ML100950578: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(16 intermediate revisions by the same user not shown)
Line 1: Line 1:
#REDIRECT [[IR 05000269/2010301]]
{{Adams
| number = ML100950578
| issue date = 04/02/2010
| title = Operator Licensing Written Examination Approval 05000269-10-301, 05000270-10-301, 05000287-10-301
| author name = Widmann M
| author affiliation = NRC/RGN-II/DRS/OLB
| addressee name = Hubbard D
| addressee affiliation = Duke Energy Corp
| docket = 05000269, 05000270, 05000287
| license number = DPR-038, DPR-047, DPR-055
| contact person =
| case reference number = 50-269/10-301, 50-270/10-301, 50-287/10-301
| document type = Letter, License-Operator, Other HQ and Regional Correspondence
| page count = 2
}}
See also: [[see also::IR 05000270/2010301]]
 
=Text=
{{#Wiki_filter:UNITED STATES
                                    NUCLEAR REGULATORY COMMISSION
                                                  REGION II
                                    SAM NUNN ATLANTA FEDERAL CENTER
                                    61 FORSYTH STREET, SW, SUITE 23T85
                                        ATLANTA, GEORGIA 30303-8931
                                            April 2, 2010
Duke Energy Corporation
ATTN: Mr. Dean M. Hubbard
        Training Manager
Oconee Nuclear Station
7800 Rochester Highway
Seneca, SC 29672-0752
SUBJECT:        OCONEE NUCLEAR PLANT - OPERATOR LICENSING WRITTEN
                EXAMINATION APPROVAL 05000269/2010301, 05000270/2010301 AND
                05000287/2010301
Dear Mr. Hubbard:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing written
examination at Oconee Nuclear Plant.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license
applications submitted in connection with this examination and separately provided a list of approved
applicants to your office. The NRC staff will administer the operating tests to individuals, as applicable,
during the week of March 29, 2010. Note that any examination waivers and application denials have
been addressed in separate correspondence.
The NRC has approved the subject written examination and hereby authorizes you to administer the
written examination in accordance with Revision 9, Supplement 1, of NUREG-1021, Operator Licensing
Examination Standards for Power Reactors, on April 7, 2010.
This examination has undergone extensive review by my staff and representatives responsible for
operator training at your facility. Based on this review I have concluded that the examination meets the
guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this
examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the
qualifications of licensed operators at your facility. If you determine that this examination is not
appropriate for licensing operators at your facility, do not administer the examination and contact me at
(404) 562-4550.
Please contact Mr. Frank Ehrhardt, at (404) 562-4611 or cell (678) 327-1453 if you have any questions
or identify any errors or changes in license level (RO or SRO) or type of examination (partial or complete
written examination and/or operating test) specified for each applicant on the list of approved applicants.
                                                Sincerely,
                                                /RA/
                                                Malcolm T. Widmann, Chief
                                                Operations Branch
                                                Division of Reactor Safety
Docket Nos.: 50-269, 50-270, 50-287
License Nos.: DPR-38, DPR-47, DPR-55
 
 
ML                                  X SUNSI REVIEW COMPLETE
    OFFICE              RII:DRS          RII:DRS
    SIGNATURE          GWL              MTW
    NAME                GLASKA          MWIDMANN
    DATE                    3/25/10          4/2/10                            4/    /2010      4/    /2010        4/  /2010    4/ /2010
    E-MAIL COPY?          YES        NO  YES          NO    YES        NO  YES          NO  YES          NO  YES        NO YES      N
}}

Latest revision as of 17:46, 21 March 2020

Operator Licensing Written Examination Approval 05000269-10-301, 05000270-10-301, 05000287-10-301
ML100950578
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/02/2010
From: Widmann M
NRC/RGN-II/DRS/OLB
To: Hubbard D
Duke Energy Corp
References
50-269/10-301, 50-270/10-301, 50-287/10-301
Download: ML100950578 (2)


See also: IR 05000270/2010301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

April 2, 2010

Duke Energy Corporation

ATTN: Mr. Dean M. Hubbard

Training Manager

Oconee Nuclear Station

7800 Rochester Highway

Seneca, SC 29672-0752

SUBJECT: OCONEE NUCLEAR PLANT - OPERATOR LICENSING WRITTEN

EXAMINATION APPROVAL 05000269/2010301, 05000270/2010301 AND

05000287/2010301

Dear Mr. Hubbard:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing written

examination at Oconee Nuclear Plant.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license

applications submitted in connection with this examination and separately provided a list of approved

applicants to your office. The NRC staff will administer the operating tests to individuals, as applicable,

during the week of March 29, 2010. Note that any examination waivers and application denials have

been addressed in separate correspondence.

The NRC has approved the subject written examination and hereby authorizes you to administer the

written examination in accordance with Revision 9, Supplement 1, of NUREG-1021, Operator Licensing

Examination Standards for Power Reactors, on April 7, 2010.

This examination has undergone extensive review by my staff and representatives responsible for

operator training at your facility. Based on this review I have concluded that the examination meets the

guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this

examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the

qualifications of licensed operators at your facility. If you determine that this examination is not

appropriate for licensing operators at your facility, do not administer the examination and contact me at

(404) 562-4550.

Please contact Mr. Frank Ehrhardt, at (404) 562-4611 or cell (678) 327-1453 if you have any questions

or identify any errors or changes in license level (RO or SRO) or type of examination (partial or complete

written examination and/or operating test) specified for each applicant on the list of approved applicants.

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-269, 50-270, 50-287

License Nos.: DPR-38, DPR-47, DPR-55

ML X SUNSI REVIEW COMPLETE

OFFICE RII:DRS RII:DRS

SIGNATURE GWL MTW

NAME GLASKA MWIDMANN

DATE 3/25/10 4/2/10 4/ /2010 4/ /2010 4/ /2010 4/ /2010

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES N