| | title = Request for Additional Information Related to Response to NRC Bulletin 2007-01, Security Officer Attentiveness (TAC Nos. MD7586 and MD7587) | | | title = Request for Additional Information Related to Response to NRC Bulletin 2007-01, Security Officer Attentiveness |
| | author name = Singal B | | | author name = Singal B |
| | author affiliation = NRC/NRR/ADRO/DORL/LPLIV | | | author affiliation = NRC/NRR/ADRO/DORL/LPLIV |
Line 41: |
Line 41: |
| Request for Additional Information cc w/encl: See next page | | Request for Additional Information cc w/encl: See next page |
|
| |
|
| ML081780397 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NRR/LPL4/PM NAME BSingal JBurkhardt THiltz BSingal DATE 6/27/08 6/26/08 6/30/08 6/30/08 | | ML081780397 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NRR/LPL4/PM NAME BSingal JBurkhardt THiltz BSingal DATE 6/27/08 6/26/08 6/30/08 6/30/08 Comanche Peak Steam Electric Station (6/10/2008) cc: |
| | |
| Comanche Peak Steam Electric Station (6/10/2008) cc: | |
| Senior Resident Inspector Mr. Richard A. Ratliff, Chief U.S. Nuclear Regulatory Commission Bureau of Radiation Control P.O. Box 2159 Texas Department of Health Glen Rose, TX 76403-2159 1100 West 49th Street Austin, TX 78756-3189 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Mr. Brian Almon 612 E. Lamar Blvd., Suite 400 Public Utility Commission Arlington, TX 76011-4125 William B. Travis Building P.O. Box 13326 Mr. Fred W. Madden, Director 1701 North Congress Avenue Regulatory Affairs Austin, TX 78701-3326 Luminant Generation Company LLC P.O. Box 1002 Ms. Susan M. Jablonski Glen Rose, TX 76043 Office of Permitting, Remediation and Registration Timothy P. Matthews, Esq. Texas Commission on Environmental Morgan Lewis Quality 1111 Pennsylvania Avenue, NW MC-122 Washington, DC 20004 P.O. Box 13087 Austin, TX 78711-3087 County Judge P.O. Box 851 Anthony P. Jones Glen Rose, TX 76043 Chief Boiler Inspector Texas Department of Licensing Environmental and Natural and Regulation Resources Policy Director Boiler Division Office of the Governor E.O. Thompson State Office Building P.O. Box 12428 P.O. Box 12157 Austin, TX 78711-3189 Austin, TX 78711 | | Senior Resident Inspector Mr. Richard A. Ratliff, Chief U.S. Nuclear Regulatory Commission Bureau of Radiation Control P.O. Box 2159 Texas Department of Health Glen Rose, TX 76403-2159 1100 West 49th Street Austin, TX 78756-3189 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Mr. Brian Almon 612 E. Lamar Blvd., Suite 400 Public Utility Commission Arlington, TX 76011-4125 William B. Travis Building P.O. Box 13326 Mr. Fred W. Madden, Director 1701 North Congress Avenue Regulatory Affairs Austin, TX 78701-3326 Luminant Generation Company LLC P.O. Box 1002 Ms. Susan M. Jablonski Glen Rose, TX 76043 Office of Permitting, Remediation and Registration Timothy P. Matthews, Esq. Texas Commission on Environmental Morgan Lewis Quality 1111 Pennsylvania Avenue, NW MC-122 Washington, DC 20004 P.O. Box 13087 Austin, TX 78711-3087 County Judge P.O. Box 851 Anthony P. Jones Glen Rose, TX 76043 Chief Boiler Inspector Texas Department of Licensing Environmental and Natural and Regulation Resources Policy Director Boiler Division Office of the Governor E.O. Thompson State Office Building P.O. Box 12428 P.O. Box 12157 Austin, TX 78711-3189 Austin, TX 78711 |
|
| |
|
Letter Sequence RAI |
---|
|
|
MONTHYEARML0817803972008-06-30030 June 2008 Request for Additional Information Related to Response to NRC Bulletin 2007-01, Security Officer Attentiveness Project stage: RAI 2008-06-30
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000445/20240032024-10-30030 October 2024 Integrated Inspection Report 05000445/2024003 and 05000446/2024003 IR 05000445/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000445/2024404 and 05000446/2024404 (Public) IR 07200074/20244012024-10-10010 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200074/2024401 Public 05000445/LER-2024-002-01, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions2024-10-0303 October 2024 Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions 05000446/LER-2024-001-01, Unit Two, Recurring Reactor Scrams Associated with Main Feedwater System Modifications2024-09-30030 September 2024 Unit Two, Recurring Reactor Scrams Associated with Main Feedwater System Modifications CP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel2024-09-12012 September 2024 License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel