{{#Wiki_filter:ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-RO-HTBAL2 Page 1 of 4 UNIT: 1 REVISION #
{{#Wiki_filter:ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-RO-HTBAL2                                                                   Page 1 of 4 UNIT:   1     REVISION #       0     DATE:
0 DATE:   TUOI NUMBER: A1JPM-RO-HTBAL2 SYSTEM: A.1 - Conduct of Operations TASK: Perform a Manual Heat Balance Calculation JTA: ANO-RO-ADMIN-NORM-182 KA VALUE RO 2.9 SRO 4.0 KA  
TUOI NUMBER:     A1JPM-RO-HTBAL2 SYSTEM:   A.1 - Conduct of Operations TASK:     Perform a Manual Heat Balance Calculation JTA:       ANO-RO-ADMIN-NORM-182 KA VALUE     RO     2.9     SRO     4.0   KA  


==REFERENCE:==
==REFERENCE:==
 
2.1.12 APPROVED FOR ADMINISTRATION TO:           RO     X SRO TASK LOCATION:     INSIDE CR:             OUTSIDE CR:           BOTH:   X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
2.1.12   APPROVED FOR ADMINISTRATION TO: RO X SRO   TASK LOCATION:
PLANT SITE:                 SIMULATOR:   PERFORM     LAB:
INSIDE CR:
POSITION EVALUTED:     RO     X     SRO ACTUAL TESTING ENVIRONMENT:         PLANT SITE:           SIMULATOR:   X   LAB:
OUTSIDE CR:
ACTUAL TESTING METHOD:             SIMULATE:             PERFORM:     X APPROXIMATE COMPLETION TIME IN MINUTES:               45 MINUTES
BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR:PERFORM LAB:   POSITION EVALUTED: RO X SRO   ACTUAL TESTING ENVIRONMENT: PLANT SITE:
SIMULATOR:X LAB:   ACTUAL TESTING METHOD: SIMULATE:
PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 45 MINUTES  


==REFERENCES:==
==REFERENCES:==
1103.016 Heat Balance Calculation EXAMINEE'S NAME:
1103.016 Heat Balance Calculation EXAMINEES NAME:                                       SSN:
SSN:   EVALUATOR'S NAME:
EVALUATORS NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEES PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
SATISFACTORY:                     UNSATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
START TIME:
START TIME:                   STOP TIME:                 TOTAL TIME:
STOP TIME:
SIGNED:                                                     DATE:
TOTAL TIME:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARTED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SIGNED: DATE:   SIGNATURE INDICATES THIS JPM HAS BEEN COMPARTED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.  


ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-RO-HTBAL2 Page 2 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE
ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-RO-HTBAL2                                                                                               Page 2 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
The examiner shall review the Briefing Checklist - System Walkthrough portion of 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: It is desired to verify the accuracy of the PMS calculated Rx Thermal Power (XPP) in order to ensure compliance with Technical Specification SR 3.3.1.2. All data has been recorded and 1103.016, Att. 2 has been started. TASK STANDARD
JPM INITIAL TASK CONDITIONS:         It is desired to verify the accuracy of the PMS calculated Rx Thermal Power (XPP) in order to ensure compliance with Technical Specification SR 3.3.1.2.
: The examinee has correctly calculated Secondary Side Heat Balance in Att. 2, step 2.4 and Best Estimate of Reactor Power, step 2.6.
All data has been recorded and 1103.016, Att. 2 has been started.
TASK PERFORMANCE AIDS
TASK STANDARD:       The examinee has correctly calculated Secondary Side Heat Balance in Att. 2, step 2.4 and Best Estimate of Reactor Power, step 2.6.
: Copies of partially completed 1103.016.
TASK PERFORMANCE AIDS:           Copies of partially completed 1103.016.


ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-RO-HTBAL2 Page 3 of 4 INITIATING CUE:
ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-RO-HTBAL2                                                                                         Page 3 of 4 INITIATING CUE:
The CRS requests that you complete the remainder of 1103.016, Attachment 2, Manual Heat Balance, beginning with step 9.2. CRITICAL ELEMENTS (C):
The CRS requests that you complete the remainder of 1103.016, Attachment 2, Manual Heat Balance, beginning with step 9.2.
1 (C) PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT NOTE: Provide examinee with a copy of partially completed 1103.016.  
CRITICAL ELEMENTS (C):         1 (C)       PERFORMANCE CHECKLIST                   STANDARDS                   N/A         SAT         UNSAT NOTE: Provide examinee with a copy of partially completed 1103.016.
  (C) 1. Perform calculations in Attachment 2.
(C)     1. Perform calculations in         Examinee calculated %FPSEC Attachment 2.                   as 99.989% per step 2.4 in Att. 2. Accept answers between 99.7 and 100.2%.
Examinee calculated %FP SEC as 99.989% per step 2.4 in Att. 2. Accept answers between 99.7 and 100.2%.
Examinee calculated %FP as 99.989% per step 2.4 in Att.
Examinee calculated %FP as 99.989% per step 2.4 in Att. 2. Accept answers between  
: 2. Accept answers between 99.7 and 100.2%.
END


99.7 and 100.2%.
ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-RO-HTBAL2                                                                           Page 4 of 4 JPM INITIAL TASK CONDITIONS:
END ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-RO-HTBAL2 Page 4 of 4 JPM INITIAL TASK CONDITIONS:
* It is desired to verify the accuracy of the PMS calculated Rx Thermal Power (XPP) in order to ensure compliance with Technical Specification SR 3.3.1.2.
It is desired to verify the accuracy of the PMS calculated Rx Thermal Power (XPP) in order to ensure compliance with Technical Specification SR 3.3.1.2. All data has been recorded and 1103.016, Att. 2 has been started.
* All data has been recorded and 1103.016, Att. 2 has been started.
INITIATING CUE:
INITIATING CUE:
The CRS requests that you complete the remainder of 1103.016, Attachment 2, Manual Heat Balance, beginning with step 9.2.
* The CRS requests that you complete the remainder of 1103.016, Attachment 2, Manual Heat Balance, beginning with step 9.2.


A D M I NI ST RA T I VE JO B PERFO R M A NCE M E A S URE  T U O I: A1J P M-RO-DW G 1 Page 1 of 4 UNIT: 1 REV # 0 DATE: ______________________________
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-DWG1 Page 1 of 4 UNIT: 1               REV # 0             DATE: ______________________________
TUOI NUMBER: A1JPM-RO-DWG1 SYSTEM/DUTY AREA: ADMINISTRATIVE TOPIC - CONDUCT OF OPERATIONS TASK: DETERMINE ISOLATION BOUNDARY USING DRAWINGS AND/OR PRINTS JTA#: ENS-OPER-PTAG-ADMIN-1 KA VALUE RO: 2.8 SRO: 3.1   KA  
TUOI NUMBER: A1JPM-RO-DWG1 SYSTEM/DUTY AREA: ADMINISTRATIVE TOPIC - CONDUCT OF OPERATIONS TASK: DETERMINE ISOLATION BOUNDARY USING DRAWINGS AND/OR PRINTS JTA#: ENS-OPER-PTAG-ADMIN-1 KA VALUE RO:       2.8     SRO:     3.1     KA  


==REFERENCE:==
==REFERENCE:==
2.1.24 APPROVED FOR ADMINISTRATION TO: RO:    SRO: X   TASK LOCATION: INSIDE CR: X OUTSIDE CR:_________ BOTH:________
2.1.24 APPROVED FOR ADMINISTRATION TO: RO:         X     SRO:   X TASK LOCATION: INSIDE CR: X       OUTSIDE CR:_________ BOTH:________
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:_______________ SIMULATOR: PERFORM LAB:__________________
PLANT SITE:_______________ SIMULATOR: PERFORM           LAB:__________________
POSITION EVALUATED: RO:___
POSITION EVALUATED: RO:___       __       SRO:___________
__ SRO:___________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:           X     PLANT SITE:__________ LAB:________
ACTUAL TESTING ENVIRONMENT: SIMULATOR: X PLANT SITE:__________ LAB:________
TESTING METHOD: SIMULATE:_________       PERFORM:___________
TESTING METHOD: SIMULATE:_________ PERFORM:___________
APPROXIMATE COMPLETION TIME IN MINUTES:           10 MINUTES REFERENCE(S): 1107.001, M-213 sh. 2 EXAMINEE'S NAME:________________________________       SSN ______-_____-____________
APPROXIMATE COMPLETION TIME IN MINUTES:   10 MINUTES REFERENCE(S): 1107.001, M-213 sh. 2
______________________________________________________________________
EXAMINEE'S NAME:________________________________ SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________ UNSATISFACTORY:_________________
SATISFACTORY:________________               UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
____________ Start Time       ____________ Stop Time       ____________ Total Time SIGNED ________________________________ DATE: _______________________
___________________________________________________________________________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
___________________________________________________________________________________
 
____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-DWG1 Page 2 of 4 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
* The WCO reports the Laundry Drain pump (P-45) has a severe seal leak.
A D M I NI ST RA T I VE JO B PERFO R M A NCE M E A S URE  T U O I: A1J P M-RO-DW G 1 Page 2 of 4 EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS
The WCO reports the Laundry Drain pump (P-45) has a severe seal leak.
INITIATING CUE:
INITIATING CUE:
The CRS directs you to determine the isolation boundary (electrical and mechanical) for Laundry Drain pump (P-45) in accordance with approved drawings and procedures.  
The CRS directs you to determine the isolation boundary (electrical and mechanical) for Laundry Drain pump (P-45) in accordance with approved drawings and procedures.


A D M I NI ST RA T I VE JO B PERFO R M A NCE M E A S URE  T U O I: A1J P M-RO-DW G 1 Page 3 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-DWG1 Page 3 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: The WCO reports the Laundry Drain pump (P-45) has a severe seal leak.
JPM INITIAL TASK CONDITIONS: The WCO reports the Laundry Drain pump (P-45) has a severe seal leak.
TASK STANDARD
TASK STANDARD: The examinee has correctly identified the isolation boundary for Laundry Drain pump (P-45) using controlled drawings and procedures.
: The examinee has correctly identified the isolation boundary for Laundry Drain pump (P-45) using controlled drawings and procedures.
TASK PERFORMANCE AIDS: Simulator drawings and procedures
TASK PERFORMANCE AIDS
: Simulator drawings and procedures      


ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-DWG1 Page 4 of 4 INITIATING CUE:
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-DWG1 Page 4 of 4 INITIATING CUE:
The CRS directs you to determine the isolation boundary (electrical and mechanical) for Laundry Drain pump (P-45) in accordance with approved drawings and procedures.
The CRS directs you to determine the isolation boundary (electrical and mechanical) for Laundry Drain pump (P-
CRITICAL ELEMENTS (C) 1   (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT NOTE: Inform examinee that th is task is to identify the isolation bounda ry only, a tagout will not be prepared.  
: 45) in accordance with approved drawings and procedures.
  (C) 1. Determine isolation boundaries.
CRITICAL ELEMENTS (C)                 1 (C)       PERFORMANCE CHECKLIST                             STANDARD                     N/A     SAT   UNSAT NOTE:
Examinee determined proper boundary isolations to include:
Inform examinee that this task is to identify the isolation boundary only, a tagout will not be prepared.
B3134, power supply LZ-2A, Suction from T-19 LZ-2B, Suction from T-19 LZ-4411A, Suction from T-109 LZ-4411B, Suction from T-109 LZ-4, Discharge Open ABS-25 casing drain(not required for full credit)  
(C)   1. Determine isolation boundaries.       Examinee determined proper boundary isolations to include:
(Note: Examinee should determine boundary isolations using controlled procedures and drawings, specifically 1107.001 and M-213 sh. 2).
* B3134, power supply
END A D M I NI ST RA T I VE JO B PERFO R M A NCE M E A S URE  T U O I: A1J P M-RO-S URV3  Page 1 of 4   UNIT: 1 REV # 2 DATE: ______________________________
* LZ-2A, Suction from T-19
TUOI NUMBER: A1JPM-RO-SURV3 SYSTEM/DUTY AREA: ADMINISTRATIVE TOPIC - EQUIPMENT CONTROL TASK: PERFORM SURVEILLANCE TESTS JTA#: ANO-RO-ADMIN-NORM-23 KA VALUE RO: 3.0 SRO: 3.4   KA  
* LZ-2B, Suction from T-19
* LZ-4411A, Suction from T-109
* LZ-4411B, Suction from T-109
* LZ-4, Discharge
* Open ABS-25 casing drain(not required for full credit)
(Note: Examinee should determine boundary isolations using controlled procedures and drawings, specifically 1107.001 and M-213 sh. 2).
END
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-SURV3                                                                Page 1 of 4 UNIT: 1               REV # 2             DATE: ______________________________
TUOI NUMBER: A1JPM-RO-SURV3 SYSTEM/DUTY AREA: ADMINISTRATIVE TOPIC - EQUIPMENT CONTROL TASK: PERFORM SURVEILLANCE TESTS JTA#: ANO-RO-ADMIN-NORM-23 KA VALUE RO:       3.0     SRO:     3.4     KA  


==REFERENCE:==
==REFERENCE:==
2.2.12 APPROVED FOR ADMINISTRATION TO: RO:   X   SRO:       TASK LOCATION: INSIDE CR:   X OUTSIDE CR:_________ BOTH:________
2.2.12 APPROVED FOR ADMINISTRATION TO: RO:       X           SRO:
TASK LOCATION: INSIDE CR:       X     OUTSIDE CR:_________ BOTH:________
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:_______________ SIMULATOR: PERFORM LAB:__________________
PLANT SITE:_______________ SIMULATOR: PERFORM             LAB:__________________
POSITION EVALUATED: RO:____
POSITION EVALUATED: RO:____       __     SRO:___________
__ SRO:___________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:                 PLANT SITE:__________ LAB:________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:   PLANT SITE:__________ LAB:________
TESTING METHOD: SIMULATE:_________       PERFORM:___________
TESTING METHOD: SIMULATE:_________ PERFORM:___________
APPROXIMATE COMPLETION TIME IN MINUTES:           10 MINUTES REFERENCE(S): 1104.036, Emergency Diesel Generator Operation EXAMINEE'S NAME:________________________________       SSN ______-_____-____________
APPROXIMATE COMPLETION TIME IN MINUTES:   10 MINUTES REFERENCE(S): 1104.036, Emergency Diesel Generator Operation    
 
EXAMINEE'S NAME:________________________________ SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________ UNSATISFACTORY:_________________
SATISFACTORY:________________               UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
____________ Start Time       ____________ Stop Time       ____________ Total Time SIGNED ________________________________ DATE: _______________________
___________________________________________________________________________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
___________________________________________________________________________________
 
____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-SURV3                                                            Page 2 of 4 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
* A surveillance test of DG1 Fuel Transfer Pump P-16A is in progress.
A D M I NI ST RA T I VE JO B PERFO R M A NCE M E A S URE  T U O I: A1J P M-RO-S URV3  Page 2 of 4 EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS
* Supplement 5 of 1104.036 up to step 2.6 is completed.
A surveillance test of DG1 Fuel Transfer Pump P-16A is in progress.
Supplement 5 of 1104.036 up to step 2.6 is completed.
INITIATING CUE:
INITIATING CUE:
The CRS directs you to complete the surveillance test of P-16A in accordance with 1104.036, Supplement 5.  
The CRS directs you to complete the surveillance test of P-16A in accordance with 1104.036, Supplement 5.


A D M I NI ST RA T I VE JO B PERFO R M A NCE M E A S URE  T U O I: A1J P M-RO-S URV3  Page 3 of 4   THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-SURV3                                                                    Page 3 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS
JPM INITIAL TASK CONDITIONS: A surveillance test of DG1 Fuel Transfer Pump P-16A is in progress.
: A surveillance test of DG1 Fuel Transfer Pump P-16A is in progress.
Data gathering of Supplement 5 of 1104.029 up to step 2.6 is completed.
Data gathering of Supplement 5 of 1104.029 up to step 2.6 is completed.    
TASK STANDARD: The examinee calculates pump flow rate correctly on Supplement 5 of 1104.036 and determines the data is below the minimum in the acceptance criteria.
 
TASK PERFORMANCE AIDS: 1104.036, Supplement 5, completed to step 2.6.
TASK STANDARD
: The examinee calculates pump flow rate correctly on Supplement 5 of 1104.036 and determines the data is below the minimum in the acceptance criteria.      


TASK PERFORMANCE AIDS
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-SURV3                                                                           Page 4 of 4 INITIATING CUE:
: 1104.036, Supplement 5, completed to step 2.6.     
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-SURV3 Page 4 of 4 INITIATING CUE:
The CRS directs you to complete the surveillance test of P-16A in accordance with 1104.036, Supplement 5.
The CRS directs you to complete the surveillance test of P-16A in accordance with 1104.036, Supplement 5.
CRITICAL ELEMENTS (C) 2, 3, 4 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT   1. Review 1104.036, Supplement 5.
CRITICAL ELEMENTS (C)                 2, 3, 4 (C)       PERFORMANCE CHECKLIST                               STANDARD                   N/A     SAT     UNSAT
Examinee reviewed 1104.036, Supplement 5.
: 1. Review 1104.036, Supplement 5.         Examinee reviewed 1104.036, Supplement 5.                           ____     ____     ____
____   ____   ____ NOTE: Inform examinee that the stopwatch reads 9:41.36 (9 minutes, 41.36 seconds).  
NOTE: Inform examinee that the stopwatch reads 9:41.36 (9 minutes, 41.36 seconds).
  (C) 2. Calculate pump flow rate.
(C)   2. Calculate pump flow rate.             Examinee correctly calculated pump flow rate.
Examinee correctly calculated pump flow rate.
Per note, 41.36 seconds equals .68       ____    ____    ____
Per note, 41.36 seconds equals .68 minutes. (200 - 105) / 9.68 = 9.81 gpm
minutes.
____    ____    ____  (C)  3 Record flow rate in Section 3.0.
(200 - 105) / 9.68 = 9.81 gpm (C)   3 Record flow rate in Section 3.0.       Examinee recorded flow rate in           ____    ____    ____
Examinee recorded flow rate in Section 3.0.
Section 3.0.
____  ____  ____  (C)  4 Evaluate flow rate, compare to "LIMITING RANGE FOR OPERABILITY" value.
(C)   4 Evaluate flow rate, compare to         Examinee circled NO in column LIMITING RANGE FOR                    titled IS DATA WITHIN LIMITING         ____    ____    ____
Examinee circled "NO" in column titled "IS DATA WITHIN LIMITING  
OPERABILITY value.                    RANGE.
Examinee discussed declaring pump inoperable, notifying SM, writing Condition Report, initiating corrective action, and referring to Tech Specs.
NOTE:
The SM or CRS will consult Tech Specs to determine operability, it is the ROs responsibility to report the inoperability of P-16A only. Diesel operability will be determined by the SM/CRS.
Inform examinee that steps 2.8 through 2.11 have been completed.
END


RANGE". Examinee discussed declaring pump inoperable, notifying SM, writing Condition Report, initiating corrective action, and referring to Tech Specs.
TUOI NUMBER:                                                                                                           Page 1 of 4 A1JPM-RO-DOSE-XX JOB PERFORMANCE MEASURE Unit:               1               Rev #                         1                         Date:         1/12/2004 TUOI NUMBER:           A1JPM-RO- DOSE-XX System/Duty Area:       Administrative Topic-Radiation Control Task:     Calculate Stay times for yourself and another operator JA#
____  ____  ____  NOTE: The SM or CRS will consult Tech Specs to determine ope rability, it is the RO's responsibility to report the inoperability of P-16A only. Diesel operability will be determined by the SM/CRS.
KA Value RO       2.6       SRO     3.3     KA Reference       G 2.3.10 Approved For Administration To: RO                                 SRO Task Location: Inside CR:                           Outside CR:                       Both:
Inform examinee that steps 2.8 through 2.11 have been completed
Suggested Testing Environment And Method (Perform Or Simulate): Simulate Plant Site:                       Simulator:               Perform                 Lab:
. END T UOI NUMB E R:
Position Evaluated: RO:                           X                           SRO:                     X Actual Testing Environment: Simulator:                             Plant Site:                     Lab Testing Method: Simulate:                                                 Perform:
Page 1 of 4 A1JPM-RO-DOSE-XX JOB PERFORMANCE MEASURE Unit: 1 Rev # 1 Date: 1/12/2004 TUOI NUMBER:
Approximate Completion Time In Minutes:                                         10 Minutes Reference(S):       HP Survey Map of P36C, Pump Room 54.
A1JPM-RO- DOSE-XX System/Duty Area:
Examinee's Name:                                                                     SSN:
Administrative Topic-Radiation Control Task: Calculate Stay times for yourself and another operator JA#   KA Value RO 2.6 SRO 3.3 KA Reference G 2.3.10 Approved For Administration To: RO SRO   Task Location: Inside CR:
Evaluator's Name:
Outside CR: Both:   Suggested Testing Environment And Method (Perform Or Simulate): Simulate Plant Site:
Simulator: Perform         Lab:       Position Evaluated: RO:
X SRO: X Actual Testing Environment: Simulator:
Plant Site:
Lab   Testing Method: Simulate:
Perform:   Approximate Completion Time In Minutes: 10 Minutes Reference(S): HP Survey Map of P36C, Pump Room 54.
Examinee's Name:
SSN:   Evaluator's Name:
The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:
The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:
Satisfactory:
Satisfactory:                                         Unsatisfactory:
Unsatisfactory:
Performance Checklist Comments:
Performance Checklist Comments:
Start Time Stop Time Total Time Signed Date:   Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
Start Time                                     Stop Time                                     Total Time Signed                                                                 Date:
T UOI NUMB E R:
Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
Page 2 of 4 A1JPM-RO-DOSE-XX THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
 
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
TUOI NUMBER:                                                                                         Page 2 of 4 A1JPM-RO-DOSE-XX THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
You are an AO with the plant at full power. A hot spot has developed on Makeup PUMP P36C. You and another AO will be working in the vicinity of the reduction gear assembly in order to flush the lines reduce the hot spot radiation field.
You are an AO with the plant at full power. A hot spot has developed on Makeup PUMP P36C. You and another AO will be working in the vicinity of the reduction gear assembly in order to flush the lines reduce the hot spot radiation field.
Using the supplied survey map, determine the individual stay times for yourself AND the other AO without exceeding the annual administrative dose limit (Ignore dose received during transit). You have an accumulated annual Whole Body dose of 1805 mR (ANO records). The other AO has an accumulated annual Whole Body dose of 1820 mR (ANO records). No additional dose has been received at any other site.
Using the supplied survey map, determine the individual stay times for yourself AND the other AO without exceeding the annual administrative dose limit (Ignore dose received during transit). You have an accumulated annual Whole Body dose of 1805 mR (ANO records). The other AO has an accumulated annual Whole Body dose of 1820 mR (ANO records). No additional dose has been received at any other site.
Also, calculate stay time if the air in the pump room was contaminated with a level of 0.29 DAC (stochastic) assuming no respirators are used.
Also, calculate stay time if the air in the pump room was contaminated with a level of 0.29 DAC (stochastic) assuming no respirators are used.
Calculations should be based on ANO Unit 1 Administrative dose limits. Provide answers with 3 significant figures (example 4.50). Do not consider ALARA task requirements. Any required dose extensions have been processed and approved.
Calculations should be based on ANO Unit 1 Administrative dose limits. Provide answers with 3 significant figures (example 4.50). Do not consider ALARA task requirements. Any required dose extensions have been processed and approved.
TASK STANDARD:
TASK STANDARD:
The examinee has correctly determined the stay times for himself and the other AO on the assignment.
The examinee has correctly determined the stay times for himself and the other AO on the assignment.
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
HP Survey map of P36C Pump Room, Room number 54.
HP Survey map of P36C Pump Room, Room number 54.
SIMULATOR SETUP: N/A T UOI NUMB E R:
SIMULATOR SETUP:
Page 3 of 4 A1JPM-RO-DOSE-XX INITIATING CUE:  Determine the Stay time for you and the other AO on the job. Also determine the stay time if the air in the pump room was contaminated with a level of 0.29 DAC (stochastic) assuming no respirators are used. Provide answers with 3 significant figures (example 4.50).
N/A
CRITICAL ELEMENTS  (c):
1,2, and 3 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT  C  1. Determine the HIGHEST general area dose rate in the area of the reduction gear assembly to be used from the survey map.
Examinee has determined the HIGHEST general area dose rate in the area of the reduction gear assembly to be used from the survey map of P36C pump room.
(60 mR/hr)
____  ____  ___  C  2. Determine Stay time (to 3 significant figures) with no airborne contamination for both operators.
Examinee has determined that the stay time for him/her is 3.25 hrs and the stay time for the other AO is 3.00 hrs plus or minus 0.01 hours. ____  ____  ___  C  3. Determine Stay time( to 3 significant figures) WITH airborne contamination for both operators.
Examinee has determined that the stay time for him/her is 3.21hrs and the stay time for the other AO is 2.96 hrs plus or minus 0.01 hours.
____  ____  ___  EXAMINER'S CUE:  This concludes the JPM.
END TUOI NUMBER: A1JPM-RO-DOSE-XX


Page 4 of 4   EXAMINEE'S COPY INITIAL CONDITIONS:
TUOI NUMBER:                                                                                              Page 3 of 4 A1JPM-RO-DOSE-XX INITIATING CUE: Determine the Stay time for you and the other AO on the job. Also determine the stay time if the air in the pump room was contaminated with a level of 0.29 DAC (stochastic) assuming no respirators are used. Provide answers with 3 significant figures (example 4.50).
CRITICAL ELEMENTS (c): 1,2, and 3 C                PERFORMANCE CHECKLIST                                    STANDARD                N/A  SAT    UN SAT C  1. Determine the HIGHEST general area dose rate in        Examinee has determined the the area of the reduction gear assembly to be used  HIGHEST general area dose rate      ____ ____    ___
from the survey map.                                in the area of the reduction gear assembly to be used from the survey map of P36C pump room.
(60 mR/hr)
C  2. Determine Stay time (to 3 significant figures) with    Examinee has determined that no airborne contamination for both operators.        the stay time for him/her is 3.25  ____ ____    ___
hrs and the stay time for the other AO is 3.00 hrs plus or minus 0.01 hours.
C  3. Determine Stay time( to 3 significant figures) WITH    Examinee has determined that airborne contamination for both operators.          the stay time for him/her is        ____ ____    ___
3.21hrs and the stay time for the other AO is 2.96 hrs plus or minus 0.01 hours.
EXAMINERS CUE: This concludes the JPM.
END
 
TUOI NUMBER:                                                                                          Page 4 of 4 A1JPM-RO-DOSE-XX EXAMINEES COPY INITIAL CONDITIONS:
You are an AO with the plant at full power. A hot spot has developed on Makeup PUMP P36C. You and another AO will be working in the vicinity of the reduction gear assembly in order to flush the lines reduce the hot spot radiation field.
You are an AO with the plant at full power. A hot spot has developed on Makeup PUMP P36C. You and another AO will be working in the vicinity of the reduction gear assembly in order to flush the lines reduce the hot spot radiation field.
Using the supplied survey map, determine the individual stay times and another AO without exceeding the annual administrative dose limit (Ignore dose received during transit). You have an accumulated annual Whole Body dose of 1810 mR (ANO records). The other AO has an accumulated annual Whole Body dose of 1820 mR (ANO records). No additional dose has been received at any other site.
Using the supplied survey map, determine the individual stay times and another AO without exceeding the annual administrative dose limit (Ignore dose received during transit). You have an accumulated annual Whole Body dose of 1810 mR (ANO records). The other AO has an accumulated annual Whole Body dose of 1820 mR (ANO records). No additional dose has been received at any other site.
Line 208: Line 195:
Calculations should be based on ANO Unit 1 Administrative dose limits. Provide answers with 3 significant figures (example 4.50). Do not consider ALARA task requirements. Any required dose extensions have been processed and approved.
Calculations should be based on ANO Unit 1 Administrative dose limits. Provide answers with 3 significant figures (example 4.50). Do not consider ALARA task requirements. Any required dose extensions have been processed and approved.
INITIATING CUE:
INITIATING CUE:
Determine the Stay time for you and the other AO on the job. Also determine stay time if the air in the pump room was contaminated with a level of 0.29 DAC (stochastic) assuming no respirators are used. Provide answers with 3 significant figures (example 4.50).  
Determine the Stay time for you and the other AO on the job. Also determine stay time if the air in the pump room was contaminated with a level of 0.29 DAC (stochastic) assuming no respirators are used. Provide answers with 3 significant figures (example 4.50).


T UOI NUMB E R: A1 J P M-R O-E P-X X              Adm i nis t rative Q u es tions           
TUOI NUMBER:                             Administrative Questions A1JPM-RO-EP-XX                    Page 1 of 4 JOB PERFORMANCE MEASURE Unit:               1               Rev #                         1                         Date:         1/12/2004 TUOI NUMBER:           A1JPM-RO- EP-XX System/Duty Area:       Administrative Topic-Emergency Plan Task:     Answer two questions regarding RO responsibilities in Emergency Plan implementation JA#
 
KA Value RO       3.3         SRO   3.1     KA Reference       G 2.4.39 Approved For Administration To: RO                                 SRO Task Location: Inside CR:                             Outside CR:                       Both:
Page 1 of 4 JOB PERFORMANCE MEASURE Unit: 1 Rev # 1 Date: 1/12/2004 TUOI NUMBER:
Suggested Testing Environment And Method (Perform Or Simulate): Perform Plant Site:                       Simulator:               Perform                 Lab:
A1JPM-RO- EP-XX System/Duty Area:
Position Evaluated: RO:                           X                             SRO:
Administrative Topic-Emergency Plan Task: Answer two questions regarding RO responsibilities in Emergency Plan implementation JA#   KA Value RO 3.3 SRO 3.1 KA Reference G 2.4.39 Approved For Administration To: RO SRO   Task Location: Inside CR:
Actual Testing Environment: Simulator:                             Plant Site:                     Lab Testing Method: Simulate:                                                   Perform:
Outside CR: Both:   Suggested Testing Environment And Method (Perform Or Simulate): Perform Plant Site:
Approximate Completion Time In Minutes:                                           10 Minutes Reference(S):       1903.030, change 024-03-0, step 6.2.2c.
Simulator: Perform       Lab:       Position Evaluated: RO:
1903.011, change 024-03-0, form YY.
X SRO:   Actual Testing Environment: Simulator:
Examinee's Name:                                                                       SSN:
Plant Site:
Evaluator's Name:
Lab   Testing Method: Simulate:
Perform:   Approximate Completion Time In Minutes: 10 Minutes Reference(S): 1903.030, change 024-03-0, step 6.2.2c. 1903.011, change 024-03-0, form YY.
Examinee's Name:
SSN:   Evaluator's Name:
The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:
The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:
Satisfactory:
Satisfactory:                                         Unsatisfactory:
Unsatisfactory:
Performance Checklist Comments:
Performance Checklist Comments:
Start Time Stop Time Total Time Signed Date:   Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
Start Time                                     Stop Time                                     Total Time Signed                                                                 Date:
T UOI NUMB E R: A1 J P M-R O-E P-X X              Adm i nis t rative Q u es tions           
Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.


Page 2 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
TUOI NUMBER:                      Administrative Questions A1JPM-RO-EP-XX            Page 2 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.
Type: Closed Reference Completion Time: 10 minutes Question 1: You are attending requal training in the RETC. A plant evacuation is announced. What is your assembly area?
Type: Closed Reference Completion Time: 10 minutes Question 1: You are attending requal training in the RETC. A plant evacuation is announced. What is your assembly area?
Q1 Answer : The Operations Support Center (OSC).  
Q1 Answer : The Operations Support Center (OSC).


==Reference:==
==Reference:==
1903.030, change 024-03-0, step 6.2.2c.
1903.030, change 024-03-0, step 6.2.2c.
Comments:   Question 2: After declaring an emergency, how soon must the ADH be notified?
Comments:
Q2 Answer : 15 minutes  
Question 2: After declaring an emergency, how soon must the ADH be notified?
Q2 Answer : 15 minutes


==Reference:==
==Reference:==
Line 244: Line 227:
Comments:
Comments:
TASK STANDARD:
TASK STANDARD:
The examinee has correctly answered both questions.  
The examinee has correctly answered both questions.


TUOI NUMBER: A1JPM-RO-EP-XX Administrative Questions Page 3 of 4   EXAMINEE'S COPY Type: Closed Reference Completion Time: 10 minutes Question 1: You are attending requal training in the RETC. A plant evacuation is announced. What is your assembly area?
TUOI NUMBER:                     Administrative Questions A1JPM-RO-EP-XX           Page 3 of 4 EXAMINEES COPY Type: Closed Reference Completion Time: 10 minutes Question 1: You are attending requal training in the RETC. A plant evacuation is announced. What is your assembly area?
Comments:   Question 2: After declaring an emergency, how soon must the ADH be notified?
Comments:
Question 2: After declaring an emergency, how soon must the ADH be notified?
Comments:
Comments:
ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-SRO-HTBAL1 Page 1 of 4 UNIT: 1 REVISION #
 
0 DATE:   TUOI NUMBER: A1JPM-SRO-HTBAL1 SYSTEM: A.1 - Conduct of Operations TASK: Review a Manual Heat Balance Calculation JTA: ANO-SRO-ADMIN-NORM-200 KA VALUE RO 2.9 SRO 4.0 KA  
ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-SRO-HTBAL1                                                                   Page 1 of 4 UNIT:   1     REVISION #       0     DATE:
TUOI NUMBER:     A1JPM-SRO-HTBAL1 SYSTEM:   A.1 - Conduct of Operations TASK:     Review a Manual Heat Balance Calculation JTA:       ANO-SRO-ADMIN-NORM-200 KA VALUE     RO     2.9     SRO     4.0   KA  


==REFERENCE:==
==REFERENCE:==
 
2.1.12 APPROVED FOR ADMINISTRATION TO:           RO         SRO     X TASK LOCATION:     INSIDE CR:             OUTSIDE CR:           BOTH:   X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
2.1.12   APPROVED FOR ADMINISTRATION TO: RO SRO X TASK LOCATION:
PLANT SITE:                 SIMULATOR:   PERFORM     LAB:
INSIDE CR:
POSITION EVALUTED:     RO             SRO       X ACTUAL TESTING ENVIRONMENT:         PLANT SITE:           SIMULATOR:   X   LAB:
OUTSIDE CR:
ACTUAL TESTING METHOD:             SIMULATE:             PERFORM:     X APPROXIMATE COMPLETION TIME IN MINUTES:               45 MINUTES
BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR:PERFORM LAB:   POSITION EVALUTED: RO SRO X ACTUAL TESTING ENVIRONMENT: PLANT SITE:
SIMULATOR:X LAB:   ACTUAL TESTING METHOD: SIMULATE:
PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 45 MINUTES  


==REFERENCES:==
==REFERENCES:==
1103.016 Heat Balance Calculation EXAMINEE'S NAME:
1103.016 Heat Balance Calculation EXAMINEES NAME:                                       SSN:
SSN:   EVALUATOR'S NAME:
EVALUATORS NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEES PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
SATISFACTORY:                     UNSATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
START TIME:
START TIME:                   STOP TIME:                 TOTAL TIME:
STOP TIME:
SIGNED:                                                     DATE:
TOTAL TIME:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARTED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SIGNED: DATE:   SIGNATURE INDICATES THIS JPM HAS BEEN COMPARTED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.  


ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-SRO-HTBAL1 Page 2 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE
ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-SRO-HTBAL1                                                                                             Page 2 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
The examiner shall review the Briefing Checklist - System Walkthrough portion of 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: It is desired to verify the accuracy of the PMS calculated Rx Thermal Power (XPP) in order to ensure compliance with Technical Specification SR 3.3.1.2. The CBOT has completed 1103.016, Heat Balance Calculation, and calculated Rx thermal power to be 101.483%. NI's are reading an average of 99.1%.
JPM INITIAL TASK CONDITIONS:         It is desired to verify the accuracy of the PMS calculated Rx Thermal Power (XPP) in order to ensure compliance with Technical Specification SR 3.3.1.2.
The CBOT's math has been verified to be correct by an extra RO.
The CBOT has completed 1103.016, Heat Balance Calculation, and calculated Rx thermal power to be 101.483%.
TASK STANDARD
NIs are reading an average of 99.1%. The CBOTs math has been verified to be correct by an extra RO.
: The examinee has correctly identified two of four errors in Heat Balance Calculation.
TASK STANDARD:       The examinee has correctly identified two of four errors in Heat Balance Calculation.
TASK PERFORMANCE AIDS
TASK PERFORMANCE AIDS:           Copies of completed 1103.016.
: Copies of completed 1103.016.


ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-SRO-HTBAL1 Page 3 of 4 INITIATING CUE:
ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-SRO-HTBAL1                                                                                       Page 3 of 4 INITIATING CUE:
Review the operator's completed 1103.016 and complete section 11.0. In addition, verify compliance with Technical Specification SR 3.3.1.2. .
* Review the operators completed 1103.016 and complete section 11.0.
CRITICAL ELEMENTS (C):
* In addition, verify compliance with Technical Specification SR 3.3.1.2. .
1, 3 (C) PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT NOTE: Provide examinee with a copy of completed 1103.016. Examinee may state initially that the as performed Heat Balance would require adjustment of NI's to be in compliance with Tech Spec SR 3.3.1.2.  
CRITICAL ELEMENTS (C):         1, 3 (C)       PERFORMANCE CHECKLIST                         STANDARDS                 N/A       SAT       UNSAT NOTE: Provide examinee with a copy of completed 1103.016. Examinee may state initially that the as performed Heat Balance would require adjustment of NIs to be in compliance with Tech Spec SR 3.3.1.2.
  (C) 1. Review 1103.016.
(C)   1. Review 1103.016.                     Examinee reviewed 1103.016.
Examinee reviewed 1103.016. Examinee discovered two of four errors in calculations. 1. Step 2.4 value used for Q losses was taken from step 2.2 vs. 2.3. 2. Step 2.5 a value of 600 was given for HHA instead of real value. 3. Step 2.5 value used for Q losses was taken from step 2.2 vs. 2.3. 4. Step 2.6 % full power calculation is incorrect due to above errors.  
Examinee discovered two of four errors in calculations.
: 2. Instruct CBOT to re-perform 1103.016.
: 1. Step 2.4 value used for Q losses was taken from step 2.2 vs. 2.3.
Examinee stated that 1103.016 should be re-performed.
: 2. Step 2.5 a value of 600 was given for HHA instead of real value.
: 3. Step 2.5 value used for Q losses was taken from step 2.2 vs. 2.3.
: 4. Step 2.6 % full power calculation is incorrect due to above errors.
: 2. Instruct CBOT to re-perform           Examinee stated that 1103.016.                           1103.016 should be re-performed.
NOTE: Inform examinee that 1103.016 has been re-performed and calculated Rx thermal power is 99.99%.
NOTE: Inform examinee that 1103.016 has been re-performed and calculated Rx thermal power is 99.99%.
  (C) 3. Verify compliance with Technical Specification surveillance SR  
(C)   3. Verify compliance with Technical     Examinee concludes that SR Specification surveillance SR       3.3.1.2 as recalculated Rx 3.3.1.2.                            thermal power is within 2% of initial NI readings.
END


3.3.1.2. Examinee concludes that SR 3.3.1.2 as recalculated Rx thermal power is within 2% of initial NI readings.
ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-SRO-HTBAL1                                                                           Page 4 of 4 JPM INITIAL TASK CONDITIONS:
END ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-SRO-HTBAL1 Page 4 of 4 JPM INITIAL TASK CONDITIONS:
* It is desired to verify the accuracy of the PMS calculated Rx Thermal Power (XPP) in order to ensure compliance with Technical Specification SR 3.3.1.2.
It is desired to verify the accuracy of the PMS calculated Rx Thermal Power (XPP) in order to ensure compliance with Technical Specification SR 3.3.1.2. The CBOT has completed 1103.016, Heat Balance Calculation, and calculated Rx thermal power to be 101.483% NI's are reading an average of 99.1%. The CBOT's math calculations have been verified to be correct by an extra RO.
* The CBOT has completed 1103.016, Heat Balance Calculation, and calculated Rx thermal power to be 101.483%
* NIs are reading an average of 99.1%.
* The CBOTs math calculations have been verified to be correct by an extra RO.
INITIATING CUE:
INITIATING CUE:
Review the operator's completed 1103.016 and complete section 11.0. In addition, verify compliance with Technical Specification SR 3.3.1.2.
* Review the operators completed 1103.016 and complete section 11.0.
* In addition, verify compliance with Technical Specification SR 3.3.1.2.


A D M I NI ST RA T I VE JO B PERFO R M A NCE M E A S URE  T U O I: A1J P M-SRO-SURV4   Page 1 of 4 UNIT: 1 REV # 0 DATE: ______________________________
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-SRO-SURV4                                                               Page 1 of 4 UNIT: 1               REV # 0             DATE: ______________________________
TUOI NUMBER: A1JPM-SRO-SURV4 SYSTEM/DUTY AREA: ADMINISTRATIVE TOPIC - CONDUCT OF OPERATIONS TASK: MONITOR CONDUCT OF SHIFT SURVEILLANCE TESTS JTA#: ANO-SRO-ADMIN-NORM-200 KA VALUE RO: 3.0 SRO: 3.4   KA  
TUOI NUMBER: A1JPM-SRO-SURV4 SYSTEM/DUTY AREA: ADMINISTRATIVE TOPIC - CONDUCT OF OPERATIONS TASK: MONITOR CONDUCT OF SHIFT SURVEILLANCE TESTS JTA#: ANO-SRO-ADMIN-NORM-200 KA VALUE RO:       3.0     SRO:     3.4     KA  


==REFERENCE:==
==REFERENCE:==
2.2.12 APPROVED FOR ADMINISTRATION TO: RO:       SRO: X   TASK LOCATION: INSIDE CR:
2.2.12 APPROVED FOR ADMINISTRATION TO: RO:                     SRO:   X TASK LOCATION: INSIDE CR:         OUTSIDE CR:_________ BOTH:____X____
OUTSIDE CR:_________ BOTH:____
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
X____  SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:_______________ SIMULATOR: PERFORM           LAB:__________________
PLANT SITE:_______________ SIMULATOR: PERFORM LAB:__________________
POSITION EVALUATED: RO:____     __       SRO:___________
POSITION EVALUATED: RO:____
ACTUAL TESTING ENVIRONMENT: SIMULATOR:                 PLANT SITE:__________ LAB:________
__ SRO:___________
TESTING METHOD: SIMULATE:_________       PERFORM:___________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:   PLANT SITE:__________ LAB:________
APPROXIMATE COMPLETION TIME IN MINUTES:           20 MINUTES REFERENCE(S): 1106.006, Emergency Feedwater Pump Operation EXAMINEE'S NAME:________________________________       SSN ______-_____-____________
TESTING METHOD: SIMULATE:_________ PERFORM:___________
APPROXIMATE COMPLETION TIME IN MINUTES:   20 MINUTES REFERENCE(S): 1106.006, Emergency Feedwater Pump Operation    
 
EXAMINEE'S NAME:________________________________ SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________ UNSATISFACTORY:_________________
SATISFACTORY:________________               UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
____________ Start Time       ____________ Stop Time       ____________ Total Time SIGNED ________________________________ DATE: _______________________
___________________________________________________________________________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
___________________________________________________________________________________
 
____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-SRO-SURV4                                                             Page 2 of 4 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
* The quarterly test of Emergency Feedwater Pump (P-7B) per 1106.006, Supplement 11, was performed on the previous shift.
A D M I NI ST RA T I VE JO B PERFO R M A NCE M E A S URE  T U O I: A1J P M-SRO-SURV4   Page 2 of 4   EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS
* The SM is performing Section 4, Shift Manager Review and Analysis.
The quarterly test of Emergency Feedwater Pump (P-7B) per 1106.006, Supplement 11, was performed on the previous shift. The SM is performing Section 4, Shift Manager Review and Analysis.
INITIATING CUE:
INITIATING CUE:
The SM requests that you conduct a peer review of the test since he has found some errors. Identify at least 2 errors in the test.  
* The SM requests that you conduct a peer review of the test since he has found some errors.
* Identify at least 2 errors in the test.


A D M I NI ST RA T I VE JO B PERFO R M A NCE M E A S URE  T U O I: A1J P M-SRO-SURV4   Page 3 of 4   THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-SRO-SURV4                                                                         Page 3 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS
JPM INITIAL TASK CONDITIONS: The quarterly test of Emergency Feedwater Pump (P-7B) per 1106.006, Supplement 11, was performed on the previous shift. The SM is performing Section 4, Shift Manager Review and Analysis.
: The quarterly test of Emergency Feedwater Pump (P-7B) per 1106.006, Supplement 11, was performed on the previous shift. The SM is performing Section 4, Shift Manager Review and Analysis.            
TASK STANDARD: The examinee has reviewed 1106.0006, Supplement 11 and identified at least 2 administrative errors in the test.
TASK PERFORMANCE AIDS: Completed 1106.0006, Supplement 11.


TASK STANDARD
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-SRO-SURV4                                                                          Page 4 of 4 INITIATING CUE:
: The examinee has reviewed 1106.0006, Supplement 11 and identified at least 2 administrative errors in the test.
* The SM requests that you conduct a peer review of the test since he has found some errors.
TASK PERFORMANCE AIDS
* Identify at least 2 errors in the test.
: Completed 1106.0006, Supplement 11.    
CRITICAL ELEMENTS (C)                      2 (C)        PERFORMANCE CHECKLIST                              STANDARD                  N/A      SAT    UNSAT
: 1. Review 1106.006, Supplement 11.      Examinee reviewed 1106.006, Supplement 11.
(C)  2. Identify at least 2 administrative    Examinee identified at least 2 of the errors.                              following administrative errors:
* Independent verification initials missing in step 1.2.1.
* Entry into T.S. time clock step was N/Ad at step 2.1.4.
* Acceptance Criteria Table 4, EFW Test Recirc Flow FI-2888 recorded as 532 gpm and YES circled when this value is greater than Limiting Range for Operability.
* Stopwatch cal due date has expired in step 3.2.1.
END


ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-SRO-SURV4 Page 4 of 4 INITIATING CUE:
TUOI NUMBER:                                                                                                           Page 1 of 4 A1JPM-SRO-XX JOB PERFORMANCE MEASURE Unit:               1               Rev #                         1                         Date:         1/12/2004 TUOI NUMBER:           A1JPM-SRO-XX System/Duty Area:       Administrative Topic-Emergency Procedures/Plan Task:     Determine Emergency Action Level after Scenario #3 of OP test.
The SM requests that you conduct a peer review of the test since he has found some errors. Identify at least 2 errors in the test.
JA#
CRITICAL ELEMENTS (C)  2    (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT  1. Review 1106.006, Supplement 11.
KA Value RO                 SRO     4.1     KA Reference       G 2.4.41 Approved For Administration To: RO                               SRO Task Location: Inside CR:                         Outside CR:                         Both:
Examinee reviewed 1106.006, Supplement 11.
Suggested Testing Environment And Method (Perform Or Simulate): Simulate Plant Site:                     Simulator:               Perform                 Lab:
      (C)  2. Identify at least 2 administrative errors. Examinee identified at least 2 of the following administrative errors:
Position Evaluated: RO:                                                       SRO:                   X Actual Testing Environment: Simulator:                             Plant Site:                     Lab Testing Method: Simulate:                                                 Perform:
Independent verification initials missing in step 1.2.1. Entry into T.S. time clock step was N/A'd at step 2.1.4. Acceptance Criteria Table 4, EFW Test Recirc Flow FI-2888 recorded as 532 gpm and "YES" circled when this value is greater than Limiting Range for Operability. Stopwatch cal due date has expired in step 3.2.1.
Approximate Completion Time In Minutes:                                         5 Minutes Reference(S):       1903.010 Emergency Action Level Classification, 1903.011, Emergency Response Notifications Examinee's Name:                                                                     SSN:
END TUOI NUM BER: A1JPM-SRO-XX Page 1 of 4  JOB PERFORMANCE MEASURE Unit: 1 Rev # 1 Date: 1/12/2004 TUOI NUMBER:
Evaluator's Name:
A1JPM-SRO-XX System/Duty Area:
Administrative Topic-Emergency Procedures/Plan Task: Determine Emergency Action Level after Scenario #3 of OP test.
JA#   KA Value RO SRO 4.1 KA Reference G 2.4.41 Approved For Administration To: RO SRO   Task Location: Inside CR:
Outside CR: Both:   Suggested Testing Environment And Method (Perform Or Simulate): Simulate Plant Site:
Simulator: Perform Lab:       Position Evaluated: RO:
SRO: X Actual Testing Environment: Simulator:
Plant Site:
Lab   Testing Method: Simulate:
Perform:   Approximate Completion Time In Minutes: 5 Minutes Reference(S): 1903.010 Emergency Action Level Classification, 1903.011, Emergency Response Notifications Examinee's Name:
SSN:   Evaluator's Name:
The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:
The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:
Satisfactory:
Satisfactory:                                       Unsatisfactory:
Unsatisfactory:
Performance Checklist Comments:
Performance Checklist Comments:
Start Time Stop Time Total Time Signed Date:   Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
Start Time                                   Stop Time                                     Total Time Signed                                                               Date:
TUOI NUM BER: A1JPM-SRO-XX Page 2 of 4  THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
The examiner shall review the "Briefing Checklist -
 
System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
TUOI NUMBER:                                                                                           Page 2 of 4 A1JPM-SRO-XX THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
The following conditions existed at the end of Scenario 3:
The following conditions existed at the end of Scenario 3:
Unit 1 Reactor was tripped due to SB LOCA with SCM lost and it will not be restored. All appropriate ESAS channels had actuated and Full HPI was injecting water into the RCS with pressure stable and being  
Unit 1 Reactor was tripped due to SB LOCA with SCM lost and it will not be restored. All appropriate ESAS channels had actuated and Full HPI was injecting water into the RCS with pressure stable and being controlled close to the saturation line (may even be on it) but within the limits of Figure 3 of EOP (RT14). No fuel clad failure was indicated.
 
controlled close to the saturation line (may even be on it) but within the limits of Figure 3 of EOP (RT14). No fuel clad failure was indicated.
TASK STANDARD:
TASK STANDARD:
Examinee correctly classifies this event as an Site Area Emergency per EAL 2.4 and makes notifications to plant personnel per 1903.011M.
Examinee correctly classifies this event as an Site Area Emergency per EAL 2.4 and makes notifications to plant personnel per 1903.011M.
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
1903.010 Attachments 1 and 3, 1903.011 Attachment 2, and 1903.011M SIMULATOR SETUP:
1903.010 Attachments 1 and 3, 1903.011 Attachment 2, and 1903.011M SIMULATOR SETUP:
N/A TUOI NUM BER: A1JPM-SRO-XX Page 3 of 4  INITIATING CUE: For the given plant conditions, determine t he applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Dire ction and Control Checklist in 1903.011.
N/A
CRITICAL ELEMENTS (c):
 
3and 6 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT   1. Compare event conditions with the Index of EALs, Attachment 1 of 1903.010, Emergency Action Level Classification.
TUOI NUMBER:                                                                                                 Page 3 of 4 A1JPM-SRO-XX INITIATING CUE: For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and Control Checklist in 1903.011.
Turned to Attachment 1 of 1903.010, Index of EALs.
CRITICAL ELEMENTS (c): 3and 6 C               PERFORMANCE CHECKLIST                                   STANDARD                     N/A   SAT     UN SAT
____  ____   ___   2. Turn to appropriate EAL and compare EAL criteria with event conditions.
: 1. Compare event conditions with the Index of EALs,       Turned to Attachment 1 of Attachment 1 of 1903.010, Emergency Action Level     1903.010, Index of EALs.               ____  ____     ___
Turned to a specific EAL in Safety System Function, Attachment 3 of 1903.010.
Classification.
____   ____  ___  C  3. Declare the emergency classification.
: 2. Turn to appropriate EAL and compare EAL criteria       Turned to a specific EAL in Safety with event conditions.                                System Function, Attachment 3 of       ____  ____    ___
Declared or stated the event is an SAE per EAL 2.4, based on RCS leakage greater than normal makeup capacity (not required to be stated), no fuel clad damage, and SCM not restored.
1903.010.
____  ____  ___  4. Initiate immediate notifications.
C   3. Declare the emergency classification.                 Declared or stated the event is an SAE per EAL 2.4, based on RCS           ____  ____    ___
Referred to 1903.011 and turned to Attachment 2.
leakage greater than normal makeup capacity (not required to be stated), no fuel clad damage, and SCM not restored.
NOTE: Cue the examinee that the Unit 2 Shift Engineer is performing the initial notifications per 1903.011 after the examinee has stated that Unit 2 Shift Engineer (or control room communicator) has been requested.  
: 4. Initiate immediate notifications.                     Referred to 1903.011 and turned to Attachment 2.
: 5. Begin completion of form 1903.011M, Alert Emergency Direction and Control Checklist for Shift Manager. Began completion of form 1903.011M Alert Emergency Direction and Control Checklist for Shift Manager.
NOTE: Cue the examinee that the Unit 2 Shift Engineer is performing the initial notifications per 1903.011 after the examinee has stated that Unit 2 Shift Engineer (or control room communicator) has been requested.
: 5. Begin completion of form 1903.011M, Alert             Began completion of form Emergency Direction and Control Checklist for Shift   1903.011M Alert Emergency               ____  ____    ___
Manager.                                              Direction and Control Checklist for Shift Manager.
Examinee should fill in the data on items 1 and 2.
Examinee should fill in the data on items 1 and 2.
Examinee should simulate (or  
Examinee should simulate (or state) direction of the SE to complete the initial notification.
C  6. (Simulate) Announce emergency on plant paging          Used plant-paging system to system.                                              (simulate) make announcement            ____  ____    ___
per step 4 of form 1903.011M.
EXAMINERS CUE: This concludes the JPM.
END


state) direction of the SE to complete the initial notification.
TUOI NUMBER:                                                                                                     Page 4 of 4 A1JPM-SRO-XX EXAMINEES COPY INITIAL CONDITIONS:
____  ____  ___  C  6. (Simulate) Announce emergency on plant paging system. Used plant-paging system to (simulate) make announcement per step 4 of form 1903.011M.
____  ____  ___  EXAMINER'S CUE:  This concludes the JPM.
END TUOI NUMBER: A1JPM-SRO-XX
 
Page 4 of 4    EXAMINEE'S COPY INITIAL CONDITIONS:
The initial conditions for this jpm are the plant conditions when scenario #3 was terminated.
The initial conditions for this jpm are the plant conditions when scenario #3 was terminated.
INITIATING CUE:
INITIATING CUE:
For the given plant conditions, determine the applicable EAL cla ssification and initiate notifications per the applicable Shift Manager Emergency Direction and Control Checklist in 1903.011.
For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and Control Checklist in 1903.011.


