ML092160183: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:August 4, 2009  
{{#Wiki_filter:UNITED STATES
 
                                NUC LE AR RE G UL AT O RY C O M M I S S I O N
Mr. Ross T. Ridenoure Senior Vice President and  Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station  
                                                    R E GI ON I V
P. O. Box 128 San Clemente, CA 92674-0128  
                                        612 EAST LAMAR BLVD , SU I TE 400
  SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION - NOTIFICATION OF  
                                          AR LI N GTON , TEXAS 76011-4125
INSPECTION (50-361; 50-362/2009004) AND REQUEST FOR INFORMATION  
                                            August 4, 2009
Dear Mr. Ridenoure:  
Mr. Ross T. Ridenoure
From August 24 through September 4, 2009, Reactor Inspectors from NRC's Region IV office  
Senior Vice President and
will perform the baseline inspection of changes, tests, experiments, and permanent plant modifications at San Onofre Nuclear Generating Station, using NRC Inspection Procedure 71111.17, "Evaluations of Changes, Tests, Experiments, and Permanent Plant Modifications.
   Chief Nuclear Officer
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a  
Southern California Edison Company
productive inspection, we have enclosed a request for documents needed for this inspection. Upon review of these documents, the inspectors will select additional documentation for review upon arrival. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.  
San Onofre Nuclear Generating Station
P. O. Box 128
San Clemente, CA 92674-0128
SUBJECT:       SAN ONOFRE NUCLEAR GENERATING STATION - NOTIFICATION OF
INSPECTION (50-361; 50-362/2009004) AND REQUEST FOR INFORMATION
Dear Mr. Ridenoure:
From August 24 through September 4, 2009, Reactor Inspectors from NRCs Region IV office
will perform the baseline inspection of changes, tests, experiments, and permanent plant
modifications at San Onofre Nuclear Generating Station, using NRC Inspection
Procedure 71111.17, Evaluations of Changes, Tests, Experiments, and Permanent Plant
Modifications.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Upon review of these documents, the inspectors will select additional documentation for review
upon arrival. It is important that all of these documents are up to date and complete in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Dave Axline of your licensing organization.
If there are any questions about this inspection or the material requested, please contact the
lead inspector Shiattin Makor at 817-276-6507 or by email shiattin.makor@nrc.gov.


We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Dave Axline of your licensing organization.  If there are any questions about this inspection or the material requested, please contact the lead inspector Shiattin Makor at 817-276-6507 or by email shiattin.makor@nrc.gov.        UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
Southern California Edison Co.                 -2-
       
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
Southern California Edison Co. - 2 -  
enclosure will be available electronically for public inspection in the NRC Public Document
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Room or from the Publicly Available Records (PARS) component of NRC's document system
      Sincerely, /RA/       Thomas Farnholtz, Chief       Engineering Branch 1       Division of Reactor Safety  
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
Dockets: 50-361 50-362   Licenses: NPF-10 NPF-15  
rm/adams.html (the Public Electronic Reading Room).
Enclosure: Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Document Request  
                                              Sincerely,
cc w/Enclosure: Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335  
                                                /RA/
San Diego, CA 92101  
                                              Thomas Farnholtz, Chief
Gary L. Nolff Assistant Director-Resources City of Riverside  
                                              Engineering Branch 1
3900 Main Street Riverside, CA 92522  
                                              Division of Reactor Safety
Mark L. Parsons Deputy City Attorney  
Dockets:       50-361
City of Riverside 3900 Main Street Riverside, CA 92522  
                50-362
Gary H. Yamamoto, P.E., Chief Division of Drinking Water and   Environmental Management
Licenses:       NPF-10 NPF-15
1616 Capitol Avenue, MS 7400 P.O. Box 997377 Sacramento, CA 95899-7377  
Enclosure:
 
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Document
 
Request
Southern California Edison Co.  - 3 -
cc w/Enclosure:
  Michael J. DeMarco San Onofre Liaison San Diego Gas & Electric Company 8315 Century Park Ct. CP21G
Chairman, Board of Supervisors
San Diego, CA  92123-1548
County of San Diego
Director, Radiological Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)
1600 Pacific Highway, Room 335
Sacramento, CA  95899-7414
San Diego, CA 92101
Mayor  City of San Clemente 100 Avenida Presidio San Clemente, CA  92672
Gary L. Nolff
Assistant Director-Resources
James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34) Sacramento, CA  95814
City of Riverside
3900 Main Street
Douglas K. Porter, Esq. Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA  91770
Riverside, CA 92522
Mark L. Parsons
Albert R. Hochevar Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA  92675
Deputy City Attorney
City of Riverside
3900 Main Street
Riverside, CA 92522
Gary H. Yamamoto, P.E., Chief
Division of Drinking Water and
  Environmental Management
1616 Capitol Avenue, MS 7400
P.O. Box 997377
Sacramento, CA 95899-7377