ML24031A6322024-09-11011 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4), Final Safety Analysis Report Update Schedule (EPID L-2023-LLE-0023) - Letter ML24243A0152024-09-0303 September 2024 – Notification of Comprehensive Engineering Team Inspection (05000445/2025012 and 05000446/2025012) and Request for Information ML24194A1332024-08-28028 August 2024 Issuance of Amendment Nos. 190 and 190, Respectively, Revision to Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24228A2252024-08-22022 August 2024 Relief to Use Later Code Edition for Inservice Inspection Program ML24179A0772024-08-20020 August 2024 Issuance of Amendment Nos. 189 and 189, Respectively, Extension of Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24232A2262024-08-19019 August 2024 Information Request, Security IR 2024404 ML24232A2412024-08-19019 August 2024 Information Request, ISFSI Security IR 2024401 CP-202400294, (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000445/20240052024-08-15015 August 2024 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2024005 and 05000446/2024005) CP-202400319, (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-13013 August 2024 (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality ML24177A2692024-08-0707 August 2024 Issuance of Amendment Nos. 188 and 188, Respectively, Revision to Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-0505 August 2024 (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality IR 05000445/20240022024-07-31031 July 2024 Units 1 and 2 - Integrated Inspection Report 05000445/2024002 and 05000446/2024002,and Independent Spent Fuel Storage Installation Inspection Report 07200074/2024001 IR 05000445/20244032024-07-16016 July 2024 Security Baseline Inspection Report 05000445/2024403 and 05000446/2024403 (Full Report) ML24187A0372024-07-15015 July 2024 Withdrawal of Requested Licensing Action Exemption from Select Requirements of 10 CFR Part 55, Operators Licenses ML24192A1862024-07-10010 July 2024 Notification of Inspection (NRC Inspection Report 05000445/2024003 and 05000446/2024003) and Request for Information ML24185A1382024-07-0202 July 2024 Inservice Inspection Request for Information CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 52024-06-26026 June 2024 (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5 IR 05000445/20244012024-06-26026 June 2024 MC&A Program Inspection Report 05000445-2024401 and 05000446-2024401 Public-Final CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 02024-06-18018 June 2024 (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0 IR 05000445/20240122024-06-17017 June 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000445/2024012 and 05000446/2024012 ML24120A3632024-06-10010 June 2024 Issuance of Amendment Nos. 187 and 187, Respectively Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants 05000445/LER-1924-002, (Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions2024-06-0303 June 2024 (Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval2024-05-30030 May 2024 (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval CP-202400175, (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-05-16016 May 2024 (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator 05000446/LER-2024-001, (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications2024-05-13013 May 2024 (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications 05000445/LER-2024-001, Re Potential Loss of Safety Function Due to Inoperability of Both Trains of Uninterruptible Power Supply Heating, Ventilation & Air Conditioning2024-05-0606 May 2024 Re Potential Loss of Safety Function Due to Inoperability of Both Trains of Uninterruptible Power Supply Heating, Ventilation & Air Conditioning ML24120A3042024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Sylestine, R, Alabama-Coushatta Tribe of Texas ML24120A2902024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Bunch, J, United Keetoowah Band of Cherokee Indians ML24120A2912024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Cooper, D, Apache Tribe of Oklahoma ML24120A3032024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-SpottedBird, L, Kiowa Indian Tribe ML24107B1012024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Cernek, J, Coushatta Tribe of Louisiana ML24120A3022024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Pierite, M, Tunica-Biloxi Tribe of Louisiana