ML20065N740: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_ _ _ . -
{{#Wiki_filter:}}
ll                                                                                    l g      D:ike Power Company                  ,
D. L Rmy                  ,
* Catawba Nuclear Generation Depanment                                                  Vice President 4800 ConcordRoad                                                                      (803)&1)3205 Office York, SC29745                                                                        (803)L113426 Fax
  \    DUKEPOWER April 11,1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
 
==Subject:==
Catawba Nuclear Station Docket Nos. 50-413 and 50-414
                      ' Technical Specification Amendment Unit 2 Cycle 7 Reload Supplement
 
==Reference:==
Letter from Duke Power Company to NRC, dated March 24, 1994 The reference letter submitted the Catawba Unit 2 Cycle 7 reload Technical Specification (TS) changes. In the reference, the change to the Bases section for TS 3/4.9.1, Boron                          )
Concentration (boron concentration during refueling operations) was inadvertently omitted.                      J l
Accordingly, please find marked-up page B 3/4 9-1 which changes the boron concentration for Unit 2 to 2175 ppm (identical to the Unit i value). The conclusions of the No Significant Hazards Consideration Analysis contained in the reference contmue to remam                          i valid.
l Pursuant to 10 CFR 50.91 (b)(1), the appropriate South Carolina official is being provided a copy of this amendment request supplement.
Very truly ouri,                                                                                                ,
Of D. L. Rehn Attachments UR/
00$$ o$8$l,Q n,m a, m m e PDR fh            \
l
 
U.S. Nuclear Regulatory Commission
          . April 11,1994 Page 2 xc:
            'S.D. Ebneter, Regional Administrator Region II R.J. Freudenberger, Senior Resident Inspector h            R.E. Martin, NRC Project Manager
(            ONRR Heyward Shealy, Chief Bureau of Radiological Health, SC j            American Nuclear Insurers -
l M&M Nuclear Consultants l'          INPO Records Center i
i
                              . - , , . ..          -        -- _ . . , - ~ - , - . .
Y
 
U.Si Nuclear Regulatory Commission April 11,1994 Page 3 '
D. L. Rehn, being duly sworn, states that he is Vice President, Catawba Nuclear Station';
that he is authorized on the part of said company to _ sign and file with the Nuclear -
Regulatory Conunission this; revision to : the Catawba Nuclear Station Technical -
Specifications, Appendix A to License Nos. NPF-35 and NPF-52; and that all statements -
and matters set forth therein are tnie and correct to the best of his knowledge, oc 1 D. L. Rehn Subscribed and sworn to before me this lith day of April,1994.
Y&tM4u Ylbu                        ..
N/ary Pubiic [/.
4 My commission expires:
hlov af, c; Loco
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _}}

Revision as of 16:18, 30 March 2020

Forwards Catawba Unit 2,Cycle 7 Reload TS Bases Section 3/4.9.1, Boron Concentration, Inadvertently Omitted from 940324 Ltr
ML20065N740
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/11/1994
From: Rehn D
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20065N743 List:
References
NUDOCS 9404280062
Download: ML20065N740 (3)


Text