ML20056H433
| ML20056H433 | |
| Person / Time | |
|---|---|
| Site: | 05000192 |
| Issue date: | 07/21/1993 |
| From: | Ansari A OAK RIDGE ASSOCIATED UNIVERSITIES |
| To: | Murray B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20056H434 | List: |
| References | |
| NUDOCS 9309090315 | |
| Download: ML20056H433 (1) | |
Text
.
1"!
ORISE
! r,, &.vtuve, eat e ; t r s 11 e ii 4
\\-
July 21,1993 Mr. Blaine Murray U.S. NRC, Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011
SUBJECT:
FINAL REPORT - CONFIRMATORY SURVEY OF THE UNIVERSITY OF TEXAS TRIGA REACTOR, AUSTIN, TEXAS [ Docket 50 - 192]
Dear Mr. Murray:
Enclosed are five copies of the subject document. There were a number of minor revisions made to the draft report issued in June,1993 to reflect the comments which Mr. Holly communicated to me by telephone. The changes were made to the Cover Page, first parapaph of Document Review (page 5), the paragraph on Surface Scans (page 7), and last paragraph of the Summary (page 9).
Please do not hesitate to call me at (615) 576-3355 or Michele Landis at (615) 576-2908 should i
you reed any additionalinformation.
l Sincerely, Armin J. Ansari Project leader Environmental Survey and i
Site Assessment Program I
AJ: age Enclosure cc:
A. Adams, NRC/NMSS,6H3 /
T. Mo, NRC/NMSS, 6H33 /
D. Tik*.insky, NRC/NMSS, 6H3 J. Callan, NRC/ Region IV W. Holley, NRC/ Region IV M. Landis, ORISE J. Berger, ORISE PMDA, 6E6 File /215
{()f 9309090315 930721 F O. BOX 117, CAK RIDGE TENNESSEE 37831-0117 Monoged and operowd by Ook R dpe Assoacted Univers.t.es for the U.S. Depo tment of Ene gy