ML24120A2922024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Dotson, Delaware Nation ML24120A2952024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Johnson, L.J., Seminole Nation of Oklahoma CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2024-04-29029 April 2024 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters ML24120A3052024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Woommavovah, M, Comanche Nation ML24120A3072024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Yargee, W, Alabama-Quassarte Tribal Town ML24120A2932024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Garza, Jr, Juan, Kickapoo Traditional Tribe of Texas ML24120A3002024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Morrow, R K, Thlopthlocco Tribal Town ML24120A2942024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Gonzalez, B, Caddo Nation ML24120A3012024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Parton, T, Wichita and Affiliated Tribes ML24120A2972024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Martin, R, Tonkawa Tribe of Oklahoma ML24120A2962024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Kaskaske, D, Kickapoo Tribe of Oklahoma 2024-09-30
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24204A0022024-07-18018 July 2024 NRR E-mail Capture - Request for Additional Information Comanche Peak Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule ML24192A1862024-07-10010 July 2024 Notification of Inspection (NRC Inspection Report 05000445/2024003 and 05000446/2024003) and Request for Information ML24052A0122024-02-16016 February 2024 NRR E-mail Capture - Comanche Peak - Draft Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ML24036A0122024-02-0202 February 2024 NRR E-mail Capture - Comanche Peak - Request for Additional Information - License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24033A2642024-02-0202 February 2024 NRR E-mail Capture - Comanche Peak - Revised Draft Request for Additional Information - License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24019A0742024-01-19019 January 2024 NRR E-mail Capture - Comanche Peak - Draft Request for Additional Information - License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24018A1072024-01-18018 January 2024 – Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information ML23256A1492023-09-11011 September 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 4 ML23256A1502023-09-11011 September 2023 Request for Additional Information Requests - Comanche Peak - Set 4 ML23213A2162023-08-0202 August 2023 Vistra Operations Company, LLC Notification of License Renewal Inspection and Request for Information ML23188A0452023-07-0707 July 2023 Request for Additional Information Requests - Comanche Peak - Set 3 ML23188A0442023-07-0707 July 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 3 ML23181A0212023-06-29029 June 2023 Request for Additional Information Requests - Comanche Peak - Set 2 ML23181A0202023-06-29029 June 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 2 ML23167A0232023-06-14014 June 2023 Request for Additional Information (RAI) for the Review of the Comanche Peak Initial License Renewal Application (Lra), Set 1 ML23167A0222023-06-14014 June 2023 Email: Request for Additional Information (RAI) Letter for the Review of the Comanche Peak Initial License Renewal Application, Set 1 ML23145A2322023-05-25025 May 2023 LRA - Request for Confirmation of Information - Set 2 ML23132A2542023-05-23023 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action LAR to Adopt 10 CFR 50.69,Risk-Informed Categorization & Treatment of Structures,Systems & Components for Nuclear Power Reactors EPID L-2023-LLA-0057 ML23143A1372023-05-23023 May 2023 LRA - Request for Confirmation of Information - Set 1 ML23068A0562023-05-0909 May 2023 Request for Additional Information - Comanche Peak License Renewal Application Environmental Review ML23068A0732023-04-13013 April 2023 Requests for Confirmation of Information for the Environmental Review of the Comanche Peak Nuclear Power Plant, Units 1 and 2, Licensed Renewal Application (EPID Number: L-2022-LNE-0004) (Docket Numbers 50-445 and 50-446) ML23103A4682023-04-11011 April 2023 NRR E-mail Capture - Comanche Peak – Request for Additional Information - License Amendment Request to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model ML23086B9852023-03-27027 March 2023 NRR E-mail Capture - Comanche Peak – Draft Request for Additional Information - Request