A. Edward Scherer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128  
Southern California Edison Co.        -3-
San Clemente, CA 92674-0128  
Michael J. DeMarco
Mr. Steve Hsu Department of Health Services Radiologic Health Branch MS 7610, P.O. Box 997414 Sacramento, CA 95899-7414  
San Onofre Liaison
San Diego Gas & Electric Company
8315 Century Park Ct. CP21G
San Diego, CA 92123-1548
Director, Radiological Health Branch
State Department of Health Services
P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414
Mayor
City of San Clemente
100 Avenida Presidio
San Clemente, CA 92672
James D. Boyd, Commissioner
California Energy Commission
1516 Ninth Street (MS 34)
Sacramento, CA 95814
Douglas K. Porter, Esq.
Southern California Edison Company
2244 Walnut Grove Avenue
Rosemead, CA 91770
Albert R. Hochevar
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92675
A. Edward Scherer
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
Mr. Steve Hsu
Department of Health Services
Radiologic Health Branch
MS 7610, P.O. Box 997414
Sacramento, CA 95899-7414
Mr. Mike Short
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128


Mr. Mike Short Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128
Southern California Edison Co.           -4-
San Clemente, CA  92674-0128
Chief, Technological Hazards Branch
 
FEMA Region 9
Southern California Edison Co. - 4 -  
1111 Broadway, Suite 1200
  Chief, Technological Hazards Branch FEMA Region 9 1111 Broadway, Suite 1200 Oakland, CA 94607-4052  
Oakland, CA 94607-4052
Chairperson, Radiological Assistance Committee
Region IX
Federal Emergency Management Agency
Department of Homeland Security
1111 Broadway, Suite 1200
Oakland, CA 94607-4052


Chairperson, Radiological Assistance Committee Region IX Federal Emergency Management Agency Department of Homeland Security
Southern California Edison Co.               -5-
1111 Broadway, Suite 1200 Oakland, CA  94607-4052 
Electronic distribution by RIV:
Southern California Edison Co. - 5 -  
Regional Administrator (Elmo.Collins@nrc.gov )
  Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov ) Deputy Regional Administrator (Chuck.Casto@nrc.gov ) DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov ) DRS Director (Roy.Caniano@nrc.gov ) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Greg.Warnick@nrc.gov) Resident Inspector (John.Reynoso@nrc.gov ) Branch Chief, DRP/D (Michael.Hay@nrc.gov) Senior Project Engineer, DRP/D (Don.Allen@nrc.gov ) SO Site Secretary (Heather.Hutchinson@nrc.gov ) Public Affairs Officer (Victor.Dricks@nrc.gov ) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov ) RITS Coordinator (Marisa.Herrera@nrc.gov ) Only inspection reports to the following:  
Deputy Regional Administrator (Chuck.Casto@nrc.gov )
DRS STA (Dale.Powers@nrc.gov ) OEDO RIV Coordinator (John.Adams@nrc.gov) ROPreports  
DRP Director (Dwight.Chamberlain@nrc.gov)
 
DRP Deputy Director (Anton.Vegel@nrc.gov )
   
DRS Director (Roy.Caniano@nrc.gov )
   
DRS Deputy Director (Troy.Pruett@nrc.gov)
   
Senior Resident Inspector (Greg.Warnick@nrc.gov)
  File located: R:Reactors\SONGS 2009004 RFI - STM ML  SUNSI Rev Compl. X Yes No ADAMS X Yes No Reviewer Initials TRF Publicly Avail X Yes No Sensitive Yes X No Sens. Type Initials TRF  
Resident Inspector (John.Reynoso@nrc.gov )
EB 1 EB 1 EB 1 C:EB 1  S. Makor M. Young I. Anchondo T. Farnholtz  e-mail e-mail /RA/ /RA/ 7/30/09 7/30/09 7/30/09 8/4/09 OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax  
Branch Chief, DRP/D (Michael.Hay@nrc.gov)
 