T UOI NUMB E R: Page 1 of 5 A1JPM-RO-CRD02 JOB PERFORMANCE MEASURE Unit: 1 Rev # 4 Date:   TUOI NUMBER:
TUOI NUMBER:                                                                                                             Page 1 of 5 A1JPM-RO-CRD02 JOB PERFORMANCE MEASURE Unit:               1             Rev #                         4                         Date:
A1JPM-RO-CRD02 System/Duty Area:
TUOI NUMBER:           A1JPM-RO-CRD02 System/Duty Area:       CONTROL ROD DRIVE SYSTEM Task:     Perform Transfer To Auxiliary Supply JA#       ANO1-RO-CRD-NORM-12 KA Value RO       3.4       SRO   3.4     KA Reference       001 A4.03 Approved For Administration To: RO                               SRO Task Location: Inside CR:                           Outside CR:                       Both:
CONTROL ROD DRIVE SYSTEM Task: Perform Transfer To Auxiliary Supply JA# ANO1-RO-CRD-NORM-12 KA Value RO 3.4 SRO 3.4 KA Reference 001 A4.03 Approved For Administration To: RO SRO   Task Location: Inside CR:
Suggested Testing Environment And Method (Perform Or Simulate):
Outside CR: Both:   Suggested Testing Environment And Method (Perform Or Simulate):
Plant Site:                     Simulator:               Perform                 Lab:
Plant Site:
Position Evaluated: RO:                                                       SRO:
Simulator: Perform Lab:       Position Evaluated: RO:
Actual Testing Environment: Simulator:                             Plant Site:                     Lab Testing Method: Simulate:                                                 Perform:
SRO:   Actual Testing Environment: Simulator:
Approximate Completion Time In Minutes:                                         15 Minutes Reference(S):       1105.009 Examinee's Name:                                                                     SSN:
Plant Site:
Evaluator's Name:
Lab   Testing Method: Simulate:
Perform:   Approximate Completion Time In Minutes: 15 Minutes Reference(S): 1105.009 Examinee's Name:
SSN:   Evaluator's Name:
The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:
The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:
Satisfactory:
Satisfactory:                                       Unsatisfactory:
Unsatisfactory:
Performance Checklist Comments:
Performance Checklist Comments:
Start Time Stop Time Total Time Signed Date:   Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
Start Time                                   Stop Time                                       Total Time Signed                                                               Date:
T UOI NUMB E R: Page 2 of 5 A1JPM-RO-CRD02 TUOI NUMBER:
Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
ANO-1-JPM-RO-CRD02 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
 
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
TUOI NUMBER:                                                                                                           Page 2 of 5 A1JPM-RO-CRD02 TUOI NUMBER:         ANO-1-JPM-RO-CRD02 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
Rx demand and diamond stations are in manual.
Rx demand and diamond stations are in manual. Preparation to exercise rods per Supplement 2, 1105.009, is in progress.
Preparation to exercise rods per Supplement 2, 1105.009, is in progress.
TASK STANDARD:
TASK STANDARD:
Group 1 Rods have been transferred to the Auxiliary Power Supply and are enabled for being moved on that power supply in run speed.
Group 1 Rods have been transferred to the Auxiliary Power Supply and are enabled for being moved on that power supply in run speed.
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
1105.009, Section 8.0          
1105.009, Section 8.0


T UOI NUMB E R: Page 3 of 5 A1JPM-RO-CRD02 TUOI NUMBER:
TUOI NUMBER:                                                                                                       Page 3 of 5 A1JPM-RO-CRD02 TUOI NUMBER:         ANO-1-JPM-RO-CRD02 INITIATING CUE:         The CRS/SM directs you to transfer Group 1 Rods to the Auxiliary Power Supply for movement of Group 1 at run speed. IAW 1105.009, Section 8.0 CRITICAL ELEMENTS (c): 2, 3, 5, 6, 7, 8, 9, 10, 11 C                 PERFORMANCE CHECKLIST                                     STANDARD                     N/A   SAT     UN SAT INSTRUCTOR NOTE:
ANO-1-JPM-RO-CRD02 INITIATING CUE: The CRS/SM directs you to transfer Group 1 Rods to the Auxiliary Power Supply for movement of Group 1 at run speed. IAW 1105.009, Section 8.0 CRITICAL ELEMENTS (c):
Verify the Reactor Demand and Diamond are in manual.
2, 3, 5, 6, 7, 8, 9, 10, 11 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT INSTRUCTOR NOTE: Verify the Reactor Demand and Diamond are in manual.  
: 1. Verify transfer reset lamp is ON and TR CF is         On CRD Diamond Panel,                   ____  ____    ____
: 1. Verify transfer reset lamp is ON and TR CF is OFF. On CRD Diamond Panel, condition of both lights was checked. Transfer reset lamp was ON and TR CF lamp was OFF.
OFF.                                                  condition of both lights was checked. Transfer reset lamp was ON and TR CF lamp was OFF.
____  ____  ____  C 2. Place Group select switch to Group 1.
C
On CRD Diamond Panel, Group Select Switch was placed in Group 1 position.
: 2. Place Group select switch to Group 1.                 On CRD Diamond Panel, Group             ____  ____    ____
____  ____   ____ 3. Select Single Select Switch to ALL.
Select Switch was placed in Group 1 position.
On CRD Diamond Panel, Single select switch was selected to ALL. ____  ____  ____    4. Set Auto/Manual Switch to Manual, verify Manual Lamp is ON.
C                                                                                                      ____  ____   ____
On CRD Diamond Panel, verified manual lamp ON or Auto/Manual pushbutton depressed to select MANUAL. ____  ____  ____  C 5. Set SEQ.- SEQ OR. switch to SEQ. OR position.
: 3. Select Single Select Switch to ALL.                   On CRD Diamond Panel, Single select switch was selected to ALL.
On CRD Diamond Panel, SEQ.- SEQ OR. switch was selected to SEQ. OR position.
: 4. Set Auto/Manual Switch to Manual, verify Manual       On CRD Diamond Panel, verified         ____  ____    ____
____  ____  ____
Lamp is ON.                                          manual lamp ON or Auto/Manual pushbutton depressed to select MANUAL.
T UOI NUMB E R: Page 4 of 5 A1JPM-RO-CRD02 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT C 6. Set Group/Auxiliary Switch to Auxiliary. Aux PB.
C
On CRD Diamond Panel, Group/Aux. PB was selected to Aux. ____  ____  ____  C 7. Set Speed Select Switch to "JOG".
: 5. Set SEQ.- SEQ OR. switch to SEQ. OR position.         On CRD Diamond Panel, SEQ.-             ____  ____    ____
On CRD Diamond Panel, Speed Select Switch was selected to JOG position.
SEQ OR. switch was selected to SEQ. OR position.
____  ____  ____  C 8. Set Clamp/Clamp Release Switch to CLAMP.
 
On CRD Diamond Panel, selected Clamp/Clamp Release Switch to CLAMP. ____  ____  ____  C 9. Press Manual Transfer Switch.
TUOI NUMBER:                                                                                     Page 4 of 5 A1JPM-RO-CRD02 C               PERFORMANCE CHECKLIST                               STANDARD           N/A SAT     UN SAT C
On CRD Diamond Panel, manual transfer PB was depressed.
: 6. Set Group/Auxiliary Switch to Auxiliary. Aux PB. On CRD Diamond Panel,         ____ ____  ____
____  ____  ____  C 10. Set Clamp/Clamp Release Switch to Clamp Release. On CRD Diamond Panel, depressed Clamp/Clamp Release Switch.
Group/Aux. PB was selected to Aux.
____  ____  ____  C 11. Set Group/ AUX switch to Group.
C
On CRD Diamond Panel, Group/Aux PB was selected to Group. ____  ____  ____  12. If movement at RUN speed is desired, set speed switch to RUN.
: 7. Set Speed Select Switch to "JOG".                   On CRD Diamond Panel, Speed   ____ ____  ____
On CRD Diamond Panel, Speed Select Switch was selected to RUN position.
Select Switch was selected to JOG position.
____  ____  ____  END TUOI NUMBER: A1JPM-RO-CRD02 Page 5 of 5    EXAMINEE'S COPY INITIAL CONDITIONS:
C
Preparation to exercise rods per Supplement 2, 1105.009, is in progress. Rx Demand and Diamond sta tions are in manual.
: 8. Set Clamp/Clamp Release Switch to CLAMP.           On CRD Diamond Panel, selected ____ ____  ____
Clamp/Clamp Release Switch to CLAMP.
C
: 9. Press Manual Transfer Switch.                       On CRD Diamond Panel, manual   ____ ____  ____
transfer PB was depressed.
C
: 10. Set Clamp/Clamp Release Switch to Clamp               On CRD Diamond Panel,     ____ ____  ____
Release.                                              depressed Clamp/Clamp Release Switch.
C
: 11. Set Group/ AUX switch to Group.                   On CRD Diamond Panel,         ____ ____  ____
Group/Aux PB was selected to Group.
: 12. If movement at RUN speed is desired, set speed     On CRD Diamond Panel, Speed   ____ ____  ____
switch to RUN.                                    Select Switch was selected to RUN position.
END
 
TUOI NUMBER:                                                                                   Page 5 of 5 A1JPM-RO-CRD02 EXAMINEES COPY INITIAL CONDITIONS:
* Preparation to exercise rods per Supplement 2, 1105.009, is in progress.
* Rx Demand and Diamond stations are in manual.
INITIATING CUE:
INITIATING CUE:
The CRS/SM directs you to transfer Group 1 Rods to the Auxiliary Power Supply for movement of Group 1 at run speed. IAW 1105.009, Section 8.0.  
The CRS/SM directs you to transfer Group 1 Rods to the Auxiliary Power Supply for movement of Group 1 at run speed. IAW 1105.009, Section 8.0.


T UOI NUMB E R: A1 J P M-R O- Page 1 of 6   JOB PERFORMANCE MEASURE Unit: 1 Rev # 1 Date:   TUOI NUMBER:
TUOI NUMBER:                                                                                                             Page 1 of 6 A1JPM-RO-JOB PERFORMANCE MEASURE Unit:               1             Rev #                         1                         Date:
A1JPM-RO-System/Duty Area:
TUOI NUMBER:           A1JPM-RO-System/Duty Area:       002 Reactor Coolant System Task:     Restart a Make-up Pump following an RCS leak isolation JA#       ANO1-RO-KA Value RO       4.3       SRO     4.4     KA Reference       002.A2.01 Approved For Administration To: RO                               SRO Task Location: Inside CR:                           Outside CR:                       Both:
002 Reactor Coolant System Task: Restart a Make-up Pump following an RCS leak isolation JA# ANO1-RO- KA Value RO 4.3 SRO 4.4 KA Reference 002.A2.01 Approved For Administration To: RO SRO   Task Location: Inside CR:
Suggested Testing Environment And Method (Perform Or Simulate):
Outside CR: Both:   Suggested Testing Environment And Method (Perform Or Simulate):
Plant Site:                     Simulator:           Perform       X             Lab:
Plant Site:
Position Evaluated: RO:                       X                               SRO:                     X Actual Testing Environment: Simulator:                             Plant Site:                     Lab Testing Method: Simulate:                                                 Perform:
Simulator: Perform       X Lab:       Position Evaluated: RO:
Approximate Completion Time In Minutes:                                         20 Minutes Reference(S):       AOP 1203.026 Examinee's Name:                                                                     SSN:
X SRO: X Actual Testing Environment: Simulator:
Evaluator's Name:
Plant Site:
Lab   Testing Method: Simulate:
Perform:   Approximate Completion Time In Minutes: 20 Minutes Reference(S): AOP 1203.026 Examinee's Name:
SSN:   Evaluator's Name:
The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:
The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:
Satisfactory:
Satisfactory:                                       Unsatisfactory:
Unsatisfactory:
Performance Checklist Comments:
Performance Checklist Comments:
Start Time Stop Time Total Time Signed Date:   Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
Start Time                                   Stop Time                                       Total Time Signed                                                               Date:
T UOI NUMB E R: A1 J P M-R O- Page 2 of 6     THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
 
TUOI NUMBER:                                                                                                         Page 2 of 6 A1JPM-RO-THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
You are the CBOR and section 2 of AOP 1202.026 was entered because of a small leak in the Makeup system on the discharge side of the pumps. The reactor was tripped and the plant is stable in Mode 3 conditions. All Makeup pumps had to be stopped to repair the leak. The leak has been repaired. Make up pump line up: P-36A is ES, P-36B is OP, P-36C is STBY. RCP seal bleedoff temperature is 160 0F.
You are the CBOR and section 2 of AOP 1202.026 was entered because of a small leak in the Makeup system on the discharge side of the pumps. The reactor was tripped and the plant is stable in Mode 3 conditions. All Makeup pumps had to be stopped to repair the leak. The leak has been repaired. Make up pump line up: P-36A is ES, P-36B is OP, P-36C is STBY. RCP seal bleedoff temperature is 1600F.
TASK STANDARD:
TASK STANDARD:
Restart a Makeup pump following RCS leak isolation per section 2 of Procedure 1203.026, starting with step 3.6.6. TASK PERFORMANCE AIDS:
Restart a Makeup pump following RCS leak isolation per section 2 of Procedure 1203.026, starting with step 3.6.6.
TASK PERFORMANCE AIDS:
Radio (may be simulated), copy of section 2 AOP 1203.026, steps 3.6.6 - 3.7.
Radio (may be simulated), copy of section 2 AOP 1203.026, steps 3.6.6 - 3.7.
SIMULATOR SETUP:  
SIMULATOR SETUP:
: 1. Trip reactor 2. Perform 1202.001 rx trip, with enclosures as appropriate 3. Allow plant to stabilize (OTSG on LLL, DFT stable) 4. Lower PZR level SP to 100" 5. Allow PZR level to reach 100" 6. Initialize MUT at 80" 7. When PZR level reaches 100" close all Make up valves  
: 1. Trip reactor
: 2. Perform 1202.001 rx trip, with enclosures as appropriate
: 3. Allow plant to stabilize (OTSG on LLL, DFT stable)
: 4. Lower PZR level SP to 100
: 5. Allow PZR level to reach 100
: 6. Initialize MUT at 80
: 7. When PZR level reaches 100 close all Make up valves
: 8. Shutdown all running Makeup pumps
: 8. Shutdown all running Makeup pumps
: 9. Store IC T UOI NUMB E R: A1 J P M-R O- Page 3 of 6   INITIATING CUE: The CRS/SM directs you to restart Makeup Pump P-36C (STBY pump) IAW section 2 of AOP 1203.026, starting with step 3.6.6 CRITICAL ELEMENTS (c):
: 9. Store IC
3, 8, 9 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT INSTRUCTOR NOTE: Examinee may review the AOP 1203.0126 prior to starting the JPM.
 
: 1. Verify Makeup Tank outlet (CV-1275) is open (step 3.6.6A of procedure)
TUOI NUMBER:                                                                                                     Page 3 of 6 A1JPM-RO-INITIATING CUE:             The CRS/SM directs you to restart Makeup Pump P-36C (STBY pump) IAW section 2 of AOP 1203.026, starting with step 3.6.6 CRITICAL ELEMENTS (c): 3, 8, 9 C                   PERFORMANCE CHECKLIST                                     STANDARD                 N/A SAT     UN SAT INSTRUCTOR NOTE: Examinee may review the AOP 1203.0126 prior to starting the JPM.
Operator verifies CV-1275 open.
: 1. Verify Makeup Tank outlet (CV-1275) is open               Operator verifies CV-1275 open.      ____ ____    ____
____  ____  ____    2. Add to Makeup tank as necessary to maintain level  
(step 3.6.6A of procedure)
> 55" using current RCS boron concentration.     (step 3.6.6B of procedure)
Operator verifies MUT level is
Operator verifies MUT level is 
: 2. Add to Makeup tank as necessary to maintain level         > 55.                              ____ ____    ____
> 55".      ____   ____   ____ 3. Start Aux Lube Oil pump for STBY HPI pump (P-36C). (step 3.6.7 of procedure is conditional on STBY HPI pump being available which was given as the initial condition).
            > 55 using current RCS boron concentration.
Operator rotates control handle for P-36C aux lube oil pump and verifies that red light is on, green light is off.
(step 3.6.6B of procedure)
____  ____  ____    4. Review SPDS data for HPI pump suction pressure history, leak location, and lowest suction pressure achieved. (This is the BOXED NOTE prior to step 3.6.10 in the procedure).
Operator rotates control handle C                                                                                                      ____ ____   ____
See Cue below NOTE: Operator should sk ip step 3.6.10 since             pump venting is not required.
: 3. Start Aux Lube Oil pump for STBY HPI pump (P- for P-36C aux lube oil pump and 36C). (step 3.6.7 of procedure is conditional on         verifies that red light is on, green STBY HPI pump being available which was given light is off.
Operator should review the SPDS data and determine that no pump venting is required. See Cue below
as the initial condition).
____  ____  ____  INSTRUCTOR NOTE: Examinee must review the SPDS.
: 4. Review SPDS data for HPI pump suction pressure           Operator should review the SPDS      ____ ____    ____
INSTRUCTOR CUE: The lowest suction pressure for the STBY pump should be around 25psig. If the SPDS is not available, then instructor must cue this value. No loss of pump suction occurred therefore candidate should NOT try to vent pump.
history, leak location, and lowest suction pressure     data and determine that no pump achieved. (This is the BOXED NOTE prior to step         venting is required.
: 5. Verify HPI suction pressure >10psig.                 (step 3.6.11)
3.6.10 in the procedure).
Operator verifies suction pressure >10psig. ____  ____  ____
See Cue below See Cue below NOTE: Operator should skip step 3.6.10 since pump venting is not required.
T UOI NUMB E R: A1 J P M-R O- Page 4 of 6   C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT   6. Verify the following valves in HAND and CLOSED:         CV-1207 (seal injection supply)                                       CV-1235 (normal makeup supply) (step 3.6.12)
INSTRUCTOR NOTE: Examinee must review the SPDS.
NOTE: Operator should skip step 3.6.13 since ES pump is not used. 7. Operator verifies white light for HAND is on and red light for AUTO is off for both CV-1207 (seal injection supply) and CV-1235 (normal makeup supply) and valves both indicate CLOSED with corresponding valve position indicator green lights ON and red lights OFF.
INSTRUCTOR CUE: The lowest suction pressure for the STBY pump should be around 25psig. If the SPDS is not available, then instructor must cue this value. No loss of pump suction occurred therefore candidate should NOT try to vent pump.
____  ____   ____  C  8. After AUX lube oil pump has run for  
: 5. Verify HPI suction pressure >10psig.                     Operator verifies suction pressure  ____ ____    ____
> 1 minute, start the STBY HPI pump.  
(step 3.6.11)                                           >10psig.
      (step 3.6.14)
 
Operator verifies red light is lit for AUX lube oil pump and places hand control switch for STBY HPI pump P-36C to start. Verifies the red light ON and green light OFF for P-36C.
TUOI NUMBER:                                                                                       Page 4 of 6 A1JPM-RO-C                 PERFORMANCE CHECKLIST                               STANDARD             N/A SAT     UN SAT
____  ____  ____  C 9. Stop the AUX lube oil pump for the STBY HPI pump (P-36C).
: 7. Operator verifies white light
       (step 3.6.15)
: 6. Verify the following valves in HAND and                 for HAND is on and red light  ____ ____  ____
Operator places the hand control switch for the AUX lube oil pump (for P-36C) to the OFF position and verifies green light ON and red light OFF.
CLOSED:                                               for AUTO is off for both CV-1207 (seal injection supply)
____  ____  ____    10. Place CV-1206 pushbutton to OVRD. Open CV-1206 (seal injection isolation valve).  
CV-1207 (seal injection supply)                       and CV-1235 (normal CV-1235 (normal makeup supply)                         makeup supply) and valves (step 3.6.12)                                         both indicate CLOSED with corresponding valve position indicator green lights ON and NOTE: Operator should skip step 3.6.13 since ES       red lights OFF.
      (steps 3.6.16 and 3.6.17)
pump is not used.
Operator pushes CV-1206 button, observes OVRD light is ON, and places the valve hand switch to open position and observes red light ON and green light OFF.
Operator verifies red light is lit C   8. After AUX lube oil pump has run for > 1 minute,   for AUX lube oil pump and          ____ ____  ____
____  ____  ____    11. Slowly open CV-1207 (seal injection control valve) and adjust seal flow to 30-40gpm and place valve in AUTO.  
start the STBY HPI pump.                         places hand control switch for STBY HPI pump P-36C to start.
    (step 3.6.18B)
Verifies the red light ON and (step 3.6.14)                                    green light OFF for P-36C.
NOTE: step B is used because RCP bleedoff       temperature should be 160 0 F or less.
Operator places the hand control C
Operator slowly turns hand switch CCW for CV-1207 in order to open it enough to get 30-40gpm flow and place mode switch for the valve in AUTO and observe red light is ON, white light is OFF. ____  ____  ____    12. When RCP seals total flow is above setpoint (CV-1206 FLOW light ON), return CV-1206 OVRD pushbutton to normal (OVRD light off).  
: 9. Stop the AUX lube oil pump for the STBY HPI        switch for the AUX lube oil pump  ____ ____  ____
      (step 3.6.19)
pump (P-36C).                                    (for P-36C) to the OFF position and verifies green light ON and red light OFF.
Operator should observe CV-1206 FLOW light is ON and then push the OVRD pushbutton in to return it to normal and observe the OVRD light is OFF.
(step 3.6.15)
____  ____  ____
Operator pushes CV-1206 button,
T UOI NUMB E R: A1 J P M-R O- Page 5 of 6   C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT C 13. Slowly open CV-1235 until makeup flow indication is on-scale and adjust CV-1235 setpoint to desired value and place in AUTO.  
: 10. Place CV-1206 pushbutton to OVRD. Open CV-       observes OVRD light is ON, and    ____ ____  ____
      (steps 3.6.20 and 3.6.21)
1206 (seal injection isolation valve).            places the valve hand switch to open position and observes red light ON and green light OFF.
Operator should SLOWLY turn CV-1235 position switch CCW to open the valve and watch for flow indications on scale. Operator should then adjust the SP to a nominal value, place valve hand station in AUTO and observe white light OFF and RED light ON. ____  ____  ____  C 14. Re-establish letdown.  
(steps 3.6.16 and 3.6.17)
      (step 3.7)
Operator slowly turns hand switch
JPM is complete Operator places hand station for letdown isolation valve CV-1221 to CCW position to initiate letdown and observes letdown flow rate and red light ON and green light OFF (for valve open indication).
: 11. Slowly open CV-1207 (seal injection control       CCW for CV-1207 in order to        ____ ____  ____
____  ____  ____  END T UOI NUMB E R: A1 J P M-R O- Page 6 of 6     EXAMINEE'S COPY INITIAL CONDITIONS:
valve) and adjust seal flow to 30-40gpm and place open it enough to get 30-40gpm valve in AUTO.                                   flow and place mode switch for (step 3.6.18B)                                     the valve in AUTO and observe red light is ON, white light is NOTE: step B is used because RCP bleedoff OFF.
You are the CBOR and AOP 1202.026 was entered because of a small leak in the Makeup system on the discharge side of the pumps . The reactor was tripped and the plant is stable in Mode 3 conditions. All Makeup pumps had to be stopped to repair the leak. The leak has been repaired. Make up pump line up: P-36A is ES, P-36B is OP, P-36C is STBY. RCP seal bleedoff temperature is 160 0F.
temperature should be 160 0F or less.
Operator should observe CV-
: 12. When RCP seals total flow is above setpoint (CV- 1206 FLOW light is ON and then    ____ ____  ____
1206 FLOW light ON), return CV-1206 OVRD          push the OVRD pushbutton in to pushbutton to normal (OVRD light off).           return it to normal and observe the OVRD light is OFF.
(step 3.6.19)
 
TUOI NUMBER:                                                                                         Page 5 of 6 A1JPM-RO-C                 PERFORMANCE CHECKLIST                                 STANDARD             N/A SAT     UN SAT C                                                           Operator should SLOWLY turn
: 13. Slowly open CV-1235 until makeup flow               CV-1235 position switch CCW to    ____ ____  ____
indication is on-scale and adjust CV-1235 setpoint open the valve and watch for flow to desired value and place in AUTO.                 indications on scale. Operator should then adjust the SP to a (steps 3.6.20 and 3.6.21)                           nominal value, place valve hand station in AUTO and observe white light OFF and RED light ON.
C                                                           Operator places hand station for
: 14. Re-establish letdown.                               letdown isolation valve CV-1221   ____ ____  ____
to CCW position to initiate (step 3.7)                                          letdown and observes letdown flow rate and red light ON and green light OFF (for valve open JPM is complete indication).
END
 
TUOI NUMBER:                                                                                           Page 6 of 6 A1JPM-RO-EXAMINEES COPY INITIAL CONDITIONS:
You are the CBOR and AOP 1202.026 was entered because of a small leak in the Makeup system on the discharge side of the pumps . The reactor was tripped and the plant is stable in Mode 3 conditions. All Makeup pumps had to be stopped to repair the leak. The leak has been repaired. Make up pump line up: P-36A is ES, P-36B is OP, P-36C is STBY. RCP seal bleedoff temperature is 1600F.
INITIATING CUE:
INITIATING CUE:
The CRS/SM directs you to restart Makeup Pump P-36C (STBY pump) IAW AOP 1203.026, starting with step 3.6.6.
The CRS/SM directs you to restart Makeup Pump P-36C (STBY pump) IAW AOP 1203.026, starting with step 3.6.6.
PR O C./W O R K PLA N N O.
PR O C ED U R E/W O R K PLA N T I T L E:                                                                                                    P AG E: 8 o f 1203.026 11 LOSS OF REACTOR COOLANT MAKEUP                                                    CHANGE: 009-04-0  SECTION 2 -- LARGE MAKEUP AND PURIFICATION SYSTEM LEAK (continued)
NOTE The SPDS Safety System Diagnostic Inst. display contains the previous 20 minutes of data.


====3.6.4 Select====
PROC./WORK PLAN NO.      PROCEDURE/WORK PLAN TITLE:                                                      PAGE: 8 of 1203.026                11 LOSS OF REACTOR COOLANT MAKEUP                                              CHANGE: 009-04-0 SECTION 2 -- LARGE MAKEUP AND PURIFICATION SYSTEM LEAK (continued)
Safety System Diagnostic Inst. display on SPDS for OP HPI pump and evaluate suction pressure and flow stability prior to event.
NOTE The SPDS Safety System Diagnostic Inst. display contains the previous 20 minutes of data.
3.6.5   If radiation levels prohibit leak isolation, perform the following:
3.6.4         Select Safety System Diagnostic Inst. display on SPDS for OP HPI pump and evaluate suction pressure and flow stability prior to event.
3.6.5         If radiation levels prohibit leak isolation, perform the following:
A. Open BWST Outlet (CV-1407 or CV-1408) to ES HPI pump.
A. Open BWST Outlet (CV-1407 or CV-1408) to ES HPI pump.
B. Operate ES HPI pump and associated HPI Block valve (CV-1220 or CV-1285) only as necessary to maintain RCS inventory.
B. Operate ES HPI pump and associated HPI Block valve (CV-1220 or CV-1285) only as necessary to maintain RCS inventory.
C. GO TO step 3.7. 3.6.6 When system leakage has been isolated, perform the following:
C. GO TO step 3.7.
3.6.6         When system leakage has been isolated, perform the following:
A. Verify Makeup Tank Outlet (CV-1275) open.
A. Verify Makeup Tank Outlet (CV-1275) open.
B. Add to MU tank as necessary to maintain level 55" using current RCS boron concentration.
B. Add to MU tank as necessary to maintain level 55" using current RCS boron concentration.
3.6.7 If STBY HPI pump is available, perform the following:
3.6.7         If STBY HPI pump is available, perform the following:
A. Start AUX lube oil pump for STBY HPI pump.
A. Start AUX lube oil pump for STBY HPI pump.
B. GO TO step 3.6.10 to place STBY HPI pump in service.
B. GO TO step 3.6.10 to place STBY HPI pump in service.
3.6.8   If STBY HPI pump is not available, and OP HPI pump damage is not suspected, perform the following:
3.6.8         If STBY HPI pump is not available, and OP HPI pump damage is not suspected, perform the following:
A. Start AUX lube oil pump for OP HPI pump.
A. Start AUX lube oil pump for OP HPI pump.
B. GO TO step 3.6.10 to place OP HPI pump in service.
B. GO TO step 3.6.10 to place OP HPI pump in service.
3.6.9 If both OP and STBY HPI pumps are not available, perform the following:
3.6.9         If both OP and STBY HPI pumps are not available, perform the following:
A. Start AUX lube oil pump for ES HPI pump.
A. Start AUX lube oil pump for ES HPI pump.
B. Place ES standby HPI pump in service per step 3.6.10.
B. Place ES standby HPI pump in service per step 3.6.10.
PR O C./W O R K PLA N N O.
 
PR O C ED U R E/W O R K PLA N T I T L E:                                                                                                   P AG E: 8 o f 1203.026 11 LOSS OF REACTOR COOLANT MAKEUP                                                   CHANGE: 009-04-0     SECTION 2 -- LARGE MAKEUP AND PURIFICATION SYSTEM LEAK (continued)
PROC./WORK PLAN NO.         PROCEDURE/WORK PLAN TITLE:                                                     PAGE: 8 of 1203.026                   11 LOSS OF REACTOR COOLANT MAKEUP                                           CHANGE: 009-04-0 SECTION 2 -- LARGE MAKEUP AND PURIFICATION SYSTEM LEAK (continued)
NOTE   Decision to vent HPI pump shoul d be based on suction pressure from SPDS history as           well as leak location and lowest suction pressure achieved.
NOTE Decision to vent HPI pump should be based on suction pressure from SPDS history as well as leak location and lowest suction pressure achieved.
3.6.10 If loss of pump suction was indicated, perform the following:
3.6.10           If loss of pump suction was indicated, perform the following:
A. If ES HPI pump is being re-aligned per Attachment A, verify associated P-36 Makeup Pump Suction Cross-Over open prior to venting.
A. If ES HPI pump is being re-aligned per Attachment A, verify associated P-36 Makeup Pump Suction Cross-Over open prior to venting.
B. Vent pump using applicable Makeup Pump P-36 Vent to ABV Header:
B. Vent pump using applicable Makeup Pump P-36 Vent to ABV Header:
P-36A P-36B P-36C ABV-9A ABV-9B ABV-9C   3.6.11 Verify HPI pump suction pressure >10 psig.
P-36A       P-36B     P-36C ABV-9A ABV-9B ABV-9C 3.6.11           Verify HPI pump suction pressure >10 psig.
3.6.12 Verify the following valves in HAND and closed:
3.6.12           Verify the following valves in HAND and closed:
* CV-1207
* CV-1207
* CV-1235 3.6.13 If ES HPI pump will be used, verify Attachment A steps 1 through 6 complete.
* CV-1235 3.6.13           If ES HPI pump will be used, verify Attachment A steps 1 through 6 complete.
CAUTION Operation of Aux Lube Oil Pump with HPI/MU Pump running should be minimized.
CAUTION Operation of Aux Lube Oil Pump with HPI/MU Pump running should be minimized.
3.6.14 After AUX lube oil pump has run for 1 minute, start HPI pump.
3.6.14           After AUX lube oil pump has run for 1 minute, start HPI pump.
3.6.15 Stop AUX lube oil pump for HPI pump.
3.6.15           Stop AUX lube oil pump for HPI pump.
3.6.16 Place CV-1206 pushbutton in OVRD (OVRD light on).
3.6.16           Place CV-1206 pushbutton in OVRD (OVRD light on).
3.6.17 Open CV-1206.
3.6.17           Open CV-1206.
3.6.18 Slowly open CV-1207 as follows:
3.6.18           Slowly open CV-1207 as follows:
A. If seal bleedoff temperature is >180&deg;F, establish and maintain 8 to 12 gpm RCP Seal Total INJ Flow until <180&deg;F.
A. If seal bleedoff temperature is >180&deg;F, establish and maintain 8 to 12 gpm RCP Seal Total INJ Flow until <180&deg;F.
PROC./WORK PLAN NO.
1203.026 PROCEDURE/WORK PLAN TITLE:                                                                                                    PAGE: 8 of 11 LOSS OF REACTOR COOLANT MAKEUP                                                    CHANGE: 009-04-0    B. When seal bleedoff temperature is <180&deg;F, adjust CV-1207 for        30-40 gpm and place in AUTO.
SECTION 2 -- LARGE MAKEUP AND PURIFICATION SYSTEM LEAK (continued) 3.6.19 When RCP Seals Total INJ Flow is above setpoint (CV-1206 FLOW light on),  return CV-1206 OVRD pushbutton to normal (OVRD light off).
3.6.20  Slowly open CV-1235 until makeup flow indication is on-scale.
3.6.21  Adjust CV-1235 setpoint to desired value and place in AUTO.
3.7  If  normal makeup is in service, reestablish letdown.


T UOI NUMB E R: Page 1 of 6 A1JPM-RO- JOB PERFORMANCE MEASURE Unit: 1 Rev # 1 Date:   TUOI NUMBER:
PROC./WORK PLAN NO.      PROCEDURE/WORK PLAN TITLE:                                                PAGE: 8 of 1203.026                  11 LOSS OF REACTOR COOLANT MAKEUP                                      CHANGE: 009-04-0 B. When seal bleedoff temperature is <180&deg;F, adjust CV-1207 for 30-40 gpm and place in AUTO.
A1JPM-RO-System/Duty Area:
SECTION 2 -- LARGE MAKEUP AND PURIFICATION SYSTEM LEAK (continued) 3.6.19        When RCP Seals Total INJ Flow is above setpoint (CV-1206 FLOW light on),
Task: Perform ERV (PSV-1000) Exercise Test JA# ANO1-RO- KA Value RO 3.0 SRO 3.2 KA Reference 010.A3.01 Approved For Administration To: RO SRO   Task Location: Inside CR:
return CV-1206 OVRD pushbutton to normal (OVRD light off).
Outside CR: Both:   Suggested Testing Environment And Method (Perform Or Simulate):
3.6.20        Slowly open CV-1235 until makeup flow indication is on-scale.
Plant Site:
3.6.21        Adjust CV-1235 setpoint to desired value and place in AUTO.
Simulator: Perform       X Lab:       Position Evaluated: RO:
3.7          If normal makeup is in service, reestablish letdown.
X SRO: X Actual Testing Environment: Simulator:
 
Plant Site:
TUOI NUMBER:                                                                                                             Page 1 of 6 A1JPM-RO-JOB PERFORMANCE MEASURE Unit:               1             Rev #                         1                         Date:
Lab   Testing Method: Simulate:
TUOI NUMBER:           A1JPM-RO-System/Duty Area:
Perform:   Approximate Completion Time In Minutes: 10 Minutes Reference(S):
Task:     Perform ERV (PSV-1000) Exercise Test JA#       ANO1-RO-KA Value RO       3.0       SRO     3.2     KA Reference       010.A3.01 Approved For Administration To: RO                               SRO Task Location: Inside CR:                           Outside CR:                       Both:
OP 1103.005 Supplement 1 (change 030-02-0), 1203.012H (change 031-03-0),   and AOP 1203.015 (change 011-00-0)
Suggested Testing Environment And Method (Perform Or Simulate):
Examinee's Name:
Plant Site:                     Simulator:           Perform       X             Lab:
SSN:   Evaluator's Name:
Position Evaluated: RO:                       X                               SRO:                     X Actual Testing Environment: Simulator:                             Plant Site:                     Lab Testing Method: Simulate:                                                 Perform:
Approximate Completion Time In Minutes:                                         10 Minutes Reference(S):
OP 1103.005 Supplement 1 (change 030-02-0), 1203.012H (change 031-03-0),
and AOP 1203.015 (change 011-00-0)
Examinee's Name:                                                                     SSN:
Evaluator's Name:
The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:
The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:
Satisfactory:
Satisfactory:                                       Unsatisfactory:
Unsatisfactory:
Performance Checklist Comments:
Performance Checklist Comments:
Start Time Stop Time Total Time Signed Date:   Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
Start Time                                   Stop Time                                       Total Time Signed                                                               Date:
T UOI NUMB E R: Page 2 of 6 A1JPM-RO- THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
 
TUOI NUMBER:                                                                                                         Page 2 of 6 A1JPM-RO-THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
You are the CBOR and you are directed by the CRS to perform OP 1103.005, Supplement 1, "Exercising of the Pressurizer Electromatic Relief Valve (PSV-1000)" in order to meet the regularly scheduled 18 month test. The plant conditions are as follows: RC Temperature = 120 0 F RC Pressure = 55 psig TASK STANDARD:
You are the CBOR and you are directed by the CRS to perform OP 1103.005, Supplement 1, Exercising of the Pressurizer Electromatic Relief Valve (PSV-1000) in order to meet the regularly scheduled 18 month test. The plant conditions are as follows:
RC Temperature = 1200F RC Pressure = 55 psig TASK STANDARD:
Perform the ERV exercise test per OP 1103.005, Supplement 1 (change 030-02-0).
Perform the ERV exercise test per OP 1103.005, Supplement 1 (change 030-02-0).
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
Stopwatch, Radio (may be simulated), copy of OP 1103.005, Supplement 1 (change 030-02-0).
Stopwatch, Radio (may be simulated), copy of OP 1103.005, Supplement 1 (change 030-02-0).
SIMULATOR SETUP: 1. Reactor tripped, in Mode 5 2. RC Temperature = 120 0F, RC Pressure = 55 psig 3. When step 2.2.4 is reached, ERV (PSV-1000) sticks open and will not close 4. When ERV Isolation valve is closed (CV-1000), the leak stops  
SIMULATOR SETUP:
: 1. Reactor tripped, in Mode 5
: 2. RC Temperature = 1200F, RC Pressure = 55 psig
: 3. When step 2.2.4 is reached, ERV (PSV-1000) sticks open and will not close
: 4. When ERV Isolation valve is closed (CV-1000), the leak stops


T UOI NUMB E R: Page 3 of 6 A1JPM-RO- INITIATING CUE: The CRS/SM directs you to perform the ERV exercise test per OP 1103.005, Supplement 1 (change 030-02-0) in order to meet the regularly scheduled 18 month test.
TUOI NUMBER:                                                                                                           Page 3 of 6 A1JPM-RO-INITIATING CUE:             The CRS/SM directs you to perform the ERV exercise test per OP 1103.005, Supplement 1 (change 030-02-0) in order to meet the regularly scheduled 18 month test.
CRITICAL ELEMENTS (c):
CRITICAL ELEMENTS (c): 5, 6, 8 C                   PERFORMANCE CHECKLIST                                     STANDARD                   N/A     SAT     UN SAT INSTRUCTOR NOTE: Examinee may review the OP 1103.005, Supplement 1 prior to starting the JPM. Also, the Examinee should initial each step on the procedure forms although it is not written into the JPM.
5, 6, 8 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT INSTRUCTOR NOTE: Examinee may review the OP 1103.005, Supplement 1 prior to starting the JPM. Also, the Examinee should initial each step on the procedure forms although it is not written into the JPM.
: 1. Check purpose of test (step 1.1 of procedure)             Operator checks B for regularly       ____    ____    ____
: 1. Check purpose of test (step 1.1 of procedure)
scheduled 18 month test.
Operator checks "B" for regularly scheduled 18 month test.
Operator enters stopwatch cal
____  ____  ____    2. Records stop watch M & TE # and cal date in section 3.0 of procedure. Checks RC Temp  
: 2. Records stop watch M & TE # and cal date in               data, initials for correct RCS          ____    ____    ____
> 100 o F Checks RC Pressure  
section 3.0 of procedure.                               temp/pressure, and checks ERV isolation valve light RED is ON Checks RC Temp > 100oF                                  and GREEN is OFF.
< 70 psig       Checks ERV Isolation (CV-1000) open (steps 1.2 thru 1.5 of procedure)
Checks RC Pressure < 70 psig Checks ERV Isolation (CV-1000) open (steps 1.2 thru 1.5 of procedure)
Operator enters stopwatch cal data, initials for correct RCS temp/pressure, and checks ERV isolation valve light RED is ON and GREEN is OFF.
: 3. If elevated airborne activity is expected as a result     Operator should ask CRS about            ____    ____    ____
____  ____  ____    3. If elevated airborne activity is expected as a result of ERV operations, personnel hatch interlock enabled or --. Instructor Cue here NOTE: No elevated ai rborne activity is expected See Instructor Cue below Operator should ask CRS about expected airborne activity.
of ERV operations, personnel hatch interlock           expected airborne activity.
Instructor cues as given below.
enabled or .                                          Instructor cues as given below.
Operator should N/A the step after the cue.
Instructor Cue here                                    Operator should N/A the step after the cue.
____  ____  ____  INSTRUCTOR CUE: CRS reports that there is no elevated airborne activity expected. N/A the step on the form.  
NOTE: No elevated airborne activity is expected See Instructor Cue below INSTRUCTOR CUE: CRS reports that there is no elevated airborne activity expected. N/A the step on the form.
: 4. Verify no one is at the vicinity of the ERV.  
: 4. Verify no one is at the vicinity of the ERV.               Operator asks CRS to determine          ____    ____    ____
      (step 2.1)
(step 2.1)                                               or uses radio to call and determine that no one is near the ERV.
Instructor Cue: when operato r calls on radio or asks CRS, reply back that no one is in the vicinity of ERV See Instructor Cue at left.
Instructor Cue: when operator calls on radio or asks CRS, reply back that no one is in the vicinity of ERV.        See Instructor Cue at left.
. Operator asks CRS to determine or uses radio to call and determine that no one is near the ERV.
____  ____  ____
T UOI NUMB E R: Page 4 of 6  A1JPM-RO-  C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT  C  5. Perform the following steps while ensuring RCS pressure remains
> 30psig:   
-Place ERV Acoustic Monitor Full Scale Range        selector to 1 g position.
      -Open and measure stroke time of ERV (Record in Section 3.0).
  (steps 2.2.1 - 2.2.2)
Operator selects 1 g position for ERV Acoustic Monitor with Acoustic selector switch. Operator places hand switch for ERV to "open" position and verifies ERV open by using all three parameter indications listed here: Acoustic Monitor indicating light on panel C04 Dropping RCS pressure (Operator should not let pressure drop below 30psig) Rising Quench Tank Pressure  Operator then enters the stroke time in Section 3.0.
____  ____  ____  C  6. Close and measure the stroke time of ERV (Record in Section 3.0).
      (step 2.2.4)
NOTE: This is the alternate path portion of the JPM. The ERV will stick completely open and will not move under any conditions. The block valve (CV-1000) should be closed to stop the release.
Operator places hand switch for ERV to "close" position and should attempt to verify that the ERV is closed by using all three parameter indications listed here: Acoustic Monitor indicating light on panel C04 (displays open) Stable RCS pressure (It should continue to drop) Stable Quench Tank Pressure (It should continue to rise)
____  ____  ____ NOTE:  This is the alternate path portion of the JPM. The ERV will stick completely open and will not move under any conditions. The block valve (CV-1000) should be closed to stop the release per Alarm procedure OP 1203.012H for alarm K09-A1, "Relief Valve Open", page 2.


T UOI NUMB E R: Page 5 of 6 A1JPM-RO- C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT    7. Operator should enter the Annunciator Response OP 1203.012H for alarm K09-A1, " Relief Valve Open", page 2.
TUOI NUMBER:                                                                                             Page 4 of 6 A1JPM-RO-C                 PERFORMANCE CHECKLIST                                   STANDARD               N/A SAT     UN SAT Operator selects 1 g position for C   5. Perform the following steps while ensuring RCS        ERV Acoustic Monitor with          ____ ____    ____
s Failure s Failure.Operator is directed by OP1203.012H to refer to procedure AOP 1203.015 for "
pressure remains > 30psig:                            Acoustic selector switch.
Pressurizer System
Operator places hand switch for
". Operator should refer to section 1.0 of this procedure for "ERV Failure or Leak."
          -Place ERV Acoustic Monitor Full Scale Range          ERV to open position and selector to 1 g position.                           verifies ERV open by using all three parameter indications listed
Operator acknowledges alarm and enters Alarm procedure OP 1203.012H for alarm K09-A1, "Relief Valve Open", page 2. This procedure directs Operator to AOP 1203.015 for "Pressurizer System
        -Open and measure stroke time of ERV                  here:
" Operator should refer to section 1.0 of this procedure for ERV failure or Leak.      ____   ____   ____ C  8. Operator should commence follow-up actions for section 1.0, which include: a. Close the ERV Isolation valve (CV-1000). b. Trip reactor if can't maintain pressure (N/A in this JPM)
(Record in Section 3.0).
      (steps 3.1-3.2)
* Acoustic Monitor indicating light on panel (steps 2.2.1 - 2.2.2)                                          C04
Operator closes the isolation valve with hand switch for CV-1000 and observes the following: Acoustic Monitor indicating light on panel C04 (displays closed) Stable RCS pressure  Stable Quench Tank Pressure
* Dropping RCS pressure (Operator should not let pressure drop below 30psig)
____  ____  ____ NOTE: Closing the ERV block or isolation valve CV-1000 will stop the leak.  
* Rising Quench Tank Pressure Operator then enters the stroke time in Section 3.0.
: 9. If closing CV-1000 stops the leak, perform the following: a. Continue power operations with ERV isolated (N/A for this JPM) b. Notify OPS manager c. Log in station log and on plant status board (step 3.3)
Operator places hand switch for C    6. Close and measure the stroke time of ERV (Record      ERV to close position and        ____ ____   ____
END of JPM Operator notifies the OPS manager of the stuck open ERV, block valve has contained the leak, and logs the entry in the station log and PSB.
should attempt to verify that the in Section 3.0).                                     ERV is closed by using all three parameter indications listed here:
____  ____  ____ INSTRUCTOR CUE:  This concludes the JPM.
(step 2.2.4)
END T UOI NUMB E R: Page 6 of 6  A1JPM-RO-    EXAMINEE'S COPY INITIAL CONDITIONS:
* Acoustic Monitor indicating light on panel C04 (displays open)
You are the CBOR and you are directed by the CRS to perform OP 1103.005, Supplement 1, "Exercising of the Pressurizer Electromatic Relief Valve (PSV-1000)" in order to meet the regularly scheduled 18 month test. The plant conditions are as follows: RC Temperature = 120 0 F RC Pressure = 55 psig INITIATING CUE:
NOTE: This is the alternate path portion of the JPM.
The CRS/SM directs you to perform the ERV exercise test per OP 1103.005, Supplement 1 (change 030-02-0) in order to meet the regularly scheduled 18-month test.  
* Stable RCS pressure (It The ERV will stick completely open and will not move              should continue to drop) under any conditions. The block valve (CV-1000)
* Stable Quench Tank should be closed to stop the release.                             Pressure (It should continue to rise)
NOTE: This is the alternate path portion of the JPM. The ERV will stick completely open and will not move under any conditions. The block valve (CV-1000) should be closed to stop the release per Alarm procedure OP 1203.012H for alarm K09-A1, Relief Valve Open, page 2.


P R OC./W O RK P L A N NO. P R OCEDURE/W O RK P L A N T I T L E:                                                                         Page 33 of 38 1103.005                      PRESSURIZER OPERATION                                                      CHANGE: 030-02-0 SUPPLEMENT 1 Page 1 of 4 EXERCISING OF THE PRESSURIZER        ELECTROMATIC RELIEF VALVE (PSV-1000)
TUOI NUMBER:                                                                                            Page 5 of 6 A1JPM-RO-C                  PERFORMANCE CHECKLIST                                  STANDARD              N/A SAT      UN SAT
This test demonstrates operability of the pressurizer ERV by exercising the valve. This test satisfies TS 5.5.8 (ANO IST program requirements) for stroke time measurement, exercising, and fail-safe operation. This test also satisfies part of Surveillance TR 3.4.2.1 for RCS vent path operability. This test is related to SR 3.4.11.5 "Channel calibration of ERV opening circuitry".  
: 7. Operator should enter the Annunciator Response              Operator acknowledges alarm  ____ ____    ____
OP 1203.012H for alarm K09-A1, Relief Valve              and enters Alarm procedure Open, page 2.                                            OP 1203.012H for alarm Operator is directed by OP1203.012H to refer to            K09-A1, Relief Valve procedure AOP 1203.015 for Pressurizer Systems            Open, page 2.
Failure. Operator should refer to section 1.0 of          This procedure directs this procedure for ERV Failure or Leak.                  Operator to AOP 1203.015 for Pressurizer Systems Failure. Operator should refer to section 1.0 of this procedure for ERV failure or Leak.
Operator closes the isolation C
: 8. Operator should commence follow-up actions for        valve with hand switch for CV-     ____ ____    ____
section 1.0, which include:                          1000 and observes the following:
: a. Close the ERV Isolation valve (CV-1000).
* Acoustic Monitor
: b. Trip reactor if cant maintain pressure (N/A in            indicating light on panel C04 (displays closed) this JPM)
(steps 3.1-3.2)
* Stable RCS pressure
* Stable Quench Tank Pressure NOTE: Closing the ERV block or isolation valve CV-1000 will stop the leak.
Operator notifies the OPS
: 9. If closing CV-1000 stops the leak, perform the        manager of the stuck open ERV,    ____ ____    ____
following:                                            block valve has contained the
: a. Continue power operations with ERV isolated        leak, and logs the entry in the (N/A for this JPM)                              station log and PSB.
: b. Notify OPS manager
: c. Log in station log and on plant status board (step 3.3)
END of JPM INSTRUCTOR CUE: This concludes the JPM.
END


===1.0 INITIAL===
TUOI NUMBER:                                                                                        Page 6 of 6 A1JPM-RO-EXAMINEES COPY INITIAL CONDITIONS:
CONDITIONS          INITIALS
You are the CBOR and you are directed by the CRS to perform OP 1103.005, Supplement 1, Exercising of the Pressurizer Electromatic Relief Valve (PSV-1000) in order to meet the regularly scheduled 18 month test. The plant conditions are as follows:
RC Temperature = 1200F RC Pressure = 55 psig INITIATING CUE:
The CRS/SM directs you to perform the ERV exercise test per OP 1103.005, Supplement 1 (change 030-02-0) in order to meet the regularly scheduled 18-month test.