to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model ML23010A1442023-01-0909 January 2023 Inservice Inspection Request for Information ML22325A2742022-11-21021 November 2022 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Proposed Alternative P-1 Regarding IST of Safeguards Building Sump Pumps ML22318A3102022-11-10010 November 2022 NRR E-mail Capture - Comanche Peak - Draft Request for Additional Information - Proposed Alternative P-1 Regarding IST of Safeguards Building Sump Pumps ML22230B1092022-08-17017 August 2022 NRR E-mail Capture - Comanche Peak Unit 2 - Request for Additional Information - 2RE19 Inspection Summary Report for Steam Generator Tubing ML22220A1942022-08-0808 August 2022 NRR E-mail Capture - Comanche Peak Unit 2 - Draft Request for Additional Information - 2RE19 Inspection Summary Report for Steam Generator Tubing IR 05000445/20224012022-06-28028 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000445/2022401; 05000446/2022401 ML22083A0262022-03-23023 March 2022 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Request to Adopt TSTF 505 Revision 2 ML21286A7912021-10-13013 October 2021 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Request to Adopt TSTF-577 Revision 1 ML21253A2242021-09-0909 September 2021 Request for Information Occupational Radiation Safety Inspection (71124.01, 71124.02, and 71151) from 10/18-22/2021 ML21253A2332021-09-0909 September 2021 Request for Information: Comanche Peak Nuclear Power Plant, Units 1 and 2 (05000445 and 05000446); Occupation Radiation Safety (71124.01, 71124.02, 7511) ML21245A3072021-09-0202 September 2021 Request for Information ML21245A307 ML21166A3382021-06-22022 June 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action LAR to Adopt TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML21165A1022021-06-13013 June 2021 Pi&R; Request for Information ML21103A3982021-04-13013 April 2021 CP Security Inspection Information Request 2021403 ML20225A0932020-08-12012 August 2020 Notification of Inspection 05000445/2020004 and 05000446/2020004 and Request for Information ML20105A1072020-04-13013 April 2020 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Exigent Amendment Request for One Time Change to Unit 2 Steam Generator Inspection Frequency ML20104A0022020-04-11011 April 2020 NRR E-mail Capture - Comanche Peak Unit 2 - Request for Additional Information - Proposed Alternative to ASME OM Code for Deferral of Snubber Testing (SNB-1) and Visual Examinations (SNB-2) ML20045E3512020-02-13013 February 2020 Information Request February 13, 2020 Notification of Inspection and Request for Information Comanche Peak Unit 2 NRC Inspection Report 05000446/2020002 ML19346B3812019-12-11011 December 2019 NRR E-mail Capture - Comanche Peak RAIs - Quality Assurance Program Reduction in Commitment ML19319A5432019-11-14014 November 2019 NRR E-mail Capture - Draft Comanche Peak RAIs - Quality Assurance Program Reduction in Commitment ML19058A3592019-02-27027 February 2019 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 - Final Request for Additional Information Concerning License Amendment Request to Revise the Emergency Plan IR 05000445/20170072018-02-0808 February 2018 Notification of Nrc Design Bases Assurance Inspection (Programs) (05000445/2017007 and 05000446/2017007) ML17276B8622017-10-0303 October 2017 Notification of NRC Design Bases Assurance Inspection (Programs)(05000445/2017007 and 05000446/2017007) and Initial Request for Information ML17087A2032017-03-28028 March 2017 NRR E-mail Capture - Comanche Peak, Unit 2 - Final Request for Additional Information Regarding Request No. 2B3-1 ML17066A2372017-03-0707 March 2017 Notification of NRC Triennial Fire Protection Baseline Inspection (05000445/2017008 and 05000446/2017008) and Request for Information ML17048A4172017-02-17017 February 2017 Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment... ML16034A1962016-02-0808 February 2016 Independent Spent Fuel Storage Installation - Request for Additional Information, Application for Order Approving Transfer of Facility Operating Licenses and Conforming Amendment 2024-07-18
[Table view] |
Text
June 30, 2008 Mr. M. R. Blevins Executive Vice President
& Chief Nuclear Officer Luminant Generation Company LLC Attn. Regulatory Affairs Department P.O. Box 1002 Glen Rose, TX 76043
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO RESPONSE TO NRC BULLETIN 2007-01, SECURITY OFFICER ATTENTIVENESS (TAC NOS.