Senior Project Engineer, DRP/D (Don.Allen@nrc.gov )
  - 1 - Enclosure Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification
SO Site Secretary (Heather.Hutchinson@nrc.gov )
Public Affairs Officer (Victor.Dricks@nrc.gov )
Inspection Dates:  August 24 - September 4, 2009
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )
Inspection Procedures: IP 71111.17 "Evaluation of Changes, Tests, or Experiments and 
RITS Coordinator (Marisa.Herrera@nrc.gov )
    Permanent Plant Modifications"
Only inspection reports to the following:
Inspectors:  Shiattin Makor, Reactor Inspector, Lead Inspector    Matt Young, Reactor Inspector    Isaac Anchondo, Reactor Inspector
DRS STA (Dale.Powers@nrc.gov )
OEDO RIV Coordinator (John.Adams@nrc.gov)
ROPreports
File located: R:Reactors\SONGS 2009004 RFI - STM                 ML
  SUNSI Rev Compl. X Yes No             ADAMS       X Yes No       Reviewer Initials   TRF
Publicly Avail         X Yes No       Sensitive     Yes X No   Sens. Type Initials TRF
EB 1                   EB 1             EB 1           C:EB 1
  S. Makor               M. Young         I. Anchondo     T. Farnholtz
  e-mail                 e-mail           /RA/           /RA/
7/30/09                 7/30/09           7/30/09         8/4/09
OFFICIAL RECORD COPY                                   T=Telephone       E=E-mail     F=Fax


  Information Requested for the In-Office Preparation Week
    Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification
  The following information should be sent to the Region IV office in hard copy or electronic format (Certrec database preferred), in care of Shiattin Makor, by August 10, 2009, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The  
Inspection Dates:                August 24 - September 4, 2009
inspectors will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection weeks. We ask that the specific items requested be available and ready for review on the first day of inspection. Also, we request that you categorize the documents in your response with the numbered list below. Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible.  
Inspection Procedures:            IP 71111.17 Evaluation of Changes, Tests, or Experiments and
1. A list with descriptions, of all 50.59 screenings (or equivalent) performed since October of 2007, which did not result in an evaluation. Note: Description of screenings should be brief, but of sufficient detail so that inspectors can determine the significance of the  
                                  Permanent Plant Modifications
issue. 2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in an application for license amendment to NRC from October, 2007, to the present. Note: Description of evaluations should be brief, but of sufficient detail so that inspectors can determine the significance of the issue.  
Inspectors:                      Shiattin Makor, Reactor Inspector, Lead Inspector
3. San Onofre Nuclear Generating Station procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.  
                                  Matt Young, Reactor Inspector
4. A list with descriptions of all Corrective Action documents related to 50.59 activities, including screenings and evaluations from October of 2007, to the present.  
                                  Isaac Anchondo, Reactor Inspector
5. A list with descriptions of all permanent plant modifications dating from October, 2007, to the present. Include sufficient detail to enable the inspector to determine the  
Information Requested for the In-Office Preparation Week
significance of each modification.
The following information should be sent to the Region IV office in hard copy or electronic
For this inspection, permanent plant modifications include permanent plant changes, design changes, setpoint changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications.  
format (Certrec database preferred), in care of Shiattin Makor, by August 10, 2009, to facilitate
 
the selection of specific items that will be reviewed during the onsite inspection week. The
  - 2 - Enclosure 6. San Onofre Nuclear Generating Station procedure for implementing and controlling permanent plant modifications.  
inspectors will select specific items from the information requested below and then request from
7. A list with descriptions of all Corrective Action documents related to your permanent plant modification program and its implementation since October of 2007. Include sufficient detail to enable the inspector to determine the significance of each  
your staff additional documents needed during the onsite inspection weeks. We ask that the
modification.  
specific items requested be available and ready for review on the first day of inspection. Also,
8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including qualification dates.  
we request that you categorize the documents in your response with the numbered list below.
9. A listing of personnel qualified to review and approve 50.59 screenings and/or evaluations, including qualification dates.  
Please provide requested documentation electronically if possible. If requested documents are
  Inspector Contact Information:  
large and only hard copy formats are available, please inform the inspector(s), and provide
Shiattin Makor   Matt Young   Isaac Anchondo  
subject documentation during the first day of the onsite inspection. If you have any questions
Reactor Inspector Reactor Inspector Reactor Inspector 817-276-6545   817-860-8545   817-860-8152 shiattin.makor@nrc.gov
regarding this information request, please call the lead inspector as soon as possible.
matt.young@nrc.gov
    1. A list with descriptions, of all 50.59 screenings (or equivalent) performed since October
  Isaac.anchondo@nrc.gov
        of 2007, which did not result in an evaluation. Note: Description of screenings should be
   