===1.1 Check===
PROC./WORK PLAN NO.          PROCEDURE/WORK PLAN TITLE:                                                    Page 33 of 38 1103.005                            PRESSURIZER OPERATION                                        CHANGE: 030-02-0 SUPPLEMENT 1 Page 1 of 4 EXERCISING OF THE PRESSURIZER ELECTROMATIC RELIEF VALVE (PSV-1000)
the purpose of this test:       _________ __A) Regularly scheduled cold shutdown test.       __B) Regularly scheduled 18 month test __C) Operability test following significant maintenance.
This test demonstrates operability of the pressurizer ERV by exercising the valve. This test satisfies TS 5.5.8 (ANO IST program requirements) for stroke time measurement, exercising, and fail-safe operation. This test also satisfies part of Surveillance TR 3.4.2.1 for RCS vent path operability. This test is related to SR 3.4.11.5 "Channel calibration of ERV opening circuitry".
1.0    INITIAL CONDITIONS                                                                                  INITIALS 1.1     Check the purpose of this test:                                                             _________
__A) Regularly scheduled cold shutdown test.
__B) Regularly scheduled 18 month test
__C) Operability test following significant maintenance.
__D) Other (describe in section 4.0).
__D) Other (describe in section 4.0).
1.2 Stop watch available for measuring valve stroke time. _________  
1.2     Stop watch available for measuring valve stroke time.                                     _________
1.2.1    Record Stopwatch M&TE# and Cal Due Date in Section 3.0.
1.3    RC temperature > 1000F.                                                                    _________
1.4    RC pressure < 70 psig.                                                                      _________
1.5    ERV Isolation (CV-1000) open.                                                              _________
1.6    If elevated airborne activity is expected as a result of                                    _________
ERV operations, personnel Hatch interlock enabled or Personnel Hatch watch stationed to ensure only one door opened at a time. Otherwise N/A.
2.0    TEST METHOD WARNING Opening the ERV causes a localized steam release at the pilot valve vent.
This is a radiation and safety hazard.
2.1 Verify no one is at the vicinity of the ERV.


====1.2.1 Record====
PROC./WORK PLAN NO.        PROCEDURE/WORK PLAN TITLE:                                Page 34 of 38 1103.005                          PRESSURIZER OPERATION                      CHANGE: 030-02-0 SUPPLEMENT 1 Page 2 of 4 NOTE ERV position and vent path operability are obtained using:
Stopwatch M&TE# and Cal Due Date in Section 3.0.
* Acoustic Monitor indication on C04 and
1.3 RC temperature
* dropping RCS pressure and
> 100 0F.        _________
* rising Quench Tank pressure.
1.4  RC pressure < 70 psig.         _________
2.2      Perform the following steps while ensuring RCS pressure remains < 30 psig.
1.ERV Isolation (CV-1000) open.       _________
2.2.1   Place ERV Acoustic Monitor Full Scale Range                            _______
1.6 If elevated airborne activity is expected as a result of     _________  ERV operations, personnel Hatch interlock enabled or Personnel Hatch watch stationed to ensure only one door opened at a time. Otherwise N/A.
selector to 1 g position.
2.0  TEST METHOD WARNING    Opening the ERV causes a localized steam release at the pilot valve vent. This is a radiation and safety hazard.  
2.2.2  Open and measure stroke time of ERV                                    _______
(Record in Section 3.0).
2.2.3   Verify ERV open using all of the following:                            _______
* Acoustic Monitor Indication on C04
* Dropping RCS pressure
* Rising Quench Tank pressure.
2.2.4  Close and measure stroke time of ERV                                   _______
(Record in Section 3.0).
2.2.5  Verify ERV closed using all of the following:                          _______
* Acoustic Monitor Indication on C04
* Stable RCS pressure
* Stable Quench Tank pressure.
2.2.6  Place ERV Acoustic Monitor Full Scale Range                            _______
selector to 10 g position.


===2.1 Verify===
PROC./WORK PLAN NO.         PROCEDURE/WORK PLAN TITLE:                                                 Page 35 of 38 1103.005                          PRESSURIZER OPERATION                                       CHANGE: 030-02-0 SUPPLEMENT 1 Page 3 of 4 3.0     ACCEPTANCE CRITERIA 3.1   Record stroke time measured during testing and compare with "Limiting Value For Operability".
no one is at the vicinity of the ERV.
 
P R OC./W O RK P L A N NO. P R OCEDURE/W O RK P L A N T I T L E:                                                                        Page 34 of 38 1103.005                      PRESSURIZER OPERATION                                                      CHANGE: 030-02-0 SUPPLEMENT 1 Page 2 of 4 NOTE ERV position and vent path operability are obtained using: Acoustic Monitor indication on C04 and dropping RCS pressure and rising Quench Tank pressure.
 
===2.2 Perform===
the following steps while ensuring RCS pressure remains < 30 psig.
 
====2.2.1 Place====
ERV Acoustic Monitor Full Scale Range      _______ selector to 1 g position.
2.2.2  Open and measure stroke time of ERV      _______ (Record in Section 3.0).
 
====2.2.3 Verify====
ERV open using all of the following:      _______
Acoustic Monitor Indication on C04 Dropping RCS pressure Rising Quench Tank pressure.
 
====2.2.4 Close====
and measure stroke time of ERV      _______ (Record in Section 3.0).
 
====2.2.5 Verify====
ERV closed using all of the following:      _______
Acoustic Monitor Indication on C04 Stable RCS pressure Stable Quench Tank pressure.
 
====2.2.6 Place====
ERV Acoustic Monitor Full Scale Range      _______ selector to 10 g position.
 
PROC./WORK PLAN NO.
 
1103.005 PROCEDURE/WORK PLAN TITLE:
Page 35 of 38                       PRESSURIZER OPERATION                                                       CHANGE: 030-02-0 SUPPLEMENT 1 Page 3 of 4  
 
===3.0 ACCEPTANCE===
CRITERIA  
 
===3.1 Record===
stroke time measured during testing and compare with "Limiting Value For Operability".
Stopwatch M&TE#___________ Cal Due Date ________________
Stopwatch M&TE#___________ Cal Due Date ________________
Valve Control Panel Test Direction Measured Stroke Time (nearest 1/10 second) Acceptable Normal Range (Sec) Limiting Value For Operability (Sec) Is Measured Stroke Time Less Than "Limiting Value For Operability"Design Bases Value Open < 2.0 < 2.0 Yes     No  
Valve   Control     Test         Measured Stroke       Acceptable  Limiting  Is Measured  Design Panel    Direction  Time (nearest 1/10 second)   Normal     Value    Stroke Time  Bases Range       For      Less Than    Value (Sec)   Operability  "Limiting (Sec)     Value For Operability" PSV-1000    C04      Open                                   < 2.0     < 2.0     Yes   No     < 2.0 Closed                                 2.6-7.8   <10.4*     Yes   No     N/A
< 2.0 PSV-1000 C04 Closed 2.6-7.8 <10.4* Yes     No N/A
* Valve closure verifies proper fail-safe operation.
* Valve closure verifies proper fail-safe operation.
3.2 If "No" is circled in 3.1 above, declare PSV-1000     _______ inoperable, immediately notify the Shift Manager/CRS, write a Condition Report, initiate corrective action. Reference applicable Tech Spec for LCO.
3.2   If "No" is circled in 3.1 above, declare PSV-1000                                       _______
3.3 If any measured stroke time does not fall within the     _______ "Acceptable Normal Range", immediately retest valve or declare that valve inoperable. Refer to "Operability" section of this procedure for additional guidance.
inoperable, immediately notify the Shift Manager/CRS, write a Condition Report, initiate corrective action. Reference applicable Tech Spec for LCO.
PERFORMED BY _______________________OPERATOR DATE/TIME ______/______  
3.3   If any measured stroke time does not fall within the                                     _______
                      "Acceptable Normal Range", immediately retest valve or declare that valve inoperable. Refer to "Operability" section of this procedure for additional guidance.
PERFORMED BY _______________________OPERATOR DATE/TIME ______/______


Page 1 of 5 T U O I: A1J P M-DHR01 JOB PERFORMANCE MEASURE UNIT: ______
Page 1 of 5 TUOI: A1JPM-DHR01 JOB PERFORMANCE MEASURE UNIT: ______1_______ REV # ______8_______        DATE: ______________________________
1_______ REV # ______
TUOI NUMBER:_A1JPM-RO-DHR01_____________
8_______ DATE: ______________________________
SYSTEM/DUTY AREA:_DECAY HEAT REMOVAL______________________________________________
TUOI NUMBER:_A1JPM-RO-DHR01
TASK:__ESTABLISH DECAY HEAT REMOVAL USING P-34A____________________________________
_____________
JTA#:__ANO1-RO-DHR-NORM-2__________                                        ________________
SYSTEM/DUTY AREA:_DECAY HEAT REMOVAL
KA VALUE RO:___3.6____ SRO:__3.4_____ KA  
______________________________________________
TASK:__ESTABLISH DECAY HEAT REMOVAL USING P-34A
____________________________________
JTA#:__ANO1-RO-DHR-NORM-2
__________      ________________
KA VALUE RO:___
3.6____ SRO:__
3.4_____ KA  


==REFERENCE:==
==REFERENCE:==
__
__005 A4.01__________________
005 A4.01__________________
APPROVED FOR ADMINISTRATION TO: RO:___X____ SRO:____X____
APPROVED FOR ADMINISTRATION TO: RO:___
TASK LOCATION: INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________
X____ SRO:____
X____  TASK LOCATION: INSIDE CR:____
X____ OUTSIDE CR:_________ BOTH:________
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________
PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________
POSITION EVALUATED: RO:__________ SRO:___________
POSITION EVALUATED: RO:__________       SRO:___________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
TESTING METHOD: SIMULATE:_________ PERFORM:___________
TESTING METHOD: SIMULATE:_________       PERFORM:___________
APPROXIMATE COMPLETION TIME IN MINUTES:___20 MINUTES
APPROXIMATE COMPLETION TIME IN MINUTES:___20 MINUTES_______________________________
_______________________________
REFERENCE(S):__1104.004                               _____________________________
REFERENCE(S):__1104.004
EXAMINEE'S NAME:________________________________     SSN ______-_____-____________
_____________________________
EXAMINEE'S NAME:________________________________ SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________ UNSATISFACTORY:_________________
SATISFACTORY:________________           UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
____________ Start Time     ____________ Stop Time       ____________ Total Time SIGNED ________________________________ DATE: _______________________
___________________________________________________________________________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________
 
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
Page 2 of 5 TUOI: A1JPM-DHR01 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
Page 2 of 5 T U O I: A1J P M-DHR01 EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS
* Plant shutdown and cooldown per 1102.010 is complete to step 10.8.
Plant shutdown and cooldown per 1102.010 is complete to step 10.8. Breakers B-5255/B-6255/B-5651 are closed. 1104.004 is complete up to step 7.2.3.
* Breakers B-5255/B-6255/B-5651 are closed.
* 1104.004 is complete up to step 7.2.3.
INITIATING CUE:
INITIATING CUE:
The CRS directs that Decay Heat Pump P34A be placed in service with DHR flow <3500 gpm and discharge pressure <400 psig, complete procedure through step 7.2.18.  
The CRS directs that Decay Heat Pump P34A be placed in service with DHR flow <3500 gpm and discharge pressure <400 psig, complete procedure through step 7.2.18.
 
Page 3 of 5 T U O I:  A1J P M-DHR01 TUOI NUMBER:    ANO-1-JPM-RO-DHR01 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
Plant shutdown and cooldown per 1102.010 is complete to step 10.8. Decay heat removal with P34A is to be established per 1104.004. Breakers B-5255/B-6255/B-5651 are closed.                                       
 
TASK STANDARD:
P-34A decay heat pump running per OP 1104.004. Flow indicated         
  < 3500 gpm and discharge pressure <400 psig.                                                                       


TASK PERFORMANCE AIDS:
Page 3 of 5 TUOI: A1JPM-DHR01 TUOI NUMBER:      ANO-1-JPM-RO-DHR01 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
1104.004 Section 7.0                                              
The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: Plant shutdown and cooldown per 1102.010 is complete to step 10.8. Decay heat removal with P34A is to be established per 1104.004. Breakers B-5255/B-6255/B-5651 are closed.
TASK STANDARD: P-34A decay heat pump running per OP 1104.004. Flow indicated
< 3500 gpm and discharge pressure <400 psig.
TASK PERFORMANCE AIDS: 1104.004 Section 7.0


Page 4 of 5 T U O I: A1J P M-DHR01 TUOI NUMBER:     ANO-1-JPM-RO-DHR01 INITIATING CUE:
Page 4 of 5 TUOI: A1JPM-DHR01 TUOI NUMBER:       ANO-1-JPM-RO-DHR01 INITIATING CUE:
The CRS directs that P34A be placed in service with DHR flow <3500 gpm and discharge pressure <400 psig, complete procedure through step 7.2.18.
The CRS directs that P34A be placed in service with DHR flow <3500 gpm and discharge pressure <400 psig, complete procedure through step 7.2.18.
INSTRUCTOR NOTE: Ensure B-5255, B-6255,and B-5651 are closed and Programmable Annunciator alarm for P34A (P1404) set at 400 psig.
INSTRUCTOR NOTE: Ensure B-5255, B-6255,and B-5651 are closed and Programmable Annunciator alarm for P34A (P1404) set at 400 psig.
CRITICAL ELEMENTS (C):
CRITICAL ELEMENTS (C):         1, 2, 5, 7, 8, 9, 10, 11, 12, 15 C           PERFORMANCE CHECKLIST                             STANDARDS           N/A SAT     UNSAT (C)     1. Close Decay Heat P-34A Suction from           CV-1436 red light off,    ____ ____      ____
1, 2, 5, 7, 8, 9, 10, 11, 12, 15 C PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT (C) 1. Close Decay Heat P-34A Suction from BWST (CV-1436).
BWST (CV-1436).                             green light on.
CV-1436 red light off, green light on.
(C)     2. Open Decay Heat P-34A Suction from           CV-1434 red light on,      ____ ____      ____
____  ____  ____  (C) 2. Open Decay Heat P-34A Suction from RCS (CV-1434).
RCS (CV-1434).                             green light off.
CV-1434 red light on, green light off.
: 3. Open E-35A and E-35B sample valves           Contacted the WCO and      ____ ____      ____
____  ____  ____  3. Open E-35A and E-35B sample valves SS-41A and SS-41B.
SS-41A and SS-41B.                         instructed the WCO to open SS-41A and SS-41B.
Contacted the WCO and instructed the WCO to open SS-41A and SS-41B. ____  ____  ____  NOTE: Inform examinee that Category "E" log entry has been made.  
NOTE: Inform examinee that Category E log entry has been made.
: 4. Verify white Open Permit light ON at CV-1410 handswitch on C16.
: 4. Verify white Open Permit light ON at         Verified white open permit ____ ____      ____
Verified white open permit light on.
CV-1410 handswitch on C16.                 light on.
____  ____  ____  (C) 5. Open CV-1410.
(C)     5. Open CV-1410.                                 Opened DH suction valve   ____ ____      ____
Opened DH suction valve CV-1410. ____  ____  ____  6. Verify white Open Permit light ON at CV-1050 handswitch on C18.
CV-1410.
Verified white open permit
: 6. Verify white Open Permit light ON at       Verified white open permit ____ ____      ____
CV-1050 handswitch on C18.                  light on.
C      7. Open DH Suction Valve CV-1050              Opened DH suction valve CV-1050.                  ____ ____      ____
C      8. Open DH suction RB isolation CV-          Opened CV-1404.
1404.                                                                ____ ____      ____
C      9. Close decay heat cooler E-35A              Closed CV-1428.
outlet valve CV-1428.                                                ____ ____      ____


light on.
Page 5 of 5 TUOI: A1JPM-DHR01 C          PERFORMANCE CHECKLIST                          STANDARDS            N/A SAT    UNSAT C    10. Position E-35A Cooler Bypass (CV-      Positioned CV-1433 to ~
____ ____ ____   C 7. Open DH Suction Valve CV-1050 Opened DH suction valve CV-1050. ____ ____ ____ C   8. Open DH suction RB isolation CV-1404. Opened CV-1404.
1433) to ~ 50% as indicated on HIC-    50% open.                 ____ ____   ____
____ ____ ____ C  9. Close decay heat cooler E-35A outlet valve CV-1428.
1433.
Closed CV-1428.
C
____ ____ ____
: 11. Open Decay Heat Block Valve CV-           Opened CV-1401.
Page 5 of 5 TUOI:  A1JPM-DHR01 C PERFORMANCE CHECKLIST STANDARDS N/A  SAT  UNSAT  C  10. Position E-35A Cooler Bypass (CV-1433) to ~ 50% as indicated on HIC-1433. Positioned CV-1433 to ~
1401                                                                ____ ____   ____
C
: 12. Start P-34A.                              Started P-34A.
: 13. Verify LPI/Decay Heat Pump Brg          On C-18, verified CV-CLR E-50A Inlet (CV-3840) and          3840 and CV-3822 open. ____ ____   ____
Decay HT CLR Service Water E-35A Inlet (CV-3822) open.
: 14. Monitor pressurizer level.             Monitored pressurizer      ____ ____   ____
level on C04 or SPDS.
C     15. Adjust CV-1433 to establish decay      Adjusted DHR flow to      ____ ____    ____
heat removal flow at < 3500 gpm        <3500 gpm and from P-34A and discharge pressure      discharge pressure < 400
                < 400 psig.                             psig using CV-1433.
NOTE: Inform examinee that it is not necessary to perform Part 2 of Supplement 3.
: 16. Verify LPI Room Cooler VUC-1A          At panel C-19, verified    ____ ____    ____
starts.                                VUC-1A started (red light on).
: 17. Adjust the DECAY HEAT VORTEX            Selected the U5 function  ____ ____    ____
WARNING SETPOINT.                      of the SPDS computer and set KP34ALO just below the Decay Heat Pump motor current and adjusted KP34AHI just above the Decay Heat Pump motor current.
END


50% open.
Page 1 of 5 TUOI: A1JPM-DHR01 JOB PERFORMANCE MEASURE UNIT: ______1_______ REV # ______8_______        DATE: ______________________________
____  ____  ____  C  11. Open Decay Heat Block Valve CV-1401  Opened CV-1401.
TUOI NUMBER:_A1JPM-RO-DHR01_____________
____  ____  ____  C  12. Start P-34A.
SYSTEM/DUTY AREA:_DECAY HEAT REMOVAL______________________________________________
Started P-34A.
TASK:__ESTABLISH DECAY HEAT REMOVAL USING P-34A____________________________________
____  ____  ____  13. Verify LPI/Decay Heat Pump Brg CLR E-50A Inlet (CV-3840) and Decay HT CLR Service Water E-35A Inlet (CV-3822) open.
JTA#:__ANO1-RO-DHR-NORM-2__________                                        ________________
On C-18, verified CV-3840 and CV-3822 open.
KA VALUE RO:___3.6____ SRO:__3.4_____ KA  
____  ____  ____  14. Monitor pressurizer level.
Monitored pressurizer level on C04 or SPDS.
____  ____  ____  C  15. Adjust CV-1433 to establish decay heat removal flow at < 3500 gpm from P-34A and discharge pressure < 400 psig.
Adjusted DHR flow to <3500 gpm and discharge pressure < 400 psig using CV-1433.
____  ____  ____  NOTE:  Inform examinee that it is not necessary to perform Part 2 of Supplement 3.
: 16. Verify LPI Room Cooler VUC-1A starts. At panel C-19, verified VUC-1A started (red light on). ____  ____  ____  17. Adjust the DECAY HEAT VORTEX WARNING SETPOINT.
Selected the U5 function of the SPDS computer and set KP34ALO just below the Decay Heat Pump motor current and adjusted KP34AHI just above the Decay Heat Pump motor current.
____  ____  ____    END Page 1 of 5 T U O I: A1J P M-DHR01 JOB PERFORMANCE MEASURE UNIT: ______
1_______ REV # ______
8_______ DATE: ______________________________
TUOI NUMBER:_A1JPM-RO-DHR01
_____________
SYSTEM/DUTY AREA:_DECAY HEAT REMOVAL
______________________________________________
TASK:__ESTABLISH DECAY HEAT REMOVAL USING P-34A
____________________________________
JTA#:__ANO1-RO-DHR-NORM-2
__________      ________________
KA VALUE RO:___
3.6____ SRO:__
3.4_____ KA  


==REFERENCE:==
==REFERENCE:==
__
__005 A4.01__________________
005 A4.01__________________
APPROVED FOR ADMINISTRATION TO: RO:___X____ SRO:____X____
APPROVED FOR ADMINISTRATION TO: RO:___
TASK LOCATION: INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________
X____ SRO:____
X____  TASK LOCATION: INSIDE CR:____
X____ OUTSIDE CR:_________ BOTH:________
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________
PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________
POSITION EVALUATED: RO:__________ SRO:___________
POSITION EVALUATED: RO:__________       SRO:___________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
TESTING METHOD: SIMULATE:_________ PERFORM:___________
TESTING METHOD: SIMULATE:_________       PERFORM:___________
APPROXIMATE COMPLETION TIME IN MINUTES:___20 MINUTES
APPROXIMATE COMPLETION TIME IN MINUTES:___20 MINUTES_______________________________
_______________________________
REFERENCE(S):__1104.004                               _____________________________
REFERENCE(S):__1104.004
EXAMINEE'S NAME:________________________________     SSN ______-_____-____________
_____________________________
EXAMINEE'S NAME:________________________________ SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________ UNSATISFACTORY:_________________
SATISFACTORY:________________           UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
____________ Start Time     ____________ Stop Time       ____________ Total Time SIGNED ________________________________ DATE: _______________________
___________________________________________________________________________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________
 
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
Page 2 of 5 TUOI: A1JPM-DHR01 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
Page 2 of 5 T U O I: A1J P M-DHR01 EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS
* Plant shutdown and cooldown per 1102.010 is complete to step 10.8.
Plant shutdown and cooldown per 1102.010 is complete to step 10.8. Breakers B-5255/B-6255/B-5651 are closed. 1104.004 is complete up to step 7.2.3.
* Breakers B-5255/B-6255/B-5651 are closed.
* 1104.004 is complete up to step 7.2.3.
INITIATING CUE:
INITIATING CUE:
The CRS directs that Decay Heat Pump P34A be placed in service with DHR flow <3500 gpm and discharge pressure <400 psig, complete procedure through step 7.2.18.  
The CRS directs that Decay Heat Pump P34A be placed in service with DHR flow <3500 gpm and discharge pressure <400 psig, complete procedure through step 7.2.18.


Page 3 of 5 T U O I: A1J P M-DHR01 TUOI NUMBER:     ANO-1-JPM-RO-DHR01 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
Page 3 of 5 TUOI: A1JPM-DHR01 TUOI NUMBER:       ANO-1-JPM-RO-DHR01 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS: Plant shutdown and cooldown per 1102.010 is complete to step 10.8. Decay heat removal with P34A is to be established per 1104.004. Breakers B-5255/B-6255/B-5651 are closed.
Plant shutdown and cooldown per 1102.010 is complete to step 10.8. Decay heat removal with P34A is to be established per 1104.004. Breakers B-5255/B-6255/B-5651 are closed.                                      
TASK STANDARD: P-34A decay heat pump running per OP 1104.004. Flow indicated
< 3500 gpm and discharge pressure <400 psig.
TASK PERFORMANCE AIDS: 1104.004 Section 7.0


TASK STANDARD:
Page 4 of 5 TUOI: A1JPM-DHR01 TUOI NUMBER:       ANO-1-JPM-RO-DHR01 INITIATING CUE:
P-34A decay heat pump running per OP 1104.004. Flow indicated         
  < 3500 gpm and discharge pressure <400 psig.                                                                       
 
TASK PERFORMANCE AIDS:
1104.004 Section 7.0                                             
 
Page 4 of 5 T U O I: A1J P M-DHR01 TUOI NUMBER:     ANO-1-JPM-RO-DHR01 INITIATING CUE:
The CRS directs that P34A be placed in service with DHR flow <3500 gpm and discharge pressure <400 psig, complete procedure through step 7.2.18.
The CRS directs that P34A be placed in service with DHR flow <3500 gpm and discharge pressure <400 psig, complete procedure through step 7.2.18.
INSTRUCTOR NOTE: Ensure B-5255, B-6255,and B-5651 are closed and Programmable Annunciator alarm for P34A (P1404) set at 400 psig.
INSTRUCTOR NOTE: Ensure B-5255, B-6255,and B-5651 are closed and Programmable Annunciator alarm for P34A (P1404) set at 400 psig.
CRITICAL ELEMENTS (C):
CRITICAL ELEMENTS (C):         1, 2, 5, 7, 8, 9, 10, 11, 12, 15 C           PERFORMANCE CHECKLIST                             STANDARDS           N/A SAT     UNSAT (C)     1. Close Decay Heat P-34A Suction from           CV-1436 red light off,    ____ ____      ____
1, 2, 5, 7, 8, 9, 10, 11, 12, 15 C PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT (C) 1. Close Decay Heat P-34A Suction from BWST (CV-1436).
BWST (CV-1436).                             green light on.
CV-1436 red light off, green light on.
(C)     2. Open Decay Heat P-34A Suction from           CV-1434 red light on,      ____ ____      ____
____  ____  ____  (C) 2. Open Decay Heat P-34A Suction from RCS (CV-1434).
RCS (CV-1434).                             green light off.
CV-1434 red light on, green light off.
: 3. Open E-35A and E-35B sample valves           Contacted the WCO and      ____ ____      ____
____  ____  ____  3. Open E-35A and E-35B sample valves SS-41A and SS-41B.
SS-41A and SS-41B.                         instructed the WCO to open SS-41A and SS-41B.
Contacted the WCO and instructed the WCO to open SS-41A and SS-41B. ____  ____  ____  NOTE: Inform examinee that Category "E" log entry has been made.  
NOTE: Inform examinee that Category E log entry has been made.
: 4. Verify white Open Permit light ON at CV-1410 handswitch on C16.
: 4. Verify white Open Permit light ON at         Verified white open permit ____ ____      ____
Verified white open permit light on.
CV-1410 handswitch on C16.                 light on.
____  ____  ____  (C) 5. Open CV-1410.
(C)     5. Open CV-1410.                                 Opened DH suction valve   ____ ____      ____
Opened DH suction valve CV-1410. ____  ____  ____  6. Verify white Open Permit light ON at CV-1050 handswitch on C18.
CV-1410.
Verified white open permit
: 6. Verify white Open Permit light ON at       Verified white open permit ____ ____      ____
CV-1050 handswitch on C18.                  light on.
C      7. Open DH Suction Valve CV-1050              Opened DH suction valve CV-1050.                  ____ ____      ____
C      8. Open DH suction RB isolation CV-          Opened CV-1404.
1404.                                                                ____ ____      ____
C      9. Close decay heat cooler E-35A              Closed CV-1428.
outlet valve CV-1428.                                                ____ ____      ____


light on.
Page 5 of 5 TUOI: A1JPM-DHR01 C          PERFORMANCE CHECKLIST                          STANDARDS            N/A SAT    UNSAT C    10. Position E-35A Cooler Bypass (CV-      Positioned CV-1433 to ~
____ ____ ____   C 7. Open DH Suction Valve CV-1050 Opened DH suction valve CV-1050. ____ ____ ____ C   8. Open DH suction RB isolation CV-1404. Opened CV-1404.
1433) to ~ 50% as indicated on HIC-    50% open.                 ____ ____   ____
____ ____ ____ C  9. Close decay heat cooler E-35A outlet valve CV-1428.
1433.
Closed CV-1428.
C
____ ____ ____
: 11. Open Decay Heat Block Valve CV-           Opened CV-1401.
Page 5 of 5 TUOI:  A1JPM-DHR01 C PERFORMANCE CHECKLIST STANDARDS N/A  SAT  UNSAT  C  10. Position E-35A Cooler Bypass (CV-1433) to ~ 50% as indicated on HIC-1433. Positioned CV-1433 to ~
1401                                                                ____ ____   ____
C
: 12. Start P-34A.                              Started P-34A.
: 13. Verify LPI/Decay Heat Pump Brg          On C-18, verified CV-CLR E-50A Inlet (CV-3840) and          3840 and CV-3822 open. ____ ____   ____
Decay HT CLR Service Water E-35A Inlet (CV-3822) open.
: 14. Monitor pressurizer level.             Monitored pressurizer      ____ ____   ____
level on C04 or SPDS.
C     15. Adjust CV-1433 to establish decay      Adjusted DHR flow to      ____ ____    ____
heat removal flow at < 3500 gpm        <3500 gpm and from P-34A and discharge pressure      discharge pressure < 400
                < 400 psig.                             psig using CV-1433.
NOTE: Inform examinee that it is not necessary to perform Part 2 of Supplement 3.
: 16. Verify LPI Room Cooler VUC-1A          At panel C-19, verified    ____ ____    ____
starts.                                VUC-1A started (red light on).
: 17. Adjust the DECAY HEAT VORTEX            Selected the U5 function  ____ ____    ____
WARNING SETPOINT.                      of the SPDS computer and set KP34ALO just below the Decay Heat Pump motor current and adjusted KP34AHI just above the Decay Heat Pump motor current.
END


50% open.
TUOI NUMBER:_ANO-1-JPM-RO-RPS02_                                          Page 1 of 5 JOB PERFORMANCE MEASURE UNIT: ______1_______    REV # ______4________  DATE: ______________________________
____  ____  ____  C  11. Open Decay Heat Block Valve CV-1401  Opened CV-1401.
TUOI NUMBER:_A1JPM-RO-RPS02           ______________
____  ____  ____  C  12. Start P-34A.
SYSTEM/DUTY AREA:_REACTOR PROTECTION SYSTEM________________________________________
Started P-34A.
TASK:_REMOVE A CHANNEL OF RPS FROM MANUAL BYPASS___________________________________
____  ____  ____  13. Verify LPI/Decay Heat Pump Brg CLR E-50A Inlet (CV-3840) and Decay HT CLR Service Water E-35A Inlet (CV-3822) open.
JTA#:_ANO1-RO-RPS-NORM-6___________________________
On C-18, verified CV-3840 and CV-3822 open.
KA VALUE RO:___3.6____ SRO:__3.6_____ KA  
____  ____  ____  14. Monitor pressurizer level.
Monitored pressurizer level on C04 or SPDS.
____  ____  ____  C  15. Adjust CV-1433 to establish decay heat removal flow at < 3500 gpm from P-34A and discharge pressure < 400 psig.
Adjusted DHR flow to <3500 gpm and discharge pressure < 400 psig using CV-1433.
____  ____  ____  NOTE:  Inform examinee that it is not necessary to perform Part 2 of Supplement 3.
: 16. Verify LPI Room Cooler VUC-1A starts. At panel C-19, verified VUC-1A started (red light on). ____  ____  ____  17. Adjust the DECAY HEAT VORTEX WARNING SETPOINT.
Selected the U5 function of the SPDS computer and set KP34ALO just below the Decay Heat Pump motor current and adjusted KP34AHI just above the Decay Heat Pump motor current.
____  ____  ____    END T U O I N U M BER:_A N O-1-JPM-R O-R PS 02_      Pag e  1 of 5 JOB PERFORMANCE MEASURE UNIT: ______
1_______ REV # ______
4________ DATE: ______________________________
TUOI NUMBER:_A1JPM-RO-RPS02 ______________
SYSTEM/DUTY AREA:_
REACTOR PROTECTION SYSTEM
________________________________________
TASK:_REMOVE A CHANNEL OF RPS FROM MANUAL BYPASS
___________________________________
JTA#:_ANO1-RO-RPS-NORM-6
___________________________
KA VALUE RO:___
3.6____ SRO:__
3.6_____ KA  


==REFERENCE:==
==REFERENCE:==
__
__012 A4.03_________________
012 A4.03_________________
APPROVED FOR ADMINISTRATION TO:   RO:____X___ SRO:___ X ___
APPROVED FOR ADMINISTRATION TO: RO:____
TASK LOCATION:  INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________
X___ SRO:___
X ___ TASK LOCATION:  INSIDE CR:____
X____ OUTSIDE CR:_________ BOTH:________
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:_______________ SIMULATOR:___
PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________
PERFORM_______ LAB:__________________
POSITION EVALUATED:   RO:__________   SRO:___________
POSITION EVALUATED: RO:__________ SRO:___________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
TESTING METHOD: SIMULATE:_________ PERFORM:___________
TESTING METHOD: SIMULATE:_________   PERFORM:___________
APPROXIMATE COMPLETION TIME IN MINUTES
APPROXIMATE COMPLETION TIME IN MINUTES:___   15 MINUTES______________________________
:___ 15 MINUTES
REFERENCE(S):__1105.001                       ______________________________________
______________________________
EXAMINEE'S NAME:________________________________         SSN ______-_____-____________
REFERENCE(S):__1105.001
______________________________________
______________________________________________________________________
EXAMINEE'S NAME:________________________________ SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________ UNSATISFACTORY:_________________
SATISFACTORY:________________         UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
____________ Start Time           ____________ Stop Time       ____________ Total Time SIGNED ________________________________ DATE: _______________________
___________________________________________________________________________________
___________________________________________________________________________________
____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
T U O I N U M BER:_A N O-1-JPM-R O-R PS 02_      Pag e  2 of 5 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
 
TUOI NUMBER:_ANO-1-JPM-RO-RPS02_                                        Page 2 of 5 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:_
JPM INITIAL TASK CONDITIONS:_The plant is operating at 100% power with ICS in auto-_
The plant is operating at 100% power with ICS in auto-
_matic. The A RPS channel is in manual bypass for maintenance. The maintenance____
_matic. The "A" RPS channel is in manual bypass for maintenance. The maintenance
_has been completed.________________________________________________________________
____  _has been completed.
TASK STANDARD:_The A RPS channel is removed from manual bypass.___________________
________________________________________________________________
TASK PERFORMANCE AIDS:_Manual bypass key, 1105.001_________________________________
TASK STANDARD:_
SIMULATOR SETUP: Power operations, place A RPS in manual bypass, select SASS Neutron Flux selector to the Y position.
The "A" RPS channel is removed from manual bypass.
 
___________________
TUOI NUMBER:_ANO-1-JPM-RO-RPS02_                                        Page 3 of 5 TUOI NUMBER:_ANO-1-JPM-RO-RPS02_
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
TASK PERFORMANCE AIDS:_
Manual bypass key, 1105.001_________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
SIMULATOR SETUP: Power operations, place "A" RPS in manual bypass, select SASS Neutron Flux selector to the "Y" position.
T U O I N U M BER:_A N O-1-JPM-R O-R PS 02_      Pag e  3 of 5 TUOI NUMBER:_
ANO-1-JPM-RO-RPS02_
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs you to remove the "A" RPS channel from manual bypass per section 11.0 of 1105.001, NI & RPS Operating Procedure.
The SM/CRS directs you to remove the A RPS channel from manual bypass per section 11.0 of 1105.001, NI & RPS Operating Procedure.
CRITICAL ELEMENTS (C):__
CRITICAL ELEMENTS (C):__2__
2__  (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT NOTE: Due to the uniqueness of the design in the simulator, all channel indications are located in one RPS cabinet.
(C)       PERFORMANCE CHECKLIST                 STANDARD           N/A     SAT     UNSAT NOTE: Due to the uniqueness of the design in the simulator, all channel indications are located in one RPS cabinet.
: 1. Verify "A" RPS channel is reset. Inside the RPS cabinet in the back of the control room: a) Verified all test modules are in "operate" with the On Test lamps ON dim.
: 1. Verify A RPS channel is   Inside the RPS cabinet in reset.                      the back of the control room:
b) Depressed and released the Output State and Output Memory Reset switches for all bistables with Output State and/or Output Memory lamps ON bright.
a) Verified all test modules are in operate with the On Test lamps ON dim.
c) Verified the Building  
b) Depressed and released the Output State and Output Memory Reset switches for all bistables with Output State and/or Output Memory   _____    _____    _____
 
lamps ON bright.
Pressure contact buffer is reset (both Input State lamps OFF).
c) Verified the Building Pressure contact buffer is reset (both Input State lamps OFF).
d) On the Channel A Reactor  
d) On the Channel A Reactor Trip Module, placed Subsystem Reset switch to down position.
 
e) Verified the Subsystem No. 1 lamps ON dim for Reactor Trip modules and Cabinet Indicating Panels on all RPS Channels.
Trip Module, placed Subsystem Reset switch to down position.
(C)   2. Turn Manual Bypass key     On the Reactor Trip Module switch out of bypass        in A RPS, turned keyswitch _____    _____    _____
e) Verified the Subsystem  
position.                  out of bypass position.
 
No. 1 lamps ON dim for Reactor Trip modules and Cabinet Indicating Panels on all RPS Channels.
_____            _____              _____ (C) 2. Turn Manual Bypass key switch out of bypass
 
position.
On the Reactor Trip Module in "A" RPS, turned keyswitch out of bypass position.
Reactor Trip Module did NOT trip (verifies previous step properly performed).
Reactor Trip Module did NOT trip (verifies previous step properly performed).
_____  _____  _____  3. Verify Manual Bypass lamps ON dim. On the Reactor Trip module and indicating panel, verified the Manual Bypass lamps are ON dim.
: 3. Verify Manual Bypass lamps On the Reactor Trip module ON dim.                    and indicating panel, verified the Manual Bypass   _____   _____    _____
_____   _____    _____
lamps are ON dim.
T U O I N U M BER:_A N O-1-JPM-R O-R PS 02_      Pag e  4 of 5 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT  4. Verify annunciator K08-D3 clear. Verified that annunciator K08-D3 RPS CHANNEL BYPASSED is clear.
_____  _____  _____  5. Verify "A" EFIC channel Maintenance Bypass light


ON solid.
TUOI NUMBER:_ANO-1-JPM-RO-RPS02_                                      Page 4 of 5 (C)      PERFORMANCE CHECKLIST              STANDARD            N/A      SAT    UNSAT
Verified "A" EFIC channel Maintenance Bypass light ON solid on the upper right of the "A" EFIC cabinet.
: 4. Verify annunciator K08-D3  Verified that annunciator clear.                    K08-D3 RPS CHANNEL BYPASSED  _____    _____    _____
_____  _____    _____  6. Remove Manual Bypass key from Reactor Trip module and return to Shift Mgr.
is clear.
Removed Manual Bypass key from Reactor Trip module and returned to Shift Mgr.
: 5. Verify A EFIC channel    Verified A EFIC channel Maintenance Bypass light  Maintenance Bypass light ON ON solid.                  solid on the upper right of _____    _____    _____
_____  _____  _____  7. Verify <1% difference between NI-5/NI-6 high and  
the A EFIC cabinet.
: 6. Remove Manual Bypass key  Removed Manual Bypass key from Reactor Trip module  from Reactor Trip module and _____    _____    _____
and return to Shift Mgr. returned to Shift Mgr.
: 7. Verify <1% difference     Used panel readings on C03 between NI-5/NI-6 high and or plant computer points NI-7/NI-8 high.            N1I56HI and N1I78HI to      _____    _____    _____
determine the difference between the highest of NI5/NI6 is <1% different from the highest of NI7/NI8.
: 8. Return the SASS Neutron    On C03, the SASS Neutron Flux selector switch to    Flux switch is placed in the SASS Enable.              SASS Enable position after  _____    _____    _____
the signals (N1I56HI and N1I78HI) had been compared.
END


NI-7/NI-8 high.
TUOI NUMBER:_ANO-1-JPM-RO-RPS02_                                                   Page 5 of 5 EXAMINEES COPY INITIAL CONDITIONS:
Used panel readings on C03 or plant computer points N1I56HI and N1I78HI to determine the difference between the highest of NI5/NI6 is <1% different from the highest of NI7/NI8.
* The plant is operating at 100% power with ICS in automatic.
_____  _____    _____  8. Return the SASS Neutron Flux selector switch to
* The A RPS channel is in manual bypass for maintenance.
 
* The maintenance has been completed.
SASS Enable.
On C03, the SASS Neutron Flux switch is placed in the SASS Enable position after the signals (N1I56HI and N1I78HI) had been compared.
_____  _____    _____  END TUOI NUMBER:_ANO-1-JPM-RO-RPS02_       Page 5 of 5 EXAMINEE'S COPY INITIAL CONDITIONS:
The plant is operating at 100% power with ICS in automatic. The "A" RPS channel is in manual bypass for maintenance. The maintenance has been completed.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs you to remove the "A" R PS channel from manual by pass per section 11.0 of 1105.001, NI & RPS Operating Procedure.  
The SM/CRS directs you to remove the A RPS channel from manual bypass per section 11.0 of 1105.001, NI & RPS Operating Procedure.


T UOI NUMB E R: Page 1 of 6 A1JPM-RO-EOP11 JOB PERFORMANCE MEASURE Unit: 1 Rev # 1 Date:   TUOI NUMBER:
TUOI NUMBER:                                                                                                             Page 1 of 6 A1JPM-RO-EOP11 JOB PERFORMANCE MEASURE Unit:               1             Rev #                         1                         Date:
A1JPM-RO- EOP11 System/Duty Area:
TUOI NUMBER:           A1JPM-RO- EOP11 System/Duty Area:       Emergency and Abnormal Operations Task:     Perform Actions during ESAS Actuation to swap ECCS suction to RB sump (ALTERNATE PATH JPM)
Emergency and Abnormal Operations Task: Perform Actions during ESAS Actuation to swap ECCS suction to RB sump (ALTERNATE PATH JPM)
JA#       ANO1-RO-KA Value RO       4.0       SRO     3.8     KA Reference       006.A4.02 Approved For Administration To: RO                               SRO Task Location: Inside CR:                           Outside CR:                       Both:
JA# ANO1-RO- KA Value RO 4.0 SRO 3.8 KA Reference 006.A4.02 Approved For Administration To: RO SRO   Task Location: Inside CR:
Suggested Testing Environment And Method (Perform Or Simulate):
Outside CR: Both:   Suggested Testing Environment And Method (Perform Or Simulate):
Plant Site:                     Simulator:           Perform       X             Lab:
Plant Site:
Position Evaluated: RO:                       X                               SRO:                     X Actual Testing Environment: Simulator:                             Plant Site:                     Lab Testing Method: Simulate:                                                 Perform:
Simulator: Perform       X Lab:       Position Evaluated: RO:
Approximate Completion Time In Minutes:                                         20 Minutes Reference(S):
X SRO: X Actual Testing Environment: Simulator:
Examinee's Name:                                                                     SSN:
Plant Site:
Evaluator's Name:
Lab   Testing Method: Simulate:
Perform:   Approximate Completion Time In Minutes: 20 Minutes Reference(S):
Examinee's Name:
SSN:   Evaluator's Name:
The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:
The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:
Satisfactory:
Satisfactory:                                       Unsatisfactory:
Unsatisfactory:
Performance Checklist Comments:
Performance Checklist Comments:
Start Time Stop Time Total Time Signed Date:   Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
Start Time                                   Stop Time                                       Total Time Signed                                                               Date:
T UOI NUMB E R: Page 2 of 6 A1JPM-RO-EOP11 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
 
TUOI NUMBER:                                                                               Page 2 of 6 A1JPM-RO-EOP11 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
ESAS has actuated due to a LOCA. RCS pressure is 50 psig. All unnecessary people have been evacuated from the Aux Building. Aux Spray has been aligned from LPI system. BWST level is at ~ 6 feet, BWST LO and LO LO annunciators are in alarm.
ESAS has actuated due to a LOCA. RCS pressure is &#xa3; 50 psig. All unnecessary people have been evacuated from the Aux Building. Aux Spray has been aligned from LPI system. BWST level is at ~
6 feet, BWST LO and LO LO annunciators are in alarm.
TASK STANDARD:
TASK STANDARD:
LPI and RB Spray pumps operating with their suctions aligned to the RB sump and BWST outlet valves closed (i.e. CV-1405/1406 open AND CV-1407/1408 closed).
LPI and RB Spray pumps operating with their suctions aligned to the RB sump and BWST outlet valves closed (i.e. CV-1405/1406 open AND CV-1407/1408 closed).
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
RT15 from 1202.012, change 004-02-0.
RT15 from 1202.012, change 004-02-0.
SIMULATOR SETUP: IC2, then insert large RCS leak so that full ESAS actuation occurs. Trip all RCPs and go to reflux boiling setpoint for EFW. Close CV-1000 and CV-1009. Close CV-2415 and CV-2419 (CFT Outlets).Secure HPI pumps, close all HPI block valves, close CV-1206. Secure EFW-- P-7B in P-T-L, close CV-2613/CV-2663 in manual, close MFIVs and MSIVs. Throttle RB Spray to 1050-1200 gpm. Fail CV-1405 closed.  
SIMULATOR SETUP:
IC2, then insert large RCS leak so that full ESAS actuation occurs. Trip all RCPs and go to reflux boiling setpoint for EFW. Close CV-1000 and CV-1009. Close CV-2415 and CV-2419 (CFT Outlets).Secure HPI pumps, close all HPI block valves, close CV-1206. Secure EFW-- P-7B in P-T-L, close CV-2613/CV-2663 in manual, close MFIVs and MSIVs. Throttle RB Spray to 1050-1200 gpm. Fail CV-1405 closed.


T UOI NUMB E R: Page 3 of 6 A1JPM-RO-EOP11 INITIATING CUE: The CRS/SM directs you to shift to RB sump suction using RT-15.
TUOI NUMBER:                                                                                         Page 3 of 6 A1JPM-RO-EOP11 INITIATING CUE: The CRS/SM directs you to shift to RB sump suction using RT-15.
CRITICAL ELEMENTS (c):
CRITICAL ELEMENTS (c): 9, 10, 11, 12 C                 PERFORMANCE CHECKLIST                             STANDARD                 N/A SAT     UN SAT
9, 10, 11, 12 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT   1. Verify both LPI pumps running (P34A and B).
: 1. Verify both LPI pumps running (P34A and B).       On C16 and C18, operator           ____ ____    ___
On C16 and C18, operator verifies RED lights ON and GREEN lights OFF for both P34A and P34B.
verifies RED lights ON and                         _
____  ____  ____    2. Verify LPI Room Coolers running: VUC1A or VUC1B AND VUC1C or VUC1D.
GREEN lights OFF for both P34A and P34B.
On C19, operator verifies RED lights ON and GREEN lights OFF for VU1CA and VU1CC.
: 2. Verify LPI Room Coolers running: VUC1A or         On C19, operator verifies RED      ____ ____    ___
____  ____  ____    3. Verify both LPI Block valves fully open (CV-1400           and CV-1401).
VUC1B AND VUC1C or VUC1D.                       lights ON and GREEN lights OFF                     _
On C16 and C18, operator verifies valves are open with RED lights ON and GREEN lights OFF for CV-1400 and CV-1401.
for VU1CA and VU1CC.
____  ____  ____    4. Verify Letdown isolated by CV-1221 closed on C16 or CV-1214/CV-1216 closed on C18.
: 3. Verify both LPI Block valves fully open (CV-1400 On C16 and C18, operator            ____ ____    ___
On C-16, operator verifies letdown isolated by observing CV-1221 closed with the GREEN light ON and RED light OFF   
and CV-1401).                                   verifies valves are open with RED                 _
lights ON and GREEN lights OFF for CV-1400 and CV-1401.
: 4. Verify Letdown isolated by CV-1221 closed on C16 On C-16, operator verifies          ____ ____    ___
or CV-1214/CV-1216 closed on C18.               letdown isolated by observing CV-                  _
1221 closed with the GREEN light ON and RED light OFF or on C-18, operator verifies letdown isolated by observing CV-1214/CV-1216 closed with the GREEN lights ON and RED lights OFF.
: 5. Verify both Decay Heat Supply to Makeup Pump      Operator Opens CV1276 and CV-Suctions open (CV-1276 and CV-1277).              1277 on panels C16 and C18 and observes Red lights ON, green      ____ ____    ___
NOTE: valves will be shut when examinee gets to      lights OFF.                                        _
this step, after examinee goes to open on these valves give the POSITIVE CUE.
Operator verifies that RB Spray
: 6. Verify RB Spray flow throttled to maintain 1050- flow is throttled to maintain 1050-1200 gpm per train (as indicated    ____ ____    ___
1200 gpm per train.                              on SPDS, C16/C18 or recorder                      _
on C14, approximately 1150 gpm indicated flow on each train)


or  on C-18, operator verifies letdown isolated by observing CV-1214/CV-1216 closed with the GREEN lights ON and RED lights  
TUOI NUMBER:                                                                                          Page 4 of 6 A1JPM-RO-EOP11 C                PERFORMANCE CHECKLIST                                  STANDARD                N/A SAT      UN SAT
: 7. If NaOH Tank T10 level is &#xa3;25 ft, THEN close RB      Operator Closes CV-1616 and spray NaOH Addition T-10 Outlets (CV-1616 and      CV-1617 IF T-10 level is &#xa3;25 ft CV-1617).                                          and observes GREEN lights ON and RED lights OFF.
NOTE: if this JPM is being simulated, tell examinee that T10 level is 20 ft then give POSITIVE CUE after examinee goes to close on the valves.
: 8. Verify RB Sump Outlets open (CV-1414 and CV          On C16 and C18, operator 1415).                                            verifies CV-1414 and CV-1415 open with RED lights ON and GREEN lights OFF.
NOTE: This is the alternate path portion of the JPM. The RB sump outlet valve CV-1405 will fail to open.
: 9. Open RB Sump Outlets (CV-1405 and CV-1406).          On panel C16 operator attempts C                                                          to open CV-1405 (it will not open) and observes the GREEN light ON and RED light OFF for it.
On panel C18, operator opens CV-1406 and observes RED light ON and GREEN light OFF for it.
See note: This is the Alternate Path step for the JPM
: 10. Stop associated LPI, HPI, and RB Spray pumps,      On C-16 and C-18, operator C                                                          secures LPI pump P-34A AND which includes:                                                                      ____ ____    ___
secures RB Spray pump P-35A.
RB Spray pump P-35A                              (HPI is already secured) and                      _
LPI pump P-34A                                    observes GREEN lights ON and RED lights OFF.
C  11. Take manual control of BWST outlets CV-1407        On C16 and C18, operator and CV-1408.                                    depresses the manual pushbutton    ____ ____    ___
on each of two AUTO/MANUAL                        _
pushbuttons for CV-1407 and CV-1408 in MANUAL and observes WHITE light ON and RED light OFF for each.
C  12. Close BWST Outlets (CV-1407 and CV-1408).          On C16 and C18, operator verifies GREEN lights ON and RED lights OFF for closed valves CV-1407 and CV-1408.