MD7586 AND MD7587)
Dear Mr. Blevins:
By letter dated February 11, 2008, Luminant Generation Company LLC (the licensee) submitted the required written response to U.S. Nuclear Regulatory Commission (NRC)Bulletin 2007-01, Security Officer Attentiveness, for the Comanche Peak Steam Electric Station, Units 1 and 2.
The response was submitted to the NRC in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(f) and 10 CFR 70.22(d).
The NRC staff has reviewed your submittal and determined that additional information is required to complete the final staff assessment of the licensee response to NRC Bulletin 2007-01. NRC Bulletin 2007-01 requested licensees to provide information regarding administrative and managerial programs and controls established to prevent, identify, and correct 1) security personnel inattentiveness and complicity, and 2) failures to implement the behavioral observation program for licensee security personnel including security contractors and subcontractors. The staff will use the additional information received to inform the Commission and to determine if further regulatory action is warranted or if additional assessment of licensee program implementation is needed.
The specific information requested is addressed in the enclosure to this letter. Responses are requested within 35 days of the issuance of this letter. Before submitting responses to the NRC, licensees must evaluate them for proprietary, sensitive, safeguards, or classified information and mark such information appropriately.
M.R. Blevins If you have any questions, please contact me at 301-415-3016.
Sincerely,
/RA/
Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446
Enclosure:
Request for Additional Information cc w/encl: See next page
ML081780397 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NRR/LPL4/PM NAME BSingal JBurkhardt THiltz BSingal DATE 6/27/08 6/26/08 6/30/08 6/30/08 Comanche Peak Steam Electric Station (6/10/2008) cc:
Senior Resident Inspector Mr. Richard A. Ratliff, Chief U.S. Nuclear Regulatory Commission Bureau of Radiation Control P.O. Box 2159 Texas Department of Health Glen Rose, TX 76403-2159 1100 West 49th Street Austin, TX 78756-3189 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Mr. Brian Almon 612 E. Lamar Blvd., Suite 400 Public Utility Commission Arlington, TX 76011-4125 William B. Travis Building P.O. Box 13326 Mr. Fred W. Madden, Director 1701 North Congress Avenue Regulatory Affairs Austin, TX 78701-3326 Luminant Generation Company LLC P.O. Box 1002 Ms. Susan M. Jablonski Glen Rose, TX 76043 Office of Permitting, Remediation and Registration Timothy P. Matthews, Esq. Texas Commission on Environmental Morgan Lewis Quality 1111 Pennsylvania Avenue, NW MC-122 Washington, DC 20004 P.O. Box 13087 Austin, TX 78711-3087 County Judge P.O. Box 851 Anthony P. Jones Glen Rose, TX 76043 Chief Boiler Inspector Texas Department of Licensing Environmental and Natural and Regulation Resources Policy Director Boiler Division Office of the Governor E.O. Thompson State Office Building P.O. Box 12428 P.O. Box 12157 Austin, TX 78711-3189 Austin, TX 78711
REQUEST FOR ADDITIONAL INFORMATION RELATED TO RESPONSE TO NRC BULLETIN 2007-01, SECURITY OFFICER ATTENTIVENESS COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 DOCKET NOS. 50-445 AND 50-446 In responding to each of the following questions, the licensee should provide information that addresses measures that are currently in place, and any additional planned actions with expected completion dates.
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed your response to Question 1b. and requests the following additional information:
- 1. Describe any licensee processes or programs that are in place to identify problems in climate-controlled security areas. What methods are used to track, inspect, and ensure timely repairs are completed?