        brief, but of sufficient detail so that inspectors can determine the significance of the
Mailing Address: US NRC Region IV Attn: Shiattin Makor 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125
        issue.
    2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in
        an application for license amendment to NRC from October, 2007, to the present. Note:
        Description of evaluations should be brief, but of sufficient detail so that inspectors can
        determine the significance of the issue.
    3. San Onofre Nuclear Generating Station procedure(s) for conducting 10 CFR 50.59
        screenings and evaluations.
    4. A list with descriptions of all Corrective Action documents related to 50.59 activities,
        including screenings and evaluations from October of 2007, to the present.
    5. A list with descriptions of all permanent plant modifications dating from October, 2007, to
        the present. Include sufficient detail to enable the inspector to determine the
        significance of each modification.
        For this inspection, permanent plant modifications include permanent plant changes,
        design changes, setpoint changes, procedure changes, equivalency evaluations,
        suitability analyses, calculations, and commercial grade dedications.
                                                    -1-                                 Enclosure
 
    6. San Onofre Nuclear Generating Station procedure for implementing and controlling
        permanent plant modifications.
    7. A list with descriptions of all Corrective Action documents related to your permanent
        plant modification program and its implementation since October of 2007. Include
        sufficient detail to enable the inspector to determine the significance of each
        modification.
    8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including
        qualification dates.
    9. A listing of personnel qualified to review and approve 50.59 screenings and/or
        evaluations, including qualification dates.
Inspector Contact Information:
Shiattin Makor                 Matt Young                   Isaac Anchondo
Reactor Inspector               Reactor Inspector             Reactor Inspector
817-276-6545                   817-860-8545                 817-860-8152
shiattin.makor@nrc.gov         matt.young@nrc.gov           Isaac.anchondo@nrc.gov
Mailing Address:
US NRC Region IV
Attn: Shiattin Makor
612 E. Lamar Blvd., Suite 400
Arlington, TX 76011-4125
                                                -2-                                  Enclosure
}}
}}

Latest revision as of 00:55, 22 March 2020

Notification of Inspection (05000361-09-004; 05000362-09-004) and Request for Information
ML092160183
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/04/2009
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Ridenoure R
Southern California Edison Co
References
IR-09-004
Download: ML092160183 (7)


See also: IR 05000361/2009004

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

August 4, 2009

Mr. Ross T. Ridenoure

Senior Vice President and

Chief Nuclear Officer

Southern California Edison Company

San Onofre Nuclear Generating Station

P. O. Box 128

San Clemente, CA 92674-0128

SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION - NOTIFICATION OF

INSPECTION (50-361; 50-362/2009004) AND REQUEST FOR INFORMATION

Dear Mr. Ridenoure:

From August 24 through September 4, 2009, Reactor Inspectors from NRCs Region IV office

will perform the baseline inspection of changes, tests, experiments, and permanent plant

modifications at San Onofre Nuclear Generating Station, using NRC Inspection

Procedure 71111.17, Evaluations of Changes, Tests, Experiments, and Permanent Plant

Modifications.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Upon review of these documents, the inspectors will select additional documentation for review

upon arrival. It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Dave Axline of your licensing organization.

If there are any questions about this inspection or the material requested, please contact the

lead inspector Shiattin Makor at 817-276-6507 or by email shiattin.makor@nrc.gov.

Southern California Edison Co. -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Dockets: 50-361

50-362

Licenses: NPF-10 NPF-15

Enclosure:

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Document

Request

cc w/Enclosure:

Chairman, Board of Supervisors

County of San Diego

1600 Pacific Highway, Room 335

San Diego, CA 92101

Gary L. Nolff

Assistant Director-Resources

City of Riverside

3900 Main Street

Riverside, CA 92522

Mark L. Parsons

Deputy City Attorney

City of Riverside

3900 Main Street

Riverside, CA 92522

Gary H. Yamamoto, P.E., Chief

Division of Drinking Water and

Environmental Management

1616 Capitol Avenue, MS 7400

P.O. Box 997377

Sacramento, CA 95899-7377

Southern California Edison Co. -3-

Michael J. DeMarco

San Onofre Liaison

San Diego Gas & Electric Company

8315 Century Park Ct. CP21G

San Diego, CA 92123-1548

Director, Radiological Health Branch

State Department of Health Services

P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414

Mayor

City of San Clemente

100 Avenida Presidio

San Clemente, CA 92672

James D. Boyd, Commissioner

California Energy Commission

1516 Ninth Street (MS 34)

Sacramento, CA 95814

Douglas K. Porter, Esq.

