive of learning objectives and the details presented during lecture rather than be in the form of outlines.

Training materials should be identified by plant and unit, bound, and i indexed. Failure to provide complete, properly bound and indexed reference )

material will result in canceling and rescheduling of the examinations.

Training materials which include the following should be provided:

System descriptions, including descriptions of all operationally relevant flow paths, components, controls and instrumentation.

System training material should draw parallels to the actual procedures used for operating the applicable system.

Complete and operationally useful descriptions of all safety system interactions and, where available, B0P system interactions under emergency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure.

Training material used to clarify and strengthen understanding of emergency operating procedures. <

l Comprehensive theory material that includes fundamentals in the area j of theory of reactor operation, thermodynamics, heat transfer, and i fluid flow, as well as specific applications to actual in-plant j components. For example, mechanical theory material should include  ;

pump theory as well as descriptions of how these principles actually apply to major plant pumps and the system in which they are installed (i.e., reactor coolant pumps, all ECCS pumps, recirculation pumps, feedwater, and emergency feedwater pumps). Reactor theory material should include descriptions that draw explicit ties between the fundamental and actual operating limits followed in the plant (e.g.,

reactor theory material should contain explanations of how principles relate to the actual curves used by operators to verify shutdown margin or calculate an ECP).

2. Procedure Index (alphabetical by subject).
3. All administrative procedures (as applicable to reactor operation or safety).
4. All integrated plant procedures (normal or general operating procedures).

-2_

5. Emergency procedures (emergency instructions, abnormal, or special procedures).
6. Standing orders (important orders that are safety-related and may supersede the regular procedures).
7. Fuel handling and core loading procedures (initial core loading procedure,~whenappropriate).
8. Radiation protection manual (radiation protection manual or procedures).
9. Emergency plan implementing procedures.
10. Technical Specifications.
11. System operating procedures.
12. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams.
13. Technical data book and/or plant curve information as used by operators, and facility precautions, limitations, and set points (PLS) for the facility.
14. Questions and answers that the facility licensee has prepared (voluntary by facility licensee).
15. The following on the plant reference simulation facility:
a. List of all readily available initialization points.
b. List of all preset malfunctions with a clear identification number.-

The list should include cause and effect information. Specifically for each malfunction, a concise descript1on of the expected result, or range of results, that will occur upon implementation should be provided. Additionally, an indication of which annunciators are to be initially expected should be given,

c. A description of simulator failure capabilities for valves, breakers, e indicators, and alarms,
d. Where the capability exists, an explanation of the ability to vary the severity of a particular malfunction'should be provided, i.e.,

the ability to vary the size of a given LOCA or steam leak, or the ability to cause a slow failure of a component such as a feed pump, turbine generator, or major valve (e.g., drifting shut of a main feedwater control valve),

e. An indication of modeling conditions or problems that may impact the examination.

____________.___________m_ _ . _ _ _ _ _ _ _ _

f. Identification of unknown Performance Test Failures not yet completed.
g. Identification of significant differences'between the simulator and the control room.
h. Copies of facility licensee-generated scenarios that ~ expose the-candidates to situations of degraded pressure control (PWR), degraded heat (BWR)removal capability luntary may be provided (vo(PWR byand BWR),

facility and containment challenges licensee).

i.. Simulator instructor's manual (voluntary by facility licensee).

J. Description of the scenarios used for the training class (voluntary by facility licensee).

16. Additional material required by the examiners to develop examinations that meet the requirements of these standards and regulations.

The above reference material should be approved; final issued, and so marked.

If a plant has not finalized some of the material, the chief examiner .is responsible for ensuring that the most complete, up-to-date material is available and that agreement has been reached with the facility licensee for limiting changes before the administration of the examination. All procedures and reference material should be bound or IN THE FORM VSED BY THE CONTROL ROOM OPERATORS, WITH appropriate INDEXES or TABLES OF CONTENTS so that they can be used efficiently.

1 1

l 1

l l

j

.. c.

El; CLOSURE 2 Part I - REQUIREMENTS FOR ADMINISTRATION OF WRITTEN EXAMINATIONS

1. A single room shall be provided for completing the written examination.

The loct.tfon of this room and supporting restroom facilities shall be such as to prevent contact with all other facility licensee and/or contractor personnel during the duration of the written examination. If necessary, the facility licensee should make arrangerrents for use of a suitable room at a local school, motel, or other building. Obtaining this room is the respensibility of the facility licensee.