Include the following information in your response:
A description of how the security areas are maintained including, but not limited to: (1) a discussion of the maintenance and/or preventive maintenance process and programs in place for these security areas including an overview and brief discussion on routine inspection schedules by maintenance personnel; (2) a discussion on the process a security officer can follow to report concerns with the upkeep and maintenance of his or her post; and (3) a discussion on the timeliness of repairs and any follow-up actions taken by the licensee to ensure the repairs are completed and resolved adequately.
The NRC staff reviewed your response to Question 1c. and requests the following additional information:
- 2. What is the level of involvement from management who do not have direct responsibility for the security program (including executive and corporate management) in conducting behavior observations of security personnel?
Include the following information in your response:
A description of any processes in place for licensee and/or contract management who work day-to-day at the site or visit the site on a routine basis from a corporate office or other applicable offsite location, for conducting behavior observations of security personnel while on duty at their assigned posts. Examples should include, but are not limited to, a discussion of random or scheduled observations conducted by licensee and/or contract management such as the Plant Operations Shift Managers or other Plant Operations Shift Supervisors, Plant Maintenance Supervisors (licensee and contractor), or Quality Assurance Supervisor, etc. The discussion should include whether these random or scheduled observations are proceduralized and the required or recommended level of licensee and/or contract management involvement.
ENCLOSURE
The NRC staff reviewed your response to Question 1 and requests the following additional information:
- 3. Are security personnel provided opportunities to participate in any personnel surveys regarding the work environment? If so, what is the frequency of the surveys, the average participation rate of security personnel as compared to the general site average, and the process for providing feedback and addressing the results from the survey?
- 4. How is the licensees policy regarding site employee attentiveness and/or inattentiveness communicated to personnel, both licensee and contractor, and at what frequency?
The NRC staff reviewed your response to Question 2 and requests the following additional information:
- 5. Describe the process for employees to file reports through the site corrective action program (CAP). Can employees file CAP reports without prior supervisory/management review or approval?
Include the following information in your response:
Describe the process for employees to file reports through the CAP. Discuss the supervisor/management review and/or approval process including, but not limited to: (1) does a supervisor/manager have the authority to reject a report before entering it into the CAP without additional management review and approval; and (2) does a supervisor/manager have the authority to modify the report before such report has been entered into the CAP?
- 6. Can the employees view the status and disposition of reports directly, or must this information be requested? If yes, please describe the process.
The NRC staff reviewed your response to Question 4 and requests the following additional information:
- 7. Are formal assessments of the security program conducted by organizations/
individuals that do not have direct responsibility for the security program? If so, provide information on the process, including, but not limited to, the organizations and levels of management involved, the frequency of such activities, and any tracking of how findings are resolved.
- 8. How are self-assessment findings and relevant operating experience information communicated to the security force? Describe those processes including, but not limited to, information such as the criteria by which such information is identified, the frequency of such communications, the responsible department(s) or position(s) for such communications, and the recipients of such communications.
Include the following information in your response:
Describe the process including, but not limited to: (1) formal or informal communication methods; (2) procedures that ensure availability of the policy to staff; and (3) training opportunities for staff to read and understand the policy.
The NRC staff reviewed your response to Question 5 and requests the following additional information:
- 9. How do you assess the effectiveness of your oversight of contractors and subcontractors?
Include the following information in your response:
Describe the licensees program for oversight of contractors and subcontractors including, but not limited to: (1) a brief overview and description of licensees procedures that describe the oversight process; (2) a detailed list (bulleted is preferred) of assigned duties for the licensee supervisor(s) or manager(s) responsible for overseeing contractors and subcontractors at the site; (3) a detailed list (bulleted is preferred) of the assigned duties for the contractor and subcontractor supervisor(s) or manager(s) responsible for overseeing the contractor and subcontractor staff at the site; and (4) a brief discussion of the corporate (management) involvement with the oversight of contractors and subcontractors at the site.