Southern California Edison Company

2244 Walnut Grove Avenue

Rosemead, CA 91770

Albert R. Hochevar

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92675

A. Edward Scherer

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Mr. Steve Hsu

Department of Health Services

Radiologic Health Branch

MS 7610, P.O. Box 997414

Sacramento, CA 95899-7414

Mr. Mike Short

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Southern California Edison Co. -4-

Chief, Technological Hazards Branch

FEMA Region 9

1111 Broadway, Suite 1200

Oakland, CA 94607-4052

Chairperson, Radiological Assistance Committee

Region IX

Federal Emergency Management Agency

Department of Homeland Security

1111 Broadway, Suite 1200

Oakland, CA 94607-4052

Southern California Edison Co. -5-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

Deputy Regional Administrator (Chuck.Casto@nrc.gov )

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov )

DRS Director (Roy.Caniano@nrc.gov )

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Greg.Warnick@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov )

Branch Chief, DRP/D (Michael.Hay@nrc.gov)

Senior Project Engineer, DRP/D (Don.Allen@nrc.gov )

SO Site Secretary (Heather.Hutchinson@nrc.gov )

Public Affairs Officer (Victor.Dricks@nrc.gov )

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov )

Only inspection reports to the following:

DRS STA (Dale.Powers@nrc.gov )

OEDO RIV Coordinator (John.Adams@nrc.gov)

ROPreports

File located: R:Reactors\SONGS 2009004 RFI - STM ML

SUNSI Rev Compl. X Yes No ADAMS X Yes No Reviewer Initials TRF

Publicly Avail X Yes No Sensitive Yes X No Sens. Type Initials TRF

EB 1 EB 1 EB 1 C:EB 1

S. Makor M. Young I. Anchondo T. Farnholtz

e-mail e-mail /RA/ /RA/

7/30/09 7/30/09 7/30/09 8/4/09

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification

Inspection Dates: August 24 - September 4, 2009

Inspection Procedures: IP 71111.17 Evaluation of Changes, Tests, or Experiments and

Permanent Plant Modifications

Inspectors: Shiattin Makor, Reactor Inspector, Lead Inspector

Matt Young, Reactor Inspector

Isaac Anchondo, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (Certrec database preferred), in care of Shiattin Makor, by August 10, 2009, to facilitate

the selection of specific items that will be reviewed during the onsite inspection week. The

inspectors will select specific items from the information requested below and then request from

your staff additional documents needed during the onsite inspection weeks. We ask that the

specific items requested be available and ready for review on the first day of inspection. Also,

we request that you categorize the documents in your response with the numbered list below.

Please provide requested documentation electronically if possible. If requested documents are

large and only hard copy formats are available, please inform the inspector(s), and provide

subject documentation during the first day of the onsite inspection. If you have any questions

regarding this information request, please call the lead inspector as soon as possible.

1. A list with descriptions, of all 50.59 screenings (or equivalent) performed since October

of 2007, which did not result in an evaluation. Note: Description of screenings should be

brief, but of sufficient detail so that inspectors can determine the significance of the

issue.

2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in

an application for license amendment to NRC from October, 2007, to the present. Note:

Description of evaluations should be brief, but of sufficient detail so that inspectors can

determine the significance of the issue.

3. San Onofre Nuclear Generating Station procedure(s) for conducting 10 CFR 50.59

screenings and evaluations.

4. A list with descriptions of all Corrective Action documents related to 50.59 activities,

including screenings and evaluations from October of 2007, to the present.

5. A list with descriptions of all permanent plant modifications dating from October, 2007, to

the present. Include sufficient detail to enable the inspector to determine the

significance of each modification.

For this inspection, permanent plant modifications include permanent plant changes,

design changes, setpoint changes, procedure changes, equivalency evaluations,

suitability analyses, calculations, and commercial grade dedications.

-1- Enclosure

6. San Onofre Nuclear Generating Station procedure for implementing and controlling

permanent plant modifications.

7. A list with descriptions of all Corrective Action documents related to your permanent

plant modification program and its implementation since October of 2007. Include

sufficient detail to enable the inspector to determine the significance of each

modification.

8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including

qualification dates.

9. A listing of personnel qualified to review and approve 50.59 screenings and/or

evaluations, including qualification dates.

Inspector Contact Information:

Shiattin Makor Matt Young Isaac Anchondo

Reactor Inspector Reactor Inspector Reactor Inspector

817-276-6545 817-860-8545 817-860-8152

shiattin.makor@nrc.gov matt.young@nrc.gov Isaac.anchondo@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Shiattin Makor

612 E. Lamar Blvd., Suite 400

Arlington, TX 76011-4125

-2- Enclosure