2. Minimum spacing is required to ensure examination integrity as determined  ;

by the chief examiner. Minimum spacing should be one candidate per table, )

with a 3-foot space between tables. No wall charts, models, or other training materials shall be present in the examination room. i l

3. Suitable arrangements shall be made by the facility licensee if the i candidates are to have lunch, coffee, or other refreshments. These arrangements shall comply with Item 1 above. These arrangements shall be reviewed by the chief examiner and/or proctor.
4. The facility licensee shall provide pads of 8 1/2- by 11-in. lined paper 1 in unopened packages for each candidate's use in completing the  !

examination. The examiner shall distribute these pads to the candidates.

The facility licensee shall provide unmarked steam tables for candidate l use as requested by the chief examiner. When requested by the chief examiner, the facility licensee shall also prepare copies of large documents (i.e., Technical Specifications, Emergency Plan Implementing Procedures, Emergency Operating Procedures, etc.) for use by the j candidates. Such requests will normally be made known to the facility i licensee the working day prior to the written examination. All other  !

reference material needed to complete the examination shall be furnished  !

by the examiner. Candidates may bring pens, pencils, nonprogramable  !

calculators, or slide rules into the examinatiori room. No other equipment I or reference material shall be allowed.

5. Only black ink or dark pencils should be used for writing answers to ,

questions. I l

l i

I I

Part II - NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination, the following rules apply:

1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
2. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contact with anyone outside the examination room to avoid even the appearance or possibility of cheating.
3. Use black ink or dark pencil only to facilitate legible reproductions.
4. Print your name in the blank provided on the cover sheet of the examination.
5. Fill in the date on the cover sheet of the examination (if necessary).
6. Use only the paper provided for answers.
7. Print your name in the upper, right-hand corner of the first page of each section of the answer sheet.
8. Consecutively number each answer sheet, write 'End of Category " as appropriate, start each category on a new page, write on only one side of the paper, and write "Last Page" on the last answer sheet.
9. Number each answer as to category and number, for example, 1.4, 6.3, etc.
10. Skip at least three lines between each answer.
11. Separate answer sheets from pad and place finished answer sheets face down on your desk or table.
12. Use abbreviations only if they are commonly used in facility literature.
13. The point value for each question is indicated in parentheses after the question and can be used as a guide for the depth of answer required.
14. Show all calculations, methods, or assumptions used to obtain an answer to mathematical problems whether indicated in the question or not.
15. Partial credit may be given. Therefore, ANSWER ALL PARTS OF THE QUESTION.

DO NOT LEAVE ANY ANSWER BLANK.

16. If parts of the examination are not clear as to intent, ask questions of the examiner only.
17. You must sign the statement on the cover sheet that indicates that the work is your own and you have not received or been given assistance in

- < . . - ... .sa - s.-- - . - . > - u~ ,

l

.,- e.

l l

i completing the examination. This must be done after the examination has been completed.

18. When you complete your examination, you shall: ,
a. Assemble your examination as follows:

(1) Exam questions on top.

(2) Exam aids - figures, tables, etc.

1 (3) Answer pages including figures which are a part of the answer. '

b. Turn in your copy of the examination and all pages used to answer the.

examination questions,

c. Turn in all scrap paper and the balance of the paper that you did not use for answering the questions. I
d. Leave the examination area, as defined by the examiner. If after leaving, you are found in this area while the examination is still in ,

progress, your license may be denied or revoked. .

W

- - , -- , , -,.._.._y -. ., , , ~.,.,,-,,--,,,n,. , , , . - , , __ _ , , . . - .,, ,.,-p.e ,,,,,,..,.,,,.,-,e u,. y .-me ,

ENCLOSURE 3 REQUIREMENTS FOR FACILITY REVIEW 0F WRITTEN EXAMINATIONS

1. There shall be no review of the written examination by the facility licensee staff before or during the administration of the examination.

Following the administration of.the written examination, the facility licensee staff shall be provided a marked-up copy of the examination and the answer key.

2. The facility licensee will have five (5) working days from the date the written examination is given to submit formal comments. The formal comments will be approved by the highest level of corporate management for plant operations, e.g., Vice President for Nuclear Operations, and submitted to the Region IV office with a copy to the Section Chief for Operator.

Licensing. Comments not submitted within five (5) working days will be incorporated into the grading process on a case-by-case basis as determined by the Section Chief. No grading will be done until the formal comments are received and resolved. If the formal comments are not received by the deadline, the final examination results may be delayed  ;

several weeks, since the grading may have to be rescheduled for a later time.

3. The following information shall be provided for each individual comment:
a. NRC question number,
b. Facility licensee comment.
c. Copy of supporting documentation (the reference may be cited if the document is held by the Operator Licensing Section).

NOTES: 1. No change to the examination will be made without submittal of, or proper reference to, complete, current, and approved reference material.

2. Comments made without a clear, concise facility licensee recommendation will not be addressed.