OFF. ____  ____  ____  5. Verify both Decay Heat Supply to Makeup Pump Suctions open (CV-1276 and CV-1277).
TUOI NUMBER:                                                                                              Page 5 of 6 A1JPM-RO-EOP11 C                PERFORMANCE CHECKLIST                                      STANDARD              N/A SAT    UN SAT
NOTE: valves will be shut when examinee gets to this step, after examinee goes to open on these valves give the POSITIVE CUE.
: 13. Check LPI/RB Spray flow is maintained.                   Checked proper LPI/RB Spray flow is being maintained by observing SPDS or meters on C16/C18 or recorder on C14 with values for spray @ 1100 gpm, LPI
Operator Opens CV1276 and CV-1277 on panels C16 and C18 and observes Red lights ON, green lights OFF.
                                                                  @ 3000 gpm.
____  ____  ____    6. Verify RB Spray flow throttled to maintain 1050-        1200 gpm per train.
: 14. Notify HP to monitor BWST suction line for              Notified Health Physics.
Operator verifies that RB Spray flow is throttled to maintain 1050-1200 gpm per train (as indicated on SPDS, C16/C18 or recorder on C14, approximately 1150 gpm indicated flow on each train)
indication of back-leakage from LPI suction.
____  ____  ____
POSITIVE CUE:
T UOI NUMB E R: Page 4 of 6  A1JPM-RO-EOP11 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT    7. If NaOH Tank T10 level is 25 ft, THEN close RB  spray NaOH Addition T-10 Outlets (CV-1616 and CV-1617).
HP has been notified.
NOTE: if this JPM is being simulated, tell examinee         that T10 level is 20 ft then give POSITIVE CUE after        examinee goes to close on the valves.
Instructor Note: INFORM EXAMINEE THAT MAKEUP TANK LEVEL IS STEADY AT 50 INCHES.
Operator Closes CV-1616 and CV-1617 IF T-10 level is 25 ft and observes GREEN lights ON and RED lights OFF.
: 15. IF NaOH Tank T10 Level >25 ft, THEN open CV-          Opened CV-1616 and CV-1617 IF 1616 and CV-1617.                                    T10 level >25 ft.
: 8. Verify RB Sump Outlets open (CV-1414 and CV 1415).          On C16 and C18, operator verifies CV-1414 and CV-1415 open with RED lights ON and GREEN lights OFF.
NOTE: If being simulated tell examinee that T10 level is 20 ft which will make this step (14 and 14.a) N/A.
NOTE:  This is the alternate path portion of the JPM. The RB sump outlet valve CV-1405 will fail to open.
a) WHEN T10 level is 11-25 ft, THEN close CV-1616            a) Closed CV-1616 and CV-1617 and CV-1617.                                                 after T10 level is in range of 11-25 ft.
C  9. Open RB Sump Outlets (CV-1405 and CV-1406).
INFORM EXAMINEE THAT RB LEVELS HAVE STABILIZED AND BWST REFILL HAS BEEN INITIATED.
On panel C16 operator attempts to open CV-1405 (it will not open)  and observes the GREEN light ON and RED light OFF for it.
INSTRUCTOR CUE: This concludes the JPM.
On panel C18, operator opens CV-1406 and observes RED light ON and GREEN light OFF for it.
END
See note: This is the Alternate Path step for  the JPM C  10. Stop associated LPI, HPI, and RB Spray pumps,          which includes:        RB Spray pump P-35A        LPI pump P-34A On C-16 and C-18, operator secures LPI pump P-34A AND secures RB Spray pump P-35A.
(HPI is already secured) and observes GREEN lights ON and RED lights OFF.
____  ____  ____  C  11. Take manual control of BWST outlets CV-1407 and CV-1408.
On C16 and C18, operator depresses the manual pushbutton on each of two AUTO/MANUAL pushbuttons for CV-1407 and CV-1408 in MANUAL and observes WHITE light ON and RED light OFF for each.
____  ____  ____  C  12. Close BWST Outlets (CV-1407 and CV-1408).
On C16 and C18, operator verifies GREEN lights ON and RED lights OFF for closed valves CV-1407 and CV-1408.


T UOI NUMB E R: Page 5 of 6  A1JPM-RO-EOP11 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT  13. Check LPI/RB Spray flow is maintained.
TUOI NUMBER:                                                                         Page 6 of 6 A1JPM-RO-EOP11 EXAMINEES COPY INITIAL CONDITIONS:
Checked proper LPI/RB Spray flow is being maintained by observing SPDS or meters on C16/C18 or recorder on C14 with values for spray @ 1100 gpm, LPI
ESAS has actuated due to a LOCA. RCS pressure is &#xa3; 50 psig. All unnecessary people have been evacuated from the Aux Building. Aux Spray has been aligned from LPI system. BWST level is at ~ 6 feet, BWST LO and LO LO annunciators are in alarm.
@ 3000 gpm.
: 14. Notify HP to monitor BWST suction line for indication of back-leakage from LPI suction.
POSITIVE CUE
:        HP has been notified.
Notified Health Physics.
Instructor Note: INFORM EXAMINEE THAT MAKEUP TANK LEVEL IS STEADY AT 50 INCHES.
: 15. IF NaOH Tank T10 Level >25 ft, THEN open CV-1616 and CV-1617.
NOTE: If being simulated tell examinee that T10                      level is 20 ft which will make this step (14                        and 14.a) N/A.
a) WHEN T10 level is 11-25 ft, THEN close CV-1616 and CV-1617.
Opened CV-1616 and CV-1617 IF T10 level >25 ft.
a) Closed CV-1616 and CV-1617 after T10 level is in range of 11-25 ft.      INFORM EXAMINEE THAT RB LEVELS HAVE STABILIZED AND BWST REFILL HAS BEEN INITIATED.
INSTRUCTOR CUE:  This concludes the JPM.
END T UOI NUMB E R: Page 6 of 6 A1JPM-RO-EOP11 EXAMINEE'S COPY INITIAL CONDITIONS:
ESAS has actuated due to a LOCA. RCS pressure is 50 psig. All unnecessary people have been evacuated from the Aux Building. Aux Spray has been aligned from LPI system. BWST level is at ~ 6 feet, BWST LO and LO LO annunciators are in alarm.
INITIATING CUE:
INITIATING CUE:
The CRS/SM directs you to shift to RB sump suction using RT-15.
The CRS/SM directs you to shift to RB sump suction using RT-15.


P R OC./W O RK P L A N NO.
PROC./WORK PLAN N
1202.012 P R OCEDURE/W O RK P L A N T I T L E:                                                                         Page 28 of 30 RE PE T I T I VE T A SKS C
 
H A N G E: 004-02-0 T UOI NUMB E R:_A 1 J P M-R O-EDG0 4          P a g e  1 of 5 JOB PERFORMANCE MEASURE UNIT: ______
==O. PROCEDURE==
1_______ REV # ______
/WORK PLAN TITLE:   Page 28 of 30 1202.012              REPETITIVE TASKS  CHANGE: 004-02-0
1_______ DATE: ______________________________
 
TUOI NUMBER:_A1JPM-RO-EDG04__ ___________
TUOI NUMBER:_A1JPM-RO-EDG04                                              Page 1 of 5 JOB PERFORMANCE MEASURE UNIT: ______1_______    REV # ______1_______  DATE: ______________________________
SYSTEM/DUTY AREA:_
TUOI NUMBER:_A1JPM-RO-EDG04__             ___________
EMERGENCY DIESEL GENERATOR (EDG) SYSTEM
SYSTEM/DUTY AREA:_EMERGENCY DIESEL GENERATOR (EDG) SYSTEM__________________________
__________________________
TASK:_LOAD EDG1____________________________________________________________________
TASK:_LOAD EDG1____________________________________________________________________
JTA#:_ANO1-RO-EDG-NORM-10
JTA#:_ANO1-RO-EDG-NORM-10___________________________
___________________________
KA VALUE RO:__3.4_____ SRO:__3.4_____ KA  
KA VALUE RO:__
3.4_____ SRO:__
3.4_____ KA  


==REFERENCE:==
==REFERENCE:==
__
__064 A4.07_________________
064 A4.07_________________
APPROVED FOR ADMINISTRATION TO:   RO:____X___ SRO:___ X ___
APPROVED FOR ADMINISTRATION TO: RO:____
TASK LOCATION:   INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________
X___ SRO:___
X ___ TASK LOCATION: INSIDE CR:____
X____ OUTSIDE CR:_________ BOTH:________
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:_______________ SIMULATOR:___
PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________
PERFORM_______ LAB:__________________
POSITION EVALUATED:   RO:__________ SRO:___________
POSITION EVALUATED: RO:__________ SRO:___________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
TESTING METHOD: SIMULATE:_________ PERFORM:___________
TESTING METHOD: SIMULATE:_________   PERFORM:___________
APPROXIMATE COMPLETION TIME IN MINUTES
APPROXIMATE COMPLETION TIME IN MINUTES:___ 15 MINUTES______________________________
:___ 15 MINUTES
REFERENCE(S):_1104.036                                     ________________________
______________________________
EXAMINEE'S NAME:________________________________       SSN ______-_____-____________
REFERENCE(S):_
1104.036
________________________
______________________________________________________________________
EXAMINEE'S NAME:________________________________ SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________ UNSATISFACTORY:_________________
SATISFACTORY:________________       UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
____________ Start Time         ____________ Stop Time     ____________ Total Time SIGNED ________________________________ DATE: _______________________
___________________________________________________________________________________
___________________________________________________________________________________
____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
T UOI NUMB E R:_A 1 J P M-R O-EDG0 4          P a g e  2 of 5   THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
 
TUOI NUMBER:_A1JPM-RO-EDG04                                            Page 2 of 5 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:_
JPM INITIAL TASK CONDITIONS:_EDG1 is running with its output breaker open and its___
EDG1 is running with its output breaker open and its___
_service water inlet valve (CV-3806) open._ ________________________________________
_service water inlet valve (CV-3806) open._ ________________________________________
____________________________________________________________________________________
TASK STANDARD:_EDG1 tripped by examinee after its load increases without operator __
TASK STANDARD:_
_control._This is an Alternate Success Path JPM.__________________________   ________
EDG1 tripped by examinee after its load increases without operator __
TASK PERFORMANCE AIDS:__1104.036 Section 7.0                     ___________________
_control._This is an Alternate Success Path JPM.__________________________ ________
NOTE: When the EDG1 output breaker is closed, insert override DI CS3-DG1_RO2; true and CS3-DG1_W02; false which will fail the governor handswitch in the raise position; this will cause the EDG load to rise without control.
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
TASK PERFORMANCE AIDS:__1104.036 Section 7.0   ___________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
NOTE: When the EDG1 output breaker is closed, insert override DI CS3-DG1_RO2; true and CS3-DG1_W02; false which will fail the governor handswitch in the raise  


position; this will cause the EDG load to rise without control.
TUOI NUMBER:_A1JPM-RO-EDG04                                              Page 3 of 5 INITIATING CUE:
T UOI NUMB E R:_A 1 J P M-R O-EDG0 4          P a g e  3 of 5 INITIATING CUE:
The SM/CRS directs you to parallel EDG1 to the grid and load EDG1 to ~2750 KW per 1104.036 Step 7.10.
The SM/CRS directs you to parallel EDG1 to the grid and load EDG1 to ~2750 KW per 1104.036 Step 7.10.
CRITICAL ELEMENTS (C):
CRITICAL ELEMENTS (C):_2, 6, 7 (C)       PERFORMANCE CHECKLIST                 STANDARD           N/A     SAT     UNSAT
_2, 6, 7   (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT 1. Inform dispatcher that EDG1 will be loaded and inquire about weather.
: 1. Inform dispatcher that     Called the dispatcher, EDG1 will be loaded and   informed him/her that EDG1 inquire about weather. is ready for loading and       ____    ____      ____
Called the dispatcher, informed him/her that EDG1 is ready for loading and asked about proper weather conditions.
asked about proper weather conditions.
____    ____    ____  (C) 2. Turn on synchronize switch for EDG1 output  
(C)   2. Turn on synchronize       On C10, placed synchronize switch for EDG1 output    switch for A-308 to ON        ____    ____      ____
breaker A-308.            position.
: 3. Verify voltage control. Verified voltage control by raising and/or lowering voltage using the EDG1        ____    ____      ____
voltage regulator control switch on C10.
: 4. Verify frequency control. Verified frequency control by raising and/or lowering frequency by using the EDG1    ____    ____      ____
governor control switch on C10.
: 5. Match running and          On C10, matched running and incoming voltages.        incoming voltages by adjusting EDG1 voltage regulator.                    ____    ____      ____
NOTE: Voltages may be verified matched on C10 or SPDS or on plant computer.
(C)  6. Adjust EDG1 frequency. On C10, adjusted EDG1 governor control to achieve
                                    ~60 hz with synchroscope      ____    ____      ____
rotating slowly in the FAST direction.
NOTE: IA Operator  When the EDG1 output breaker is closed, insert override DI CS3-DG1_RO2; true and DI CS3-DG1_W02; false which will fail the governor handswitch in the raise position, this will cause the EDG load to rise without control.


breaker A-308.
TUOI NUMBER:_A1JPM-RO-EDG04                                        Page 4 of 5 (C)      PERFORMANCE CHECKLIST              STANDARD        N/A     SAT    UNSAT (C)  7. As synchroscope          Closed EDG1 output breaker approaches 12 oclock    A-308.                     ____   ____     ____
On C10, placed synchronize switch for A-308 to ON position.
position (~5 min. til) close EDG1 output breaker A-308.
____   ____   ____   3. Verify voltage control.
(C)   8. Operator identifies      On C10, tripped EDG1.
Verified voltage control by raising and/or lowering voltage using the EDG1 voltage regulator control switch on C10.
increasing load and trips                            ____    ____     ____
____    ____    ____   4. Verify frequency control.
the EDG.
Verified frequency control by raising and/or lowering frequency by using the EDG1 governor control switch on C10. ____    ____   ____   5. Match running and incoming voltages.
END
On C10, matched running and incoming voltages by adjusting EDG1 voltage regulator.
NOTE: Voltages may be


verified matched on C10 or SPDS or on plant computer.
TUOI NUMBER:_A1JPM-RO-EDG04                                                             Page 5 of 5 EXAMINEES COPY INITIAL CONDITIONS:
____    ____    ____  (C)  6. Adjust EDG1 frequency.
EDG1 is running with its output breaker open and its service water inlet valve (CV-3806) open.
On C10, adjusted EDG1 governor control to achieve
~60 hz with synchroscope rotating slowly in the FAST direction.
____    ____    ____  NOTE: IA Operator When the EDG1 output breaker is closed, insert override DI CS3-DG1_RO2; true and DI CS3-DG1_W02; false which will fail the governor handswitch in the raise position, this will cause the EDG load to rise without control.
 
T UOI NUMB E R:_A 1 J P M-R O-EDG0 4          P a g e  4 of 5 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT (C)  7. As synchroscope approaches 12 o'clock position (~5 min. 'til) close EDG1 output breaker A-308. Closed EDG1 output breaker A-308. ____  ____  ____  (C)  8. Operator identifies increasing load and trips the EDG. On C10, tripped EDG1.
____  ____  ____  END TUOI NUMBER:_A1JPM-RO-EDG04         Page 5 of 5 EXAMINEE'S COPY INITIAL CONDITIONS:
EDG1 is running with its output breaker open and its service water in let valve (CV-3806) open.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs you to parallel EDG1 to the grid and load EDG1 to ~2750 KW per 1104.036 Step 7.10.
The SM/CRS directs you to parallel EDG1 to the grid and load EDG1 to ~2750 KW per 1104.036 Step 7.10.
JO B PERFO R M A NCE M E A S URE  T U O I: A1J P M-RO-E D030  Page 1 of 5   UNIT: 1 REV # 0 DATE: ______________________________
 
TUOI NUMBER: A1JPM-RO-ED030 SYSTEM/DUTY AREA: BATTERY AND 125V DC DISTRIBUTION TASK: PLACE BATTERY CHARGER D-03B IN SERVICE JTA#: ANO1-AO-125DC-NORM-12 KA VALUE RO: 3.9 SRO: 3.4   KA  
JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-ED030                                                                Page 1 of 5 UNIT: 1               REV # 0             DATE: ______________________________
TUOI NUMBER: A1JPM-RO-ED030 SYSTEM/DUTY AREA: BATTERY AND 125V DC DISTRIBUTION TASK: PLACE BATTERY CHARGER D-03B IN SERVICE JTA#: ANO1-AO-125DC-NORM-12 KA VALUE RO:       3.9     SRO:     3.4     KA  


==REFERENCE:==
==REFERENCE:==
2.1.30 APPROVED FOR ADMINISTRATION TO: RO:     X   SRO: X   TASK LOCATION: INSIDE CR: X OUTSIDE CR:_________ BOTH:________
2.1.30 APPROVED FOR ADMINISTRATION TO: RO:         X           SRO:   X TASK LOCATION: INSIDE CR:         X       OUTSIDE CR:_________ BOTH:________
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:____
PLANT SITE:____ X_____SIMULATOR:                         LAB:_________________
X_____SIMULATOR:   LAB:_________________
POSITION EVALUATED: RO:         X                 SRO:     X ACTUAL TESTING ENVIRONMENT: SIMULATOR:                 PLANT SITE:__________ LAB:________
POSITION EVALUATED: RO: X SRO: X   ACTUAL TESTING ENVIRONMENT: SIMULATOR:   PLANT SITE:__________ LAB:________
TESTING METHOD: SIMULATE:___X______       PERFORM:___________
TESTING METHOD: SIMULATE:___X______ PERFORM:___________
APPROXIMATE COMPLETION TIME IN MINUTES:           20 MINUTES REFERENCE(S): 1107.004 EXAMINEE'S NAME:________________________________       SSN ______-_____-____________
APPROXIMATE COMPLETION TIME IN MINUTES:   20 MINUTES REFERENCE(S): 1107.004
______________________________________________________________________
EXAMINEE'S NAME:________________________________ SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________ UNSATISFACTORY:_________________
SATISFACTORY:________________               UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
____________ Start Time       ____________ Stop Time       ____________ Total Time SIGNED ________________________________ DATE: _______________________
___________________________________________________________________________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
___________________________________________________________________________________
 
____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________
JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-ED030                                                          Page 2 of 5 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
    &sect;  Battery Charger D-03A is in service on Bus D01.
JO B PERFO R M A NCE M E A S URE  T U O I: A1J P M-RO-E D030  Page 2 of 5 EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS
Battery Charger D-03A is in service on Bus D01.
INITIATING CUE:
INITIATING CUE:
The Shift Manager requests you to place Battery Charger D-03B in service on Bus D01 and remove Battery Charger D-03A from service per 1107.004, Battery and 125V DC Distribution, Attachment B.  
The Shift Manager requests you to place Battery Charger D-03B in service on Bus D01 and remove Battery Charger D-03A from service per 1107.004, Battery and 125V DC Distribution, Attachment B.


JO B PERFO R M A NCE M E A S URE  T U O I: A1J P M-RO-E D030  Page 3 of 5   THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-ED030                                                                  Page 3 of 5 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS
JPM INITIAL TASK CONDITIONS:
:
Battery Charger D-03A is in service on Battery D01.
Battery Charger D-03A is in service on Battery D01.
TASK STANDARD
TASK STANDARD: IAW 1107.004, Att. B, examinee places charger D-03B in service, removes D-03A from service, and performs actions for D-03A DC output voltage drifting to zero.
:   IAW 1107.004, Att. B, examinee places charger D-03B in service, removes D-03A from service, and performs actions for D-03A DC output voltage drifting to zero.
THIS IS AN ALTERNATE SUCCESS PATH JPM.
THIS IS AN ALTERNATE SUCCESS PATH JPM.           TASK PERFORMANCE AIDS
TASK PERFORMANCE AIDS: 1107.0004 Attachment B
: 1107.0004 Attachment B      


JO B PERFO R M A NCE M E A S URE  T U O I: A1J P M-RO-E D030  Page 4 of 5   INITIATING CUE:
JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-ED030                                                                              Page 4 of 5 INITIATING CUE:
The Shift Manager requests you to place Battery Charger D-03B in service on Bus D01 and remove Battery Charger D-03A from service.
The Shift Manager requests you to place Battery Charger D-03B in service on Bus D01 and remove Battery Charger D-03A from service.
CRITICAL ELEMENTS (C) 5, 6, 8, 9, 12, 14, 16 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT TRANSITION NOTE: Proceed to El. 372' in Auxiliary Building off Corridor 98 to Rm. 109, DC Equipment Room.  
CRITICAL ELEMENTS (C)                   5, 6, 8, 9, 12, 14, 16 (C)         PERFORMANCE CHECKLIST                                 STANDARD                   N/A     SAT     UNSAT TRANSITION NOTE: Proceed to El. 372 in Auxiliary Building off Corridor 98 to Rm. 109, DC Equipment Room.
: 1. Verify breakers open for charger D-03B. AC Input breaker DC Output breaker On front of charger D-03B, verified the AC Input and DC Output breakers open (OFF).
: 1. Verify breakers open for charger         On front of charger D-03B, verified the D-03B.                                  AC Input and DC Output breakers
_____   _____   _____ TRANSITION NOTE: Proceed to MCC B57 in South ES Switchgear Room on the same elevation.  
* AC Input breaker                      open (OFF).                             _____   _____     _____
: 2. Verify AC feeder breaker to charger D-03B closed (B-5733).
* DC Output breaker TRANSITION NOTE: Proceed to MCC B57 in South ES Switchgear Room on the same elevation.
Verified breaker B-5733 closed (ON).
: 2. Verify AC feeder breaker to charger       Verified breaker B-5733 closed (ON).
_____  _____   _____ TRANSITION NOTE: Return to DC Equipment Room.
D-03B closed (B-5733).                                                           _____  _____     _____
In the following step, Caution the examinee not to br eak plane of cubicle door.  
TRANSITION NOTE: Return to DC Equipment Room.
: 3. Verify charger D-03B supply to bus breaker closed (D01-42).
In the following step, Caution the examinee not to break plane of cubicle door.
Inside panel D01, verified breaker D01-42 closed (ON).
: 3. Verify charger D-03B supply to bus       Inside panel D01, verified breaker breaker closed (D01-42).                 D01-42 closed (ON).                     _____  _____     _____
_____  _____   _____   4. Verify Manual Disconnect for battery D-07 closed (D-13).
: 4. Verify Manual Disconnect for battery     At D13, verified manual disconnect for  _____  _____    _____
At D13, verified manual disconnect for battery D07 closed (ON).
D-07 closed (D-13).                     battery D07 closed (ON).
_____  _____  _____  (C) 5. Close D-03B AC Input breaker.
(C)   5. Close D-03B AC Input breaker.             On front of charger D-03B, closed the   _____  _____    _____
On front of charger D-03B, closed the AC Input breaker (ON).
AC Input breaker (ON).
_____  _____  _____  (C) 6. Close D-03B DC Output breaker.
(C)   6. Close D-03B DC Output breaker.           On front of charger D-03B, closed the   _____  _____    _____
On front of charger D-03B, closed the DC Output breaker (ON).
DC Output breaker (ON).
_____  _____  _____  7. Wait ~1 minute for automatic load sharing to occur.
: 7. Wait ~1 minute for automatic load         Waited ~1 minute, observed rising      _____  _____    _____
CUE: Amps are rising on D-03B and amps are falling on D-03A.
sharing to occur.                       amps on D-03B and falling amps on D-03A.
Waited ~1 minute, observed rising amps on D-03B and falling amps on D-03A. _____  _____  _____  (C) 8. Open D-03A DC Output breaker.
CUE:    Amps are rising on D-03B and amps are falling on D-03A.
On front of charger D-03A, opened the DC Output breaker (OFF).
(C)   8. Open D-03A DC Output breaker.             On front of charger D-03A, opened       _____   _____     _____
_____ _____ _____
the DC Output breaker (OFF).
JOB PERFORMANCE MEASURE TUOI:  A1JPM-RO-ED030 Page  5 of 5 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT (C)  9. Open D-03A AC Input breaker.
On front of charger D-03A, opened the AC Input breaker (OFF).
_____  _____  _____  10. Check Charger D-03B picks up load. CUE:  D-03B DC Out  ~100 amps AC In ~30 amps D01 bus voltage 130V  At charger D-03B checked ammeter deflected to a nominal value, and at D01 checked bus voltage maintained at ~130 volts.
_____  _____  _____  11. Reset local alarm panel for Charger D-03B. At charger D-03B, pressed "R" button on RIS panel.
_____  _____  _____  (C)  12. Place D-03B alarm to control room toggle switch ON.
At charger D-03B, placed control room alarm switch to ON (up).
_____  _____  _____  13. Place D-03A alarm to control room toggle switch OFF.
At charger D-03A, placed control room alarm switch to OFF (down).
_____  _____  _____  14. Check annunciator D01 CHARGER TROUBLE (K01-E7) clears.
Called control room and requested check for clear annunciator K01-E7.
_____  _____  _____  ALTERNATE PATH CUE: Inform examinee that D-03A DC Output Voltage drifted to zero, also inform examinee that one minute has passed since D-03A was de-energized.
  (C)  15. Close D-03A AC Input breaker.
On front of charger D-03A, closed the AC Input breaker (ON).
_____  _____  _____  16. Check D-03A DC output voltage and AC input voltage.
CUE:  DC Output Voltage ~90V AC Input Voltage ~480V On charger D-03A, observed DC


output voltage and AC input voltage meters.
JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-ED030                                                                            Page 5 of 5 (C)        PERFORMANCE CHECKLIST                            STANDARD                    N/A      SAT    UNSAT (C)  9. Open D-03A AC Input breaker.          On front of charger D-03A, opened        _____    _____    _____
Examinee stated that he would contact electrical maintenance for support. _____  _____  _____  (C) 17. Open D-03A AC Input breaker.
the AC Input breaker (OFF).
On front of charger D-03A, opened the AC Input breaker (OFF).
: 10. Check Charger D-03B picks up        At charger D-03B checked ammeter        _____    _____    _____
_____  _____  _____    18. Submit condition report and WR.
load.                                deflected to a nominal value, and at D01 checked bus voltage maintained CUE:                                    at ~130 volts.
Examinee stated that he would submit a condition report and Work Request or Work Order on D-03A.
* D-03B DC Out ~100 amps
_____  _____  _____  END TUOI NUMBER: A1JPM-RO-AOP08                                                                                                                                            Page 1 of 6  JOB PERFORMANCE MEASURE Unit: 1 Rev # 4 Date: 11/04/2003 TUOI NUMBER:
* AC In ~30 amps
A1JPM-RO- AOP08  System/Duty Area:
* D01 bus voltage 130V
Emergency and Abnormal Operations Task:  RO #1 Duties for Alternate Shutdown with immediate Control Room evacuation JA#  13035210401 KA Value RO 4.3 SRO 4.2 KA Reference A06.AA1.1  Approved For Administration To:  RO SRO  Task Location:  Inside CR:
: 11. Reset local alarm panel for Charger  At charger D-03B, pressed R button    _____    _____    _____
Outside CR:
D-03B.                              on RIS panel.
Both:  Suggeste d Testing Environment And Method (Perform Or Simulate): Simulate Plant Site:
(C)  12. Place D-03B alarm to control room    At charger D-03B, placed control        _____    _____    _____
Perform          Simulator:
toggle switch ON.                    room alarm switch to ON (up).
Lab:        Position Evaluated:  RO:
: 13. Place D-03A alarm to control room    At charger D-03A, placed control        _____    _____    _____
X SRO: X  Actual Testing Environment: Simulator:
toggle switch OFF.                  room alarm switch to OFF (down).
Plant Site:
: 14. Check annunciator D01 CHARGER        Called control room and requested        _____    _____    _____
Lab  T esting Method: Simulate:
TROUBLE (K01-E7) clears.            check for clear annunciator K01-E7.
X Perform:  Approximate Completion Time In Minutes:
ALTERNATE PATH CUE:            Inform examinee that D-03A DC Output Voltage drifted to zero, also inform examinee that one minute has passed since D-03A was de-energized.
20 Minutes Reference(S):
(C)  15. Close D-03A AC Input breaker.        On front of charger D-03A, closed the    _____    _____    _____
OP 1203.002 change 015 0      Examinee's Name:
AC Input breaker (ON).
SSN:    Evaluator's Name:
: 16. Check D-03A DC output voltage and    On charger D-03A, observed DC            _____    _____    _____
The Examinee's performance was evaluated against the standards cont ained in this JPM and is determined to be:
AC input voltage.                    output voltage and AC input voltage meters.
Satisfactory:
CUE:
Unsatisfactory:
* DC Output Voltage ~90V          Examinee stated that he would
* AC Input Voltage ~480V          contact electrical maintenance for support.
(C)   17. Open D-03A AC Input breaker.         On front of charger D-03A, opened       _____    _____    _____
the AC Input breaker (OFF).
: 18. Submit condition report and WR.     Examinee stated that he would submit     _____    _____    _____
a condition report and Work Request or Work Order on D-03A.
END


TUOI NUMBER:                                                                                                      Page 1 of 6 A1JPM-RO-AOP08 JOB PERFORMANCE MEASURE Unit:              1              Rev #                        4                          Date:        11/04/2003 TUOI NUMBER:          A1JPM-RO- AOP08 System/Duty Area:      Emergency and Abnormal Operations Task:    RO #1 Duties for Alternate Shutdown with immediate Control Room evacuation JA#      13035210401 KA Value RO      4.3      SRO    4.2    KA Reference        A06.AA1.1 Approved For Administration To: RO                              SRO Task Location: Inside CR:                        Outside CR:                        Both:
Suggested Testing Environment And Method (Perform Or Simulate): Simulate Plant Site:    Perform        Simulator:                                        Lab:
Position Evaluated: RO:                      X                              SRO:                    X Actual Testing Environment: Simulator:                          Plant Site:                      Lab Testing Method: Simulate:                    X                        Perform:
Approximate Completion Time In Minutes:                                      20 Minutes Reference(S):      OP 1203.002 change 015-05-0 Examinee's Name:                                                                    SSN:
Evaluator's Name:
The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:
Satisfactory:                                      Unsatisfactory:
Performance Checklist Comments:
Performance Checklist Comments:
Start Time Stop Time Total Time Signed Date:   Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
Start Time                                 Stop Time                                       Total Time Signed                                                               Date:
Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.


TUOI NUMBER: A1JPM-RO-AOP08                                                                                                                                           Page 2 of 6  THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
TUOI NUMBER:                                                                                     Page 2 of 6 A1JPM-RO-AOP08 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist  
The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.
- System Walkthrough" portion of OP 1064.023 Attachment 6 with the ex aminee. JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
There is a Fire in the Cable Spreading Room. An Alternate Shutdown is in progress. At the Alternate Shutdown Cabinet, you have received a copy of OP 1203.002 and Section 1C.Perform to step 3.14 of applicable section.
There is a Fire in the Cable Spreading Room. An Alternate Shutdown is in progress. At the Alternate Shutdown Cabinet, you have received a copy of OP 1203.002 and Section 1C.Perform to step 3.14 of applicable section.
TASK STANDARD:
TASK STANDARD:
RO#1 perform actions for alternate shutdown completed through step 3.14.
RO#1 perform actions for alternate shutdown completed through step 3.14.
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
OP 1203.002 and Section 1C, change 015 0. SIMULATOR SETUP:
OP 1203.002 and Section 1C, change 015-05-0.
N/A TUOI NUMBER: A1JPM-RO-AOP08                                                                                                                                           Page 3 of 6  INITIATING CUE:
SIMULATOR SETUP:
The first 3 steps of OP 1203.002 Section 1C have been completed. Perform the actions required of RO  
N/A
 
TUOI NUMBER:                                                                                         Page 3 of 6 A1JPM-RO-AOP08 INITIATING CUE: The first 3 steps of OP 1203.002 Section 1C have been completed. Perform the actions required of RO
#1 through step 3.14.
#1 through step 3.14.
CRITICAL ELEMENTS (c):
CRITICAL ELEMENTS (c): 1, 7, 9, 11, 12, and 13 C                  PERFORMANCE CHECKLIST                                STANDARD                N/A    SAT      UN SAT C    1. At The MSIV's, open the instrument air vent      Opened instrument air vent valves for each MSIV (IA-2691B through E and    valves IA-2691B through E and IA-2692B through E).                            IA-2692B through E.              ____    ____    ___
1, 7, 9, 11, 12, and 13
POSITIVE CUE:
All 8 vent valves have stem full out, with each valves handwheel fully CW.
: 2. Verify CV-2667 open.                            CV-2667 verified open by visually observing stem or valve position POSITIVE CUE:                                          indicator.                        ____    ____    ___
CV-2667 has stem full out, with the valve handwheel fully CW.
: 3.      Verify CV-2617 open.                            CV-2617 verified open by visually observing stem or valve position POSITIVE CUE:                                          indicator.                        ____    ____    ___
CV-2617 has stem full out, with the valve handwheel fully CW.
: 4.      Verify CV-2663 open.                            CV-2663 verified open by visually observing stem or valve position POSITIVE CUE:                                          indicator.                        ____    ____    ___
CV-2663 has stem full out, with the valve handwheel fully CW.
: 5.      Verify CV-2613 open.                            CV-2613 verified open by visually observing stem or valve position POSITIVE CUE:                                          indicator.                        ____    ____    ___
CV-2613 has stem full out, with the valve handwheel fully CW.
: 6.      Notify TSC of completion                      Communicated via phone or radio the Completion of Item 1.A        ____    ____    ___
POSITIVE CUE:
TSC notified of completion of actions EXAMINERS NOTE: The examinee should proceed to the Auxiliary Building 354 elevation.
C    7.      Proceed to Aux Bldg, 354. Slowly open CV-    Used manual lever and 1407 manually                                  handwheel, fully opened CV-      ____    ____    ___
1407.
POSITIVE CUE:
Valve has stem full out, with the valve handwheel fully CW.


C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT C 1. At The MSIV's, open the instrument air vent valves for each MSIV (IA
TUOI NUMBER:                                                                                        Page 4 of 6 A1JPM-RO-AOP08 C                 PERFORMANCE CHECKLIST                                 STANDARD               N/A   SAT     UN SAT
-2691B through E and IA-2692B through E).
: 8.       Check for flow noise as CV-1407 is opened.        Checked for flow noise as CV-1407 was opened.                 ____  ____    ___
POSITIVE CUE:
POSITIVE CUE:
All 8 vent valves have stem full out, with each valve's handwheel fully CW.
No flow noise is heard.
Opened instrum ent air vent valves IA-2691B through E and IA-2692B through E.
EXAMINERS NOTE: The examinee should proceed to the UNPPR.
____  ____   ___ 2. Verify CV-2667 open.
C  9.      Manually open CV-1219 and CV-1220. Close          Opened CV-1219, CV-1220, CV-1206                                          closed CV-1206 with manual      ____  ____    ___
lever and handwheel, verified POSITIVE CUE:                                              valve movement CV1219 and CV1220 have stems full out, with the valves handwheels fully CW, CV1206 has stem full in, with the valve handwheel fully CCW.
: 10.      Notify TSC of completion                          Established communication with TSC telephone or radio, notified ____  ____    ___
POSITIVE CUE:                                              of action HPI Item 5.A, 5.B, TSC notified of completion of actions EXAMINERS NOTE:
When TSC is notified have examinee throttle EFW P-7A to SG-A ISOL, CV-2627 to approximately 50 % open.
C
: 11.      Close CV-2627 to approximately 50% open.          Moved to CV-2627, and used the manual lever and hand wheel to  ____  ____    ___
POSITIVE CUE:                                              close CV-2627 to approximately CV-2627 has stem approximately halfway out.                to 50% open.
EXAMINERS NOTE:        Inform examinee that EFW flow is controlled.
C  12.      Open valves:                                      Opened EFW P-7B to SG-A ISOL EFW P-7B to SG-A ISOL (CV-2670)                  (CV-2670), B HPI Block Valve  ____  ____     ___
B HPI Block Valve (CV-1227)                    (CV-1227), and A HPI Block A HPI Block Valve (CV1228)                      Valve (CV1228) using manual handwheel and clutch lever.
POSITIVE CUE:
POSITIVE CUE:
CV-2667 has stem full out, with the valve handwheel fully CW. CV-2667 verified open by visually observing stem or valve position ind icator. ____  ____   ___ 3. Verify CV-2617 open.
CV-2670, CV-1227, CV-1228 have stems full out, with each valves handwheel fully CW.
TRANSITION NOTE: The examinee should proceed to the 354 elevation waste gas room.
C  13.      Slowly open BWST Outlet CV-1408.                  Opened CV-1408 using clutch lever and manual handwheel.     ____  ____     ___
POSITIVE CUE:
POSITIVE CUE:
CV-2617 has stem full out, with the valve handwheel fully CW. CV-2617 verified open by visually observing stem or valve position indicator.
CV-1408 has stem full out, with the valve handwheel fully CW.
____  ____  ___  4. Verify CV-2663 open.
POSITIVE CUE
: CV-2663 has stem full out, with the valve handwheel fully CW. CV-2663 verified open by visually observing stem or valve position indicator.
____  ____  ___  5. Verify CV-2613 open.
POSITIVE CUE
: CV-2613 has stem full out, with the valve handwheel fully CW. CV-2613 verified open by visually observing stem or valve position indicator.
____  ____  ___  6. Notify TSC of completion POSITIVE CUE
: TSC notified of completion of actions Communicated via phone or radio


the Completion of Item 1.A  ____  ____  ___  EXAMINER'S NOTE:  The examinee should proceed to the Auxiliary Building 354' elevation.
TUOI NUMBER:                                                                                       Page 5 of 6 A1JPM-RO-AOP08 C                 PERFORMANCE CHECKLIST                                   STANDARD             N/A   SAT     UN SAT
C  7. Proceed to Aux Bldg, 354'. Slowly open CV
: 14.     Check for flow noise as CV-1408 is opened.       Checked for flow noise as CV1408 was opened.               ____  ____     ___
-1407 manually POSITIVE CUE
POSITIVE CUE:
: Valve has stem full out, with the valve handwheel fully CW. Used manual lever and
No flow noise is heard.
 
TRANSITION NOTE: The examinee should proceed to the 335 elevation letdown filter area.
handwheel, fully opened CV
: 15.      Verify service water header pressure >40 psig. Opened RB Coolers VCC-2C &
-1407. ____  ____  ___
2D PI-3813A ISOL SW-3813A        ____  ____    ___
TUOI NUMBER: A1JPM-RO-AOP08                                                                                                                                           Page 4 of 6  C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT   8. Check for flow noise as CV
POSITIVE CUE:                                             and verified pressure >40 psig.
-1407 is opened.
Service water pressure is 50 psig.
POSITIVE CUE
NEGATIVE CUE:
: No flow noise is heard.
Service water pressure is 0 psig.
Checked for flow noise as CV
: 16.      Establish communications with the TSC and        Operator Calls TSC via radio or report completion of steps.                      telephone and reports completion of steps 2.B, 6.A, 6.B, 7.B. ____  ____     ___
-1407 was opened.
____  ____   ___ EXAMINER'S NOTE
: The examinee should proceed to the UNPPR.
C  9. Manually open CV
-1219 and CV
-1220. Close CV-1206  POSITIVE CUE:
CV1219 and CV1220 have stems full out, with the valve's handwheels fully CW , CV1206 has stem full in, with the valve handwheel fully CCW
. Opened CV-1219, CV-1220, closed CV-1206 with manual lever and handwheel, verified valve movement
____  ____  ___  10. Notify TSC of completion POSITIVE CUE
: TSC notified of completion of actions Established communication with
 
TSC telephone or radio, notified of action HPI Item 5.A, 5.B,   ____  ____  ___  EXAMINER'S NOTE:
When TSC is notified have examinee throttle EFW P
-7A to SG-A ISOL, CV
-2627 to approximately 50 % open.
C  11. Close CV-2627 to approximately 50% open.
POSITIVE CUE
: CV-2 627 has stem approximately halfway out.
Moved to CV
-2627, and used the manual lever and hand wheel to close CV-2627 to approximately to 50% open.
____  ____   ___ EXAMINER'S NOTE:
Inform examinee that EFW flow is controlled.
C  12. Open valves:
E FW P-7B to SG-A ISOL (CV
-2670)  "B" HPI Block Valve (CV
-1227)  "A" HPI Block Valve (CV1228)
POSITIVE CUE:
POSITIVE CUE:
CV-2670, CV-1227, CV-1228 have stems full out, with each valve's handwheel fully CW.
All steps have been reported to TSC.
Opened EFW P
NOTE:
-7B to SG-A ISOL (CV-2670), "B" HPI Block Valve (C V-1227), and "A" HPI Block Valve (CV1228) using manual handwheel and clutch lever.
Provide the cue for steps missed.
____  ____  ___  TRANSITION NOTE:  The examinee should proceed to the 354 elevation waste gas room.
NEGATIVE CUE:
C  13. Slowly open BWST Outlet CV
Step 1 RCS is overcooling due to high steam flow.
-1408. POSITIVE CUE:
CV-1408 ha s stem full out, with the valve handwheel fully CW. Opened CV-1408 using clutch lever and manual handwheel.
____  ____  ___
TUOI NUMBER: A1JPM-RO-AOP08                                                                                                                                            Page 5 of 6  C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT  14. Check for flow noise as CV
-1408 is opened.
POSITIVE CUE
: No flow noise is heard.
Checked for flow noise as
 
CV1408 was opened. ____  ____  ___  TRANSITION NOTE:  The examinee should proceed to the 335 elevation letdown filter area.
: 15. Verify service water header pressure >40 psig.
POSITIVE CUE
: Service water pressure is 50 psig.
NEGATIVE CUE
: Service water pre ssure is 0 psig.
Opened RB Coolers VCC
-2C & 2D PI-3813A ISOL SW
-3813A and verified pressure >40 psig.
____  ____  ___  16. Establish communications with the TSC and report completion of steps.
POSITIVE CUE
: All steps have been reported to TSC.
NO TE: Provide the cue for steps missed.
NEGATIVE CUE
: Step 1   RCS is overcooling due to high steam flow.
Step 9. A OTSG level is going up rapidly.
Step 9. A OTSG level is going up rapidly.
Step 7, 10b or c, 11. Unable to establish HPI flow.
Step 7, 10b or c, 11. Unable to establish HPI flow.
Operator Calls TSC via radio or
INSTRUCTOR CUE: This concludes the JPM.
 
END
telephone and repo rts completion of steps 2.B, 6.A, 6.B, 7.B.
 
____
____
___ INSTRUCTOR CUE: This concludes the JPM.
END TUOI NUMBER: A1JPM-RO-AOP08                                                                                                                                            Page 6 of 6    EXAMINEE'S COPY
 
INITIAL CONDITIONS:
There is a Fire in the Cable Spreading Room. An Alternate Shutdown is in progress. At the Alterna te Shutdown Cabinet, you have received a copy of OP 1203.002 and Section 1C.


TUOI NUMBER:                                                                                    Page 6 of 6 A1JPM-RO-AOP08 EXAMINEES COPY INITIAL CONDITIONS:
There is a Fire in the Cable Spreading Room. An Alternate Shutdown is in progress. At the Alternate Shutdown Cabinet, you have received a copy of OP 1203.002 and Section 1C.
INITIATING CUE:
INITIATING CUE:
The first 3 steps of OP 1203.002 Section 1C have been completed. Perform the actions required of RO #1  
The first 3 steps of OP 1203.002 Section 1C have been completed. Perform the actions required of RO #1 through step 3.14.


through step 3.14.
TUOI NUMBER:                                                                                                           Page 1 of 5 A1JPM-RO-EFW01 JOB PERFORMANCE MEASURE Unit:               1               Rev #                       10                         Date:         11/04/2003 TUOI NUMBER:           A1JPM-RO- EFW01 System/Duty Area:       Emergency Feedwater and EFIC Task:     Reset the Steam Driven Emergency Feedwater Pump after an overspeed trip JA#       ANO1-RO-EFW-NORM-13 KA Value RO       3.4       SRO     3.8     KA Reference       061 A2.04 Approved For Administration To: RO                               SRO Task Location: Inside CR:                           Outside CR:                       Both:
 
Suggested Testing Environment And Method (Perform Or Simulate): Simulate Plant Site:     Perform          Simulator:                                         Lab:
T UOI NUMB E R:
Position Evaluated: RO:                         X                             SRO:                     X Actual Testing Environment: Simulator:                             Plant Site:                     Lab Testing Method: Simulate:                       X                       Perform:
Page 1 of 5 A1JPM-RO-EFW01 JOB PERFORMANCE MEASURE Unit: 1 Rev # 10 Date: 11/04/2003 TUOI NUMBER:
Approximate Completion Time In Minutes:                                         15 Minutes Reference(S):       1106.006 Exhibit A, change 063-08-0.
A1JPM-RO- EFW01 System/Duty Area:
Examinee's Name:                                                                     SSN:
Emergency Feedwater and EFIC Task: Reset the Steam Driven Emergency Feedwater Pump after an overspeed trip JA# ANO1-RO-EFW-NORM-13 KA Value RO 3.4 SRO 3.8 KA Reference 061 A2.04 Approved For Administration To: RO SRO   Task Location: Inside CR:
Evaluator's Name:
Outside CR: Both:   Suggested Testing Environment And Method (Perform Or Simulate): Simulate Plant Site: Perform          Simulator:
Lab:       Position Evaluated: RO:
X SRO: X Actual Testing Environment: Simulator:
Plant Site:
Lab   Testing Method: Simulate:
X Perform:   Approximate Completion Time In Minutes: 15 Minutes Reference(S): 1106.006 Exhibit A, change 063-08-0.
Examinee's Name:
SSN:   Evaluator's Name:
The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:
The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:
Satisfactory:
Satisfactory:                                       Unsatisfactory:
Unsatisfactory:
Performance Checklist Comments:
Performance Checklist Comments:
Start Time Stop Time Total Time Signed Date:   Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
Start Time                                     Stop Time                                     Total Time Signed                                                               Date:
T UOI NUMB E R:
Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
Page 2 of 5 A1JPM-RO-EFW01 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
 
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
TUOI NUMBER:                                                                                   Page 2 of 5 A1JPM-RO-EFW01 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
P7A Emergency Feedwater Pump has tripped on overspeed during an EFIC actuation.
P7A Emergency Feedwater Pump has tripped on overspeed during an EFIC actuation.
Line 1,417: Line 1,311:
P7A turbine has been reset per 1106.006 Exhibit A.
P7A turbine has been reset per 1106.006 Exhibit A.
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
OP 1106.006 Exhibit A, change 063-08-0.
OP 1106.006 Exhibit A, change 063-08-0.
SIMULATOR SETUP: N/A T UOI NUMB E R:
SIMULATOR SETUP:
Page 3 of 5 A1JPM-RO-EFW01 INITIATING CUE:  The SM/CRS directs you to reset P7A overspeed trip per 1106.006, Exhibit A.
N/A
CRITICAL ELEMENTS  (c):
2, 3, and 8 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT  EXAMINER'S NOTE:  Simulate communications with the Control Room.
: 1. Verify the following valves are closed. If EFW initiate signal is present, manual control is required. EFW Pump Turbine K3 Steam Admission Valves (CV-2613 and CV-2663) EFW Pump Turbine K3 Steam Admission Valve Bypasses (SV-2613 and SV-2663)
POSITIVE CUE
: SV-2613, SV-2663, CV-2613, CV-2663 have valve stems full out with handwheel's full CW.
Called control room to verify SV-2613, SV-2663, CV-2613, CV-2663 are closed.
____      ____      ____  C  2. Turn EFW Turbine K3 Trip-Throttle Valve (CV-6601A) handwheel clockwise. Observe rotation of screw raises sliding nut and latch lever to where it will engage the trip hook.
POSITIVE CUE
: Trip/ Throttle valve (CV-6601A) sliding nut raised and latch lever has engaged the trip hook.
Trip/ Throttle valve (CV-6601A) handwheel turned clockwise until sliding nut rises and latch lever engages the trip hook.
____    ____    ___  EXAMINER'S NOTE:  The following steps will reset the mechanical trip linkage.
C  3. Pull spring-loaded connecting rod against spring force to move head lever away from tappet and


tappet nut.
TUOI NUMBER:                                                                                            Page 3 of 5 A1JPM-RO-EFW01 INITIATING CUE: The SM/CRS directs you to reset P7A overspeed trip per 1106.006, Exhibit A.
POSITIVE CUE
CRITICAL ELEMENTS (c): 2, 3, and 8 C                  PERFORMANCE CHECKLIST                                    STANDARD              N/A  SAT    UN SAT EXAMINERS NOTE: Simulate communications with the Control Room.
: Head lever moved away from tappet and tappet nut.
: 1. Verify the following valves are closed. If EFW          Called control room to verify SV-initiate signal is present, manual control is required. 2613, SV-2663, CV-2613, CV-
Connecting rod pulled against spring force to move head lever away from tappet and tappet nut.
* EFW Pump Turbine K3 Steam Admission                  2663 are closed.
____  ____  ___  4. Lift and release tappet assembly POSITIVE CUE
Valves (CV-2613 and CV-2663)
: Tappet assembly lifted and released.
* EFW Pump Turbine K3 Steam Admission                                                    ____ ____    ____
Valve Bypasses (SV-2613 and SV-2663)
POSITIVE CUE:
SV-2613, SV-2663, CV-2613, CV-2663 have valve stems full out with handwheels full CW.
C  2. Turn EFW Turbine K3 Trip-Throttle Valve (CV-            Trip/ Throttle valve (CV-6601A) 6601A) handwheel clockwise. Observe rotation of        handwheel turned clockwise until screw raises sliding nut and latch lever to where it  sliding nut rises and latch lever will engage the trip hook.                            engages the trip hook.            ____ ____    ___
POSITIVE CUE:
Trip/ Throttle valve (CV-6601A) sliding nut raised and latch lever has engaged the trip hook.
EXAMINERS NOTE: The following steps will reset the mechanical trip linkage.
C  3. Pull spring-loaded connecting rod against spring        Connecting rod pulled against force to move head lever away from tappet and          spring force to move head lever   ____ ____    ___
tappet nut.                                            away from tappet and tappet nut.
POSITIVE CUE:
Head lever moved away from tappet and tappet nut.
: 4. Lift and release tappet assembly                         Tappet assembly lifted and released.                         ____ ____    ___
POSITIVE CUE:
Tappet assembly lifted and released.
Tappet assembly lifted and released.
____  ____  ___  5. Verify tappet nut in trip reset position.
: 5. Verify tappet nut in trip reset position.               Verified tappet nut in trip reset position.                         ____ ____    ___
POSITIVE CUE
POSITIVE CUE:
: Tappet nut in trip reset position.
Tappet nut in trip reset position.
Verified tappet nut in trip reset position.
 
____  ____  ___
TUOI NUMBER:                                                                                             Page 4 of 5 A1JPM-RO-EFW01 C                 PERFORMANCE CHECKLIST                                     STANDARD               N/A SAT     UN SAT
T UOI NUMB E R:
: 6. Observe tappet returns to reset position.               Observed tappet returns to reset position.                          ____ ____    ___
Page 4 of 5 A1JPM-RO-EFW01 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT   6. Observe tappet returns to reset position.
POSITIVE CUE:
POSITIVE CUE
Tappet is in reset position.
: Tappet is in reset position.
: 7. Verify the following:                                   Verified tappet nut in trip reset
Observed tappet returns to reset position.
* Tappet nut in trip reset position and properly       position and properly aligned. ____ ____    ___
____  ____  ___  7. Verify the following: Tappet nut in trip reset position and properly aligned. Spring tension holds connecting rod in position.
aligned.                                           Verified spring tension holds
POSITIVE CUE
* Spring tension holds connecting rod in position. connecting rod in position.
: Tappet nut in trip reset position and properly aligned.
POSITIVE CUE:
Tappet nut in trip reset position and properly aligned.
Spring tension is holding connecting rod in position.
Spring tension is holding connecting rod in position.
Verified tappet nut in trip reset position and properly aligned.
C   8. Slowly turn CV-6601A handwheel                           CV-6601A fully opened.
Verified spring tension holds connecting rod in position.
counterclockwise until valve is fully open.                                               ____ ____    ___
____   ____  ___  C  8. Slowly turn CV-6601A handwheel counterclockwise until valve is fully open.
POSITIVE CUE:
POSITIVE CUE
CV-6601A has valve stem full out with handwheel in the full CW position.
: CV-6601A has valve stem full out with handwheel in the full CW position.
: 9. Close valve (CV-6601A) 3/4 turn to prevent binding       CV-6601A closed 3/4 turn.
CV-6601A fully opened.
on heatup.                                                                               ____ ____    ___
____  ____  ___  9. Close valve (CV-6601A) 3/4 turn to prevent binding on heatup.
POSITIVE CUE:
POSITIVE CUE
CV-6601A as you see it.
: CV-6601A as you see it.
EXAMINERS NOTE: Simulate communications with the Control Room.
CV-6601A closed 3/4 turn.
: 10. Verify P-7A TURBINE TRIP (K12-B5) clear.               Call Control Room and verified that P-7A TURBINE TRIP (K12-       ____ ____    ___
____  ____  ___  EXAMINER'S NOTE: Simulate communications with the Control Room.
POSITIVE CUE:                                              B5) is clear.
: 10. Verify P-7A TURBINE TRIP (K12-B5) clear.
P-7A TURBINE TRIP (K12-B5) clear
POSITIVE CUE
: 11. Notify Control Room that P-7A is ready for restart. Control Room notified that P-7A is ready for restart.                 ____ ____    ___
: P-7A TURBINE TRIP (K12-B5) clear Call Control Room and verified that P-7A TURBINE TRIP (K12-B5) is clear.
POSITIVE CUE:
____  ____  ___  11. Notify Control Room that P-7A is ready for restart.
POSITIVE CUE
: Control Room notified that P-7A is ready for restart.
Control Room notified that P-7A is ready for restart.
Control Room notified that P-7A is ready for restart.
____  ____  ___  EXAMINER'S CUE: This concludes the JPM.
EXAMINERS CUE: This concludes the JPM.
END TUOI NUMBER: A1JPM-RO-EFW01
END


Page 5 of 5   EXAMINEE'S COPY INITIAL CONDITIONS:
TUOI NUMBER:                                                                    Page 5 of 5 A1JPM-RO-EFW01 EXAMINEES COPY INITIAL CONDITIONS:
P7A Emergency Feedwater Pump has tripped on overspeed during an EFIC actuation.
P7A Emergency Feedwater Pump has tripped on overspeed during an EFIC actuation.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs you to reset P7A overspeed trip per 1106.006, Exhibit A.  
The SM/CRS directs you to reset P7A overspeed trip per 1106.006, Exhibit A.


