Notification of Inspection (05000361-09-004; 05000362-09-004) and Request for Information
ML092160183
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/04/2009
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Ridenoure R
Southern California Edison Co
References
IR-09-004
Download: ML092160183 (7)


See also: IR 05000361/2009004

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

August 4, 2009

Mr. Ross T. Ridenoure

Senior Vice President and

Chief Nuclear Officer

Southern California Edison Company

San Onofre Nuclear Generating Station

P. O. Box 128

San Clemente, CA 92674-0128

SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION - NOTIFICATION OF

INSPECTION (50-361; 50-362/2009004) AND REQUEST FOR INFORMATION

Dear Mr. Ridenoure:

From August 24 through September 4, 2009, Reactor Inspectors from NRCs Region IV office

will perform the baseline inspection of changes, tests, experiments, and permanent plant

modifications at San Onofre Nuclear Generating Station, using NRC Inspection

Procedure 71111.17, Evaluations of Changes, Tests, Experiments, and Permanent Plant

Modifications.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Upon review of these documents, the inspectors will select additional documentation for review

upon arrival. It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Dave Axline of your licensing organization.

If there are any questions about this inspection or the material requested, please contact the

lead inspector Shiattin Makor at 817-276-6507 or by email shiattin.makor@nrc.gov.

Southern California Edison Co. -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Dockets: 50-361

50-362

Licenses: NPF-10 NPF-15

Enclosure:

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Document

Request

cc w/Enclosure:

Chairman, Board of Supervisors

County of San Diego

1600 Pacific Highway, Room 335

San Diego, CA 92101

Gary L. Nolff

Assistant Director-Resources

City of Riverside

3900 Main Street

Riverside, CA 92522

Mark L. Parsons

Deputy City Attorney

City of Riverside

3900 Main Street

Riverside, CA 92522

Gary H. Yamamoto, P.E., Chief

Division of Drinking Water and

Environmental Management

1616 Capitol Avenue, MS 7400

P.O. Box 997377

Sacramento, CA 95899-7377

Southern California Edison Co. -3-

Michael J. DeMarco

San Onofre Liaison

San Diego Gas & Electric Company

8315 Century Park Ct. CP21G

San Diego, CA 92123-1548

Director, Radiological Health Branch

State Department of Health Services

P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414

Mayor

City of San Clemente

100 Avenida Presidio

San Clemente, CA 92672

James D. Boyd, Commissioner

California Energy Commission

1516 Ninth Street (MS 34)

Sacramento, CA 95814

Douglas K. Porter, Esq.

Southern California Edison Company

2244 Walnut Grove Avenue

Rosemead, CA 91770

Albert R. Hochevar

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92675

A. Edward Scherer

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Mr. Steve Hsu

Department of Health Services

Radiologic Health Branch

MS 7610, P.O. Box 997414

Sacramento, CA 95899-7414

Mr. Mike Short

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Southern California Edison Co. -4-

Chief, Technological Hazards Branch

FEMA Region 9

1111 Broadway, Suite 1200

Oakland, CA 94607-4052

Chairperson, Radiological Assistance Committee

Region IX

Federal Emergency Management Agency

Department of Homeland Security

1111 Broadway, Suite 1200

Oakland, CA 94607-4052

Southern California Edison Co. -5-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

Deputy Regional Administrator (Chuck.Casto@nrc.gov )

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov )

DRS Director (Roy.Caniano@nrc.gov )

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Greg.Warnick@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov )

Branch Chief, DRP/D (Michael.Hay@nrc.gov)

Senior Project Engineer, DRP/D (Don.Allen@nrc.gov )

SO Site Secretary (Heather.Hutchinson@nrc.gov )

Public Affairs Officer (Victor.Dricks@nrc.gov )

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov )

Only inspection reports to the following:

DRS STA (Dale.Powers@nrc.gov )

OEDO RIV Coordinator (John.Adams@nrc.gov)

ROPreports

File located: R:Reactors\SONGS 2009004 RFI - STM ML

SUNSI Rev Compl. X Yes No ADAMS X Yes No Reviewer Initials TRF

Publicly Avail X Yes No Sensitive Yes X No Sens. Type Initials TRF

EB 1 EB 1 EB 1 C:EB 1

S. Makor M. Young I. Anchondo T. Farnholtz

e-mail e-mail /RA/ /RA/

7/30/09 7/30/09 7/30/09 8/4/09

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification

Inspection Dates: August 24 - September 4, 2009

Inspection Procedures: IP 71111.17 Evaluation of Changes, Tests, or Experiments and

Permanent Plant Modifications

Inspectors: Shiattin Makor, Reactor Inspector, Lead Inspector

Matt Young, Reactor Inspector

Isaac Anchondo, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (Certrec database preferred), in care of Shiattin Makor, by August 10, 2009, to facilitate

the selection of specific items that will be reviewed during the onsite inspection week. The

inspectors will select specific items from the information requested below and then request from

your staff additional documents needed during the onsite inspection weeks. We ask that the

specific items requested be available and ready for review on the first day of inspection. Also,

we request that you categorize the documents in your response with the numbered list below.

Please provide requested documentation electronically if possible. If requested documents are

large and only hard copy formats are available, please inform the inspector(s), and provide

subject documentation during the first day of the onsite inspection. If you have any questions

regarding this information request, please call the lead inspector as soon as possible.

1. A list with descriptions, of all 50.59 screenings (or equivalent) performed since October

of 2007, which did not result in an evaluation. Note: Description of screenings should be

brief, but of sufficient detail so that inspectors can determine the significance of the

issue.

2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in

an application for license amendment to NRC from October, 2007, to the present. Note:

Description of evaluations should be brief, but of sufficient detail so that inspectors can

determine the significance of the issue.

3. San Onofre Nuclear Generating Station procedure(s) for conducting 10 CFR 50.59

screenings and evaluations.

4. A list with descriptions of all Corrective Action documents related to 50.59 activities,

including screenings and evaluations from October of 2007, to the present.

5. A list with descriptions of all permanent plant modifications dating from October, 2007, to

the present. Include sufficient detail to enable the inspector to determine the

significance of each modification.

For this inspection, permanent plant modifications include permanent plant changes,

design changes, setpoint changes, procedure changes, equivalency evaluations,

suitability analyses, calculations, and commercial grade dedications.

-1- Enclosure

6. San Onofre Nuclear Generating Station procedure for implementing and controlling

permanent plant modifications.

7. A list with descriptions of all Corrective Action documents related to your permanent

plant modification program and its implementation since October of 2007. Include

sufficient detail to enable the inspector to determine the significance of each

modification.

8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including

qualification dates.

9. A listing of personnel qualified to review and approve 50.59 screenings and/or

evaluations, including qualification dates.

Inspector Contact Information:

Shiattin Makor Matt Young Isaac Anchondo

Reactor Inspector Reactor Inspector Reactor Inspector

817-276-6545 817-860-8545 817-860-8152

shiattin.makor@nrc.gov matt.young@nrc.gov Isaac.anchondo@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Shiattin Makor

612 E. Lamar Blvd., Suite 400

Arlington, TX 76011-4125

-2- Enclosure