Appendi x D Oper ator Acti ons For m ES-D-1   Facility: ANO-1                         Scenario No.: 1 (NEW)                         Op-Test No.: 2004-1 Page 1 of 10 Examiners: Operators:
Appendix D                   Operator Actions                  Form ES-D-1 Facility: ANO-1                   Scenario No.: 1 (NEW)                     Op-Test No.: 2004-1 Page 1 of 10 Examiners:                                                         Operators:
Initial Conditions: 100% MOL; Severe Thunderstorm Warning for Pope and Conway counties.
Initial Conditions:
Turnover:: National Weather service has issued a Severe Thunderstorm Warning for Pope and Conway Counties until 8:00 pm today. AOP 1203.025, Natural Emergencies, Section 2, High Winds/Tornado/Thunderstorm, steps 3.1 and 3.2 have been completed. #2 EDG OOS for fuel leak repairs. 1104.036 Supplement 11 is due right after turn-over.
100% MOL; Severe Thunderstorm Warning for Pope and Conway counties.
Event No. Malf. No. Event Type* Event Description 1 N/A N (ALL) Perform 1104.036 Supplement 11 for EDG #1 2 TR568 I (BOR) "A" OTSG operating level transmitter fails high 3 CAE RX7460 I (BOT) RB atmosphere radioactivity monitor fails low. TS 3.4.15 determination.
Turnover::
4 N/A R (BOR) Dispatcher orders down power to 650 MWe due to weather that has damaged Mablevale sub-station. 5 RX150 I (BOT) Turbine EHC fails to respond in auto mode for ICS (manual control required) 6 CV2692 C (BOR) One MSIV for "B" OTSG drifts shut-requires manual reactor trip per EOP 1202.001 7 MS131 M (ALL) "A" OTSG steam leak in containment (MSLI activates). Transfer to 1202.003 overcooling if necessary.
National Weather service has issued a Severe Thunderstorm Warning for Pope and Conway Counties until 8:00 pm today. AOP 1203.025, Natural Emergencies, Section 2, High Winds/Tornado/Thunderstorm, steps 3.1 and 3.2 have been completed. #2 EDG OOS for fuel leak repairs. 1104.036 Supplement 11 is due right after turn-over.
8 ES264 CV2214  I (BOT) Containment pressure >4psig but "B" train RBIC will fail to actuate automatically and an ICW isolation valve will fail open that should shut. Operator will be required to manually initiate "B" RBIC and verify shut the redundant ICW valve to isolate ICW. *   (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor
Event         Malf. No.       Event                                Event No.                          Type*                             Description 1             N/A         N (ALL)     Perform 1104.036 Supplement 11 for EDG #1 2           TR568         I (BOR)     A OTSG operating level transmitter fails high 3         CAE RX7460       I (BOT)     RB atmosphere radioactivity monitor fails low. TS 3.4.15 determination.
4             N/A         R (BOR)     Dispatcher orders down power to 650 MWe due to weather that has damaged Mablevale sub-station.
5           RX150         I (BOT)     Turbine EHC fails to respond in auto mode for ICS (manual control required) 6           CV2692         C (BOR)     One MSIV for B OTSG drifts shut-requires manual reactor trip per EOP 1202.001 7           MS131         M (ALL)     A OTSG steam leak in containment (MSLI activates). Transfer to 1202.003 overcooling if necessary.
8           ES264         I (BOT)     Containment pressure >4psig but B train RBIC CV2214                    will fail to actuate automatically and an ICW isolation valve will fail open that should shut.
Operator will be required to manually initiate B RBIC and verify shut the redundant ICW valve to isolate ICW.
* (N)ormal,     (R)eactivity, (I)nstrument, (C)omponent,       (M)ajor


Appendi x D Oper ator Acti ons For m ES-D-1   Page 2 of 10 Ev ent No. T i m e M a lf. No. Value/Ram p Ti me Ev ent Descr ipt i on 8 T=0 IM F E S 2 6 4  IM F C V 2214 N/A 1 "B" T r ain of Reac tor Bldg. Is olation and Cooling f a ils to auto ac tuate  (ESAS c hannel 6) ICW valve CV2214 f a ils to c l os e upon ESAS ac tuation  1 T=0 N/A N/A Per f or m s u r v eillanc e tes t of the #1 EDG f o r oper ability due to m a intenanc e of #2 EDG. 2 T=~15 IM F T R 568 292 / R a mp 3 Mi n. "A" O T SG O per ating Range Level T r ans m i tter f a ils high. 3 T=2 0 C AE R X 7 4 6 0 N/A RB Sum p Radiation Monitor f a ils low (R X 7460) 4 T=2 5 N/A N/A T he dis patc her r eques ts an em er genc y pow er r educ tion to ~650 MW e to m a intain s y s t em integr ity. 5 T=2 5.5 I M F R X 1 5 0 N/A T u r b ine EHC f a ils to r e s pond. 6 T=30 IM F C V 2692 0 / R a mp 1 M i n. "B" MSIV dr if ts s hut r equir i ng m anual r eac tor tr ip. 7 T=35 IM F M S 131  .4 / Ramp 3M in. "A" O T SG Main Steam Line Leak ins i de c ontainm ent.
Appendix D             Operator Actions                    Form ES-D-1 Page 2 of 10 Event  Time      Malf. No. Value/Ramp                            Event No.                      Time                                Description 8     T=0     IMF ES264        N/A     B Train of Reactor Bldg. Isolation and Cooling fails to auto actuate (ESAS channel 6)
Appendi x D Oper ator Acti ons For m ES-D-2   Op-Test No: 2004-1 Scenario No: 1 Event No: 1 Page 3 of 10 Event
IMF CV2214        1      ICW valve CV2214 fails to close upon ESAS actuation 1     T=0         N/A           N/A     Perform surveillance test of the #1 EDG for operability due to maintenance of #2 EDG.
2   T=~15     IMF TR568  292 / Ramp 3   A OTSG Operating Range Level Transmitter Min.      fails high.
3     T=20  CAE RX7460        N/A     RB Sump Radiation Monitor fails low (RX7460) 4     T=25        N/A           N/A     The dispatcher requests an emergency power reduction to ~650 MWe to maintain system integrity.
5   T=25.5   IMF RX150        N/A     Turbine EHC fails to respond.
6     T=30   IMF CV2692 0 / Ramp 1 Min. B MSIV drifts shut requiring manual reactor trip.
7     T=35     IMF MS131 .4 / Ramp 3Min. A OTSG Main Steam Line Leak inside containment.
 
Appendix D                     Operator Actions                      Form ES-D-2 Op-Test No: 2004-1         Scenario No: 1             Event No: 1                         Page 3 of 10 Event


== Description:==
== Description:==
Perform surveillance test of the #1 EDG for operability due to maintenance of #2 EDG. Time Position Applicants Actions or Behavior T=0 CRS Directs the performance of the #1 EDG surveillance test per Supplement 11 of 1104.036.
Perform surveillance test of the #1 EDG for operability due to maintenance of #2 EDG.
CBOT Make plant announcement of the starting of #1 EDG.
Time   Position                                 Applicants Actions or Behavior T=0     CRS       Directs the performance of the #1 EDG surveillance test per Supplement 11 of 1104.036.
CBOT   Verify DG1 Volts Select switch NOT in "OFF" on C10.
CBOT     Make plant announcement of the starting of #1 EDG.
CBOT Simultaneously depress the START pushbutton for #1 EDG and start the stopwatch.
CBOT     Verify DG1 Volts Select switch NOT in OFF on C10.
CBOT   Stop the stopwatch when DG1 voltage exceeds 3750 volts.
CBOT     Simultaneously depress the START pushbutton for #1 EDG and start the stopwatch.
CBOT   Record the time from start to >3750 volts in section 3.0.
CBOT     Stop the stopwatch when DG1 voltage exceeds 3750 volts.
CBOT   Verify service water to DG1 coolers (CV3806) opens and record verification in section 3.0. CBOT Adjust the voltage and frequency within the acceptable operating bands.
CBOT     Record the time from start to >3750 volts in section 3.0.
CBOT Stop DG1 by depressing the STOP pushbutton.
CBOT     Verify service water to DG1 coolers (CV3806) opens and record verification in section 3.0.
CBOT Verify associated critical and non-critical alarms on K01 clear.
CBOT     Adjust the voltage and frequency within the acceptable operating bands.
CBOT     Stop DG1 by depressing the STOP pushbutton.
CBOT     Verify associated critical and non-critical alarms on K01 clear.
EVENT TERMINATION CRITERIA
EVENT TERMINATION CRITERIA
  #1 EDG is stopped or Next Event  
                                    #1 EDG is stopped or Next Event


Appendi x D Oper ator Acti ons For m ES-D-2   Op-Test No: 2004-1 Scenario No: 1 Event No: 2 Page 4 of 10 Event
Appendix D                       Operator Actions                    Form ES-D-2 Op-Test No: 2004-1         Scenario No: 1             Event No: 2                             Page 4 of 10 Event


== Description:==
== Description:==
"A" OTSG Operating Range Level Transmitter fails high.
A OTSG Operating Range Level Transmitter fails high.
Time Position Applicants Actions or Behavior T=15 CBOR   Acknowledge and report annunciator K07 B4, SASS MISMATCH.
Time   Position                                 Applicants Actions or Behavior T=15   CBOR       Acknowledge and report annunciator K07 B4, SASS MISMATCH.
CRS Obtain Annunciator Corrective Action for K07 B4 for guidance.
CRS       Obtain Annunciator Corrective Action for K07 B4 for guidance.
CBOR   Acknowledge and report annunciator K07 A2, "A" OTSG Hi Level Limit.
CBOR       Acknowledge and report annunciator K07 A2, A OTSG Hi Level Limit.
CRS Obtain Annunciator Corrective Action for K07 A2 for guidance.
CRS       Obtain Annunciator Corrective Action for K07 A2 for guidance.
CBOT Observe/verify "A" Operating range level on C13 level recorder.
CBOT     Observe/verify A Operating range level on C13 level recorder.
CRS Direct the CBOR to place the "A" feed pump H/A station in "HAND" and stabilize plant.
CRS       Direct the CBOR to place the A feed pump H/A station in HAND and stabilize plant.
CBOR Place the "A" main feed pump H/A station in "HAND" and balanced feed flows.
CBOR       Place the A main feed pump H/A station in HAND and balanced feed flows.
CRS Direct board operators to validate level transmitters by comparing to other (redundant) instruments.
CRS       Direct board operators to validate level transmitters by comparing to other (redundant) instruments.
CBOT/R Determine the "A" OTSG operating level transmitter is failing high.
CBOT/R     Determine the A OTSG operating level transmitter is failing high.
CRS Verify plant stable and ICS in condition for instrument swap and direct the CBOR to select the other instrument.
CRS       Verify plant stable and ICS in condition for instrument swap and direct the CBOR to select the other instrument.
CBOT Verify the Operating Range Level for "Ais indicating properly on C13.
CBOT     Verify the Operating Range Level for A is indicating properly on C13.
CRS Direct placing ICS ("A" feed pump H/A station) back to "AUTO" EVENT TERMINATION CRITERIA ICS in "AUTO" or next event  
CRS       Direct placing ICS (A feed pump H/A station) back to AUTO EVENT TERMINATION CRITERIA ICS in AUTO or next event


Appendi x D Oper ator Acti ons For m ES-D-2   Op-Test No: 2004-1 Scenario No: 1 Event No: 3 Page 5 of 10 Event
Appendix D                       Operator Actions                    Form ES-D-2 Op-Test No: 2004-1         Scenario No: 1             Event No: 3                     Page 5 of 10 Event


== Description:==
== Description:==
RB atmosphere radioactivity monitor fails low.
RB atmosphere radioactivity monitor fails low.
Time Position Applicants Actions or Behavior T=20 CBOR   Acknowledge and report annunciator K10 C1, Radiation Monitor Trouble.
Time   Position                                 Applicants Actions or Behavior T=20   CBOR       Acknowledge and report annunciator K10 C1, Radiation Monitor Trouble.
CBOT   Observe monitors at C24 and C25 and determine that RX7460 has "FAILURE" lights "ON" and BOTH monitors, RI7460 and RI7461, are reading 0 CPM.
CBOT     Observe monitors at C24 and C25 and determine that RX7460 has FAILURE lights ON and BOTH monitors, RI7460 and RI7461, are reading 0 CPM.
CRS   Refer to ACA 1203.012I for corrective action and guidance.
CRS       Refer to ACA 1203.012I for corrective action and guidance.
CRS   Determine RB Atmosphere Gaseous Monitor is inoperable and refer to Tech Spec 3.4.15B. CRS   Initiate steps to meet requirements per Tech Specs.
CRS       Determine RB Atmosphere Gaseous Monitor is inoperable and refer to Tech Spec 3.4.15B.
CRS   Initiate steps to have the failed monitor checked and repaired.
CRS       Initiate steps to meet requirements per Tech Specs.
EVENT TERMINATION CRITERIA Tech Spec determination made  
CRS       Initiate steps to have the failed monitor checked and repaired.
EVENT TERMINATION CRITERIA Tech Spec determination made


Appendi x D Oper ator Acti ons For m ES-D-2   Op-Test No: 2004-1 Scenario No: 1 Event No: 4 & 5 Page 6 of 10 Event
Appendix D                       Operator Actions                      Form ES-D-2 Op-Test No: 2004-1           Scenario No: 1             Event No: 4 & 5                       Page 6 of 10 Event


== Description:==
== Description:==
The Mablevale substation experiences storm damage causing the breakers in the switchyard supplying that line to open. The dispatcher requests an emergency power reduction to ~650 MWe to maintain system integrity. The Turbine fails to respond to lowering demand.
The Mablevale substation experiences storm damage causing the breakers in the switchyard supplying that line to open. The dispatcher requests an emergency power reduction to ~650 MWe to maintain system integrity. The Turbine fails to respond to lowering demand.
Time Position Applicants Actions or Behavior ROLE PLAY Call control room as EOC Dispatcher and direct unit to reduce power to 650 MWe as soon as possible due to transformer damage at the Mablevale substation.
Time     Position                               Applicants Actions or Behavior ROLE PLAY Call control room as EOC Dispatcher and direct unit to reduce power to 650 MWe as soon as possible due to transformer damage at the Mablevale substation.
If asked by control room personnel inform them that there is serious concern over grid stability due to the severe weather and substation damage.
If asked by control room personnel inform them that there is serious concern over grid stability due to the severe weather and substation damage.
T=25 CRS Direct CBOR to reduce unit load to 650 MWe.
T=25       CRS     Direct CBOR to reduce unit load to 650 MWe.
CRS Direct operations per 1203.045, Rapid Plant Shutdown.
CRS     Direct operations per 1203.045, Rapid Plant Shutdown.
CBOR Commence reduction in unit load to 650 MWe using the ULD.
CBOR     Commence reduction in unit load to 650 MWe using the ULD.
NOTE: Turbine may revert to Operator Auto mode before operator takes action.
NOTE: Turbine may revert to Operator Auto mode before operator takes action.
CBOT/R Recognize and report to the CRS that the turbine is not responding during the power reduction.
CBOT/R     Recognize and report to the CRS that the turbine is not responding during the power reduction.
NOTE: The crew may elect to place both the SG/RX master and the Turbine in the "MANUAL" mode. In this configuration, the CBOR controls the change in load demand and the CBOT will maintain turbine header pressure.
NOTE: The crew may elect to place both the SG/RX master and the Turbine in the MANUAL mode. In this configuration, the CBOR controls the change in load demand and the CBOT will maintain turbine header pressure.
CRS Direct the CBOT to place the turbine in "Operator Auto" or "Manual" mode and control steam header pressure.
CRS     Direct the CBOT to place the turbine in Operator Auto or Manual mode and control steam header pressure.
CBOT Take the turbine to manual or operator auto CRS Direct the CBOR to place the SG/RX Master H/A station in "HAND" and lower load to 650 MWe. CBOR Place the SG/RX master in "HAND" and slowly toggle down.
CBOT     Take the turbine to manual or operator auto CRS     Direct the CBOR to place the SG/RX Master H/A station in HAND and lower load to 650 MWe.
continued Appendi x D Oper ator Acti ons For m ES-D-2   Op-Test No: 2004-1 Scenario No: 1 Event No: 4 & 5 Page 7 of 10 Event
CBOR     Place the SG/RX master in HAND and slowly toggle down.
continued
 
Appendix D                       Operator Actions                    Form ES-D-2 Op-Test No: 2004-1         Scenario No: 1             Event No: 4 & 5                       Page 7 of 10 Event


== Description:==
== Description:==
The Mablevale substation experiences storm damage causing the breakers in the switchyard supplying that line to open. The dispatcher requests an emergency power reduction to ~650 MWe to maintain system integrity. The Turbine fails to respond to lowering demand.
The Mablevale substation experiences storm damage causing the breakers in the switchyard supplying that line to open. The dispatcher requests an emergency power reduction to ~650 MWe to maintain system integrity. The Turbine fails to respond to lowering demand.
Time Position Applicants Actions or Behavior NOTE: In the manual mode on the SG/RX master, the operator has control of the rate the plant will change. It is expected the operator will maintain the rate of change near the directed rate by the CRS. CBOT Verify Turbine EHC responds to lowering load and maintains header pressure at or near setpoint of 895#. (Operator Auto or Manual)
Time     Position                               Applicants Actions or Behavior NOTE: In the manual mode on the SG/RX master, the operator has control of the rate the plant will change. It is expected the operator will maintain the rate of change near the directed rate by the CRS.
ROLE PLAY If asked about PPAS information, report ICS signal to EHC good.
CBOT     Verify Turbine EHC responds to lowering load and maintains header pressure at or near setpoint of 895#. (Operator Auto or Manual)
CBOR Stabilize load at ~650MWe. Power should be near 65-67%.
ROLE PLAY If asked about PPAS information, report ICS signal to EHC good.
EVENT TERMINATION CRITERIA Power reduction is complete OR the next event occurs  
CBOR     Stabilize load at ~650MWe. Power should be near 65-67%.
EVENT TERMINATION CRITERIA Power reduction is complete OR the next event occurs


Appendi x D Oper ator Acti ons For m ES-D-2   Op-Test No: 2004-1 Scenario No: 1 Event No: 6 Page 8 of 10 Event
Appendix D                       Operator Actions                    Form ES-D-2 Op-Test No: 2004-1         Scenario No: 1             Event No: 6                           Page 8 of 10 Event


== Description:==
== Description:==
The "B" Main Steam Isolation Valve drifts shut, requiring a manual reactor trip per EOP 1202.001
The B Main Steam Isolation Valve drifts shut, requiring a manual reactor trip per EOP 1202.001.
. Time Position Applicants Actions or Behavior T=30 CBOR   Acknowledge and report annunciator K07 C6, Main Steam Pressure Hi/Lo in alarm.
Time   Position                               Applicants Actions or Behavior T=30   CBOR       Acknowledge and report annunciator K07 C6, Main Steam Pressure Hi/Lo in alarm.
CRS Refer to ACA 1203.012I for guidance.
CRS       Refer to ACA 1203.012I for guidance.
CBOR/T   Observe the "B" MSIV, CV2692, closing.
CBOR/T     Observe the B MSIV, CV2692, closing.
CRS   Direct the CBOR to "TRIP" the reactor and "Carryout the immediate actions".
CRS       Direct the CBOR to TRIP the reactor and Carryout the immediate actions.
CBOR   Trip the reactor by depressing the pushbutton on C03 and observing all control rods inserted and power dropping.
CBOR       Trip the reactor by depressing the pushbutton on C03 and observing all control rods inserted and power dropping.
CBOT   Manually trip the turbine by depressing the pushbutton on C01 and observing the throttle and governor valves close and output and exciter field breakers open.
CBOT     Manually trip the turbine by depressing the pushbutton on C01 and observing the throttle and governor valves close and output and exciter field breakers open.
CBOR/T   Verify subcooling margin adequate.
CBOR/T     Verify subcooling margin adequate.
CRS   Provide direction to the crew per "Reactor Trip" EOP, 1202.001.
CRS       Provide direction to the crew per Reactor Trip EOP, 1202.001.
EVENT TERMINATION CRITERIA "B" MSIV closed and Reactor is tripped OR As determined by the lead examiner.  
EVENT TERMINATION CRITERIA B MSIV closed and Reactor is tripped OR As determined by the lead examiner.


Appendi x D Oper ator Acti ons For m ES-D-2   Op-Test No: 2004-1 Scenario No: 1 Event No: 7 & 8 Page 9 of 10 Event
Appendix D                         Operator Actions                    Form ES-D-2 Op-Test No: 2004-1           Scenario No: 1             Event No: 7 & 8                   Page 9 of 10 Event


== Description:==
== Description:==
Main Steam Line rupture inside containment. Channel 6 of ESAS fails to auto actuate. ICW valve CV2214 fails to close.
Main Steam Line rupture inside containment. Channel 6 of ESAS fails to auto actuate. ICW valve CV2214 fails to close.
Time Position Applicants Actions or Behavior T=35 CBOR Recognize "A" OTSG pressure dropping OR noticeably lower than "B" OTSG pressure.
Time     Position                                   Applicants Actions or Behavior T=35     CBOR       Recognize A OTSG pressure dropping OR noticeably lower than B OTSG pressure.
CBOR Monitor RB pressure and temperature.
CBOR       Monitor RB pressure and temperature.
NOTE: Due to rise in reactor building pressure and temperature, ESAS may actuate prior to the direction to trip the Reactor if CRS fails to recognize MSIV drifting shut in event 6 above.
NOTE:
Due to rise in reactor building pressure and temperature, ESAS may actuate prior to the direction to trip the Reactor if CRS fails to recognize MSIV drifting shut in event 6 above.
Annunciator K12A1 will alarm due to the environmental conditions inside the Reactor Building. If panel 463 is checked for location of the alarm, instruct that module A2-5 lower, RB UNEP ZONE 32-K, in alarm.
Annunciator K12A1 will alarm due to the environmental conditions inside the Reactor Building. If panel 463 is checked for location of the alarm, instruct that module A2-5 lower, RB UNEP ZONE 32-K, in alarm.
CBOR/T   Identify and announce ESAS has actuated on high RB Pressure.
CBOR/T     Identify and announce ESAS has actuated on high RB Pressure.
CRS Transition to ESAS Procedure , EOP1202.010 and direct crew actions.
CRS       Transition to ESAS Procedure , EOP1202.010 and direct crew actions.
CRS Direct the verification of ESAS per RT10.
CRS       Direct the verification of ESAS per RT10.
CBOR/T   Recognize failure of Channel 6 of ESAS to auto actuate. Tech Spec 3.3.7A. CT CBOR   Manually actuate Channel 6 of ESAS using the button on C04.
CBOR/T     Recognize failure of Channel 6 of ESAS to auto actuate. Tech Spec 3.3.7A.
CBOT   Identify and report failure of CV2214 to close.
CT     CBOR       Manually actuate Channel 6 of ESAS using the button on C04.
CRS   Direct the CBOT to verify the redundant ICW valve on Channel 6, CV2215, closed.
CBOT       Identify and report failure of CV2214 to close.
CBOT Verify actuation of ESAS per RT 10.
CRS       Direct the CBOT to verify the redundant ICW valve on Channel 6, CV2215, closed.
CREW   Recognize SG pressure <
CBOT       Verify actuation of ESAS per RT 10.
900#       continued Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 1 Event No: 7 & 8 Page 10 of 10 Event
CREW       Recognize SG pressure < 900#
continued
 
Appendix D                   Operator Actions                     Form ES-D-2 Op-Test No: 2004-1         Scenario No: 1           Event No: 7 & 8                     Page 10 of 10 Event


== Description:==
== Description:==
Main Steam Line rupture inside containment. Channel 6 of ESAS fails to auto actuate. ICW valve CV2214 fails to close.
Main Steam Line rupture inside containment. Channel 6 of ESAS fails to auto actuate. ICW valve CV2214 fails to close.
Time Position Applicants Actions or Behavior CRS Transition to Overcooling Emergency Operating procedure (1202.003).
Time     Position                           Applicants Actions or Behavior CRS     Transition to Overcooling Emergency Operating procedure (1202.003).
CT CBOT Manually override and secure HPI as directed by the CRS and the Emergency Operating Procedure.
CT         CBOT   Manually override and secure HPI as directed by the CRS and the Emergency Operating Procedure.
CBOR Report "A" MSLI actuated. EAL   NUE 3.1 Uncontrolled OTSG Depressurization Resulting in MSLI     Actuation CRS Provide RT6 to CBOR to verify proper MSLI and EFW actuation and control.
CBOR     Report A MSLI actuated.
CBOR Verify proper MSLI and EFW actuation and control per RT6.
EAL NUE 3.1 Uncontrolled OTSG Depressurization Resulting in MSLI Actuation CRS     Provide RT6 to CBOR to verify proper MSLI and EFW actuation and control.
CBOR   Control RCS pressure within the limits of Figure 3 per RT14 using PZR heaters EVENT AND SCENARIO TERMINATION CRITERIA RCS pressure and temperature stable with the "A" OTSG isolated, channel 6 of ESAS manually actuated, with the ICW flowpath isolated OR As determined by the lead examiner.  
CBOR     Verify proper MSLI and EFW actuation and control per RT6.
CBOR     Control RCS pressure within the limits of Figure 3 per RT14 using PZR heaters EVENT AND SCENARIO TERMINATION CRITERIA RCS pressure and temperature stable with the A OTSG isolated, channel 6 of ESAS manually actuated, with the ICW flowpath isolated OR As determined by the lead examiner.


Appendi x D Oper ator Acti ons For m ES-D-1   Facilit y: ANO-1                       Scenar io No.: 2 (M O D)                         O p-T est No.: 2004-1 Pag e 1 of 11 Ex am iner s: O per at or s:         I n it ial Condit i ons: 100% M O L, eq uilibr i um X enon, P4A and P4B in ser v ice (P 4C dow n f o r m a int enance). Sluice g a t e s SG-1 , SG-2 , and SG-4 open. T u r nov er:   100% pow er , M O L, eq uilibr i um X enon. Ex pect ed P4C r e t u r n t o ser v ice and r e st or e nor m a l line-up w i t h in nex t 2 hour s. . #2 EDG is O O S t o r epair it s g o v e r nor (day 1 of 7 day LCO 3.8.1.B). Ev ent No. M a lf. No. Ev ent T y pe* Ev ent Descr ipt i on 1 T R 625 I (B OT) "A" CFT-LT "L I S 2416" f a ils low. SRO T S det er m i nat ion r e q u ir ed. 2 N/A N (B OT) Shif t ser v ice w a t e r pum p t o P4A/P4C line-up, r e t u r n P4B t o st andby  3 T R 051 I (B O R) Select ed PZR lev e l t r ansm i t t e r f a ils hig h 4 T R 558 I (B O R) "B" M a in Feed f l ow t r ansm i t t e r dr if t s low slow ly 5 BAT P1B_vibes C (B OR) M F P "B" has ex cessiv e v i br at ion. 6 N/A R (B O R) Per f or m nor m a l shut dow n t o r epair M F P "B". 7 ED183 DG 175  M (A LL) C (B OT) Loss of O f f s it e pow er , Rx t r ip. #1 EDG f a ils t o aut o st ar t and pushbut t on on C10 f a i l s to sta r t i t. ST AT I O N BLACK-O U T 8   CV2645 C (B OR) EFW v a lv e f a ils open t o "A" O T SG , r e sult ing in lev e l being r a ised hig her t han EFI C cont r o lled SP. *   (N)o r m a l,   (R)eact i v i t y ,   (I)n st r u m ent ,    (C)o m ponent ,    (M)a j o r  NUREG-1021, Rev i sion 8, Supplem ent 1 Appendi x D Oper ator Acti ons For m ES-D-1   Page 2 of 11 Ev ent No. T i m e M a lf. No. Value/Ram p Ti me Ev ent Descr ipt i on 7&8 T=0 IM F D G 1 7 5  IOR DI_D G1 S  IC M C V 2645 N/A  False  1 #1 EDG  fails to autostart Pushbutton on C 10 fails to start the ED G. EFW v a lv e to the "A" O T SG fails open resulting in lev e l being raised higher than the EFIC controlled setpoint.
Appendix D                   Operator Actions                  Form ES-D-1 Facility: ANO-1                 Scenario No.: 2 (MOD)                   Op-Test No.: 2004-1 Page 1 of 11 Examiners:                                                       Operators:
1  T=2 IM F T R 625 0  R a mp 0 "A" C o re Flood T ank LT (LIS2416) fails low
Initial Conditions:
. 2  T=~10 N/A N/A Shift s e rv ic e w a ter pumps to P4A/P4C line-up, return P4B to standby 3  T=20 IM F T R 051  320  R a mp 2 M i n. PZR lev e l transmitter (LT 1001) fails to high 4  T=2 7 I M F T R 5 5 8 1.0 e 0 6  R a mp 4 M i n. "B" M a in Feed flow transmitter drifts low slow ly 5  T=30 BAT P1B_v i bes N/A R eport that "B" M a in Feed Pump has ex cessiv e v i bration 6 T=~32 N/A N/A Perform normal shutdow n to repair "B" M F P  7  T=40 IM F ED 183 N/A Loss  of offsite pow er occurs. R eactor trip.
100% MOL, equilibrium Xenon, P4A and P4B in service (P4C down for maintenance).
ST AT ION BLACKOUT NUREG-1021, Rev i sion 8, Supplem ent 1 Appendi x D Oper ator Acti ons For m ES-D-2  NUREG-1021, Rev i sion 8, Supplem ent 1  O p-T es t No:  2004-1  Sc enar io No:  2 Event No:  1 Page 3 of 11  Event Des c r iption:  "
Sluice gates SG-1, SG-2, and SG-4 open.
A" CF T Level tr ans m i tter (L IS2416) f a ils low.      Ti m e Pos i tion Applic ants Ac tions or Behavior  T=2  CBOR  Rec ogniz e and r epor t that annunc iator K10 C5, "
Turnover:
A" CF T LEVEL HI/LO
100% power, MOL, equilibrium Xenon. Expected P4C return to service and restore normal line-up within next 2 hours. . #2 EDG is OOS to repair its governor (day 1 of 7 day LCO 3.8.1.B).
", in alar m. CRS  Ref e r to ACA 1203.012I f o r c o r r e c t ive ac tion. CBOT  Diagnos e LIS2416 f a ilur e af ter c o m par ing level indic a tions f o r T 2 A on C16 and C18.
Event        Malf. No.     Event                                Event No.                       Type*                             Description 1           TR625      I (BOT)       A CFT-LT LIS2416 fails low. SRO TS determination required.
CRS  Ref e r to T e c hnic a l Spec if ic ations f o r applic ability. ACA 1203.012I r e f e r s to T S 3.5.1 if ac tual level is high or low. Ref e r enc e to the T e c hnic a l Requir e m ent Manual f o r ins t r u m entation s hould be per f o r m ed. T e c hnic a l Re quir e me nts M a nua l 3.3.5 , M i s c e lla ne ous Ins t r u me nta t ion. (O nly one pr es s u r e and one level tr ans m i tter is r equir ed f o r oper ability) EVENT T E RMINAT IO N CRIT E RIA  Nex t Event Appendi x D Oper ator Acti ons For m ES-D-2  NUREG-1021, Rev i sion 8, Supplem ent 1  O p-T es t No:  2004-1  Sc enar io No:  2 Event No:  2 Page 4 of 11  Ev ent Des c r iption:  Shif t Serv ic e W a ter Pum p s      Ti m e Pos i tion Applic ants Ac tions or Behavior  T~10  Rol e Play  Call as w o r k w eek m anager and r epor t P4C is r eady f o r oper ation and r o tation of pum ps c an pr oc eed as antic ipated. CRS  Dir e c t s h if ting the s e r v ic e w a ter pum p c onf igur ation to P4A and P4C r unning and r e tur n P4B to s t andby s t atus. CBOT  Notif y Chem is tr y of pum p r o tation s o c hem ic al inj e c t ion c an be appr opr iately aligned.
2           N/A         N (BOT)       Shift service water pump to P4A/P4C line-up, return P4B to standby 3           TR051        I (BOR)       Selected PZR level transmitter fails high 4           TR558        I (BOR)       B Main Feed flow transmitter drifts low slowly 5       BAT P1B_vibes   C (BOR)       MFP B has excessive vibration.
CBOT  Ref e r to T able 9.3 of 1104.029 to deter m i ne the s e r v ic e w a ter alignm ent nec es s a r y f o r the pum ps that w ill r e m a in in s e r v ic e. CBOT  Ver i f y s l uic e gates aligned to s upply w a ter to the des ir ed SW Pum p s. CBOT  Star t P4C  CBOT  Stop P4B  CBOT  Notif y the O u ts ide AO to c hec k f o r r e ver s e r o tation of P4B. CBOT  Align s e r v ic e w a ter s y s t em per T able 9.3 CBOR/T  Ver i f y nor m a l s e r v ic e w a ter loop pr es s u r e s. CBOR/T  Monitor SW bay level, CW bay level, and bay dif f e r entials f o r pr oper oper ation of SW bay s t r a inier s. EVENT T E RMINAT IO N CRIT E RIA  Ser v ic e W a ter Pum p s r o tated and s y s t em aligned O R Nex t Event Appendi x D Oper ator Acti ons For m ES-D-2  NUREG-1021, Rev i sion 8, Supplem ent 1   O p-T es t No: 2004-1 Sc enar io No:  2 Event No:  3 Page 5 of 11  Event Des c r iption:  PZ R level tr ans m i tter (L T 1001) f a ils to ups c a le      Ti m e Pos i tion Applic ants Ac tions or Behavior  T=20  CBOR  Rec ogniz e and r epor t that PZ R level indic a tions ar e m i s m atc hed    CREW  Diagnos e LT 1001 f a ilur e T ech. Sp ec. 3.3.15A CRS  Dir e c t oper ations per 1203.015  Pr es s u r i z e r Sy s t em s F a ilur e , s e c t ion 4.0. CRS  D i r e c t C B O R to s e lec t valid PZ R level indic a tor f o r PZ R level c ontr o l. CBOR  Selec t LT 1002 to c ontr o l PZ R level c ontr o l valve (C V-1235) us ing hand s w itc h on upr ight s e c t ion of C04. CBOR  Ver i f y CV-1235 opens to c ontr o l PZ R level at s e tpoint. EVENT T E RMINAT IO N CRIT E RIA  Pr es s u r i z e r level c ontr o l is s e lec t ed to LT 1002 and PZ R level c ontr o l valve is c ontr o lling level in auto.
6           N/A         R (BOR)       Perform normal shutdown to repair MFP B.
7           ED183       M (ALL)       Loss of Offsite power, Rx trip.
DG175        C (BOT)      #1 EDG fails to auto start and pushbutton on C10 fails to start it.
STATION BLACK-OUT 8         CV2645       C (BOR)       EFW valve fails open to A OTSG, resulting in level being raised higher than EFIC controlled SP.
* (N)ormal,     (R)eactivity, (I)nstrument,    (C)omponent,    (M)ajor NUREG-1021, Revision 8, Supplement 1


Appendix D Operator Actions Form ES-D-2 NUREG-1021, Revision 8, Supplement 1 Op-Test No: 2004-1 Scenario No: 2 Event No: 4 Page 6 of 11 Event
Appendix D               Operator Actions                   Form ES-D-1 Page 2 of 11 Event  Time      Malf. No. Value/Ramp                            Event No.                        Time                              Description 7&8    T=0      IMF DG175        N/A    #1 EDG fails to autostart IOR DI_DG1S        False    Pushbutton on C10 fails to start the EDG.
ICM CV2645          1      EFW valve to the A OTSG fails open resulting in level being raised higher than the EFIC controlled setpoint.
1    T=2     IMF TR625      0 Ramp 0  A Core Flood Tank LT(LIS2416) fails low.
2    T=~10        N/A            N/A    Shift service water pumps to P4A/P4C line-up, return P4B to standby 3    T=20    IMF TR051        320    PZR level transmitter (LT1001) fails to high Ramp 2 Min.
4    T=27    IMF TR558      1.0e06    B Main Feed flow transmitter drifts low slowly Ramp 4 Min.
5    T=30  BAT P1B_vibes        N/A    Report that B Main Feed Pump has excessive vibration 6    T=~32        N/A            N/A    Perform normal shutdown to repair B MFP 7    T=40    IMF ED183        N/A    Loss of offsite power occurs. Reactor trip.
STATION BLACKOUT NUREG-1021, Revision 8, Supplement 1
 
Appendix D                      Operator Actions                          Form ES-D-2 Op-Test No: 2004-1         Scenario No: 2             Event No: 1                            Page 3 of 11 Event


== Description:==
== Description:==
  "B" Main Feed flow transmitter drifts low slowly Time Position Applicants Actions or Behavior T=27  CBOR   Acknowledge and report annunciator K07 B4, SASS MISMATCH.
A CFT Level transmitter (LIS2416) fails low.
CBOR/T  Determine the cause of the alarm by scanning C03, C04, and C13 for SASS ENABLE light that is not illuminated. Identify the "B" MFW flow SASS Enable not illuminated.
Time   Position                                 Applicants Actions or Behavior T=2    CBOR       Recognize and report that annunciator K10 C5, A CFT LEVEL HI/LO, in alarm.
CBOR  Determine that SASS did not transfer to the "Y" instrument for control.
CRS       Refer to ACA 1203.012I for corrective action.
CRS   Refer to ACA 1203.012F for corrective action and guidance.
CBOT      Diagnose LIS2416 failure after comparing level indications for T2A on C16 and C18.
CRS   Direct the CBOR to place both FW pump H/A stations , and control rods in "MANUAL". (Reactor Demand or Diamond station to "MANUAL" is acceptable)
CRS       Refer to Technical Specifications for applicability. ACA 1203.012I refers to TS 3.5.1 if actual level is high or low. Reference to the Technical Requirement Manual for instrumentation should be performed.
CBOR  Place the BOTH MFW pump H/A stations to "MANUAL" and Reactor Demand or Diamond Station to "MANUAL".
Technical Requirements Manual 3.3.5, Miscellaneous Instrumentation.
CRS  Direct the CBOR to stabilize the plant CBOR  Using the MFW pump H/A stations and control rods, balance feedwater flows and Tave to return to normal values.
(Only one pressure and one level transmitter is required for operability)
CRS    Direct the CBOT to compare failed instrument to the non-selected instrument using PMS. CBOT  Using PMS, verify the non-selected MFW flow is reading correctly.
EVENT TERMINATION CRITERIA Next Event NUREG-1021, Revision 8, Supplement 1
CRS  Direct the CBOR to select the "Y" MFW flow instrument for loop "B".
 
CBOR  Select the "Y" instrument for loop "B" MFW flow. continued
Appendix D                      Operator Actions                          Form ES-D-2 Op-Test No: 2004-1        Scenario No: 2              Event No: 2                          Page 4 of 11 Event


Appendi x D Oper ator Acti ons For m ES-D-2  NUREG-1021, Rev i sion 8, Supplem ent 1  O p-T es t No: 2004-1 Sc enar io No:  2 Event No:  4 Page 7 of 11  Event Des c r iption:  "B" M a in Feed f l ow t r ansm i t t e r dr if t s low slow ly    Ti m e Pos i tion Applic ants Ac tions or Behavior NO T E:  A c aution plac ar d on both C03 and C13 pr ovides dir e c t ion of s e lec t ing the as s o c i ated "X" or "Y"  MF W T e m per atur e ins t r u m ent w hen the MF W f l ow ins t r u m ent is s e lec t ed due to har d w i r ed tem per atur e c o m pens ation of the MF W f l ow ins t r u m ent. CRS   Dir e c t the CBO T to s e lec t the "Y" MF W tem per atur e ins t r u m ent f o r loop  "B"  on C13.
== Description:==
CBOT   Selec t the "Y"  MF W tem per atur e ins t r u m ent f o r loop "B". CBOR  Plac e ICS in "
Shift Service Water Pumps Time    Position                                Applicants Actions or Behavior T~10      Role    Call as work week manager and report P4C is ready for operation and rotation of Play    pumps can proceed as anticipated.
A UT O" in ac c o r danc e w i th 1105.004, ICS O per ations. EVENT T E RMINAT IO N CRIT E RIA  "B" Main F eedw ater F l ow "Y" ins t r u m ent s e lec t ed and ICS in "
CRS       Direct shifting the service water pump configuration to P4A and P4C running and return P4B to standby status.
A UT O" Appendi x D Oper ator Acti ons For m ES-D-2  NUREG-1021, Rev i sion 8, Supplem ent 1  O p-T es t No: 2004-1 Sc enar io No:  2 Event No:  5 & 6 Page 8 of 11  Event Des c r iption: "B" M a in Feedw at er pum p ex cessiv e v i br at ion and pow er r educt i on t o secur e "B" M F W pum p f o r r epair. Ti m e Pos i tion Applic ants Ac tions or Behavior  T=30  CBOR  Ac k now ledge and r epor t annunc iator K06 C3, "
CBOT     Notify Chemistry of pump rotation so chemical injection can be appropriately aligned.
B" MF P T URB CO NT RO L SY S T R O U BLE. CRS  Ref e r to ACA 1203.012E f o r c o r r e c t ive ac tion and guidanc
CBOT      Refer to Table 9.3 of 1104.029 to determine the service water alignment necessary for the pumps that will remain in service.
: e. CBOR/T   Repor t vibr ation alar m on "B" MF P f r om O I T alar m panel O R T S I. CRS  Dir e c t AO to ver i f y/c onf ir m  "B" MF P has ex c e s s i ve vibr ation. CRS  Dir e c t the CBO R and CBO T to per f o r m a pow er r educ tion to appr ox iom a tely 40% pow er to s e c u r e the "B" MF P. CBOR  Begin a pow er r educ tion to 40% pow er us ing the Unit Load Dem and (U LD). EVENT T E RMINAT IO N CRIT E RIA  Pow e r r educ tion >10%
CBOT      Verify sluice gates aligned to supply water to the desired SW Pumps.
CBOT      Start P4C CBOT      Stop P4B CBOT      Notify the Outside AO to check for reverse rotation of P4B.
CBOT      Align service water system per Table 9.3 CBOR/T     Verify normal service water loop pressures.
CBOR/T     Monitor SW bay level, CW bay level, and bay differentials for proper operation of SW bay strainiers.
EVENT TERMINATION CRITERIA Service Water Pumps rotated and system aligned OR Next Event NUREG-1021, Revision 8, Supplement 1


Appendix D Operator Actions Form ES-D-2 NUREG-1021, Revision 8, Supplement 1 Op-Test No: 2004-1 Scenario No:   2 Event No: 7 & 8 Page 9 of 11 Event
Appendix D                       Operator Actions                         Form ES-D-2 Op-Test No: 2004-1           Scenario No: 2           Event No: 3                              Page 5 of 11 Event


== Description:==
== Description:==
Loss of offsite power occurs. Reactor trip.  #1 EDG fails to autostart and the pushbutton on C10 fails to start the EDG. STATION BLACKOUT. EFW valve to the "A" OTSG fails open resulting in level being raised higher than the EFIC controlled setpoint.
PZR level transmitter (LT1001) fails to upscale Time   Position                                 Applicants Actions or Behavior T=20    CBOR      Recognize and report that PZR level indications are mismatched CREW       Diagnose LT1001 failure Tech. Spec. 3.3.15A CRS       Direct operations per 1203.015 Pressurizer Systems Failure, section 4.0.
Time Position Applicants Actions or Behavior T=40  CREW Recognize loss of offsite power CRS   Direct actions per the Reactor Trip Procedure, 1202.001.
CRS      Direct CBOR to select valid PZR level indicator for PZR level control.
CBOR   Manually trip the reactor by depressing the Rx. Trip pushbutton. Verify all rods on bottom and power dropping.
CBOR       Select LT1002 to control PZR level control valve (CV-1235) using hand switch on upright section of C04.
CBOT  Manually trip the turbine by depressing the Turbine Trip pushbutton CBOR/CBOT  Verify adequate subcooling margin.
CBOR      Verify CV-1235 opens to control PZR level at setpoint.
CRS  Transition to the Degraded Power Emergency Operating Procedure (1202.007). Direct operations per 1202.007. (Tech Spec. 3.8.1.G, AC Sources - Operating, Three or more required AC sources inoperable.)
EVENT TERMINATION CRITERIA Pressurizer level control is selected to LT1002 and PZR level control valve is controlling level in auto.
CBOT  Recognize the failure of #1 EDG to autostart CBOT  Attempt to manually start #1 EDG using push-button on C10.
NUREG-1021, Revision 8, Supplement 1
CRS  Transition to the Blackout Emergency Operating Procedure  (1202.008) and direct operations.  (Tech Spec. 3.8.1.G, AC Sources - Operating, Three or more required AC sources inoperable.)
 
CBOR  Verify EFW actuated and perform RT5 CRS  Dispatch AO to #1 EDG continued Appendix D Operator Actions Form ES-D-2 NUREG-1021, Revision 8, Supplement 1 Op-Test No: 2004-1 Scenario No:   2 Event No: 7 & 8 Page 10 of 11 Event
Appendix D                         Operator Actions                       Form ES-D-2 Op-Test No: 2004-1         Scenario No: 2               Event No: 4                          Page 6 of 11 Event


== Description:==
== Description:==
Loss of offsite power occurs. Reactor trip.  #1 EDG fails to autostart and the pushbutton on C10 fails to start the EDG. STATION BLACKOUT. EFW valve to the "A" OTSG fails open resulting in level being raised higher than the EFIC controlled setpoint.
B Main Feed flow transmitter drifts low slowly Time   Position                                 Applicants Actions or Behavior T=27    CBOR      Acknowledge and report annunciator K07 B4, SASS MISMATCH.
Time Position Applicants Actions or Behavior CRS  Communicate with Unit 2  to make the AAC generator available for use by Unit 1.
CBOR/T      Determine the cause of the alarm by scanning C03, C04, and C13 for SASS ENABLE light that is not illuminated. Identify the B MFW flow SASS Enable not illuminated.
CRS  Direct manual isolation of letdown and RCP seal return.
CBOR       Determine that SASS did not transfer to the Y instrument for control.
CBOR Close CV1223 on C04.
CRS      Refer to ACA 1203.012F for corrective action and guidance.
CBOT  Place RCP seal Bleedoff alternate path to quench tank valves in CLOSED position on C13. CRS Dispatch the WCO to isolate letdown by manually closing CV1221 and isolating RCP seal return by manually closing CV1274.
CRS       Direct the CBOR to place both FW pump H/A stations , and control rods in MANUAL. (Reactor Demand or Diamond station to MANUAL is acceptable)
CBOR Close both MSIVs (CV2691 and CV2692) on C09.
CBOR       Place the BOTH MFW pump H/A stations to MANUAL and Reactor Demand or Diamond Station to MANUAL.
CBOR Report the EFW valve, CV2645 to the "A" OTSG, will not control and will not  move in manual. CT  CBOR  Manually throttle CV2627 on C09 to establish approximately 280 gpm.
CRS      Direct the CBOR to stabilize the plant CBOR      Using the MFW pump H/A stations and control rods, balance feedwater flows and Tave to return to normal values.
CRS Direct the CBOT to place the AAC generator on the A3 bus utilizing O.P. 1107.002.
CRS       Direct the CBOT to compare failed instrument to the non-selected instrument using PMS.
INSTRUCTOR NOTE:  Make the AAC generator available to the crew by performing the following; RMF EDA901 TRUE Call as the Unit 2 CRS and report the AAC generator is available for loading the vital bus.
CBOT      Using PMS, verify the non-selected MFW flow is reading correctly.
CT  CBOT  Place the AAC generator on the A3 bus.
CRS      Direct the CBOR to select the Y MFW flow instrument for loop B.
continued Appendix D Operator Actions Form ES-D-2 NUREG-1021, Revision 8, Supplement 1 Op-Test No: 2004-1 Scenario No:   2 Event No: 7 & 8 Page 11 of 11 Event
CBOR      Select the Y instrument for loop B MFW flow.
continued NUREG-1021, Revision 8, Supplement 1
 
Appendix D                   Operator Actions                         Form ES-D-2 Op-Test No: 2004-1         Scenario No: 2             Event No: 4                        Page 7 of 11 Event


== Description:==
== Description:==
Loss of offsite power occurs. Reactor trip.  #1 EDG fails to autostart and the pushbutton on C10 fails to start the EDG. STATION BLACKOUT. EFW valve to the "A" OTSG fails open resulting in level being raised higher than the EFIC controlled setpoint.
B Main Feed flow transmitter drifts low slowly Time   Position                               Applicants Actions or Behavior NOTE: A caution placard on both C03 and C13 provides direction of selecting the associated X or Y MFW Temperature instrument when the MFW flow instrument is selected due to hard wired temperature compensation of the MFW flow instrument.
Time Position Applicants Actions or Behavior CRS  Transition back to the Degraded Power procedure (1202.007).
CRS      Direct the CBOT to select the Y MFW temperature instrument for loop B on C13.
CT  CBOR  Start P7B by releasing handswitch from Pull-to-lock and placing handswitch in the start position.
CBOT      Select the Y MFW temperature instrument for loop B.
CRS  Direct the CBOR to establish EFW to both OTSGs using P7B.
CBOR       Place ICS in AUTO in accordance with 1105.004, ICS Operations.
CBOR Verify EFW flow to the OTSGs.
EVENT TERMINATION CRITERIA B Main Feedwater Flow Y instrument selected and ICS in AUTO NUREG-1021, Revision 8, Supplement 1
EVENT AND SCENARIO TERMINATION CRITERIA Power restored to the A3 bus from the AAC generator and EFW re-established to both OTSGs from P7B OR  as directed by the lead examiner.


Appendi x D Oper ator Acti ons For m ES-D-1  Facilit y: ANO-1                       Scenar io No.: 3 (M O D)                          O p-T est No.: 2004-1 Page of 10 Ex am iner s: O per at or s:          I n it ial Condit i ons:  90% pow er , eq uilibr i um X enon, M O L, #2 EDG SW v a lv e f a ils t o open on m anual st ar t. T u r nov er:: 90% pow er , M O L, eq uilibr i um X enon. AO r out inely check i ng t r av eling scr eens due t o m ild shad r un ov er past 24 hr s. Sy st em Eng i neer ing and O p s M anag em ent hav e discussed r o t a t i on of oper at ing M a k eup pum ps. T hey w ill call cont r o l r oom w hen t hey w ant t h is ev olut ion per f o r m ed. Ev ent No. M a lf. No. Ev ent T y pe* Ev ent Descr ipt i on 1 I M F C5A C (B O T) Condenser Vacuum Pum p C5A t r ips 2  N/A N (A LL)  Shif t r unning m a k e up pum ps f r om P36B t o P36C t o eq ualiz e r un t i m e s 3 N/A R (B O R)  Load dispat cher or der s pow er incr ease t o 100% due t o g r id loading
Appendix D                     Operator Actions                        Form ES-D-2 Op-Test No: 2004-1         Scenario No: 2            Event No: 5 & 6                  Page 8 of 11 Event
. 4  T R 458 I (B O R) Cont r o lling RCS pr essur e f a ils t o 2280# 5  I M F CV1008 C (B O R) PZR spr a y v a lv e leak s by af t e r cy cling 6  I M F ED453 I (A LL) SPDS f a ilur e 7  I M F RC005 M (A LL) SB LO CA  8 I M F CV1400 C (B O R) LPI inj e ct ion v a lv e CV1400 does not open. 9 I M F E S 2 5 9 I M F ES260 C (B O R)  ESAS channels 1, 2 f a il t o act uat e at RCS pr essur e set point *  (N)o r m a l,   (R)eact i v i t y ,    (I)n st r u m ent ,   (C)o m ponent ,    (M)a j o r  NUREG-1021, Rev i sion 8, Supplem ent 1 Appendi x D Oper ator Acti ons For m ES-D-1   Page of 10 Ev ent No. T i m e M a lf. No. Value/Ram p Ti me Ev ent Descr ipt i on 8 & 9 T=0 IM F C V 1400 IM F ES259 IM F ES260 IM F C V 3807 0 R a mp 0 N/A 0  R a mp 0 LPI Block v a lv e, C V 1400, does not open.
 
ES channels 1 and 2 fail to auto actuate
== Description:==
#2 ED G SW v a lv e fails to open w hen ED G autostarts 1 T=2 IM F C 5 A O FF C ondenser Vacuum Pump C 5 A trips 2 T=~10 N/A N/A Shift running M a keup Pumps 3 T=20 N/A N/A Load dispatcher orders pow er escalation  to 100%
B Main Feedwater pump excessive vibration and power reduction to secure B MFW pump for repair.
Time    Position                              Applicants Actions or Behavior T=30    CBOR      Acknowledge and report annunciator K06 C3, B MFP TURB CONTROL SYS TROUBLE.
CRS      Refer to ACA 1203.012E for corrective action and guidance.
CBOR/T      Report vibration alarm on B MFP from OIT alarm panel OR TSI.
CRS      Direct AO to verify/confirm B MFP has excessive vibration.
CRS      Direct the CBOR and CBOT to perform a power reduction to approxiomately 40%
power to secure the B MFP.
CBOR      Begin a power reduction to 40% power using the Unit Load Demand (ULD).
EVENT TERMINATION CRITERIA Power reduction >10%
NUREG-1021, Revision 8, Supplement 1
 
Appendix D                      Operator Actions                          Form ES-D-2 Op-Test No: 2004-1        Scenario No: 2              Event No: 7 & 8                        Page 9 of 11 Event
 
== Description:==
Loss of offsite power occurs. Reactor trip. #1 EDG fails to autostart and the pushbutton on C10 fails to start the EDG. STATION BLACKOUT. EFW valve to the A OTSG fails open resulting in level being raised higher than the EFIC controlled setpoint.
Time    Position                                Applicants Actions or Behavior T=40    CREW      Recognize loss of offsite power CRS      Direct actions per the Reactor Trip Procedure, 1202.001.
CBOR      Manually trip the reactor by depressing the Rx. Trip pushbutton. Verify all rods on bottom and power dropping.
CBOT      Manually trip the turbine by depressing the Turbine Trip pushbutton CBOR/      Verify adequate subcooling margin.
CBOT CRS      Transition to the Degraded Power Emergency Operating Procedure (1202.007).
Direct operations per 1202.007.
(Tech Spec. 3.8.1.G, AC Sources - Operating, Three or more required AC sources inoperable.)
CBOT      Recognize the failure of #1 EDG to autostart CBOT      Attempt to manually start #1 EDG using push-button on C10.
CRS      Transition to the Blackout Emergency Operating Procedure (1202.008) and direct operations.
(Tech Spec. 3.8.1.G, AC Sources - Operating, Three or more required AC sources inoperable.)
CBOR      Verify EFW actuated and perform RT5 CRS      Dispatch AO to #1 EDG continued NUREG-1021, Revision 8, Supplement 1
 
Appendix D                    Operator Actions                          Form ES-D-2 Op-Test No: 2004-1        Scenario No: 2              Event No: 7 & 8                      Page 10 of 11 Event
 
== Description:==
Loss of offsite power occurs. Reactor trip. #1 EDG fails to autostart and the pushbutton on C10 fails to start the EDG. STATION BLACKOUT. EFW valve to the A OTSG fails open resulting in level being raised higher than the EFIC controlled setpoint.
Time   Position                                Applicants Actions or Behavior CRS      Communicate with Unit 2 to make the AAC generator available for use by Unit 1.
CRS      Direct manual isolation of letdown and RCP seal return.
CBOR      Close CV1223 on C04.
CBOT      Place RCP seal Bleedoff alternate path to quench tank valves in CLOSED position on C13.
CRS      Dispatch the WCO to isolate letdown by manually closing CV1221 and isolating RCP seal return by manually closing CV1274.
CBOR      Close both MSIVs (CV2691 and CV2692) on C09.
CBOR      Report the EFW valve, CV2645 to the A OTSG, will not control and will not move in manual.
CT   CBOR      Manually throttle CV2627 on C09 to establish approximately 280 gpm.
CRS      Direct the CBOT to place the AAC generator on the A3 bus utilizing O.P. 1107.002.
INSTRUCTOR NOTE: Make the AAC generator available to the crew by performing the following; RMF EDA901 TRUE Call as the Unit 2 CRS and report the AAC generator is available for loading the vital bus.
CT    CBOT      Place the AAC generator on the A3 bus.
continued NUREG-1021, Revision 8, Supplement 1
 
Appendix D                       Operator Actions                          Form ES-D-2 Op-Test No: 2004-1         Scenario No: 2              Event No: 7 & 8                      Page 11 of 11 Event
 
== Description:==
Loss of offsite power occurs. Reactor trip. #1 EDG fails to autostart and the pushbutton on C10 fails to start the EDG. STATION BLACKOUT. EFW valve to the A OTSG fails open resulting in level being raised higher than the EFIC controlled setpoint.
Time    Position                                Applicants Actions or Behavior CRS      Transition back to the Degraded Power procedure (1202.007).
CT      CBOR      Start P7B by releasing handswitch from Pull-to-lock and placing handswitch in the start position.
CRS      Direct the CBOR to establish EFW to both OTSGs using P7B.
CBOR      Verify EFW flow to the OTSGs.
EVENT AND SCENARIO TERMINATION CRITERIA Power restored to the A3 bus from the AAC generator and EFW re-established to both OTSGs from P7B OR as directed by the lead examiner.
NUREG-1021, Revision 8, Supplement 1
 
Appendix D                    Operator Actions                  Form ES-D-1 Facility: ANO-1                 Scenario No.: 3 (MOD)                    Op-Test No.: 2004-1 Page 1 of 10 Examiners:                                                        Operators:
Initial Conditions:
90% power, equilibrium Xenon, MOL, #2 EDG SW valve fails to open on manual start.
Turnover::
90% power, MOL, equilibrium Xenon. AO routinely checking traveling screens due to mild shad run over past 24 hrs. System Engineering and Ops Management have discussed rotation of operating Makeup pumps. They will call control room when they want this evolution performed.
Event          Malf. No.      Event                              Event No.                          Type*                            Description 1           IMF C5A        C (BOT)    Condenser Vacuum Pump C5A trips 2             N/A         N (ALL)    Shift running make up pumps from P36B to P36C to equalize run times 3             N/A         R (BOR)    Load dispatcher orders power increase to 100%
due to grid loading.
due to grid loading.
4 T=2 5 I M F T R 4 5 8 2 2 8 0  R a mp 2 M i n. C ontrolling R C S pressure fails to 2280 psig 5 T=Spray va l v e closure IM F C V 1008 .12 PZR Spray Valv e leaks through 6 T=30 IM F ED 453 N/A SPD S failure 7 T=35 IM F R C 005 .007 R 0 Small Break LO C A into the C ontainment Building NUREG-1021, Rev i sion 8, Supplem ent 1 Appendi x D Oper ator Acti ons For m ES-D-2   O p-T es t No: 2004-1          Sc enar io No:    3 Ev ent No:   1 Page 3 of 10 Event Des c r iption: Condens er Vac uum Pum p , C5A, tr ips. Ti m e Pos i tion Applic ants Ac tions or Behavior T=2 CBOR   Ac k now ledge and r epor t annunc iator K05 A3, Vac uum Pum p T r ip, alar m  CRS   Ref e r to ACA 1203.012D f o r c o r r e c t ive ac tion and guidanc
4           TR458          I (BOR)    Controlling RCS pressure fails to 2280#
: e. CBOT   Ver i f y C5A has tr ipped by obs er ving pum p s t atus on C02. CBOT   Manually s t ar t s t andby Vac uum Pum p , C5B. CRS   Initiate s t eps to deter m i ne c aus e of pum p tr ip. Call AO to inves t igate. CBOT   Monitor c ondens er vac uum f o r r e tur n to nor m a l value. CRS   If c ondens er vac uum low e r s t o < 26.5" Hg, then go to Los s of Condens er Vac uum , 1203.016.
5         IMF CV1008        C (BOR)    PZR spray valve leaks by after cycling 6          IMF ED453        I (ALL)    SPDS failure 7          IMF RC005        M (ALL)    SB LOCA 8        IMF CV1400        C (BOR)    LPI injection valve CV1400 does not open.
CBOT   IF DESIRED, plac e the hand s w itc h f o r C5A in nor m a l-af ter-s top or Pull-T o-Loc k to c l ear the alar m. EVENT T E RM INA T IO N CRIT E RIA  C5B s t ar ted and vac uum r e tur ned to nor m a l OR Nex t Event NUREG-1021, Rev i sion 8, Supplem ent 1 Appendi x D Oper ator Acti ons For m ES-D-2   O p-T es t No: 2004-1         Sc enar io No:   3 Ev ent No:   2 Page 4 of 10 Event Des c r iption: Shif t Running Mak eup pum ps f r om P36B to P36C to equaliz e r un tim e s. Ti m e Pos i tion Applic ants Ac tions or Behavior T=10 CRS   Dir e c t the CBO R and CBO T to s h if t m a k eup pum ps by s t ar ting P36C and s t opping P36B per 1104.002, Mak eup and Pur i f i c a tion Sy s t em O per ations Pr oc edur e. CBOT   Star t P64C, Aux
9          IMF ES259        C (BOR)    ESAS channels 1, 2 fail to actuate at RCS IMF ES260                    pressure set point
. Lube O il pum p f o r P36C. CBOT   Af ter one m i nute of P64C oper ation, St art P36C. CBOT   Stop P64C.
* (N)ormal,      (R)eactivity, (I)nstrument,  (C)omponent,      (M)ajor NUREG-1021, Revision 8, Supplement 1
CBOT   Star t P64B   CBOT   Stop P36B.
 
CBOR   Ver i f y pr oper dis c har ge pr es s u r e on C04 and/or SPDS. CBOT   Af ter one m i nute of P64B oper ation, St o p P64B. CBOT   Change the pum p s t atus tags f o r the c o r r e c t alignm ent. EVENT T E RM INA T IO N CRIT E RIA  P36C r unning, P36B of f  NUREG-1021, Rev i sion 8, Supplem ent 1 Appendi x D Oper ator Acti ons For m ES-D-2   O p-T es t No: 2004-1         Sc enar io No:   3 Ev ent No:   3 Page 5 of 10 Event Des c r iption: Pow e r es c a lation to 100%.
Appendix D              Operator Actions                  Form ES-D-1 Page 2 of 10 Event    Time    Malf. No. Value/Ramp                          Event No.                        Time                              Description 8&9      T=0  IMF CV1400      0 Ramp LPI Block valve, CV1400, does not open.
Ti m e Pos i tion Applic ants Ac tions or Behavior T=20 CRS Dir e c t the c r ew to c ontinue pow er es c a lation to 100% at ~30/Hr. CBOR Begin pow er es c a lation by ver i f y ing the r a te of c hange s e t at ~.5%/m in. and r a is ing the dem and w i th the ULD s t ation. CBOT Ver i f y tur b ine load is r i s i ng and the tur b ine is m a intaining header pr es s u r e at the des ir ed s e tpoint. CBOR Ver i f y Reac tor pow er r i s i ng and f eedw ater f l ow r i s i ng to m a intain pr oper T a ve. EVENT T E RM INA T IO N CRIT E RIA  Pow e r r e tur ned to 100%
IMF ES259        N/A    ES channels 1 and 2 fail to auto actuate IMF ES260 IMF CV3807    0 Ramp 0    #2 EDG SW valve fails to open when EDG autostarts 1      T=2    IMF C5A        OFF      Condenser Vacuum Pump C5A trips 2     T=~10      N/A            N/A    Shift running Makeup Pumps 3      T=20      N/A            N/A    Load dispatcher orders power escalation to 100%
OR   Nex t Event   NUREG-1021, Rev i sion 8, Supplem ent 1 Appendi x D Oper ator Acti ons For m ES-D-2   O p-T es t No: 2004-1          Sc enar io No:   3 Event No: 4 & 5 Page 6 of 10 Event Des c r iption: Contr o lling RCS pr es s u r e f a ils and PZ R Spr a y Valve leak s thr ough. Ti m e Pos i tion Applic ants Ac tions or Behavior T=25 CBOR Identif y and r epor t a dis par ity betw een RCS pr es s u r e indic a tions. NO T E: Cr ew m a y or m a y not identif y the PZ R Spr a y valve s i m u ltaneous w i th pr es s u r e indic a tion f a ilur e. CREW   Diagnos e f a iled RCS pr es s u r e indic a tion us ing panel indic a tions , plant c o m puter and SPDS. (T ech. Sp ec. 3.3.1A
due to grid loading.
)      CBOR   If not identif ied ear lier , r epor t RCS pr es s u r e low e r i ng and the pr es s u r i z e r s p r a y valve open. CRS   Dir e c t oper ation per 1203.015, PZ R Sy s t em s F a ilur e s , Sec t ion 6   CBOR   Deter m ine and r epor t that the f a iled i ndic a tion is c ontr o lling RCS pr es s u r e. CBOR   Manually c l os e the pr es s u r i z e r s p r a y valve, CV1008.
4      T=25    IMF TR458        2280    Controlling RCS pressure fails to 2280 psig Ramp 2 Min.
CBOR   Repor t RCS pr es s u r e c ontinues to low e r. CRS   Dir e c t the CBO R to c l os e the pr es s u r i z e r s p r a y is olation, CV-1009. CT CBOR   Clos e CV1009, Pr es s u r i z e r Spr a y Valve Is olation. CRS   Dir e c t the CBO R to s e lec t the alter nat e RCS pr es s u r e indic a tion f o r c ontr o l. c ontinued          NUREG-1021, Rev i sion 8, Supplem ent 1 Appendi x D Oper ator Acti ons For m ES-D-2     O p-T es t No: 2004-1         Sc enar io No:   3 Event No: 4 & 5 Page 7 of 10 Event Des c r iption: Contr o lling RCS pr es s u r e f a ils and PZ R Spr a y Valve leak s thr ough. Ti m e Pos i tion Applic ants Ac tions or Behavior   CBOR   Selec t PT 1038 us ing the hands w i tc h on panel C04.
5   T=Spray IMF CV1008        .12     PZR Spray Valve leaks through valve closure 6     T=30   IMF ED453        N/A     SPDS failure 7     T=35   IMF RC005      .007 R 0   Small Break LOCA into the Containment Building NUREG-1021, Revision 8, Supplement 1
CRS   Ref e r enc e 1203.015, Pr es s u r i z e r Sy s t em s F a ilur e s , Pr es s u r i z e r Spr a y Valve (C V-1008) F a ilur e s e c t ion. (T ech Sp ec. T R M 3.4.3.A f o r d i f f e ren t ial t e mp erat u r e o f sp ray f l u i d an d p r essu riz e r t e mp erat u r e o f >430&deg;F)   CBOR Rec ogniz e and r epor t that RCS pr es s u r e is r e c o ver i ng. EVENT T E RM INA T IO N CRIT E RIA  Alter nate RCS pr es s u r e ins t r u m ent s e lec t ed and Pr es s u r i z e r Spr a y  valve c l os ed  OR Nex t Event NUREG-1021, Rev i sion 8, Supplem ent 1 Appendi x D Oper ator Acti ons For m ES-D-2     O p-T es t No: 2004-1 Sc enar io No: 3 Event No: 6 Page 8 of 10 Event Des c r iption: SPDS Los s of Pow e r. Ti m e Pos i tion Applic ants Ac tions or Behavior T=30 CREW Rec ogniz e and r epor t the f a ilur e of the SPDS dis p lay s in the c ontr o l r oom on panels C09 and C19.
 
CRS Contac t Unit 2 or Com puter Suppor t to attem p t to r eboot the SPDS c o m puter s. CRS   Ref e r to 1105.014, SPDS O per ation, to deter m i ne that ther e is a one hour tim e lim it to r e s t or e oper ation of at leas t one SPDS s y s t em OR it w ill bec om e a r epor table item. EVENT T E RM INA T IO N CRIT E RIA  T h is event w ill ex is t f o r the r e m a inder of the s c enar io. NUREG-1021, Rev i sion 8, Supplem ent 1 Appendi x D Oper ator Acti ons For m ES-D-2   O p-T es t No: 2004-1 Sc enar io No: 3 Event No: 7, 8, & 9 Page 9 of 10 Event Des c r iption: LO CA in the "
Appendix D                       Operator Actions                    Form ES-D-2 Op-Test No: 2004-1          Scenario No:    3         Event No: 1                         Page 3 of 10 Event
A" RCS loop T c old. ESAS c hannels 1 and 2 f a il to auto ac tuate. #2 EDG s e r v ic e w a ter valve f a ils to open w hen the EDG autos tar t s. Ti m e Pos i tion Applic ants Ac tions or Behavior T=35 CBOR Identif y pr es s u r i z e r level and RCS pr es s u r e dr opping. CBOT Rec ogniz e and r epor t RCS leak age into the Reac tor Building.  
 
(T ech Sp ec. 3.4.13.B RCS O p erat io n a l L E A K A G E) EA L 2.2, A L ERT (RCS leakag e >No r mal M akeu p cap acit y)   CRS   Dir e c t ac tions per the Reac tor T r ip Pr oc edur e, 1202.001.
== Description:==
CBOR   Manually tr ip the r eac tor by depr es s i ng the Rx. T r ip pus hbutton. Ver i f y all r ods on bottom and pow er dr opping. CBOT   Manually tr ip the tur b ine by depr es s i ng the T u r b ine T r ip pus hbutton    CBOR/CBOT  Ver i f y adequate s ubc ooling m a r g in. CRS Dir e c t initiation of HPI per RT 2. NOT E T he c r ew m a y m anually initiate ESAS due to the im m i nent autom atic ac tuation pr ior to r eac hing the s e tpoint and ther ef or e m a y not identif y the f a ilur e of c hannel 1 and 2 to auto ac tuate. CREW Rec ogniz e the ac tuation of ESAS on low RCS pr es s u r e. CBOR Identif y the f a ilur e of c hannels 1 and 2 of ESAS to ac tuate. CT CBOR Manually initiate c hannel 1 and 2 f r om the pus hbuttons on C04   CRS T r ans ition to ESAS pr oc edur e, 1202.010, and dir e c t c r ew oper ations    CBOR Chec k f o r adequate s ubc ooling m a r g in. c ontinued NUREG-1021, Rev i sion 8, Supplem ent 1 Appendix D Operator Actions Form ES-D-2 NUREG-1021, Revision 8, Supplement 1 Op-Test No: 2004-1 Scenario No: 3 Event No: 7, 8, & 9 Page 10 of 10Event
Condenser Vacuum Pump, C5A, trips.
Time    Position                                Applicants Actions or Behavior T=2     CBOR       Acknowledge and report annunciator K05 A3, Vacuum Pump Trip, alarm CRS       Refer to ACA 1203.012D for corrective action and guidance.
CBOT     Verify C5A has tripped by observing pump status on C02.
CBOT     Manually start standby Vacuum Pump, C5B.
CRS       Initiate steps to determine cause of pump trip. Call AO to investigate.
CBOT     Monitor condenser vacuum for return to normal value.
CRS       If condenser vacuum lowers to < 26.5 Hg, then go to Loss of Condenser Vacuum, 1203.016.
CBOT     IF DESIRED, place the hand switch for C5A in normal-after-stop or Pull-To-Lock to clear the alarm.
EVENT TERMINATION CRITERIA C5B started and vacuum returned to normal OR Next Event NUREG-1021, Revision 8, Supplement 1
 
Appendix D                     Operator Actions                    Form ES-D-2 Op-Test No: 2004-1         Scenario No:   3         Event No: 2                       Page 4 of 10 Event
 
== Description:==
Shift Running Makeup pumps from P36B to P36C to equalize run times.
Time    Position                              Applicants Actions or Behavior T=10     CRS       Direct the CBOR and CBOT to shift makeup pumps by starting P36C and stopping P36B per 1104.002, Makeup and Purification System Operations Procedure.
CBOT     Start P64C, Aux. Lube Oil pump for P36C.
CBOT     After one minute of P64C operation, Start P36C.
CBOT     Stop P64C.
CBOT     Start P64B CBOT     Stop P36B.
CBOR       Verify proper discharge pressure on C04 and/or SPDS.
CBOT     After one minute of P64B operation, Stop P64B.
CBOT     Change the pump status tags for the correct alignment.
EVENT TERMINATION CRITERIA P36C running, P36B off NUREG-1021, Revision 8, Supplement 1
 
Appendix D                       Operator Actions                      Form ES-D-2 Op-Test No: 2004-1         Scenario No:     3         Event No: 3                           Page 5 of 10 Event
 
== Description:==
Power escalation to 100%.
Time    Position                                  Applicants Actions or Behavior T=20     CRS       Direct the crew to continue power escalation to 100% at ~30/Hr.
CBOR       Begin power escalation by verifying the rate of change set at ~.5%/min. and raising the demand with the ULD station.
CBOT     Verify turbine load is rising and the turbine is maintaining header pressure at the desired setpoint.
CBOR       Verify Reactor power rising and feedwater flow rising to maintain proper Tave.
EVENT TERMINATION CRITERIA Power returned to 100%
OR Next Event NUREG-1021, Revision 8, Supplement 1
 
Appendix D                         Operator Actions                      Form ES-D-2 Op-Test No: 2004-1          Scenario No:     3           Event No: 4 & 5                     Page 6 of 10 Event
 
== Description:==
Controlling RCS pressure fails and PZR Spray Valve leaks through.
Time    Position                                  Applicants Actions or Behavior T=25   CBOR       Identify and report a disparity between RCS pressure indications.
NOTE: Crew may or may not identify the PZR Spray valve simultaneous with pressure indication failure.
CREW       Diagnose failed RCS pressure indication using panel indications, plant computer and SPDS. (Tech. Spec. 3.3.1A)
CBOR       If not identified earlier, report RCS pressure lowering and the pressurizer spray valve open.
CRS       Direct operation per 1203.015, PZR Systems Failures, Section 6 CBOR       Determine and report that the failed indication is controlling RCS pressure.
CBOR       Manually close the pressurizer spray valve, CV1008.
CBOR       Report RCS pressure continues to lower.
CRS       Direct the CBOR to close the pressurizer spray isolation, CV-1009.
CT     CBOR       Close CV1009, Pressurizer Spray Valve Isolation.
CRS       Direct the CBOR to select the alternate RCS pressure indication for control.
continued NUREG-1021, Revision 8, Supplement 1
 
Appendix D                     Operator Actions                  Form ES-D-2 Op-Test No: 2004-1         Scenario No:   3         Event No: 4 & 5                   Page 7 of 10 Event
 
== Description:==
Controlling RCS pressure fails and PZR Spray Valve leaks through.
Time    Position                              Applicants Actions or Behavior CBOR       Select PT1038 using the handswitch on panel C04.
CRS       Reference 1203.015, Pressurizer Systems Failures, Pressurizer Spray Valve (CV-1008) Failure section. (Tech Spec. TRM 3.4.3.A for differential temperature of spray fluid and pressurizer temperature of >430&deg;F)
CBOR       Recognize and report that RCS pressure is recovering.
EVENT TERMINATION CRITERIA Alternate RCS pressure instrument selected and Pressurizer Spray valve closed OR Next Event NUREG-1021, Revision 8, Supplement 1
 
Appendix D                     Operator Actions                      Form ES-D-2 Op-Test No: 2004-1         Scenario No: 3               Event No: 6                       Page 8 of 10 Event
 
== Description:==
SPDS Loss of Power.
Time    Position                                Applicants Actions or Behavior T=30   CREW       Recognize and report the failure of the SPDS displays in the control room on panels C09 and C19.
CRS       Contact Unit 2 or Computer Support to attempt to reboot the SPDS computers.
CRS       Refer to 1105.014, SPDS Operation, to determine that there is a one hour time limit to restore operation of at least one SPDS system OR it will become a reportable item.
EVENT TERMINATION CRITERIA This event will exist for the remainder of the scenario.
NUREG-1021, Revision 8, Supplement 1
 
Appendix D                         Operator Actions                    Form ES-D-2 Op-Test No: 2004-1         Scenario No: 3               Event No: 7, 8, & 9                 Page 9 of 10 Event
 
== Description:==
LOCA in the A RCS loop Tcold. ESAS channels 1 and 2 fail to auto actuate. #2 EDG service water valve fails to open when the EDG autostarts.
Time      Position                                Applicants Actions or Behavior T=35     CBOR     Identify pressurizer level and RCS pressure dropping.
CBOT     Recognize and report RCS leakage into the Reactor Building.
(Tech Spec. 3.4.13.B RCS Operational LEAKAGE)
EAL 2.2, ALERT(RCS leakage >Normal Makeup capacity)
CRS     Direct actions per the Reactor Trip Procedure, 1202.001.
CBOR     Manually trip the reactor by depressing the Rx. Trip pushbutton. Verify all rods on bottom and power dropping.
CBOT     Manually trip the turbine by depressing the Turbine Trip pushbutton CBOR/     Verify adequate subcooling margin.
CBOT CRS     Direct initiation of HPI per RT 2.
NOTE The crew may manually initiate ESAS due to the imminent automatic actuation prior to reaching the setpoint and therefore may not identify the failure of channel 1 and 2 to auto actuate.
CREW       Recognize the actuation of ESAS on low RCS pressure.
CBOR     Identify the failure of channels 1 and 2 of ESAS to actuate.
CT       CBOR     Manually initiate channel 1 and 2 from the pushbuttons on C04 CRS     Transition to ESAS procedure, 1202.010, and direct crew operations CBOR     Check for adequate subcooling margin.
continued NUREG-1021, Revision 8, Supplement 1
 
Appendix D                       Operator Actions                     Form ES-D-2 Op-Test No: 2004-1         Scenario No: 3               Event No: 7, 8, & 9               Page 10 of 10 Event


== Description:==
== Description:==
LOCA in the "A" RCS loop Tcold. ESAS channels 1 and 2 fail to auto actuate. #2 EDG service water valve fails to open when the EDG autostarts. Time Position Applicants Actions or Behavior CBOT Verify proper ESAS actuation per RT 10.
LOCA in the A RCS loop Tcold. ESAS channels 1 and 2 fail to auto actuate. #2 EDG service water valve fails to open when the EDG autostarts.
CBOT Identify the failure of the service water valve for the #2 EDG to open when the EDG autostarts.
Time     Position                                 Applicants Actions or Behavior CBOT     Verify proper ESAS actuation per RT 10.
CBOT Attempt to open the service water valve for #2 EDG.
CBOT     Identify the failure of the service water valve for the #2 EDG to open when the EDG autostarts.
CRS Direct the stopping of the #2 EDG.
CBOT     Attempt to open the service water valve for #2 EDG.
CBOT Stop the #2 EDG by placing the #2 EDG control switch in "LOCKOUT" position.
CRS     Direct the stopping of the #2 EDG.
CBOR Close or verify closed the following valves; CV-1008, CV-1009, and CV-1000 CRS   Transition to Loss of subcooling margin procedure, 1202.002, and direct crew actions. CBOR Control RCS pressure within limits of Figure 3 of EOP (RT 14)
CBOT     Stop the #2 EDG by placing the #2 EDG control switch in LOCKOUT position.
CBOR     Close or verify closed the following valves; CV-1008, CV-1009, and CV-1000 CRS     Transition to Loss of subcooling margin procedure, 1202.002, and direct crew actions.
CBOR     Control RCS pressure within limits of Figure 3 of EOP (RT 14)
EVENT and SCENARIO TERMINATION CRITERIA All appropriate channels of ESAS actuated and HPI injecting water into RCS and RCS pressure stable.
EVENT and SCENARIO TERMINATION CRITERIA All appropriate channels of ESAS actuated and HPI injecting water into RCS and RCS pressure stable.
OR As directed by the lead examiner}}
OR As directed by the lead examiner NUREG-1021, Revision 8, Supplement 1}}

Latest revision as of 20:27, 24 March 2020

ANO 1 - January 2004-Draft Operating Examination
ML041330337
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/23/2003
From:
Operations Branch IV
To:
Entergy Operations
References
-RFPFR, 50-313/04-301
Download: ML041330337 (128)


Text

ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-RO-HTBAL2 Page 1 of 4 UNIT: 1 REVISION # 0 DATE:

TUOI NUMBER: A1JPM-RO-HTBAL2 SYSTEM: A.1 - Conduct of Operations TASK: Perform a Manual Heat Balance Calculation JTA: ANO-RO-ADMIN-NORM-182 KA VALUE RO 2.9 SRO 4.0 KA

REFERENCE:

2.1.12 APPROVED FOR ADMINISTRATION TO: RO X SRO TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: PERFORM LAB:

POSITION EVALUTED: RO X SRO ACTUAL TESTING ENVIRONMENT: PLANT SITE: SIMULATOR: X LAB:

ACTUAL TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 45 MINUTES

REFERENCES:

1103.016 Heat Balance Calculation EXAMINEES NAME: SSN:

EVALUATORS NAME:

THE EXAMINEES PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

START TIME: STOP TIME: TOTAL TIME:

SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARTED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-RO-HTBAL2 Page 2 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: It is desired to verify the accuracy of the PMS calculated Rx Thermal Power (XPP) in order to ensure compliance with Technical Specification SR 3.3.1.2.

All data has been recorded and 1103.016, Att. 2 has been started.

TASK STANDARD: The examinee has correctly calculated Secondary Side Heat Balance in Att. 2, step 2.4 and Best Estimate of Reactor Power, step 2.6.

TASK PERFORMANCE AIDS: Copies of partially completed 1103.016.

ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-RO-HTBAL2 Page 3 of 4 INITIATING CUE:

The CRS requests that you complete the remainder of 1103.016, Attachment 2, Manual Heat Balance, beginning with step 9.2.

CRITICAL ELEMENTS (C): 1 (C) PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT NOTE: Provide examinee with a copy of partially completed 1103.016.

(C) 1. Perform calculations in Examinee calculated %FPSEC Attachment 2. as 99.989% per step 2.4 in Att. 2. Accept answers between 99.7 and 100.2%.

Examinee calculated %FP as 99.989% per step 2.4 in Att.

2. Accept answers between 99.7 and 100.2%.

END

ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-RO-HTBAL2 Page 4 of 4 JPM INITIAL TASK CONDITIONS:

  • It is desired to verify the accuracy of the PMS calculated Rx Thermal Power (XPP) in order to ensure compliance with Technical Specification SR 3.3.1.2.
  • All data has been recorded and 1103.016, Att. 2 has been started.

INITIATING CUE:

  • The CRS requests that you complete the remainder of 1103.016, Attachment 2, Manual Heat Balance, beginning with step 9.2.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-DWG1 Page 1 of 4 UNIT: 1 REV # 0 DATE: ______________________________

TUOI NUMBER: A1JPM-RO-DWG1 SYSTEM/DUTY AREA: ADMINISTRATIVE TOPIC - CONDUCT OF OPERATIONS TASK: DETERMINE ISOLATION BOUNDARY USING DRAWINGS AND/OR PRINTS JTA#: ENS-OPER-PTAG-ADMIN-1 KA VALUE RO: 2.8 SRO: 3.1 KA

REFERENCE:

2.1.24 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR:_________ BOTH:________

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:_______________ SIMULATOR: PERFORM LAB:__________________

POSITION EVALUATED: RO:___ __ SRO:___________

ACTUAL TESTING ENVIRONMENT: SIMULATOR: X PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:_________ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES: 10 MINUTES REFERENCE(S): 1107.001, M-213 sh. 2 EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-DWG1 Page 2 of 4 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

  • The WCO reports the Laundry Drain pump (P-45) has a severe seal leak.

INITIATING CUE:

The CRS directs you to determine the isolation boundary (electrical and mechanical) for Laundry Drain pump (P-45) in accordance with approved drawings and procedures.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-DWG1 Page 3 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: The WCO reports the Laundry Drain pump (P-45) has a severe seal leak.

TASK STANDARD: The examinee has correctly identified the isolation boundary for Laundry Drain pump (P-45) using controlled drawings and procedures.

TASK PERFORMANCE AIDS: Simulator drawings and procedures

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-DWG1 Page 4 of 4 INITIATING CUE:

The CRS directs you to determine the isolation boundary (electrical and mechanical) for Laundry Drain pump (P-

45) in accordance with approved drawings and procedures.

CRITICAL ELEMENTS (C) 1 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT NOTE:

Inform examinee that this task is to identify the isolation boundary only, a tagout will not be prepared.

(C) 1. Determine isolation boundaries. Examinee determined proper boundary isolations to include:

  • B3134, power supply
  • LZ-2A, Suction from T-19
  • LZ-2B, Suction from T-19
  • LZ-4411A, Suction from T-109
  • LZ-4411B, Suction from T-109
  • LZ-4, Discharge
  • Open ABS-25 casing drain(not required for full credit)

(Note: Examinee should determine boundary isolations using controlled procedures and drawings, specifically 1107.001 and M-213 sh. 2).

END

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-SURV3 Page 1 of 4 UNIT: 1 REV # 2 DATE: ______________________________

TUOI NUMBER: A1JPM-RO-SURV3 SYSTEM/DUTY AREA: ADMINISTRATIVE TOPIC - EQUIPMENT CONTROL TASK: PERFORM SURVEILLANCE TESTS JTA#: ANO-RO-ADMIN-NORM-23 KA VALUE RO: 3.0 SRO: 3.4 KA

REFERENCE:

2.2.12 APPROVED FOR ADMINISTRATION TO: RO: X SRO:

TASK LOCATION: INSIDE CR: X OUTSIDE CR:_________ BOTH:________

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:_______________ SIMULATOR: PERFORM LAB:__________________

POSITION EVALUATED: RO:____ __ SRO:___________

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:_________ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES: 10 MINUTES REFERENCE(S): 1104.036, Emergency Diesel Generator Operation EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-SURV3 Page 2 of 4 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

  • A surveillance test of DG1 Fuel Transfer Pump P-16A is in progress.
  • Supplement 5 of 1104.036 up to step 2.6 is completed.

INITIATING CUE:

The CRS directs you to complete the surveillance test of P-16A in accordance with 1104.036, Supplement 5.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-SURV3 Page 3 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: A surveillance test of DG1 Fuel Transfer Pump P-16A is in progress.

Data gathering of Supplement 5 of 1104.029 up to step 2.6 is completed.

TASK STANDARD: The examinee calculates pump flow rate correctly on Supplement 5 of 1104.036 and determines the data is below the minimum in the acceptance criteria.

TASK PERFORMANCE AIDS: 1104.036, Supplement 5, completed to step 2.6.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-SURV3 Page 4 of 4 INITIATING CUE:

The CRS directs you to complete the surveillance test of P-16A in accordance with 1104.036, Supplement 5.

CRITICAL ELEMENTS (C) 2, 3, 4 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT

1. Review 1104.036, Supplement 5. Examinee reviewed 1104.036, Supplement 5. ____ ____ ____

NOTE: Inform examinee that the stopwatch reads 9:41.36 (9 minutes, 41.36 seconds).

(C) 2. Calculate pump flow rate. Examinee correctly calculated pump flow rate.

Per note, 41.36 seconds equals .68 ____ ____ ____

minutes.

(200 - 105) / 9.68 = 9.81 gpm (C) 3 Record flow rate in Section 3.0. Examinee recorded flow rate in ____ ____ ____

Section 3.0.

(C) 4 Evaluate flow rate, compare to Examinee circled NO in column LIMITING RANGE FOR titled IS DATA WITHIN LIMITING ____ ____ ____

OPERABILITY value. RANGE.

Examinee discussed declaring pump inoperable, notifying SM, writing Condition Report, initiating corrective action, and referring to Tech Specs.

NOTE:

The SM or CRS will consult Tech Specs to determine operability, it is the ROs responsibility to report the inoperability of P-16A only. Diesel operability will be determined by the SM/CRS.

Inform examinee that steps 2.8 through 2.11 have been completed.

END

TUOI NUMBER: Page 1 of 4 A1JPM-RO-DOSE-XX JOB PERFORMANCE MEASURE Unit: 1 Rev # 1 Date: 1/12/2004 TUOI NUMBER: A1JPM-RO- DOSE-XX System/Duty Area: Administrative Topic-Radiation Control Task: Calculate Stay times for yourself and another operator JA#

KA Value RO 2.6 SRO 3.3 KA Reference G 2.3.10 Approved For Administration To: RO SRO Task Location: Inside CR: Outside CR: Both:

Suggested Testing Environment And Method (Perform Or Simulate): Simulate Plant Site: Simulator: Perform Lab:

Position Evaluated: RO: X SRO: X Actual Testing Environment: Simulator: Plant Site: Lab Testing Method: Simulate: Perform:

Approximate Completion Time In Minutes: 10 Minutes Reference(S): HP Survey Map of P36C, Pump Room 54.

Examinee's Name: SSN:

Evaluator's Name:

The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:

Satisfactory: Unsatisfactory:

Performance Checklist Comments:

Start Time Stop Time Total Time Signed Date:

Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.

TUOI NUMBER: Page 2 of 4 A1JPM-RO-DOSE-XX THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

You are an AO with the plant at full power. A hot spot has developed on Makeup PUMP P36C. You and another AO will be working in the vicinity of the reduction gear assembly in order to flush the lines reduce the hot spot radiation field.

Using the supplied survey map, determine the individual stay times for yourself AND the other AO without exceeding the annual administrative dose limit (Ignore dose received during transit). You have an accumulated annual Whole Body dose of 1805 mR (ANO records). The other AO has an accumulated annual Whole Body dose of 1820 mR (ANO records). No additional dose has been received at any other site.

Also, calculate stay time if the air in the pump room was contaminated with a level of 0.29 DAC (stochastic) assuming no respirators are used.

Calculations should be based on ANO Unit 1 Administrative dose limits. Provide answers with 3 significant figures (example 4.50). Do not consider ALARA task requirements. Any required dose extensions have been processed and approved.

TASK STANDARD:

The examinee has correctly determined the stay times for himself and the other AO on the assignment.

TASK PERFORMANCE AIDS:

HP Survey map of P36C Pump Room, Room number 54.

SIMULATOR SETUP:

N/A

TUOI NUMBER: Page 3 of 4 A1JPM-RO-DOSE-XX INITIATING CUE: Determine the Stay time for you and the other AO on the job. Also determine the stay time if the air in the pump room was contaminated with a level of 0.29 DAC (stochastic) assuming no respirators are used. Provide answers with 3 significant figures (example 4.50).

CRITICAL ELEMENTS (c): 1,2, and 3 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT C 1. Determine the HIGHEST general area dose rate in Examinee has determined the the area of the reduction gear assembly to be used HIGHEST general area dose rate ____ ____ ___

from the survey map. in the area of the reduction gear assembly to be used from the survey map of P36C pump room.

(60 mR/hr)

C 2. Determine Stay time (to 3 significant figures) with Examinee has determined that no airborne contamination for both operators. the stay time for him/her is 3.25 ____ ____ ___

hrs and the stay time for the other AO is 3.00 hrs plus or minus 0.01 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

C 3. Determine Stay time( to 3 significant figures) WITH Examinee has determined that airborne contamination for both operators. the stay time for him/her is ____ ____ ___

3.21hrs and the stay time for the other AO is 2.96 hrs plus or minus 0.01 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

EXAMINERS CUE: This concludes the JPM.

END

TUOI NUMBER: Page 4 of 4 A1JPM-RO-DOSE-XX EXAMINEES COPY INITIAL CONDITIONS:

You are an AO with the plant at full power. A hot spot has developed on Makeup PUMP P36C. You and another AO will be working in the vicinity of the reduction gear assembly in order to flush the lines reduce the hot spot radiation field.

Using the supplied survey map, determine the individual stay times and another AO without exceeding the annual administrative dose limit (Ignore dose received during transit). You have an accumulated annual Whole Body dose of 1810 mR (ANO records). The other AO has an accumulated annual Whole Body dose of 1820 mR (ANO records). No additional dose has been received at any other site.

Also calculate stay time if the air in the pump room was contaminated with a level of 0.29 DAC (stochastic) assuming no respirators are used.

Calculations should be based on ANO Unit 1 Administrative dose limits. Provide answers with 3 significant figures (example 4.50). Do not consider ALARA task requirements. Any required dose extensions have been processed and approved.

INITIATING CUE:

Determine the Stay time for you and the other AO on the job. Also determine stay time if the air in the pump room was contaminated with a level of 0.29 DAC (stochastic) assuming no respirators are used. Provide answers with 3 significant figures (example 4.50).

TUOI NUMBER: Administrative Questions A1JPM-RO-EP-XX Page 1 of 4 JOB PERFORMANCE MEASURE Unit: 1 Rev # 1 Date: 1/12/2004 TUOI NUMBER: A1JPM-RO- EP-XX System/Duty Area: Administrative Topic-Emergency Plan Task: Answer two questions regarding RO responsibilities in Emergency Plan implementation JA#

KA Value RO 3.3 SRO 3.1 KA Reference G 2.4.39 Approved For Administration To: RO SRO Task Location: Inside CR: Outside CR: Both:

Suggested Testing Environment And Method (Perform Or Simulate): Perform Plant Site: Simulator: Perform Lab:

Position Evaluated: RO: X SRO:

Actual Testing Environment: Simulator: Plant Site: Lab Testing Method: Simulate: Perform:

Approximate Completion Time In Minutes: 10 Minutes Reference(S): 1903.030, change 024-03-0, step 6.2.2c.

1903.011, change 024-03-0, form YY.

Examinee's Name: SSN:

Evaluator's Name:

The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:

Satisfactory: Unsatisfactory:

Performance Checklist Comments:

Start Time Stop Time Total Time Signed Date:

Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.

TUOI NUMBER: Administrative Questions A1JPM-RO-EP-XX Page 2 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.

Type: Closed Reference Completion Time: 10 minutes Question 1: You are attending requal training in the RETC. A plant evacuation is announced. What is your assembly area?

Q1 Answer : The Operations Support Center (OSC).

Reference:

1903.030, change 024-03-0, step 6.2.2c.

Comments:

Question 2: After declaring an emergency, how soon must the ADH be notified?

Q2 Answer : 15 minutes

Reference:

1903.011, change 024-03-0, form YY.

Comments:

TASK STANDARD:

The examinee has correctly answered both questions.

TUOI NUMBER: Administrative Questions A1JPM-RO-EP-XX Page 3 of 4 EXAMINEES COPY Type: Closed Reference Completion Time: 10 minutes Question 1: You are attending requal training in the RETC. A plant evacuation is announced. What is your assembly area?

Comments:

Question 2: After declaring an emergency, how soon must the ADH be notified?

Comments:

ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-SRO-HTBAL1 Page 1 of 4 UNIT: 1 REVISION # 0 DATE:

TUOI NUMBER: A1JPM-SRO-HTBAL1 SYSTEM: A.1 - Conduct of Operations TASK: Review a Manual Heat Balance Calculation JTA: ANO-SRO-ADMIN-NORM-200 KA VALUE RO 2.9 SRO 4.0 KA

REFERENCE:

2.1.12 APPROVED FOR ADMINISTRATION TO: RO SRO X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: PERFORM LAB:

POSITION EVALUTED: RO SRO X ACTUAL TESTING ENVIRONMENT: PLANT SITE: SIMULATOR: X LAB:

ACTUAL TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 45 MINUTES

REFERENCES:

1103.016 Heat Balance Calculation EXAMINEES NAME: SSN:

EVALUATORS NAME:

THE EXAMINEES PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

START TIME: STOP TIME: TOTAL TIME:

SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARTED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-SRO-HTBAL1 Page 2 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: It is desired to verify the accuracy of the PMS calculated Rx Thermal Power (XPP) in order to ensure compliance with Technical Specification SR 3.3.1.2.

The CBOT has completed 1103.016, Heat Balance Calculation, and calculated Rx thermal power to be 101.483%.

NIs are reading an average of 99.1%. The CBOTs math has been verified to be correct by an extra RO.

TASK STANDARD: The examinee has correctly identified two of four errors in Heat Balance Calculation.

TASK PERFORMANCE AIDS: Copies of completed 1103.016.

ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-SRO-HTBAL1 Page 3 of 4 INITIATING CUE:

  • Review the operators completed 1103.016 and complete section 11.0.
  • In addition, verify compliance with Technical Specification SR 3.3.1.2. .

CRITICAL ELEMENTS (C): 1, 3 (C) PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT NOTE: Provide examinee with a copy of completed 1103.016. Examinee may state initially that the as performed Heat Balance would require adjustment of NIs to be in compliance with Tech Spec SR 3.3.1.2.

(C) 1. Review 1103.016. Examinee reviewed 1103.016.

Examinee discovered two of four errors in calculations.

1. Step 2.4 value used for Q losses was taken from step 2.2 vs. 2.3.
2. Step 2.5 a value of 600 was given for HHA instead of real value.
3. Step 2.5 value used for Q losses was taken from step 2.2 vs. 2.3.
4. Step 2.6 % full power calculation is incorrect due to above errors.
2. Instruct CBOT to re-perform Examinee stated that 1103.016. 1103.016 should be re-performed.

NOTE: Inform examinee that 1103.016 has been re-performed and calculated Rx thermal power is 99.99%.

(C) 3. Verify compliance with Technical Examinee concludes that SR Specification surveillance SR 3.3.1.2 as recalculated Rx 3.3.1.2. thermal power is within 2% of initial NI readings.

END

ADMINISTATIVE JOB PERFORMANCE MEASURE A1JPM-SRO-HTBAL1 Page 4 of 4 JPM INITIAL TASK CONDITIONS:

  • It is desired to verify the accuracy of the PMS calculated Rx Thermal Power (XPP) in order to ensure compliance with Technical Specification SR 3.3.1.2.
  • The CBOT has completed 1103.016, Heat Balance Calculation, and calculated Rx thermal power to be 101.483%
  • NIs are reading an average of 99.1%.
  • The CBOTs math calculations have been verified to be correct by an extra RO.

INITIATING CUE:

  • Review the operators completed 1103.016 and complete section 11.0.
  • In addition, verify compliance with Technical Specification SR 3.3.1.2.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-SRO-SURV4 Page 1 of 4 UNIT: 1 REV # 0 DATE: ______________________________

TUOI NUMBER: A1JPM-SRO-SURV4 SYSTEM/DUTY AREA: ADMINISTRATIVE TOPIC - CONDUCT OF OPERATIONS TASK: MONITOR CONDUCT OF SHIFT SURVEILLANCE TESTS JTA#: ANO-SRO-ADMIN-NORM-200 KA VALUE RO: 3.0 SRO: 3.4 KA

REFERENCE:

2.2.12 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR:_________ BOTH:____X____

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:_______________ SIMULATOR: PERFORM LAB:__________________

POSITION EVALUATED: RO:____ __ SRO:___________

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:_________ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES: 20 MINUTES REFERENCE(S): 1106.006, Emergency Feedwater Pump Operation EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-SRO-SURV4 Page 2 of 4 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

  • The quarterly test of Emergency Feedwater Pump (P-7B) per 1106.006, Supplement 11, was performed on the previous shift.
  • The SM is performing Section 4, Shift Manager Review and Analysis.

INITIATING CUE:

  • The SM requests that you conduct a peer review of the test since he has found some errors.
  • Identify at least 2 errors in the test.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-SRO-SURV4 Page 3 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: The quarterly test of Emergency Feedwater Pump (P-7B) per 1106.006, Supplement 11, was performed on the previous shift. The SM is performing Section 4, Shift Manager Review and Analysis.

TASK STANDARD: The examinee has reviewed 1106.0006, Supplement 11 and identified at least 2 administrative errors in the test.

TASK PERFORMANCE AIDS: Completed 1106.0006, Supplement 11.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: A1JPM-SRO-SURV4 Page 4 of 4 INITIATING CUE:

  • The SM requests that you conduct a peer review of the test since he has found some errors.
  • Identify at least 2 errors in the test.

CRITICAL ELEMENTS (C) 2 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT

1. Review 1106.006, Supplement 11. Examinee reviewed 1106.006, Supplement 11.

(C) 2. Identify at least 2 administrative Examinee identified at least 2 of the errors. following administrative errors:

  • Independent verification initials missing in step 1.2.1.
  • Entry into T.S. time clock step was N/Ad at step 2.1.4.
  • Acceptance Criteria Table 4, EFW Test Recirc Flow FI-2888 recorded as 532 gpm and YES circled when this value is greater than Limiting Range for Operability.
  • Stopwatch cal due date has expired in step 3.2.1.

END

TUOI NUMBER: Page 1 of 4 A1JPM-SRO-XX JOB PERFORMANCE MEASURE Unit: 1 Rev # 1 Date: 1/12/2004 TUOI NUMBER: A1JPM-SRO-XX System/Duty Area: Administrative Topic-Emergency Procedures/Plan Task: Determine Emergency Action Level after Scenario #3 of OP test.

JA#

KA Value RO SRO 4.1 KA Reference G 2.4.41 Approved For Administration To: RO SRO Task Location: Inside CR: Outside CR: Both:

Suggested Testing Environment And Method (Perform Or Simulate): Simulate Plant Site: Simulator: Perform Lab:

Position Evaluated: RO: SRO: X Actual Testing Environment: Simulator: Plant Site: Lab Testing Method: Simulate: Perform:

Approximate Completion Time In Minutes: 5 Minutes Reference(S): 1903.010 Emergency Action Level Classification, 1903.011, Emergency Response Notifications Examinee's Name: SSN:

Evaluator's Name:

The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:

Satisfactory: Unsatisfactory:

Performance Checklist Comments:

Start Time Stop Time Total Time Signed Date:

Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.

TUOI NUMBER: Page 2 of 4 A1JPM-SRO-XX THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

The following conditions existed at the end of Scenario 3:

Unit 1 Reactor was tripped due to SB LOCA with SCM lost and it will not be restored. All appropriate ESAS channels had actuated and Full HPI was injecting water into the RCS with pressure stable and being controlled close to the saturation line (may even be on it) but within the limits of Figure 3 of EOP (RT14). No fuel clad failure was indicated.

TASK STANDARD:

Examinee correctly classifies this event as an Site Area Emergency per EAL 2.4 and makes notifications to plant personnel per 1903.011M.

TASK PERFORMANCE AIDS:

1903.010 Attachments 1 and 3, 1903.011 Attachment 2, and 1903.011M SIMULATOR SETUP:

N/A

TUOI NUMBER: Page 3 of 4 A1JPM-SRO-XX INITIATING CUE: For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and Control Checklist in 1903.011.

CRITICAL ELEMENTS (c): 3and 6 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT

1. Compare event conditions with the Index of EALs, Turned to Attachment 1 of Attachment 1 of 1903.010, Emergency Action Level 1903.010, Index of EALs. ____ ____ ___

Classification.

2. Turn to appropriate EAL and compare EAL criteria Turned to a specific EAL in Safety with event conditions. System Function, Attachment 3 of ____ ____ ___

1903.010.

C 3. Declare the emergency classification. Declared or stated the event is an SAE per EAL 2.4, based on RCS ____ ____ ___

leakage greater than normal makeup capacity (not required to be stated), no fuel clad damage, and SCM not restored.

4. Initiate immediate notifications. Referred to 1903.011 and turned to Attachment 2.

NOTE: Cue the examinee that the Unit 2 Shift Engineer is performing the initial notifications per 1903.011 after the examinee has stated that Unit 2 Shift Engineer (or control room communicator) has been requested.

5. Begin completion of form 1903.011M, Alert Began completion of form Emergency Direction and Control Checklist for Shift 1903.011M Alert Emergency ____ ____ ___

Manager. Direction and Control Checklist for Shift Manager.

Examinee should fill in the data on items 1 and 2.

Examinee should simulate (or state) direction of the SE to complete the initial notification.

C 6. (Simulate) Announce emergency on plant paging Used plant-paging system to system. (simulate) make announcement ____ ____ ___

per step 4 of form 1903.011M.

EXAMINERS CUE: This concludes the JPM.

END

TUOI NUMBER: Page 4 of 4 A1JPM-SRO-XX EXAMINEES COPY INITIAL CONDITIONS:

The initial conditions for this jpm are the plant conditions when scenario #3 was terminated.

INITIATING CUE:

For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and Control Checklist in 1903.011.

TUOI NUMBER: Page 1 of 5 A1JPM-RO-CRD02 JOB PERFORMANCE MEASURE Unit: 1 Rev # 4 Date:

TUOI NUMBER: A1JPM-RO-CRD02 System/Duty Area: CONTROL ROD DRIVE SYSTEM Task: Perform Transfer To Auxiliary Supply JA# ANO1-RO-CRD-NORM-12 KA Value RO 3.4 SRO 3.4 KA Reference 001 A4.03 Approved For Administration To: RO SRO Task Location: Inside CR: Outside CR: Both:

Suggested Testing Environment And Method (Perform Or Simulate):

Plant Site: Simulator: Perform Lab:

Position Evaluated: RO: SRO:

Actual Testing Environment: Simulator: Plant Site: Lab Testing Method: Simulate: Perform:

Approximate Completion Time In Minutes: 15 Minutes Reference(S): 1105.009 Examinee's Name: SSN:

Evaluator's Name:

The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:

Satisfactory: Unsatisfactory:

Performance Checklist Comments:

Start Time Stop Time Total Time Signed Date:

Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.

TUOI NUMBER: Page 2 of 5 A1JPM-RO-CRD02 TUOI NUMBER: ANO-1-JPM-RO-CRD02 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Rx demand and diamond stations are in manual. Preparation to exercise rods per Supplement 2, 1105.009, is in progress.

TASK STANDARD:

Group 1 Rods have been transferred to the Auxiliary Power Supply and are enabled for being moved on that power supply in run speed.

TASK PERFORMANCE AIDS:

1105.009, Section 8.0

TUOI NUMBER: Page 3 of 5 A1JPM-RO-CRD02 TUOI NUMBER: ANO-1-JPM-RO-CRD02 INITIATING CUE: The CRS/SM directs you to transfer Group 1 Rods to the Auxiliary Power Supply for movement of Group 1 at run speed. IAW 1105.009, Section 8.0 CRITICAL ELEMENTS (c): 2, 3, 5, 6, 7, 8, 9, 10, 11 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT INSTRUCTOR NOTE:

Verify the Reactor Demand and Diamond are in manual.

1. Verify transfer reset lamp is ON and TR CF is On CRD Diamond Panel, ____ ____ ____

OFF. condition of both lights was checked. Transfer reset lamp was ON and TR CF lamp was OFF.

C

2. Place Group select switch to Group 1. On CRD Diamond Panel, Group ____ ____ ____

Select Switch was placed in Group 1 position.

C ____ ____ ____

3. Select Single Select Switch to ALL. On CRD Diamond Panel, Single select switch was selected to ALL.
4. Set Auto/Manual Switch to Manual, verify Manual On CRD Diamond Panel, verified ____ ____ ____

Lamp is ON. manual lamp ON or Auto/Manual pushbutton depressed to select MANUAL.

C

5. Set SEQ.- SEQ OR. switch to SEQ. OR position. On CRD Diamond Panel, SEQ.- ____ ____ ____

SEQ OR. switch was selected to SEQ. OR position.

TUOI NUMBER: Page 4 of 5 A1JPM-RO-CRD02 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT C

6. Set Group/Auxiliary Switch to Auxiliary. Aux PB. On CRD Diamond Panel, ____ ____ ____

Group/Aux. PB was selected to Aux.

C

7. Set Speed Select Switch to "JOG". On CRD Diamond Panel, Speed ____ ____ ____

Select Switch was selected to JOG position.

C

8. Set Clamp/Clamp Release Switch to CLAMP. On CRD Diamond Panel, selected ____ ____ ____

Clamp/Clamp Release Switch to CLAMP.

C

9. Press Manual Transfer Switch. On CRD Diamond Panel, manual ____ ____ ____

transfer PB was depressed.

C

10. Set Clamp/Clamp Release Switch to Clamp On CRD Diamond Panel, ____ ____ ____

Release. depressed Clamp/Clamp Release Switch.

C

11. Set Group/ AUX switch to Group. On CRD Diamond Panel, ____ ____ ____

Group/Aux PB was selected to Group.

12. If movement at RUN speed is desired, set speed On CRD Diamond Panel, Speed ____ ____ ____

switch to RUN. Select Switch was selected to RUN position.

END

TUOI NUMBER: Page 5 of 5 A1JPM-RO-CRD02 EXAMINEES COPY INITIAL CONDITIONS:

  • Preparation to exercise rods per Supplement 2, 1105.009, is in progress.
  • Rx Demand and Diamond stations are in manual.

INITIATING CUE:

The CRS/SM directs you to transfer Group 1 Rods to the Auxiliary Power Supply for movement of Group 1 at run speed. IAW 1105.009, Section 8.0.

TUOI NUMBER: Page 1 of 6 A1JPM-RO-JOB PERFORMANCE MEASURE Unit: 1 Rev # 1 Date:

TUOI NUMBER: A1JPM-RO-System/Duty Area: 002 Reactor Coolant System Task: Restart a Make-up Pump following an RCS leak isolation JA# ANO1-RO-KA Value RO 4.3 SRO 4.4 KA Reference 002.A2.01 Approved For Administration To: RO SRO Task Location: Inside CR: Outside CR: Both:

Suggested Testing Environment And Method (Perform Or Simulate):

Plant Site: Simulator: Perform X Lab:

Position Evaluated: RO: X SRO: X Actual Testing Environment: Simulator: Plant Site: Lab Testing Method: Simulate: Perform:

Approximate Completion Time In Minutes: 20 Minutes Reference(S): AOP 1203.026 Examinee's Name: SSN:

Evaluator's Name:

The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:

Satisfactory: Unsatisfactory:

Performance Checklist Comments:

Start Time Stop Time Total Time Signed Date:

Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.

TUOI NUMBER: Page 2 of 6 A1JPM-RO-THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

You are the CBOR and section 2 of AOP 1202.026 was entered because of a small leak in the Makeup system on the discharge side of the pumps. The reactor was tripped and the plant is stable in Mode 3 conditions. All Makeup pumps had to be stopped to repair the leak. The leak has been repaired. Make up pump line up: P-36A is ES, P-36B is OP, P-36C is STBY. RCP seal bleedoff temperature is 1600F.

TASK STANDARD:

Restart a Makeup pump following RCS leak isolation per section 2 of Procedure 1203.026, starting with step 3.6.6.

TASK PERFORMANCE AIDS:

Radio (may be simulated), copy of section 2 AOP 1203.026, steps 3.6.6 - 3.7.

SIMULATOR SETUP:

1. Trip reactor
2. Perform 1202.001 rx trip, with enclosures as appropriate
3. Allow plant to stabilize (OTSG on LLL, DFT stable)
4. Lower PZR level SP to 100
5. Allow PZR level to reach 100
6. Initialize MUT at 80
7. When PZR level reaches 100 close all Make up valves
8. Shutdown all running Makeup pumps
9. Store IC

TUOI NUMBER: Page 3 of 6 A1JPM-RO-INITIATING CUE: The CRS/SM directs you to restart Makeup Pump P-36C (STBY pump) IAW section 2 of AOP 1203.026, starting with step 3.6.6 CRITICAL ELEMENTS (c): 3, 8, 9 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT INSTRUCTOR NOTE: Examinee may review the AOP 1203.0126 prior to starting the JPM.

1. Verify Makeup Tank outlet (CV-1275) is open Operator verifies CV-1275 open. ____ ____ ____

(step 3.6.6A of procedure)

Operator verifies MUT level is

2. Add to Makeup tank as necessary to maintain level > 55. ____ ____ ____

> 55 using current RCS boron concentration.

(step 3.6.6B of procedure)

Operator rotates control handle C ____ ____ ____

3. Start Aux Lube Oil pump for STBY HPI pump (P- for P-36C aux lube oil pump and 36C). (step 3.6.7 of procedure is conditional on verifies that red light is on, green STBY HPI pump being available which was given light is off.

as the initial condition).

4. Review SPDS data for HPI pump suction pressure Operator should review the SPDS ____ ____ ____

history, leak location, and lowest suction pressure data and determine that no pump achieved. (This is the BOXED NOTE prior to step venting is required.

3.6.10 in the procedure).

See Cue below See Cue below NOTE: Operator should skip step 3.6.10 since pump venting is not required.

INSTRUCTOR NOTE: Examinee must review the SPDS.

INSTRUCTOR CUE: The lowest suction pressure for the STBY pump should be around 25psig. If the SPDS is not available, then instructor must cue this value. No loss of pump suction occurred therefore candidate should NOT try to vent pump.

5. Verify HPI suction pressure >10psig. Operator verifies suction pressure ____ ____ ____

(step 3.6.11) >10psig.

TUOI NUMBER: Page 4 of 6 A1JPM-RO-C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT

7. Operator verifies white light
6. Verify the following valves in HAND and for HAND is on and red light ____ ____ ____

CLOSED: for AUTO is off for both CV-1207 (seal injection supply)

CV-1207 (seal injection supply) and CV-1235 (normal CV-1235 (normal makeup supply) makeup supply) and valves (step 3.6.12) both indicate CLOSED with corresponding valve position indicator green lights ON and NOTE: Operator should skip step 3.6.13 since ES red lights OFF.

pump is not used.

Operator verifies red light is lit C 8. After AUX lube oil pump has run for > 1 minute, for AUX lube oil pump and ____ ____ ____

start the STBY HPI pump. places hand control switch for STBY HPI pump P-36C to start.

Verifies the red light ON and (step 3.6.14) green light OFF for P-36C.

Operator places the hand control C

9. Stop the AUX lube oil pump for the STBY HPI switch for the AUX lube oil pump ____ ____ ____

pump (P-36C). (for P-36C) to the OFF position and verifies green light ON and red light OFF.

(step 3.6.15)

Operator pushes CV-1206 button,

10. Place CV-1206 pushbutton to OVRD. Open CV- observes OVRD light is ON, and ____ ____ ____

1206 (seal injection isolation valve). places the valve hand switch to open position and observes red light ON and green light OFF.

(steps 3.6.16 and 3.6.17)

Operator slowly turns hand switch

11. Slowly open CV-1207 (seal injection control CCW for CV-1207 in order to ____ ____ ____

valve) and adjust seal flow to 30-40gpm and place open it enough to get 30-40gpm valve in AUTO. flow and place mode switch for (step 3.6.18B) the valve in AUTO and observe red light is ON, white light is NOTE: step B is used because RCP bleedoff OFF.

temperature should be 160 0F or less.

Operator should observe CV-

12. When RCP seals total flow is above setpoint (CV- 1206 FLOW light is ON and then ____ ____ ____

1206 FLOW light ON), return CV-1206 OVRD push the OVRD pushbutton in to pushbutton to normal (OVRD light off). return it to normal and observe the OVRD light is OFF.

(step 3.6.19)

TUOI NUMBER: Page 5 of 6 A1JPM-RO-C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT C Operator should SLOWLY turn

13. Slowly open CV-1235 until makeup flow CV-1235 position switch CCW to ____ ____ ____

indication is on-scale and adjust CV-1235 setpoint open the valve and watch for flow to desired value and place in AUTO. indications on scale. Operator should then adjust the SP to a (steps 3.6.20 and 3.6.21) nominal value, place valve hand station in AUTO and observe white light OFF and RED light ON.

C Operator places hand station for

14. Re-establish letdown. letdown isolation valve CV-1221 ____ ____ ____

to CCW position to initiate (step 3.7) letdown and observes letdown flow rate and red light ON and green light OFF (for valve open JPM is complete indication).

END

TUOI NUMBER: Page 6 of 6 A1JPM-RO-EXAMINEES COPY INITIAL CONDITIONS:

You are the CBOR and AOP 1202.026 was entered because of a small leak in the Makeup system on the discharge side of the pumps . The reactor was tripped and the plant is stable in Mode 3 conditions. All Makeup pumps had to be stopped to repair the leak. The leak has been repaired. Make up pump line up: P-36A is ES, P-36B is OP, P-36C is STBY. RCP seal bleedoff temperature is 1600F.

INITIATING CUE:

The CRS/SM directs you to restart Makeup Pump P-36C (STBY pump) IAW AOP 1203.026, starting with step 3.6.6.

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 8 of 1203.026 11 LOSS OF REACTOR COOLANT MAKEUP CHANGE: 009-04-0 SECTION 2 -- LARGE MAKEUP AND PURIFICATION SYSTEM LEAK (continued)

NOTE The SPDS Safety System Diagnostic Inst. display contains the previous 20 minutes of data.

3.6.4 Select Safety System Diagnostic Inst. display on SPDS for OP HPI pump and evaluate suction pressure and flow stability prior to event.

3.6.5 If radiation levels prohibit leak isolation, perform the following:

A. Open BWST Outlet (CV-1407 or CV-1408) to ES HPI pump.

B. Operate ES HPI pump and associated HPI Block valve (CV-1220 or CV-1285) only as necessary to maintain RCS inventory.

C. GO TO step 3.7.

3.6.6 When system leakage has been isolated, perform the following:

A. Verify Makeup Tank Outlet (CV-1275) open.

B. Add to MU tank as necessary to maintain level 55" using current RCS boron concentration.

3.6.7 If STBY HPI pump is available, perform the following:

A. Start AUX lube oil pump for STBY HPI pump.

B. GO TO step 3.6.10 to place STBY HPI pump in service.

3.6.8 If STBY HPI pump is not available, and OP HPI pump damage is not suspected, perform the following:

A. Start AUX lube oil pump for OP HPI pump.

B. GO TO step 3.6.10 to place OP HPI pump in service.

3.6.9 If both OP and STBY HPI pumps are not available, perform the following:

A. Start AUX lube oil pump for ES HPI pump.

B. Place ES standby HPI pump in service per step 3.6.10.

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 8 of 1203.026 11 LOSS OF REACTOR COOLANT MAKEUP CHANGE: 009-04-0 SECTION 2 -- LARGE MAKEUP AND PURIFICATION SYSTEM LEAK (continued)

NOTE Decision to vent HPI pump should be based on suction pressure from SPDS history as well as leak location and lowest suction pressure achieved.

3.6.10 If loss of pump suction was indicated, perform the following:

A. If ES HPI pump is being re-aligned per Attachment A, verify associated P-36 Makeup Pump Suction Cross-Over open prior to venting.

B. Vent pump using applicable Makeup Pump P-36 Vent to ABV Header:

P-36A P-36B P-36C ABV-9A ABV-9B ABV-9C 3.6.11 Verify HPI pump suction pressure >10 psig.

3.6.12 Verify the following valves in HAND and closed:

  • CV-1207
  • CV-1235 3.6.13 If ES HPI pump will be used, verify Attachment A steps 1 through 6 complete.

CAUTION Operation of Aux Lube Oil Pump with HPI/MU Pump running should be minimized.

3.6.14 After AUX lube oil pump has run for 1 minute, start HPI pump.

3.6.15 Stop AUX lube oil pump for HPI pump.

3.6.16 Place CV-1206 pushbutton in OVRD (OVRD light on).

3.6.17 Open CV-1206.

3.6.18 Slowly open CV-1207 as follows:

A. If seal bleedoff temperature is >180°F, establish and maintain 8 to 12 gpm RCP Seal Total INJ Flow until <180°F.

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 8 of 1203.026 11 LOSS OF REACTOR COOLANT MAKEUP CHANGE: 009-04-0 B. When seal bleedoff temperature is <180°F, adjust CV-1207 for 30-40 gpm and place in AUTO.

SECTION 2 -- LARGE MAKEUP AND PURIFICATION SYSTEM LEAK (continued) 3.6.19 When RCP Seals Total INJ Flow is above setpoint (CV-1206 FLOW light on),

return CV-1206 OVRD pushbutton to normal (OVRD light off).

3.6.20 Slowly open CV-1235 until makeup flow indication is on-scale.

3.6.21 Adjust CV-1235 setpoint to desired value and place in AUTO.

3.7 If normal makeup is in service, reestablish letdown.

TUOI NUMBER: Page 1 of 6 A1JPM-RO-JOB PERFORMANCE MEASURE Unit: 1 Rev # 1 Date:

TUOI NUMBER: A1JPM-RO-System/Duty Area:

Task: Perform ERV (PSV-1000) Exercise Test JA# ANO1-RO-KA Value RO 3.0 SRO 3.2 KA Reference 010.A3.01 Approved For Administration To: RO SRO Task Location: Inside CR: Outside CR: Both:

Suggested Testing Environment And Method (Perform Or Simulate):

Plant Site: Simulator: Perform X Lab:

Position Evaluated: RO: X SRO: X Actual Testing Environment: Simulator: Plant Site: Lab Testing Method: Simulate: Perform:

Approximate Completion Time In Minutes: 10 Minutes Reference(S):

OP 1103.005 Supplement 1 (change 030-02-0), 1203.012H (change 031-03-0),

and AOP 1203.015 (change 011-00-0)

Examinee's Name: SSN:

Evaluator's Name:

The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:

Satisfactory: Unsatisfactory:

Performance Checklist Comments:

Start Time Stop Time Total Time Signed Date:

Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.

TUOI NUMBER: Page 2 of 6 A1JPM-RO-THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

You are the CBOR and you are directed by the CRS to perform OP 1103.005, Supplement 1, Exercising of the Pressurizer Electromatic Relief Valve (PSV-1000) in order to meet the regularly scheduled 18 month test. The plant conditions are as follows:

RC Temperature = 1200F RC Pressure = 55 psig TASK STANDARD:

Perform the ERV exercise test per OP 1103.005, Supplement 1 (change 030-02-0).

TASK PERFORMANCE AIDS:

Stopwatch, Radio (may be simulated), copy of OP 1103.005, Supplement 1 (change 030-02-0).

SIMULATOR SETUP:

1. Reactor tripped, in Mode 5
2. RC Temperature = 1200F, RC Pressure = 55 psig
3. When step 2.2.4 is reached, ERV (PSV-1000) sticks open and will not close
4. When ERV Isolation valve is closed (CV-1000), the leak stops

TUOI NUMBER: Page 3 of 6 A1JPM-RO-INITIATING CUE: The CRS/SM directs you to perform the ERV exercise test per OP 1103.005, Supplement 1 (change 030-02-0) in order to meet the regularly scheduled 18 month test.

CRITICAL ELEMENTS (c): 5, 6, 8 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT INSTRUCTOR NOTE: Examinee may review the OP 1103.005, Supplement 1 prior to starting the JPM. Also, the Examinee should initial each step on the procedure forms although it is not written into the JPM.

1. Check purpose of test (step 1.1 of procedure) Operator checks B for regularly ____ ____ ____

scheduled 18 month test.

Operator enters stopwatch cal

2. Records stop watch M & TE # and cal date in data, initials for correct RCS ____ ____ ____

section 3.0 of procedure. temp/pressure, and checks ERV isolation valve light RED is ON Checks RC Temp > 100oF and GREEN is OFF.

Checks RC Pressure < 70 psig Checks ERV Isolation (CV-1000) open (steps 1.2 thru 1.5 of procedure)

3. If elevated airborne activity is expected as a result Operator should ask CRS about ____ ____ ____

of ERV operations, personnel hatch interlock expected airborne activity.

enabled or . Instructor cues as given below.

Instructor Cue here Operator should N/A the step after the cue.

NOTE: No elevated airborne activity is expected See Instructor Cue below INSTRUCTOR CUE: CRS reports that there is no elevated airborne activity expected. N/A the step on the form.

4. Verify no one is at the vicinity of the ERV. Operator asks CRS to determine ____ ____ ____

(step 2.1) or uses radio to call and determine that no one is near the ERV.

Instructor Cue: when operator calls on radio or asks CRS, reply back that no one is in the vicinity of ERV. See Instructor Cue at left.

TUOI NUMBER: Page 4 of 6 A1JPM-RO-C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT Operator selects 1 g position for C 5. Perform the following steps while ensuring RCS ERV Acoustic Monitor with ____ ____ ____

pressure remains > 30psig: Acoustic selector switch.

Operator places hand switch for

-Place ERV Acoustic Monitor Full Scale Range ERV to open position and selector to 1 g position. verifies ERV open by using all three parameter indications listed

-Open and measure stroke time of ERV here:

(Record in Section 3.0).

  • Acoustic Monitor indicating light on panel (steps 2.2.1 - 2.2.2) C04
  • Dropping RCS pressure (Operator should not let pressure drop below 30psig)
  • Rising Quench Tank Pressure Operator then enters the stroke time in Section 3.0.

Operator places hand switch for C 6. Close and measure the stroke time of ERV (Record ERV to close position and ____ ____ ____

should attempt to verify that the in Section 3.0). ERV is closed by using all three parameter indications listed here:

(step 2.2.4)

  • Acoustic Monitor indicating light on panel C04 (displays open)

NOTE: This is the alternate path portion of the JPM.

  • Stable RCS pressure (It The ERV will stick completely open and will not move should continue to drop) under any conditions. The block valve (CV-1000)
  • Stable Quench Tank should be closed to stop the release. Pressure (It should continue to rise)

NOTE: This is the alternate path portion of the JPM. The ERV will stick completely open and will not move under any conditions. The block valve (CV-1000) should be closed to stop the release per Alarm procedure OP 1203.012H for alarm K09-A1, Relief Valve Open, page 2.

TUOI NUMBER: Page 5 of 6 A1JPM-RO-C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT

7. Operator should enter the Annunciator Response Operator acknowledges alarm ____ ____ ____

OP 1203.012H for alarm K09-A1, Relief Valve and enters Alarm procedure Open, page 2. OP 1203.012H for alarm Operator is directed by OP1203.012H to refer to K09-A1, Relief Valve procedure AOP 1203.015 for Pressurizer Systems Open, page 2.

Failure. Operator should refer to section 1.0 of This procedure directs this procedure for ERV Failure or Leak. Operator to AOP 1203.015 for Pressurizer Systems Failure. Operator should refer to section 1.0 of this procedure for ERV failure or Leak.

Operator closes the isolation C

8. Operator should commence follow-up actions for valve with hand switch for CV- ____ ____ ____

section 1.0, which include: 1000 and observes the following:

a. Close the ERV Isolation valve (CV-1000).
  • Acoustic Monitor
b. Trip reactor if cant maintain pressure (N/A in indicating light on panel C04 (displays closed) this JPM)

(steps 3.1-3.2)

  • Stable RCS pressure
  • Stable Quench Tank Pressure NOTE: Closing the ERV block or isolation valve CV-1000 will stop the leak.

Operator notifies the OPS

9. If closing CV-1000 stops the leak, perform the manager of the stuck open ERV, ____ ____ ____

following: block valve has contained the

a. Continue power operations with ERV isolated leak, and logs the entry in the (N/A for this JPM) station log and PSB.
b. Notify OPS manager
c. Log in station log and on plant status board (step 3.3)

END of JPM INSTRUCTOR CUE: This concludes the JPM.

END

TUOI NUMBER: Page 6 of 6 A1JPM-RO-EXAMINEES COPY INITIAL CONDITIONS:

You are the CBOR and you are directed by the CRS to perform OP 1103.005, Supplement 1, Exercising of the Pressurizer Electromatic Relief Valve (PSV-1000) in order to meet the regularly scheduled 18 month test. The plant conditions are as follows:

RC Temperature = 1200F RC Pressure = 55 psig INITIATING CUE:

The CRS/SM directs you to perform the ERV exercise test per OP 1103.005, Supplement 1 (change 030-02-0) in order to meet the regularly scheduled 18-month test.

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: Page 33 of 38 1103.005 PRESSURIZER OPERATION CHANGE: 030-02-0 SUPPLEMENT 1 Page 1 of 4 EXERCISING OF THE PRESSURIZER ELECTROMATIC RELIEF VALVE (PSV-1000)

This test demonstrates operability of the pressurizer ERV by exercising the valve. This test satisfies TS 5.5.8 (ANO IST program requirements) for stroke time measurement, exercising, and fail-safe operation. This test also satisfies part of Surveillance TR 3.4.2.1 for RCS vent path operability. This test is related to SR 3.4.11.5 "Channel calibration of ERV opening circuitry".

1.0 INITIAL CONDITIONS INITIALS 1.1 Check the purpose of this test: _________

__A) Regularly scheduled cold shutdown test.

__B) Regularly scheduled 18 month test

__C) Operability test following significant maintenance.

__D) Other (describe in section 4.0).

1.2 Stop watch available for measuring valve stroke time. _________

1.2.1 Record Stopwatch M&TE# and Cal Due Date in Section 3.0.

1.3 RC temperature > 1000F. _________

1.4 RC pressure < 70 psig. _________

1.5 ERV Isolation (CV-1000) open. _________

1.6 If elevated airborne activity is expected as a result of _________

ERV operations, personnel Hatch interlock enabled or Personnel Hatch watch stationed to ensure only one door opened at a time. Otherwise N/A.

2.0 TEST METHOD WARNING Opening the ERV causes a localized steam release at the pilot valve vent.

This is a radiation and safety hazard.

2.1 Verify no one is at the vicinity of the ERV.

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: Page 34 of 38 1103.005 PRESSURIZER OPERATION CHANGE: 030-02-0 SUPPLEMENT 1 Page 2 of 4 NOTE ERV position and vent path operability are obtained using:

  • Acoustic Monitor indication on C04 and
  • dropping RCS pressure and
  • rising Quench Tank pressure.

2.2 Perform the following steps while ensuring RCS pressure remains < 30 psig.

2.2.1 Place ERV Acoustic Monitor Full Scale Range _______

selector to 1 g position.

2.2.2 Open and measure stroke time of ERV _______

(Record in Section 3.0).

2.2.3 Verify ERV open using all of the following: _______

  • Acoustic Monitor Indication on C04
  • Dropping RCS pressure
  • Rising Quench Tank pressure.

2.2.4 Close and measure stroke time of ERV _______

(Record in Section 3.0).

2.2.5 Verify ERV closed using all of the following: _______

  • Acoustic Monitor Indication on C04
  • Stable RCS pressure
  • Stable Quench Tank pressure.

2.2.6 Place ERV Acoustic Monitor Full Scale Range _______

selector to 10 g position.

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: Page 35 of 38 1103.005 PRESSURIZER OPERATION CHANGE: 030-02-0 SUPPLEMENT 1 Page 3 of 4 3.0 ACCEPTANCE CRITERIA 3.1 Record stroke time measured during testing and compare with "Limiting Value For Operability".

Stopwatch M&TE#___________ Cal Due Date ________________

Valve Control Test Measured Stroke Acceptable Limiting Is Measured Design Panel Direction Time (nearest 1/10 second) Normal Value Stroke Time Bases Range For Less Than Value (Sec) Operability "Limiting (Sec) Value For Operability" PSV-1000 C04 Open < 2.0 < 2.0 Yes No < 2.0 Closed 2.6-7.8 <10.4* Yes No N/A

  • Valve closure verifies proper fail-safe operation.

3.2 If "No" is circled in 3.1 above, declare PSV-1000 _______

inoperable, immediately notify the Shift Manager/CRS, write a Condition Report, initiate corrective action. Reference applicable Tech Spec for LCO.

3.3 If any measured stroke time does not fall within the _______

"Acceptable Normal Range", immediately retest valve or declare that valve inoperable. Refer to "Operability" section of this procedure for additional guidance.

PERFORMED BY _______________________OPERATOR DATE/TIME ______/______

Page 1 of 5 TUOI: A1JPM-DHR01 JOB PERFORMANCE MEASURE UNIT: ______1_______ REV # ______8_______ DATE: ______________________________

TUOI NUMBER:_A1JPM-RO-DHR01_____________

SYSTEM/DUTY AREA:_DECAY HEAT REMOVAL______________________________________________

TASK:__ESTABLISH DECAY HEAT REMOVAL USING P-34A____________________________________

JTA#:__ANO1-RO-DHR-NORM-2__________ ________________

KA VALUE RO:___3.6____ SRO:__3.4_____ KA

REFERENCE:

__005 A4.01__________________

APPROVED FOR ADMINISTRATION TO: RO:___X____ SRO:____X____

TASK LOCATION: INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________

POSITION EVALUATED: RO:__________ SRO:___________

ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:_________ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES:___20 MINUTES_______________________________

REFERENCE(S):__1104.004 _____________________________

EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

Page 2 of 5 TUOI: A1JPM-DHR01 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

  • Plant shutdown and cooldown per 1102.010 is complete to step 10.8.
  • Breakers B-5255/B-6255/B-5651 are closed.
  • 1104.004 is complete up to step 7.2.3.

INITIATING CUE:

The CRS directs that Decay Heat Pump P34A be placed in service with DHR flow <3500 gpm and discharge pressure <400 psig, complete procedure through step 7.2.18.

Page 3 of 5 TUOI: A1JPM-DHR01 TUOI NUMBER: ANO-1-JPM-RO-DHR01 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Plant shutdown and cooldown per 1102.010 is complete to step 10.8. Decay heat removal with P34A is to be established per 1104.004. Breakers B-5255/B-6255/B-5651 are closed.

TASK STANDARD: P-34A decay heat pump running per OP 1104.004. Flow indicated

< 3500 gpm and discharge pressure <400 psig.

TASK PERFORMANCE AIDS: 1104.004 Section 7.0

Page 4 of 5 TUOI: A1JPM-DHR01 TUOI NUMBER: ANO-1-JPM-RO-DHR01 INITIATING CUE:

The CRS directs that P34A be placed in service with DHR flow <3500 gpm and discharge pressure <400 psig, complete procedure through step 7.2.18.

INSTRUCTOR NOTE: Ensure B-5255, B-6255,and B-5651 are closed and Programmable Annunciator alarm for P34A (P1404) set at 400 psig.

CRITICAL ELEMENTS (C): 1, 2, 5, 7, 8, 9, 10, 11, 12, 15 C PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT (C) 1. Close Decay Heat P-34A Suction from CV-1436 red light off, ____ ____ ____

BWST (CV-1436). green light on.

(C) 2. Open Decay Heat P-34A Suction from CV-1434 red light on, ____ ____ ____

RCS (CV-1434). green light off.

3. Open E-35A and E-35B sample valves Contacted the WCO and ____ ____ ____

SS-41A and SS-41B. instructed the WCO to open SS-41A and SS-41B.

NOTE: Inform examinee that Category E log entry has been made.

4. Verify white Open Permit light ON at Verified white open permit ____ ____ ____

CV-1410 handswitch on C16. light on.

(C) 5. Open CV-1410. Opened DH suction valve ____ ____ ____

CV-1410.

6. Verify white Open Permit light ON at Verified white open permit ____ ____ ____

CV-1050 handswitch on C18. light on.

C 7. Open DH Suction Valve CV-1050 Opened DH suction valve CV-1050. ____ ____ ____

C 8. Open DH suction RB isolation CV- Opened CV-1404.

1404. ____ ____ ____

C 9. Close decay heat cooler E-35A Closed CV-1428.

outlet valve CV-1428. ____ ____ ____

Page 5 of 5 TUOI: A1JPM-DHR01 C PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT C 10. Position E-35A Cooler Bypass (CV- Positioned CV-1433 to ~

1433) to ~ 50% as indicated on HIC- 50% open. ____ ____ ____

1433.

C

11. Open Decay Heat Block Valve CV- Opened CV-1401.

1401 ____ ____ ____

C

12. Start P-34A. Started P-34A.
13. Verify LPI/Decay Heat Pump Brg On C-18, verified CV-CLR E-50A Inlet (CV-3840) and 3840 and CV-3822 open. ____ ____ ____

Decay HT CLR Service Water E-35A Inlet (CV-3822) open.

14. Monitor pressurizer level. Monitored pressurizer ____ ____ ____

level on C04 or SPDS.

C 15. Adjust CV-1433 to establish decay Adjusted DHR flow to ____ ____ ____

heat removal flow at < 3500 gpm <3500 gpm and from P-34A and discharge pressure discharge pressure < 400

< 400 psig. psig using CV-1433.

NOTE: Inform examinee that it is not necessary to perform Part 2 of Supplement 3.

16. Verify LPI Room Cooler VUC-1A At panel C-19, verified ____ ____ ____

starts. VUC-1A started (red light on).

17. Adjust the DECAY HEAT VORTEX Selected the U5 function ____ ____ ____

WARNING SETPOINT. of the SPDS computer and set KP34ALO just below the Decay Heat Pump motor current and adjusted KP34AHI just above the Decay Heat Pump motor current.

END

Page 1 of 5 TUOI: A1JPM-DHR01 JOB PERFORMANCE MEASURE UNIT: ______1_______ REV # ______8_______ DATE: ______________________________

TUOI NUMBER:_A1JPM-RO-DHR01_____________

SYSTEM/DUTY AREA:_DECAY HEAT REMOVAL______________________________________________

TASK:__ESTABLISH DECAY HEAT REMOVAL USING P-34A____________________________________

JTA#:__ANO1-RO-DHR-NORM-2__________ ________________

KA VALUE RO:___3.6____ SRO:__3.4_____ KA

REFERENCE:

__005 A4.01__________________

APPROVED FOR ADMINISTRATION TO: RO:___X____ SRO:____X____

TASK LOCATION: INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________

POSITION EVALUATED: RO:__________ SRO:___________

ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:_________ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES:___20 MINUTES_______________________________

REFERENCE(S):__1104.004 _____________________________

EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

Page 2 of 5 TUOI: A1JPM-DHR01 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

  • Plant shutdown and cooldown per 1102.010 is complete to step 10.8.
  • Breakers B-5255/B-6255/B-5651 are closed.
  • 1104.004 is complete up to step 7.2.3.

INITIATING CUE:

The CRS directs that Decay Heat Pump P34A be placed in service with DHR flow <3500 gpm and discharge pressure <400 psig, complete procedure through step 7.2.18.

Page 3 of 5 TUOI: A1JPM-DHR01 TUOI NUMBER: ANO-1-JPM-RO-DHR01 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Plant shutdown and cooldown per 1102.010 is complete to step 10.8. Decay heat removal with P34A is to be established per 1104.004. Breakers B-5255/B-6255/B-5651 are closed.

TASK STANDARD: P-34A decay heat pump running per OP 1104.004. Flow indicated

< 3500 gpm and discharge pressure <400 psig.

TASK PERFORMANCE AIDS: 1104.004 Section 7.0

Page 4 of 5 TUOI: A1JPM-DHR01 TUOI NUMBER: ANO-1-JPM-RO-DHR01 INITIATING CUE:

The CRS directs that P34A be placed in service with DHR flow <3500 gpm and discharge pressure <400 psig, complete procedure through step 7.2.18.

INSTRUCTOR NOTE: Ensure B-5255, B-6255,and B-5651 are closed and Programmable Annunciator alarm for P34A (P1404) set at 400 psig.

CRITICAL ELEMENTS (C): 1, 2, 5, 7, 8, 9, 10, 11, 12, 15 C PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT (C) 1. Close Decay Heat P-34A Suction from CV-1436 red light off, ____ ____ ____

BWST (CV-1436). green light on.

(C) 2. Open Decay Heat P-34A Suction from CV-1434 red light on, ____ ____ ____

RCS (CV-1434). green light off.

3. Open E-35A and E-35B sample valves Contacted the WCO and ____ ____ ____

SS-41A and SS-41B. instructed the WCO to open SS-41A and SS-41B.

NOTE: Inform examinee that Category E log entry has been made.

4. Verify white Open Permit light ON at Verified white open permit ____ ____ ____

CV-1410 handswitch on C16. light on.

(C) 5. Open CV-1410. Opened DH suction valve ____ ____ ____

CV-1410.

6. Verify white Open Permit light ON at Verified white open permit ____ ____ ____

CV-1050 handswitch on C18. light on.

C 7. Open DH Suction Valve CV-1050 Opened DH suction valve CV-1050. ____ ____ ____

C 8. Open DH suction RB isolation CV- Opened CV-1404.

1404. ____ ____ ____

C 9. Close decay heat cooler E-35A Closed CV-1428.

outlet valve CV-1428. ____ ____ ____

Page 5 of 5 TUOI: A1JPM-DHR01 C PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT C 10. Position E-35A Cooler Bypass (CV- Positioned CV-1433 to ~

1433) to ~ 50% as indicated on HIC- 50% open. ____ ____ ____

1433.

C

11. Open Decay Heat Block Valve CV- Opened CV-1401.

1401 ____ ____ ____

C

12. Start P-34A. Started P-34A.
13. Verify LPI/Decay Heat Pump Brg On C-18, verified CV-CLR E-50A Inlet (CV-3840) and 3840 and CV-3822 open. ____ ____ ____

Decay HT CLR Service Water E-35A Inlet (CV-3822) open.

14. Monitor pressurizer level. Monitored pressurizer ____ ____ ____

level on C04 or SPDS.

C 15. Adjust CV-1433 to establish decay Adjusted DHR flow to ____ ____ ____

heat removal flow at < 3500 gpm <3500 gpm and from P-34A and discharge pressure discharge pressure < 400

< 400 psig. psig using CV-1433.

NOTE: Inform examinee that it is not necessary to perform Part 2 of Supplement 3.

16. Verify LPI Room Cooler VUC-1A At panel C-19, verified ____ ____ ____

starts. VUC-1A started (red light on).

17. Adjust the DECAY HEAT VORTEX Selected the U5 function ____ ____ ____

WARNING SETPOINT. of the SPDS computer and set KP34ALO just below the Decay Heat Pump motor current and adjusted KP34AHI just above the Decay Heat Pump motor current.

END

TUOI NUMBER:_ANO-1-JPM-RO-RPS02_ Page 1 of 5 JOB PERFORMANCE MEASURE UNIT: ______1_______ REV # ______4________ DATE: ______________________________

TUOI NUMBER:_A1JPM-RO-RPS02 ______________

SYSTEM/DUTY AREA:_REACTOR PROTECTION SYSTEM________________________________________

TASK:_REMOVE A CHANNEL OF RPS FROM MANUAL BYPASS___________________________________

JTA#:_ANO1-RO-RPS-NORM-6___________________________

KA VALUE RO:___3.6____ SRO:__3.6_____ KA

REFERENCE:

__012 A4.03_________________

APPROVED FOR ADMINISTRATION TO: RO:____X___ SRO:___ X ___

TASK LOCATION: INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________

POSITION EVALUATED: RO:__________ SRO:___________

ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:_________ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES:___ 15 MINUTES______________________________

REFERENCE(S):__1105.001 ______________________________________

EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

TUOI NUMBER:_ANO-1-JPM-RO-RPS02_ Page 2 of 5 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:_The plant is operating at 100% power with ICS in auto-_

_matic. The A RPS channel is in manual bypass for maintenance. The maintenance____

_has been completed.________________________________________________________________

TASK STANDARD:_The A RPS channel is removed from manual bypass.___________________

TASK PERFORMANCE AIDS:_Manual bypass key, 1105.001_________________________________

SIMULATOR SETUP: Power operations, place A RPS in manual bypass, select SASS Neutron Flux selector to the Y position.

TUOI NUMBER:_ANO-1-JPM-RO-RPS02_ Page 3 of 5 TUOI NUMBER:_ANO-1-JPM-RO-RPS02_

INITIATING CUE:

The SM/CRS directs you to remove the A RPS channel from manual bypass per section 11.0 of 1105.001, NI & RPS Operating Procedure.

CRITICAL ELEMENTS (C):__2__

(C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT NOTE: Due to the uniqueness of the design in the simulator, all channel indications are located in one RPS cabinet.

1. Verify A RPS channel is Inside the RPS cabinet in reset. the back of the control room:

a) Verified all test modules are in operate with the On Test lamps ON dim.

b) Depressed and released the Output State and Output Memory Reset switches for all bistables with Output State and/or Output Memory _____ _____ _____

lamps ON bright.

c) Verified the Building Pressure contact buffer is reset (both Input State lamps OFF).

d) On the Channel A Reactor Trip Module, placed Subsystem Reset switch to down position.

e) Verified the Subsystem No. 1 lamps ON dim for Reactor Trip modules and Cabinet Indicating Panels on all RPS Channels.

(C) 2. Turn Manual Bypass key On the Reactor Trip Module switch out of bypass in A RPS, turned keyswitch _____ _____ _____

position. out of bypass position.

Reactor Trip Module did NOT trip (verifies previous step properly performed).

3. Verify Manual Bypass lamps On the Reactor Trip module ON dim. and indicating panel, verified the Manual Bypass _____ _____ _____

lamps are ON dim.

TUOI NUMBER:_ANO-1-JPM-RO-RPS02_ Page 4 of 5 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT

4. Verify annunciator K08-D3 Verified that annunciator clear. K08-D3 RPS CHANNEL BYPASSED _____ _____ _____

is clear.

5. Verify A EFIC channel Verified A EFIC channel Maintenance Bypass light Maintenance Bypass light ON ON solid. solid on the upper right of _____ _____ _____

the A EFIC cabinet.

6. Remove Manual Bypass key Removed Manual Bypass key from Reactor Trip module from Reactor Trip module and _____ _____ _____

and return to Shift Mgr. returned to Shift Mgr.

7. Verify <1% difference Used panel readings on C03 between NI-5/NI-6 high and or plant computer points NI-7/NI-8 high. N1I56HI and N1I78HI to _____ _____ _____

determine the difference between the highest of NI5/NI6 is <1% different from the highest of NI7/NI8.

8. Return the SASS Neutron On C03, the SASS Neutron Flux selector switch to Flux switch is placed in the SASS Enable. SASS Enable position after _____ _____ _____

the signals (N1I56HI and N1I78HI) had been compared.

END

TUOI NUMBER:_ANO-1-JPM-RO-RPS02_ Page 5 of 5 EXAMINEES COPY INITIAL CONDITIONS:

  • The plant is operating at 100% power with ICS in automatic.
  • The A RPS channel is in manual bypass for maintenance.
  • The maintenance has been completed.

INITIATING CUE:

The SM/CRS directs you to remove the A RPS channel from manual bypass per section 11.0 of 1105.001, NI & RPS Operating Procedure.

TUOI NUMBER: Page 1 of 6 A1JPM-RO-EOP11 JOB PERFORMANCE MEASURE Unit: 1 Rev # 1 Date:

TUOI NUMBER: A1JPM-RO- EOP11 System/Duty Area: Emergency and Abnormal Operations Task: Perform Actions during ESAS Actuation to swap ECCS suction to RB sump (ALTERNATE PATH JPM)

JA# ANO1-RO-KA Value RO 4.0 SRO 3.8 KA Reference 006.A4.02 Approved For Administration To: RO SRO Task Location: Inside CR: Outside CR: Both:

Suggested Testing Environment And Method (Perform Or Simulate):

Plant Site: Simulator: Perform X Lab:

Position Evaluated: RO: X SRO: X Actual Testing Environment: Simulator: Plant Site: Lab Testing Method: Simulate: Perform:

Approximate Completion Time In Minutes: 20 Minutes Reference(S):

Examinee's Name: SSN:

Evaluator's Name:

The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:

Satisfactory: Unsatisfactory:

Performance Checklist Comments:

Start Time Stop Time Total Time Signed Date:

Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.

TUOI NUMBER: Page 2 of 6 A1JPM-RO-EOP11 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 with the examinee.

JPM INITIAL TASK CONDITIONS:

ESAS has actuated due to a LOCA. RCS pressure is £ 50 psig. All unnecessary people have been evacuated from the Aux Building. Aux Spray has been aligned from LPI system. BWST level is at ~

6 feet, BWST LO and LO LO annunciators are in alarm.

TASK STANDARD:

LPI and RB Spray pumps operating with their suctions aligned to the RB sump and BWST outlet valves closed (i.e. CV-1405/1406 open AND CV-1407/1408 closed).

TASK PERFORMANCE AIDS:

RT15 from 1202.012, change 004-02-0.

SIMULATOR SETUP:

IC2, then insert large RCS leak so that full ESAS actuation occurs. Trip all RCPs and go to reflux boiling setpoint for EFW. Close CV-1000 and CV-1009. Close CV-2415 and CV-2419 (CFT Outlets).Secure HPI pumps, close all HPI block valves, close CV-1206. Secure EFW-- P-7B in P-T-L, close CV-2613/CV-2663 in manual, close MFIVs and MSIVs. Throttle RB Spray to 1050-1200 gpm. Fail CV-1405 closed.

TUOI NUMBER: Page 3 of 6 A1JPM-RO-EOP11 INITIATING CUE: The CRS/SM directs you to shift to RB sump suction using RT-15.

CRITICAL ELEMENTS (c): 9, 10, 11, 12 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT

1. Verify both LPI pumps running (P34A and B). On C16 and C18, operator ____ ____ ___

verifies RED lights ON and _

GREEN lights OFF for both P34A and P34B.

2. Verify LPI Room Coolers running: VUC1A or On C19, operator verifies RED ____ ____ ___

VUC1B AND VUC1C or VUC1D. lights ON and GREEN lights OFF _

for VU1CA and VU1CC.

3. Verify both LPI Block valves fully open (CV-1400 On C16 and C18, operator ____ ____ ___

and CV-1401). verifies valves are open with RED _

lights ON and GREEN lights OFF for CV-1400 and CV-1401.

4. Verify Letdown isolated by CV-1221 closed on C16 On C-16, operator verifies ____ ____ ___

or CV-1214/CV-1216 closed on C18. letdown isolated by observing CV- _

1221 closed with the GREEN light ON and RED light OFF or on C-18, operator verifies letdown isolated by observing CV-1214/CV-1216 closed with the GREEN lights ON and RED lights OFF.

5. Verify both Decay Heat Supply to Makeup Pump Operator Opens CV1276 and CV-Suctions open (CV-1276 and CV-1277). 1277 on panels C16 and C18 and observes Red lights ON, green ____ ____ ___

NOTE: valves will be shut when examinee gets to lights OFF. _

this step, after examinee goes to open on these valves give the POSITIVE CUE.

Operator verifies that RB Spray

6. Verify RB Spray flow throttled to maintain 1050- flow is throttled to maintain 1050-1200 gpm per train (as indicated ____ ____ ___

1200 gpm per train. on SPDS, C16/C18 or recorder _

on C14, approximately 1150 gpm indicated flow on each train)

TUOI NUMBER: Page 4 of 6 A1JPM-RO-EOP11 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT

7. If NaOH Tank T10 level is £25 ft, THEN close RB Operator Closes CV-1616 and spray NaOH Addition T-10 Outlets (CV-1616 and CV-1617 IF T-10 level is £25 ft CV-1617). and observes GREEN lights ON and RED lights OFF.

NOTE: if this JPM is being simulated, tell examinee that T10 level is 20 ft then give POSITIVE CUE after examinee goes to close on the valves.

8. Verify RB Sump Outlets open (CV-1414 and CV On C16 and C18, operator 1415). verifies CV-1414 and CV-1415 open with RED lights ON and GREEN lights OFF.

NOTE: This is the alternate path portion of the JPM. The RB sump outlet valve CV-1405 will fail to open.

9. Open RB Sump Outlets (CV-1405 and CV-1406). On panel C16 operator attempts C to open CV-1405 (it will not open) and observes the GREEN light ON and RED light OFF for it.

On panel C18, operator opens CV-1406 and observes RED light ON and GREEN light OFF for it.

See note: This is the Alternate Path step for the JPM

10. Stop associated LPI, HPI, and RB Spray pumps, On C-16 and C-18, operator C secures LPI pump P-34A AND which includes: ____ ____ ___

secures RB Spray pump P-35A.

RB Spray pump P-35A (HPI is already secured) and _

LPI pump P-34A observes GREEN lights ON and RED lights OFF.

C 11. Take manual control of BWST outlets CV-1407 On C16 and C18, operator and CV-1408. depresses the manual pushbutton ____ ____ ___

on each of two AUTO/MANUAL _

pushbuttons for CV-1407 and CV-1408 in MANUAL and observes WHITE light ON and RED light OFF for each.

C 12. Close BWST Outlets (CV-1407 and CV-1408). On C16 and C18, operator verifies GREEN lights ON and RED lights OFF for closed valves CV-1407 and CV-1408.

TUOI NUMBER: Page 5 of 6 A1JPM-RO-EOP11 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT

13. Check LPI/RB Spray flow is maintained. Checked proper LPI/RB Spray flow is being maintained by observing SPDS or meters on C16/C18 or recorder on C14 with values for spray @ 1100 gpm, LPI

@ 3000 gpm.

14. Notify HP to monitor BWST suction line for Notified Health Physics.

indication of back-leakage from LPI suction.

POSITIVE CUE:

HP has been notified.

Instructor Note: INFORM EXAMINEE THAT MAKEUP TANK LEVEL IS STEADY AT 50 INCHES.

15. IF NaOH Tank T10 Level >25 ft, THEN open CV- Opened CV-1616 and CV-1617 IF 1616 and CV-1617. T10 level >25 ft.

NOTE: If being simulated tell examinee that T10 level is 20 ft which will make this step (14 and 14.a) N/A.

a) WHEN T10 level is 11-25 ft, THEN close CV-1616 a) Closed CV-1616 and CV-1617 and CV-1617. after T10 level is in range of 11-25 ft.

INFORM EXAMINEE THAT RB LEVELS HAVE STABILIZED AND BWST REFILL HAS BEEN INITIATED.

INSTRUCTOR CUE: This concludes the JPM.

END

TUOI NUMBER: Page 6 of 6 A1JPM-RO-EOP11 EXAMINEES COPY INITIAL CONDITIONS:

ESAS has actuated due to a LOCA. RCS pressure is £ 50 psig. All unnecessary people have been evacuated from the Aux Building. Aux Spray has been aligned from LPI system. BWST level is at ~ 6 feet, BWST LO and LO LO annunciators are in alarm.

INITIATING CUE:

The CRS/SM directs you to shift to RB sump suction using RT-15.

PROC./WORK PLAN N

O. PROCEDURE

/WORK PLAN TITLE: Page 28 of 30 1202.012 REPETITIVE TASKS CHANGE: 004-02-0

TUOI NUMBER:_A1JPM-RO-EDG04 Page 1 of 5 JOB PERFORMANCE MEASURE UNIT: ______1_______ REV # ______1_______ DATE: ______________________________

TUOI NUMBER:_A1JPM-RO-EDG04__ ___________

SYSTEM/DUTY AREA:_EMERGENCY DIESEL GENERATOR (EDG) SYSTEM__________________________

TASK:_LOAD EDG1____________________________________________________________________

JTA#:_ANO1-RO-EDG-NORM-10___________________________

KA VALUE RO:__3.4_____ SRO:__3.4_____ KA

REFERENCE:

__064 A4.07_________________

APPROVED FOR ADMINISTRATION TO: RO:____X___ SRO:___ X ___

TASK LOCATION: INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________

POSITION EVALUATED: RO:__________ SRO:___________

ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:_________ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES:___ 15 MINUTES______________________________

REFERENCE(S):_1104.036 ________________________

EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

TUOI NUMBER:_A1JPM-RO-EDG04 Page 2 of 5 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:_EDG1 is running with its output breaker open and its___

_service water inlet valve (CV-3806) open._ ________________________________________

TASK STANDARD:_EDG1 tripped by examinee after its load increases without operator __

_control._This is an Alternate Success Path JPM.__________________________ ________

TASK PERFORMANCE AIDS:__1104.036 Section 7.0 ___________________

NOTE: When the EDG1 output breaker is closed, insert override DI CS3-DG1_RO2; true and CS3-DG1_W02; false which will fail the governor handswitch in the raise position; this will cause the EDG load to rise without control.

TUOI NUMBER:_A1JPM-RO-EDG04 Page 3 of 5 INITIATING CUE:

The SM/CRS directs you to parallel EDG1 to the grid and load EDG1 to ~2750 KW per 1104.036 Step 7.10.

CRITICAL ELEMENTS (C):_2, 6, 7 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT

1. Inform dispatcher that Called the dispatcher, EDG1 will be loaded and informed him/her that EDG1 inquire about weather. is ready for loading and ____ ____ ____

asked about proper weather conditions.

(C) 2. Turn on synchronize On C10, placed synchronize switch for EDG1 output switch for A-308 to ON ____ ____ ____

breaker A-308. position.

3. Verify voltage control. Verified voltage control by raising and/or lowering voltage using the EDG1 ____ ____ ____

voltage regulator control switch on C10.

4. Verify frequency control. Verified frequency control by raising and/or lowering frequency by using the EDG1 ____ ____ ____

governor control switch on C10.

5. Match running and On C10, matched running and incoming voltages. incoming voltages by adjusting EDG1 voltage regulator. ____ ____ ____

NOTE: Voltages may be verified matched on C10 or SPDS or on plant computer.

(C) 6. Adjust EDG1 frequency. On C10, adjusted EDG1 governor control to achieve

~60 hz with synchroscope ____ ____ ____

rotating slowly in the FAST direction.

NOTE: IA Operator When the EDG1 output breaker is closed, insert override DI CS3-DG1_RO2; true and DI CS3-DG1_W02; false which will fail the governor handswitch in the raise position, this will cause the EDG load to rise without control.

TUOI NUMBER:_A1JPM-RO-EDG04 Page 4 of 5 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT (C) 7. As synchroscope Closed EDG1 output breaker approaches 12 oclock A-308. ____ ____ ____

position (~5 min. til) close EDG1 output breaker A-308.

(C) 8. Operator identifies On C10, tripped EDG1.

increasing load and trips ____ ____ ____

the EDG.

END

TUOI NUMBER:_A1JPM-RO-EDG04 Page 5 of 5 EXAMINEES COPY INITIAL CONDITIONS:

EDG1 is running with its output breaker open and its service water inlet valve (CV-3806) open.

INITIATING CUE:

The SM/CRS directs you to parallel EDG1 to the grid and load EDG1 to ~2750 KW per 1104.036 Step 7.10.

JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-ED030 Page 1 of 5 UNIT: 1 REV # 0 DATE: ______________________________

TUOI NUMBER: A1JPM-RO-ED030 SYSTEM/DUTY AREA: BATTERY AND 125V DC DISTRIBUTION TASK: PLACE BATTERY CHARGER D-03B IN SERVICE JTA#: ANO1-AO-125DC-NORM-12 KA VALUE RO: 3.9 SRO: 3.4 KA

REFERENCE:

2.1.30 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR:_________ BOTH:________

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:____ X_____SIMULATOR: LAB:_________________

POSITION EVALUATED: RO: X SRO: X ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:___X______ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES: 20 MINUTES REFERENCE(S): 1107.004 EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-ED030 Page 2 of 5 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

§ Battery Charger D-03A is in service on Bus D01.

INITIATING CUE:

The Shift Manager requests you to place Battery Charger D-03B in service on Bus D01 and remove Battery Charger D-03A from service per 1107.004, Battery and 125V DC Distribution, Attachment B.

JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-ED030 Page 3 of 5 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Battery Charger D-03A is in service on Battery D01.

TASK STANDARD: IAW 1107.004, Att. B, examinee places charger D-03B in service, removes D-03A from service, and performs actions for D-03A DC output voltage drifting to zero.

THIS IS AN ALTERNATE SUCCESS PATH JPM.

TASK PERFORMANCE AIDS: 1107.0004 Attachment B

JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-ED030 Page 4 of 5 INITIATING CUE:

The Shift Manager requests you to place Battery Charger D-03B in service on Bus D01 and remove Battery Charger D-03A from service.

CRITICAL ELEMENTS (C) 5, 6, 8, 9, 12, 14, 16 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT TRANSITION NOTE: Proceed to El. 372 in Auxiliary Building off Corridor 98 to Rm. 109, DC Equipment Room.

1. Verify breakers open for charger On front of charger D-03B, verified the D-03B. AC Input and DC Output breakers
  • AC Input breaker open (OFF). _____ _____ _____
  • DC Output breaker TRANSITION NOTE: Proceed to MCC B57 in South ES Switchgear Room on the same elevation.
2. Verify AC feeder breaker to charger Verified breaker B-5733 closed (ON).

D-03B closed (B-5733). _____ _____ _____

TRANSITION NOTE: Return to DC Equipment Room.

In the following step, Caution the examinee not to break plane of cubicle door.

3. Verify charger D-03B supply to bus Inside panel D01, verified breaker breaker closed (D01-42). D01-42 closed (ON). _____ _____ _____
4. Verify Manual Disconnect for battery At D13, verified manual disconnect for _____ _____ _____

D-07 closed (D-13). battery D07 closed (ON).

(C) 5. Close D-03B AC Input breaker. On front of charger D-03B, closed the _____ _____ _____

AC Input breaker (ON).

(C) 6. Close D-03B DC Output breaker. On front of charger D-03B, closed the _____ _____ _____

DC Output breaker (ON).

7. Wait ~1 minute for automatic load Waited ~1 minute, observed rising _____ _____ _____

sharing to occur. amps on D-03B and falling amps on D-03A.

CUE: Amps are rising on D-03B and amps are falling on D-03A.

(C) 8. Open D-03A DC Output breaker. On front of charger D-03A, opened _____ _____ _____

the DC Output breaker (OFF).

JOB PERFORMANCE MEASURE TUOI: A1JPM-RO-ED030 Page 5 of 5 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT (C) 9. Open D-03A AC Input breaker. On front of charger D-03A, opened _____ _____ _____

the AC Input breaker (OFF).

10. Check Charger D-03B picks up At charger D-03B checked ammeter _____ _____ _____

load. deflected to a nominal value, and at D01 checked bus voltage maintained CUE: at ~130 volts.

  • D-03B DC Out ~100 amps
  • AC In ~30 amps
  • D01 bus voltage 130V
11. Reset local alarm panel for Charger At charger D-03B, pressed R button _____ _____ _____

D-03B. on RIS panel.

(C) 12. Place D-03B alarm to control room At charger D-03B, placed control _____ _____ _____

toggle switch ON. room alarm switch to ON (up).

13. Place D-03A alarm to control room At charger D-03A, placed control _____ _____ _____

toggle switch OFF. room alarm switch to OFF (down).

14. Check annunciator D01 CHARGER Called control room and requested _____ _____ _____

TROUBLE (K01-E7) clears. check for clear annunciator K01-E7.

ALTERNATE PATH CUE: Inform examinee that D-03A DC Output Voltage drifted to zero, also inform examinee that one minute has passed since D-03A was de-energized.

(C) 15. Close D-03A AC Input breaker. On front of charger D-03A, closed the _____ _____ _____

AC Input breaker (ON).

16. Check D-03A DC output voltage and On charger D-03A, observed DC _____ _____ _____

AC input voltage. output voltage and AC input voltage meters.

CUE:

  • DC Output Voltage ~90V Examinee stated that he would
  • AC Input Voltage ~480V contact electrical maintenance for support.

(C) 17. Open D-03A AC Input breaker. On front of charger D-03A, opened _____ _____ _____

the AC Input breaker (OFF).

18. Submit condition report and WR. Examinee stated that he would submit _____ _____ _____

a condition report and Work Request or Work Order on D-03A.

END

TUOI NUMBER: Page 1 of 6 A1JPM-RO-AOP08 JOB PERFORMANCE MEASURE Unit: 1 Rev # 4 Date: 11/04/2003 TUOI NUMBER: A1JPM-RO- AOP08 System/Duty Area: Emergency and Abnormal Operations Task: RO #1 Duties for Alternate Shutdown with immediate Control Room evacuation JA# 13035210401 KA Value RO 4.3 SRO 4.2 KA Reference A06.AA1.1 Approved For Administration To: RO SRO Task Location: Inside CR: Outside CR: Both:

Suggested Testing Environment And Method (Perform Or Simulate): Simulate Plant Site: Perform Simulator: Lab:

Position Evaluated: RO: X SRO: X Actual Testing Environment: Simulator: Plant Site: Lab Testing Method: Simulate: X Perform:

Approximate Completion Time In Minutes: 20 Minutes Reference(S): OP 1203.002 change 015-05-0 Examinee's Name: SSN:

Evaluator's Name:

The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:

Satisfactory: Unsatisfactory:

Performance Checklist Comments:

Start Time Stop Time Total Time Signed Date:

Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.

TUOI NUMBER: Page 2 of 6 A1JPM-RO-AOP08 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

There is a Fire in the Cable Spreading Room. An Alternate Shutdown is in progress. At the Alternate Shutdown Cabinet, you have received a copy of OP 1203.002 and Section 1C.Perform to step 3.14 of applicable section.

TASK STANDARD:

RO#1 perform actions for alternate shutdown completed through step 3.14.

TASK PERFORMANCE AIDS:

OP 1203.002 and Section 1C, change 015-05-0.

SIMULATOR SETUP:

N/A

TUOI NUMBER: Page 3 of 6 A1JPM-RO-AOP08 INITIATING CUE: The first 3 steps of OP 1203.002 Section 1C have been completed. Perform the actions required of RO

  1. 1 through step 3.14.

CRITICAL ELEMENTS (c): 1, 7, 9, 11, 12, and 13 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT C 1. At The MSIV's, open the instrument air vent Opened instrument air vent valves for each MSIV (IA-2691B through E and valves IA-2691B through E and IA-2692B through E). IA-2692B through E. ____ ____ ___

POSITIVE CUE:

All 8 vent valves have stem full out, with each valves handwheel fully CW.

2. Verify CV-2667 open. CV-2667 verified open by visually observing stem or valve position POSITIVE CUE: indicator. ____ ____ ___

CV-2667 has stem full out, with the valve handwheel fully CW.

3. Verify CV-2617 open. CV-2617 verified open by visually observing stem or valve position POSITIVE CUE: indicator. ____ ____ ___

CV-2617 has stem full out, with the valve handwheel fully CW.

4. Verify CV-2663 open. CV-2663 verified open by visually observing stem or valve position POSITIVE CUE: indicator. ____ ____ ___

CV-2663 has stem full out, with the valve handwheel fully CW.

5. Verify CV-2613 open. CV-2613 verified open by visually observing stem or valve position POSITIVE CUE: indicator. ____ ____ ___

CV-2613 has stem full out, with the valve handwheel fully CW.

6. Notify TSC of completion Communicated via phone or radio the Completion of Item 1.A ____ ____ ___

POSITIVE CUE:

TSC notified of completion of actions EXAMINERS NOTE: The examinee should proceed to the Auxiliary Building 354 elevation.

C 7. Proceed to Aux Bldg, 354. Slowly open CV- Used manual lever and 1407 manually handwheel, fully opened CV- ____ ____ ___

1407.

POSITIVE CUE:

Valve has stem full out, with the valve handwheel fully CW.

TUOI NUMBER: Page 4 of 6 A1JPM-RO-AOP08 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT

8. Check for flow noise as CV-1407 is opened. Checked for flow noise as CV-1407 was opened. ____ ____ ___

POSITIVE CUE:

No flow noise is heard.

EXAMINERS NOTE: The examinee should proceed to the UNPPR.

C 9. Manually open CV-1219 and CV-1220. Close Opened CV-1219, CV-1220, CV-1206 closed CV-1206 with manual ____ ____ ___

lever and handwheel, verified POSITIVE CUE: valve movement CV1219 and CV1220 have stems full out, with the valves handwheels fully CW, CV1206 has stem full in, with the valve handwheel fully CCW.

10. Notify TSC of completion Established communication with TSC telephone or radio, notified ____ ____ ___

POSITIVE CUE: of action HPI Item 5.A, 5.B, TSC notified of completion of actions EXAMINERS NOTE:

When TSC is notified have examinee throttle EFW P-7A to SG-A ISOL, CV-2627 to approximately 50 % open.

C

11. Close CV-2627 to approximately 50% open. Moved to CV-2627, and used the manual lever and hand wheel to ____ ____ ___

POSITIVE CUE: close CV-2627 to approximately CV-2627 has stem approximately halfway out. to 50% open.

EXAMINERS NOTE: Inform examinee that EFW flow is controlled.

C 12. Open valves: Opened EFW P-7B to SG-A ISOL EFW P-7B to SG-A ISOL (CV-2670) (CV-2670), B HPI Block Valve ____ ____ ___

B HPI Block Valve (CV-1227) (CV-1227), and A HPI Block A HPI Block Valve (CV1228) Valve (CV1228) using manual handwheel and clutch lever.

POSITIVE CUE:

CV-2670, CV-1227, CV-1228 have stems full out, with each valves handwheel fully CW.

TRANSITION NOTE: The examinee should proceed to the 354 elevation waste gas room.

C 13. Slowly open BWST Outlet CV-1408. Opened CV-1408 using clutch lever and manual handwheel. ____ ____ ___

POSITIVE CUE:

CV-1408 has stem full out, with the valve handwheel fully CW.

TUOI NUMBER: Page 5 of 6 A1JPM-RO-AOP08 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT

14. Check for flow noise as CV-1408 is opened. Checked for flow noise as CV1408 was opened. ____ ____ ___

POSITIVE CUE:

No flow noise is heard.

TRANSITION NOTE: The examinee should proceed to the 335 elevation letdown filter area.

15. Verify service water header pressure >40 psig. Opened RB Coolers VCC-2C &

2D PI-3813A ISOL SW-3813A ____ ____ ___

POSITIVE CUE: and verified pressure >40 psig.

Service water pressure is 50 psig.

NEGATIVE CUE:

Service water pressure is 0 psig.

16. Establish communications with the TSC and Operator Calls TSC via radio or report completion of steps. telephone and reports completion of steps 2.B, 6.A, 6.B, 7.B. ____ ____ ___

POSITIVE CUE:

All steps have been reported to TSC.

NOTE:

Provide the cue for steps missed.

NEGATIVE CUE:

Step 1 RCS is overcooling due to high steam flow.

Step 9. A OTSG level is going up rapidly.

Step 7, 10b or c, 11. Unable to establish HPI flow.

INSTRUCTOR CUE: This concludes the JPM.

END

TUOI NUMBER: Page 6 of 6 A1JPM-RO-AOP08 EXAMINEES COPY INITIAL CONDITIONS:

There is a Fire in the Cable Spreading Room. An Alternate Shutdown is in progress. At the Alternate Shutdown Cabinet, you have received a copy of OP 1203.002 and Section 1C.

INITIATING CUE:

The first 3 steps of OP 1203.002 Section 1C have been completed. Perform the actions required of RO #1 through step 3.14.

TUOI NUMBER: Page 1 of 5 A1JPM-RO-EFW01 JOB PERFORMANCE MEASURE Unit: 1 Rev # 10 Date: 11/04/2003 TUOI NUMBER: A1JPM-RO- EFW01 System/Duty Area: Emergency Feedwater and EFIC Task: Reset the Steam Driven Emergency Feedwater Pump after an overspeed trip JA# ANO1-RO-EFW-NORM-13 KA Value RO 3.4 SRO 3.8 KA Reference 061 A2.04 Approved For Administration To: RO SRO Task Location: Inside CR: Outside CR: Both:

Suggested Testing Environment And Method (Perform Or Simulate): Simulate Plant Site: Perform Simulator: Lab:

Position Evaluated: RO: X SRO: X Actual Testing Environment: Simulator: Plant Site: Lab Testing Method: Simulate: X Perform:

Approximate Completion Time In Minutes: 15 Minutes Reference(S): 1106.006 Exhibit A, change 063-08-0.

Examinee's Name: SSN:

Evaluator's Name:

The Examinee's performance was evaluated against the standards contained in this JPM and is determined to be:

Satisfactory: Unsatisfactory:

Performance Checklist Comments:

Start Time Stop Time Total Time Signed Date:

Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.

TUOI NUMBER: Page 2 of 5 A1JPM-RO-EFW01 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

P7A Emergency Feedwater Pump has tripped on overspeed during an EFIC actuation.

TASK STANDARD:

P7A turbine has been reset per 1106.006 Exhibit A.

TASK PERFORMANCE AIDS:

OP 1106.006 Exhibit A, change 063-08-0.

SIMULATOR SETUP:

N/A

TUOI NUMBER: Page 3 of 5 A1JPM-RO-EFW01 INITIATING CUE: The SM/CRS directs you to reset P7A overspeed trip per 1106.006, Exhibit A.

CRITICAL ELEMENTS (c): 2, 3, and 8 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT EXAMINERS NOTE: Simulate communications with the Control Room.

1. Verify the following valves are closed. If EFW Called control room to verify SV-initiate signal is present, manual control is required. 2613, SV-2663, CV-2613, CV-
  • EFW Pump Turbine K3 Steam Admission 2663 are closed.

Valves (CV-2613 and CV-2663)

  • EFW Pump Turbine K3 Steam Admission ____ ____ ____

Valve Bypasses (SV-2613 and SV-2663)

POSITIVE CUE:

SV-2613, SV-2663, CV-2613, CV-2663 have valve stems full out with handwheels full CW.

C 2. Turn EFW Turbine K3 Trip-Throttle Valve (CV- Trip/ Throttle valve (CV-6601A) 6601A) handwheel clockwise. Observe rotation of handwheel turned clockwise until screw raises sliding nut and latch lever to where it sliding nut rises and latch lever will engage the trip hook. engages the trip hook. ____ ____ ___

POSITIVE CUE:

Trip/ Throttle valve (CV-6601A) sliding nut raised and latch lever has engaged the trip hook.

EXAMINERS NOTE: The following steps will reset the mechanical trip linkage.

C 3. Pull spring-loaded connecting rod against spring Connecting rod pulled against force to move head lever away from tappet and spring force to move head lever ____ ____ ___

tappet nut. away from tappet and tappet nut.

POSITIVE CUE:

Head lever moved away from tappet and tappet nut.

4. Lift and release tappet assembly Tappet assembly lifted and released. ____ ____ ___

POSITIVE CUE:

Tappet assembly lifted and released.

5. Verify tappet nut in trip reset position. Verified tappet nut in trip reset position. ____ ____ ___

POSITIVE CUE:

Tappet nut in trip reset position.

TUOI NUMBER: Page 4 of 5 A1JPM-RO-EFW01 C PERFORMANCE CHECKLIST STANDARD N/A SAT UN SAT

6. Observe tappet returns to reset position. Observed tappet returns to reset position. ____ ____ ___

POSITIVE CUE:

Tappet is in reset position.

7. Verify the following: Verified tappet nut in trip reset
  • Tappet nut in trip reset position and properly position and properly aligned. ____ ____ ___

aligned. Verified spring tension holds

  • Spring tension holds connecting rod in position. connecting rod in position.

POSITIVE CUE:

Tappet nut in trip reset position and properly aligned.

Spring tension is holding connecting rod in position.

C 8. Slowly turn CV-6601A handwheel CV-6601A fully opened.

counterclockwise until valve is fully open. ____ ____ ___

POSITIVE CUE:

CV-6601A has valve stem full out with handwheel in the full CW position.

9. Close valve (CV-6601A) 3/4 turn to prevent binding CV-6601A closed 3/4 turn.

on heatup. ____ ____ ___

POSITIVE CUE:

CV-6601A as you see it.

EXAMINERS NOTE: Simulate communications with the Control Room.

10. Verify P-7A TURBINE TRIP (K12-B5) clear. Call Control Room and verified that P-7A TURBINE TRIP (K12- ____ ____ ___

POSITIVE CUE: B5) is clear.

P-7A TURBINE TRIP (K12-B5) clear

11. Notify Control Room that P-7A is ready for restart. Control Room notified that P-7A is ready for restart. ____ ____ ___

POSITIVE CUE:

Control Room notified that P-7A is ready for restart.

EXAMINERS CUE: This concludes the JPM.

END

TUOI NUMBER: Page 5 of 5 A1JPM-RO-EFW01 EXAMINEES COPY INITIAL CONDITIONS:

P7A Emergency Feedwater Pump has tripped on overspeed during an EFIC actuation.

INITIATING CUE:

The SM/CRS directs you to reset P7A overspeed trip per 1106.006, Exhibit A.

Appendix D Operator Actions Form ES-D-1 Facility: ANO-1 Scenario No.: 1 (NEW) Op-Test No.: 2004-1 Page 1 of 10 Examiners: Operators:

Initial Conditions:

100% MOL; Severe Thunderstorm Warning for Pope and Conway counties.

Turnover::

National Weather service has issued a Severe Thunderstorm Warning for Pope and Conway Counties until 8:00 pm today. AOP 1203.025, Natural Emergencies, Section 2, High Winds/Tornado/Thunderstorm, steps 3.1 and 3.2 have been completed. #2 EDG OOS for fuel leak repairs. 1104.036 Supplement 11 is due right after turn-over.

Event Malf. No. Event Event No. Type* Description 1 N/A N (ALL) Perform 1104.036 Supplement 11 for EDG #1 2 TR568 I (BOR) A OTSG operating level transmitter fails high 3 CAE RX7460 I (BOT) RB atmosphere radioactivity monitor fails low. TS 3.4.15 determination.

4 N/A R (BOR) Dispatcher orders down power to 650 MWe due to weather that has damaged Mablevale sub-station.

5 RX150 I (BOT) Turbine EHC fails to respond in auto mode for ICS (manual control required) 6 CV2692 C (BOR) One MSIV for B OTSG drifts shut-requires manual reactor trip per EOP 1202.001 7 MS131 M (ALL) A OTSG steam leak in containment (MSLI activates). Transfer to 1202.003 overcooling if necessary.

8 ES264 I (BOT) Containment pressure >4psig but B train RBIC CV2214 will fail to actuate automatically and an ICW isolation valve will fail open that should shut.

Operator will be required to manually initiate B RBIC and verify shut the redundant ICW valve to isolate ICW.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Operator Actions Form ES-D-1 Page 2 of 10 Event Time Malf. No. Value/Ramp Event No. Time Description 8 T=0 IMF ES264 N/A B Train of Reactor Bldg. Isolation and Cooling fails to auto actuate (ESAS channel 6)

IMF CV2214 1 ICW valve CV2214 fails to close upon ESAS actuation 1 T=0 N/A N/A Perform surveillance test of the #1 EDG for operability due to maintenance of #2 EDG.

2 T=~15 IMF TR568 292 / Ramp 3 A OTSG Operating Range Level Transmitter Min. fails high.

3 T=20 CAE RX7460 N/A RB Sump Radiation Monitor fails low (RX7460) 4 T=25 N/A N/A The dispatcher requests an emergency power reduction to ~650 MWe to maintain system integrity.

5 T=25.5 IMF RX150 N/A Turbine EHC fails to respond.

6 T=30 IMF CV2692 0 / Ramp 1 Min. B MSIV drifts shut requiring manual reactor trip.

7 T=35 IMF MS131 .4 / Ramp 3Min. A OTSG Main Steam Line Leak inside containment.

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 1 Event No: 1 Page 3 of 10 Event

Description:

Perform surveillance test of the #1 EDG for operability due to maintenance of #2 EDG.

Time Position Applicants Actions or Behavior T=0 CRS Directs the performance of the #1 EDG surveillance test per Supplement 11 of 1104.036.

CBOT Make plant announcement of the starting of #1 EDG.

CBOT Verify DG1 Volts Select switch NOT in OFF on C10.

CBOT Simultaneously depress the START pushbutton for #1 EDG and start the stopwatch.

CBOT Stop the stopwatch when DG1 voltage exceeds 3750 volts.

CBOT Record the time from start to >3750 volts in section 3.0.

CBOT Verify service water to DG1 coolers (CV3806) opens and record verification in section 3.0.

CBOT Adjust the voltage and frequency within the acceptable operating bands.

CBOT Stop DG1 by depressing the STOP pushbutton.

CBOT Verify associated critical and non-critical alarms on K01 clear.

EVENT TERMINATION CRITERIA

  1. 1 EDG is stopped or Next Event

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 1 Event No: 2 Page 4 of 10 Event

Description:

A OTSG Operating Range Level Transmitter fails high.

Time Position Applicants Actions or Behavior T=15 CBOR Acknowledge and report annunciator K07 B4, SASS MISMATCH.

CRS Obtain Annunciator Corrective Action for K07 B4 for guidance.

CBOR Acknowledge and report annunciator K07 A2, A OTSG Hi Level Limit.

CRS Obtain Annunciator Corrective Action for K07 A2 for guidance.

CBOT Observe/verify A Operating range level on C13 level recorder.

CRS Direct the CBOR to place the A feed pump H/A station in HAND and stabilize plant.

CBOR Place the A main feed pump H/A station in HAND and balanced feed flows.

CRS Direct board operators to validate level transmitters by comparing to other (redundant) instruments.

CBOT/R Determine the A OTSG operating level transmitter is failing high.

CRS Verify plant stable and ICS in condition for instrument swap and direct the CBOR to select the other instrument.

CBOT Verify the Operating Range Level for A is indicating properly on C13.

CRS Direct placing ICS (A feed pump H/A station) back to AUTO EVENT TERMINATION CRITERIA ICS in AUTO or next event

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 1 Event No: 3 Page 5 of 10 Event

Description:

RB atmosphere radioactivity monitor fails low.

Time Position Applicants Actions or Behavior T=20 CBOR Acknowledge and report annunciator K10 C1, Radiation Monitor Trouble.

CBOT Observe monitors at C24 and C25 and determine that RX7460 has FAILURE lights ON and BOTH monitors, RI7460 and RI7461, are reading 0 CPM.

CRS Refer to ACA 1203.012I for corrective action and guidance.

CRS Determine RB Atmosphere Gaseous Monitor is inoperable and refer to Tech Spec 3.4.15B.

CRS Initiate steps to meet requirements per Tech Specs.

CRS Initiate steps to have the failed monitor checked and repaired.

EVENT TERMINATION CRITERIA Tech Spec determination made

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 1 Event No: 4 & 5 Page 6 of 10 Event

Description:

The Mablevale substation experiences storm damage causing the breakers in the switchyard supplying that line to open. The dispatcher requests an emergency power reduction to ~650 MWe to maintain system integrity. The Turbine fails to respond to lowering demand.

Time Position Applicants Actions or Behavior ROLE PLAY Call control room as EOC Dispatcher and direct unit to reduce power to 650 MWe as soon as possible due to transformer damage at the Mablevale substation.

If asked by control room personnel inform them that there is serious concern over grid stability due to the severe weather and substation damage.

T=25 CRS Direct CBOR to reduce unit load to 650 MWe.

CRS Direct operations per 1203.045, Rapid Plant Shutdown.

CBOR Commence reduction in unit load to 650 MWe using the ULD.

NOTE: Turbine may revert to Operator Auto mode before operator takes action.

CBOT/R Recognize and report to the CRS that the turbine is not responding during the power reduction.

NOTE: The crew may elect to place both the SG/RX master and the Turbine in the MANUAL mode. In this configuration, the CBOR controls the change in load demand and the CBOT will maintain turbine header pressure.

CRS Direct the CBOT to place the turbine in Operator Auto or Manual mode and control steam header pressure.

CBOT Take the turbine to manual or operator auto CRS Direct the CBOR to place the SG/RX Master H/A station in HAND and lower load to 650 MWe.

CBOR Place the SG/RX master in HAND and slowly toggle down.

continued

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 1 Event No: 4 & 5 Page 7 of 10 Event

Description:

The Mablevale substation experiences storm damage causing the breakers in the switchyard supplying that line to open. The dispatcher requests an emergency power reduction to ~650 MWe to maintain system integrity. The Turbine fails to respond to lowering demand.

Time Position Applicants Actions or Behavior NOTE: In the manual mode on the SG/RX master, the operator has control of the rate the plant will change. It is expected the operator will maintain the rate of change near the directed rate by the CRS.

CBOT Verify Turbine EHC responds to lowering load and maintains header pressure at or near setpoint of 895#. (Operator Auto or Manual)

ROLE PLAY If asked about PPAS information, report ICS signal to EHC good.

CBOR Stabilize load at ~650MWe. Power should be near 65-67%.

EVENT TERMINATION CRITERIA Power reduction is complete OR the next event occurs

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 1 Event No: 6 Page 8 of 10 Event

Description:

The B Main Steam Isolation Valve drifts shut, requiring a manual reactor trip per EOP 1202.001.

Time Position Applicants Actions or Behavior T=30 CBOR Acknowledge and report annunciator K07 C6, Main Steam Pressure Hi/Lo in alarm.

CRS Refer to ACA 1203.012I for guidance.

CBOR/T Observe the B MSIV, CV2692, closing.

CRS Direct the CBOR to TRIP the reactor and Carryout the immediate actions.

CBOR Trip the reactor by depressing the pushbutton on C03 and observing all control rods inserted and power dropping.

CBOT Manually trip the turbine by depressing the pushbutton on C01 and observing the throttle and governor valves close and output and exciter field breakers open.

CBOR/T Verify subcooling margin adequate.

CRS Provide direction to the crew per Reactor Trip EOP, 1202.001.

EVENT TERMINATION CRITERIA B MSIV closed and Reactor is tripped OR As determined by the lead examiner.

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 1 Event No: 7 & 8 Page 9 of 10 Event

Description:

Main Steam Line rupture inside containment. Channel 6 of ESAS fails to auto actuate. ICW valve CV2214 fails to close.

Time Position Applicants Actions or Behavior T=35 CBOR Recognize A OTSG pressure dropping OR noticeably lower than B OTSG pressure.

CBOR Monitor RB pressure and temperature.

NOTE:

Due to rise in reactor building pressure and temperature, ESAS may actuate prior to the direction to trip the Reactor if CRS fails to recognize MSIV drifting shut in event 6 above.

Annunciator K12A1 will alarm due to the environmental conditions inside the Reactor Building. If panel 463 is checked for location of the alarm, instruct that module A2-5 lower, RB UNEP ZONE 32-K, in alarm.

CBOR/T Identify and announce ESAS has actuated on high RB Pressure.

CRS Transition to ESAS Procedure , EOP1202.010 and direct crew actions.

CRS Direct the verification of ESAS per RT10.

CBOR/T Recognize failure of Channel 6 of ESAS to auto actuate. Tech Spec 3.3.7A.

CT CBOR Manually actuate Channel 6 of ESAS using the button on C04.

CBOT Identify and report failure of CV2214 to close.

CRS Direct the CBOT to verify the redundant ICW valve on Channel 6, CV2215, closed.

CBOT Verify actuation of ESAS per RT 10.

CREW Recognize SG pressure < 900#

continued

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 1 Event No: 7 & 8 Page 10 of 10 Event

Description:

Main Steam Line rupture inside containment. Channel 6 of ESAS fails to auto actuate. ICW valve CV2214 fails to close.

Time Position Applicants Actions or Behavior CRS Transition to Overcooling Emergency Operating procedure (1202.003).

CT CBOT Manually override and secure HPI as directed by the CRS and the Emergency Operating Procedure.

CBOR Report A MSLI actuated.

EAL NUE 3.1 Uncontrolled OTSG Depressurization Resulting in MSLI Actuation CRS Provide RT6 to CBOR to verify proper MSLI and EFW actuation and control.

CBOR Verify proper MSLI and EFW actuation and control per RT6.

CBOR Control RCS pressure within the limits of Figure 3 per RT14 using PZR heaters EVENT AND SCENARIO TERMINATION CRITERIA RCS pressure and temperature stable with the A OTSG isolated, channel 6 of ESAS manually actuated, with the ICW flowpath isolated OR As determined by the lead examiner.

Appendix D Operator Actions Form ES-D-1 Facility: ANO-1 Scenario No.: 2 (MOD) Op-Test No.: 2004-1 Page 1 of 11 Examiners: Operators:

Initial Conditions:

100% MOL, equilibrium Xenon, P4A and P4B in service (P4C down for maintenance).

Sluice gates SG-1, SG-2, and SG-4 open.

Turnover:

100% power, MOL, equilibrium Xenon. Expected P4C return to service and restore normal line-up within next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. . #2 EDG is OOS to repair its governor (day 1 of 7 day LCO 3.8.1.B).

Event Malf. No. Event Event No. Type* Description 1 TR625 I (BOT) A CFT-LT LIS2416 fails low. SRO TS determination required.

2 N/A N (BOT) Shift service water pump to P4A/P4C line-up, return P4B to standby 3 TR051 I (BOR) Selected PZR level transmitter fails high 4 TR558 I (BOR) B Main Feed flow transmitter drifts low slowly 5 BAT P1B_vibes C (BOR) MFP B has excessive vibration.

6 N/A R (BOR) Perform normal shutdown to repair MFP B.

7 ED183 M (ALL) Loss of Offsite power, Rx trip.

DG175 C (BOT) #1 EDG fails to auto start and pushbutton on C10 fails to start it.

STATION BLACK-OUT 8 CV2645 C (BOR) EFW valve fails open to A OTSG, resulting in level being raised higher than EFIC controlled SP.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-1 Page 2 of 11 Event Time Malf. No. Value/Ramp Event No. Time Description 7&8 T=0 IMF DG175 N/A #1 EDG fails to autostart IOR DI_DG1S False Pushbutton on C10 fails to start the EDG.

ICM CV2645 1 EFW valve to the A OTSG fails open resulting in level being raised higher than the EFIC controlled setpoint.

1 T=2 IMF TR625 0 Ramp 0 A Core Flood Tank LT(LIS2416) fails low.

2 T=~10 N/A N/A Shift service water pumps to P4A/P4C line-up, return P4B to standby 3 T=20 IMF TR051 320 PZR level transmitter (LT1001) fails to high Ramp 2 Min.

4 T=27 IMF TR558 1.0e06 B Main Feed flow transmitter drifts low slowly Ramp 4 Min.

5 T=30 BAT P1B_vibes N/A Report that B Main Feed Pump has excessive vibration 6 T=~32 N/A N/A Perform normal shutdown to repair B MFP 7 T=40 IMF ED183 N/A Loss of offsite power occurs. Reactor trip.

STATION BLACKOUT NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 2 Event No: 1 Page 3 of 11 Event

Description:

A CFT Level transmitter (LIS2416) fails low.

Time Position Applicants Actions or Behavior T=2 CBOR Recognize and report that annunciator K10 C5, A CFT LEVEL HI/LO, in alarm.

CRS Refer to ACA 1203.012I for corrective action.

CBOT Diagnose LIS2416 failure after comparing level indications for T2A on C16 and C18.

CRS Refer to Technical Specifications for applicability. ACA 1203.012I refers to TS 3.5.1 if actual level is high or low. Reference to the Technical Requirement Manual for instrumentation should be performed.

Technical Requirements Manual 3.3.5, Miscellaneous Instrumentation.

(Only one pressure and one level transmitter is required for operability)

EVENT TERMINATION CRITERIA Next Event NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 2 Event No: 2 Page 4 of 11 Event

Description:

Shift Service Water Pumps Time Position Applicants Actions or Behavior T~10 Role Call as work week manager and report P4C is ready for operation and rotation of Play pumps can proceed as anticipated.

CRS Direct shifting the service water pump configuration to P4A and P4C running and return P4B to standby status.

CBOT Notify Chemistry of pump rotation so chemical injection can be appropriately aligned.

CBOT Refer to Table 9.3 of 1104.029 to determine the service water alignment necessary for the pumps that will remain in service.

CBOT Verify sluice gates aligned to supply water to the desired SW Pumps.

CBOT Start P4C CBOT Stop P4B CBOT Notify the Outside AO to check for reverse rotation of P4B.

CBOT Align service water system per Table 9.3 CBOR/T Verify normal service water loop pressures.

CBOR/T Monitor SW bay level, CW bay level, and bay differentials for proper operation of SW bay strainiers.

EVENT TERMINATION CRITERIA Service Water Pumps rotated and system aligned OR Next Event NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 2 Event No: 3 Page 5 of 11 Event

Description:

PZR level transmitter (LT1001) fails to upscale Time Position Applicants Actions or Behavior T=20 CBOR Recognize and report that PZR level indications are mismatched CREW Diagnose LT1001 failure Tech. Spec. 3.3.15A CRS Direct operations per 1203.015 Pressurizer Systems Failure, section 4.0.

CRS Direct CBOR to select valid PZR level indicator for PZR level control.

CBOR Select LT1002 to control PZR level control valve (CV-1235) using hand switch on upright section of C04.

CBOR Verify CV-1235 opens to control PZR level at setpoint.

EVENT TERMINATION CRITERIA Pressurizer level control is selected to LT1002 and PZR level control valve is controlling level in auto.

NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 2 Event No: 4 Page 6 of 11 Event

Description:

B Main Feed flow transmitter drifts low slowly Time Position Applicants Actions or Behavior T=27 CBOR Acknowledge and report annunciator K07 B4, SASS MISMATCH.

CBOR/T Determine the cause of the alarm by scanning C03, C04, and C13 for SASS ENABLE light that is not illuminated. Identify the B MFW flow SASS Enable not illuminated.

CBOR Determine that SASS did not transfer to the Y instrument for control.

CRS Refer to ACA 1203.012F for corrective action and guidance.

CRS Direct the CBOR to place both FW pump H/A stations , and control rods in MANUAL. (Reactor Demand or Diamond station to MANUAL is acceptable)

CBOR Place the BOTH MFW pump H/A stations to MANUAL and Reactor Demand or Diamond Station to MANUAL.

CRS Direct the CBOR to stabilize the plant CBOR Using the MFW pump H/A stations and control rods, balance feedwater flows and Tave to return to normal values.

CRS Direct the CBOT to compare failed instrument to the non-selected instrument using PMS.

CBOT Using PMS, verify the non-selected MFW flow is reading correctly.

CRS Direct the CBOR to select the Y MFW flow instrument for loop B.

CBOR Select the Y instrument for loop B MFW flow.

continued NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 2 Event No: 4 Page 7 of 11 Event

Description:

B Main Feed flow transmitter drifts low slowly Time Position Applicants Actions or Behavior NOTE: A caution placard on both C03 and C13 provides direction of selecting the associated X or Y MFW Temperature instrument when the MFW flow instrument is selected due to hard wired temperature compensation of the MFW flow instrument.

CRS Direct the CBOT to select the Y MFW temperature instrument for loop B on C13.

CBOT Select the Y MFW temperature instrument for loop B.

CBOR Place ICS in AUTO in accordance with 1105.004, ICS Operations.

EVENT TERMINATION CRITERIA B Main Feedwater Flow Y instrument selected and ICS in AUTO NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 2 Event No: 5 & 6 Page 8 of 11 Event

Description:

B Main Feedwater pump excessive vibration and power reduction to secure B MFW pump for repair.

Time Position Applicants Actions or Behavior T=30 CBOR Acknowledge and report annunciator K06 C3, B MFP TURB CONTROL SYS TROUBLE.

CRS Refer to ACA 1203.012E for corrective action and guidance.

CBOR/T Report vibration alarm on B MFP from OIT alarm panel OR TSI.

CRS Direct AO to verify/confirm B MFP has excessive vibration.

CRS Direct the CBOR and CBOT to perform a power reduction to approxiomately 40%

power to secure the B MFP.

CBOR Begin a power reduction to 40% power using the Unit Load Demand (ULD).

EVENT TERMINATION CRITERIA Power reduction >10%

NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 2 Event No: 7 & 8 Page 9 of 11 Event

Description:

Loss of offsite power occurs. Reactor trip. #1 EDG fails to autostart and the pushbutton on C10 fails to start the EDG. STATION BLACKOUT. EFW valve to the A OTSG fails open resulting in level being raised higher than the EFIC controlled setpoint.

Time Position Applicants Actions or Behavior T=40 CREW Recognize loss of offsite power CRS Direct actions per the Reactor Trip Procedure, 1202.001.

CBOR Manually trip the reactor by depressing the Rx. Trip pushbutton. Verify all rods on bottom and power dropping.

CBOT Manually trip the turbine by depressing the Turbine Trip pushbutton CBOR/ Verify adequate subcooling margin.

CBOT CRS Transition to the Degraded Power Emergency Operating Procedure (1202.007).

Direct operations per 1202.007.

(Tech Spec. 3.8.1.G, AC Sources - Operating, Three or more required AC sources inoperable.)

CBOT Recognize the failure of #1 EDG to autostart CBOT Attempt to manually start #1 EDG using push-button on C10.

CRS Transition to the Blackout Emergency Operating Procedure (1202.008) and direct operations.

(Tech Spec. 3.8.1.G, AC Sources - Operating, Three or more required AC sources inoperable.)

CBOR Verify EFW actuated and perform RT5 CRS Dispatch AO to #1 EDG continued NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 2 Event No: 7 & 8 Page 10 of 11 Event

Description:

Loss of offsite power occurs. Reactor trip. #1 EDG fails to autostart and the pushbutton on C10 fails to start the EDG. STATION BLACKOUT. EFW valve to the A OTSG fails open resulting in level being raised higher than the EFIC controlled setpoint.

Time Position Applicants Actions or Behavior CRS Communicate with Unit 2 to make the AAC generator available for use by Unit 1.

CRS Direct manual isolation of letdown and RCP seal return.

CBOR Close CV1223 on C04.

CBOT Place RCP seal Bleedoff alternate path to quench tank valves in CLOSED position on C13.

CRS Dispatch the WCO to isolate letdown by manually closing CV1221 and isolating RCP seal return by manually closing CV1274.

CBOR Close both MSIVs (CV2691 and CV2692) on C09.

CBOR Report the EFW valve, CV2645 to the A OTSG, will not control and will not move in manual.

CT CBOR Manually throttle CV2627 on C09 to establish approximately 280 gpm.

CRS Direct the CBOT to place the AAC generator on the A3 bus utilizing O.P. 1107.002.

INSTRUCTOR NOTE: Make the AAC generator available to the crew by performing the following; RMF EDA901 TRUE Call as the Unit 2 CRS and report the AAC generator is available for loading the vital bus.

CT CBOT Place the AAC generator on the A3 bus.

continued NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 2 Event No: 7 & 8 Page 11 of 11 Event

Description:

Loss of offsite power occurs. Reactor trip. #1 EDG fails to autostart and the pushbutton on C10 fails to start the EDG. STATION BLACKOUT. EFW valve to the A OTSG fails open resulting in level being raised higher than the EFIC controlled setpoint.

Time Position Applicants Actions or Behavior CRS Transition back to the Degraded Power procedure (1202.007).

CT CBOR Start P7B by releasing handswitch from Pull-to-lock and placing handswitch in the start position.

CRS Direct the CBOR to establish EFW to both OTSGs using P7B.

CBOR Verify EFW flow to the OTSGs.

EVENT AND SCENARIO TERMINATION CRITERIA Power restored to the A3 bus from the AAC generator and EFW re-established to both OTSGs from P7B OR as directed by the lead examiner.

NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-1 Facility: ANO-1 Scenario No.: 3 (MOD) Op-Test No.: 2004-1 Page 1 of 10 Examiners: Operators:

Initial Conditions:

90% power, equilibrium Xenon, MOL, #2 EDG SW valve fails to open on manual start.

Turnover::

90% power, MOL, equilibrium Xenon. AO routinely checking traveling screens due to mild shad run over past 24 hrs. System Engineering and Ops Management have discussed rotation of operating Makeup pumps. They will call control room when they want this evolution performed.

Event Malf. No. Event Event No. Type* Description 1 IMF C5A C (BOT) Condenser Vacuum Pump C5A trips 2 N/A N (ALL) Shift running make up pumps from P36B to P36C to equalize run times 3 N/A R (BOR) Load dispatcher orders power increase to 100%

due to grid loading.

4 TR458 I (BOR) Controlling RCS pressure fails to 2280#

5 IMF CV1008 C (BOR) PZR spray valve leaks by after cycling 6 IMF ED453 I (ALL) SPDS failure 7 IMF RC005 M (ALL) SB LOCA 8 IMF CV1400 C (BOR) LPI injection valve CV1400 does not open.

9 IMF ES259 C (BOR) ESAS channels 1, 2 fail to actuate at RCS IMF ES260 pressure set point

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-1 Page 2 of 10 Event Time Malf. No. Value/Ramp Event No. Time Description 8&9 T=0 IMF CV1400 0 Ramp 0 LPI Block valve, CV1400, does not open.

IMF ES259 N/A ES channels 1 and 2 fail to auto actuate IMF ES260 IMF CV3807 0 Ramp 0 #2 EDG SW valve fails to open when EDG autostarts 1 T=2 IMF C5A OFF Condenser Vacuum Pump C5A trips 2 T=~10 N/A N/A Shift running Makeup Pumps 3 T=20 N/A N/A Load dispatcher orders power escalation to 100%

due to grid loading.

4 T=25 IMF TR458 2280 Controlling RCS pressure fails to 2280 psig Ramp 2 Min.

5 T=Spray IMF CV1008 .12 PZR Spray Valve leaks through valve closure 6 T=30 IMF ED453 N/A SPDS failure 7 T=35 IMF RC005 .007 R 0 Small Break LOCA into the Containment Building NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 3 Event No: 1 Page 3 of 10 Event

Description:

Condenser Vacuum Pump, C5A, trips.

Time Position Applicants Actions or Behavior T=2 CBOR Acknowledge and report annunciator K05 A3, Vacuum Pump Trip, alarm CRS Refer to ACA 1203.012D for corrective action and guidance.

CBOT Verify C5A has tripped by observing pump status on C02.

CBOT Manually start standby Vacuum Pump, C5B.

CRS Initiate steps to determine cause of pump trip. Call AO to investigate.

CBOT Monitor condenser vacuum for return to normal value.

CRS If condenser vacuum lowers to < 26.5 Hg, then go to Loss of Condenser Vacuum, 1203.016.

CBOT IF DESIRED, place the hand switch for C5A in normal-after-stop or Pull-To-Lock to clear the alarm.

EVENT TERMINATION CRITERIA C5B started and vacuum returned to normal OR Next Event NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 3 Event No: 2 Page 4 of 10 Event

Description:

Shift Running Makeup pumps from P36B to P36C to equalize run times.

Time Position Applicants Actions or Behavior T=10 CRS Direct the CBOR and CBOT to shift makeup pumps by starting P36C and stopping P36B per 1104.002, Makeup and Purification System Operations Procedure.

CBOT Start P64C, Aux. Lube Oil pump for P36C.

CBOT After one minute of P64C operation, Start P36C.

CBOT Stop P64C.

CBOT Start P64B CBOT Stop P36B.

CBOR Verify proper discharge pressure on C04 and/or SPDS.

CBOT After one minute of P64B operation, Stop P64B.

CBOT Change the pump status tags for the correct alignment.

EVENT TERMINATION CRITERIA P36C running, P36B off NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 3 Event No: 3 Page 5 of 10 Event

Description:

Power escalation to 100%.

Time Position Applicants Actions or Behavior T=20 CRS Direct the crew to continue power escalation to 100% at ~30/Hr.

CBOR Begin power escalation by verifying the rate of change set at ~.5%/min. and raising the demand with the ULD station.

CBOT Verify turbine load is rising and the turbine is maintaining header pressure at the desired setpoint.

CBOR Verify Reactor power rising and feedwater flow rising to maintain proper Tave.

EVENT TERMINATION CRITERIA Power returned to 100%

OR Next Event NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 3 Event No: 4 & 5 Page 6 of 10 Event

Description:

Controlling RCS pressure fails and PZR Spray Valve leaks through.

Time Position Applicants Actions or Behavior T=25 CBOR Identify and report a disparity between RCS pressure indications.

NOTE: Crew may or may not identify the PZR Spray valve simultaneous with pressure indication failure.

CREW Diagnose failed RCS pressure indication using panel indications, plant computer and SPDS. (Tech. Spec. 3.3.1A)

CBOR If not identified earlier, report RCS pressure lowering and the pressurizer spray valve open.

CRS Direct operation per 1203.015, PZR Systems Failures, Section 6 CBOR Determine and report that the failed indication is controlling RCS pressure.

CBOR Manually close the pressurizer spray valve, CV1008.

CBOR Report RCS pressure continues to lower.

CRS Direct the CBOR to close the pressurizer spray isolation, CV-1009.

CT CBOR Close CV1009, Pressurizer Spray Valve Isolation.

CRS Direct the CBOR to select the alternate RCS pressure indication for control.

continued NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 3 Event No: 4 & 5 Page 7 of 10 Event

Description:

Controlling RCS pressure fails and PZR Spray Valve leaks through.

Time Position Applicants Actions or Behavior CBOR Select PT1038 using the handswitch on panel C04.

CRS Reference 1203.015, Pressurizer Systems Failures, Pressurizer Spray Valve (CV-1008) Failure section. (Tech Spec. TRM 3.4.3.A for differential temperature of spray fluid and pressurizer temperature of >430°F)

CBOR Recognize and report that RCS pressure is recovering.

EVENT TERMINATION CRITERIA Alternate RCS pressure instrument selected and Pressurizer Spray valve closed OR Next Event NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 3 Event No: 6 Page 8 of 10 Event

Description:

SPDS Loss of Power.

Time Position Applicants Actions or Behavior T=30 CREW Recognize and report the failure of the SPDS displays in the control room on panels C09 and C19.

CRS Contact Unit 2 or Computer Support to attempt to reboot the SPDS computers.

CRS Refer to 1105.014, SPDS Operation, to determine that there is a one hour time limit to restore operation of at least one SPDS system OR it will become a reportable item.

EVENT TERMINATION CRITERIA This event will exist for the remainder of the scenario.

NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 3 Event No: 7, 8, & 9 Page 9 of 10 Event

Description:

LOCA in the A RCS loop Tcold. ESAS channels 1 and 2 fail to auto actuate. #2 EDG service water valve fails to open when the EDG autostarts.

Time Position Applicants Actions or Behavior T=35 CBOR Identify pressurizer level and RCS pressure dropping.

CBOT Recognize and report RCS leakage into the Reactor Building.

(Tech Spec. 3.4.13.B RCS Operational LEAKAGE)

EAL 2.2, ALERT(RCS leakage >Normal Makeup capacity)

CRS Direct actions per the Reactor Trip Procedure, 1202.001.

CBOR Manually trip the reactor by depressing the Rx. Trip pushbutton. Verify all rods on bottom and power dropping.

CBOT Manually trip the turbine by depressing the Turbine Trip pushbutton CBOR/ Verify adequate subcooling margin.

CBOT CRS Direct initiation of HPI per RT 2.

NOTE The crew may manually initiate ESAS due to the imminent automatic actuation prior to reaching the setpoint and therefore may not identify the failure of channel 1 and 2 to auto actuate.

CREW Recognize the actuation of ESAS on low RCS pressure.

CBOR Identify the failure of channels 1 and 2 of ESAS to actuate.

CT CBOR Manually initiate channel 1 and 2 from the pushbuttons on C04 CRS Transition to ESAS procedure, 1202.010, and direct crew operations CBOR Check for adequate subcooling margin.

continued NUREG-1021, Revision 8, Supplement 1

Appendix D Operator Actions Form ES-D-2 Op-Test No: 2004-1 Scenario No: 3 Event No: 7, 8, & 9 Page 10 of 10 Event

Description:

LOCA in the A RCS loop Tcold. ESAS channels 1 and 2 fail to auto actuate. #2 EDG service water valve fails to open when the EDG autostarts.

Time Position Applicants Actions or Behavior CBOT Verify proper ESAS actuation per RT 10.

CBOT Identify the failure of the service water valve for the #2 EDG to open when the EDG autostarts.

CBOT Attempt to open the service water valve for #2 EDG.

CRS Direct the stopping of the #2 EDG.

CBOT Stop the #2 EDG by placing the #2 EDG control switch in LOCKOUT position.

CBOR Close or verify closed the following valves; CV-1008, CV-1009, and CV-1000 CRS Transition to Loss of subcooling margin procedure, 1202.002, and direct crew actions.

CBOR Control RCS pressure within limits of Figure 3 of EOP (RT 14)

EVENT and SCENARIO TERMINATION CRITERIA All appropriate channels of ESAS actuated and HPI injecting water into RCS and RCS pressure stable.

OR As directed by the lead examiner NUREG-1021, Revision 8, Supplement 1