Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23045A184 | 14 February 2023 | Post Examination Comment - Revised Simulator JPM B | Job Performance Measure |
IR 05000269/2022301 | 7 March 2022 | Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 | |
ML22066B061 | 7 March 2022 | Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 | |
ML21218A095 | 6 August 2021 | 301 ADAMS 2B | Probabilistic Risk Assessment Job Performance Measure |
IR 05000269/2021301 | 6 July 2021 | NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 | |
ML21111A342 | 16 April 2021 | March 10, 2021, NRC Generic Fundamentals Examination Results for Oconee Nuclear Station | Generic Fundamentals Examination |
ML21019A393 | 11 January 2021 | 1 GFE Annual Letter for Fy 2021 | Generic Fundamentals Examination COVID-19 |
ML20302A432 | 28 October 2020 | 2A-3 Combined Delayed Release Exam Admin Items.Pdf | Unanalyzed Condition Shutdown Margin Probabilistic Risk Assessment Downpower Loss of condenser vacuum |
ML20302A266 | 26 October 2020 | File 2A-2 Exam Final Items Delayed Release | Unanalyzed Condition Shutdown Margin Grab sample Time to boil Arc flash Job Performance Measure Power change |
ML20302A251 | 26 October 2020 | File 2A-1 Exam Draft Items Delayed Release | Boric Acid Shutdown Margin Loop seal High Radiation Area Grab sample Slow transfer Time to boil Arc flash Locked High Radiation Area Job Performance Measure Operability Determination Power change Overspeed trip |
ML20233A815 | 20 August 2020 | 1A (2) Oconee 2020301 as Given SRO Written Exam and Key.Pdf | High winds Shutdown Margin High Radiation Area Slow transfer Time to boil Post Accident Monitoring Arc flash Surveillance Frequency Control Program Earthquake Pressure Boundary Leakage Loss of condenser vacuum |
ML20233A809 | 20 August 2020 | 1A (1) Oconee 2020301 as Given RO Written Exam and Key | Shutdown Margin High Radiation Area Arc flash Loss of condenser vacuum |
ML20225A068 | 11 August 2020 | 301 Exam Corporate Notification Letter | |
RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations | 16 March 2020 | Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations | |
ML20007F757 | 7 January 2020 | Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 | Generic Fundamentals Examination |
ML19291G226 | 18 October 2019 | Exam Corporate Notification Letter Aka 210-day Letter | |
ML19058A632 | 1 July 2019 | Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs | High winds Shutdown Margin Anticipated operational occurrence Earthquake |
RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations | 15 May 2019 | Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations | |
ML19115A248 | 25 April 2019 | 301 ADAMS2A Draft Exam Items | Unanalyzed Condition Boric Acid Shutdown Margin High Radiation Area Grab sample Fire Barrier Slow transfer Time to boil Post Accident Monitoring Fire impairment Temporary Modification Job Performance Measure Severe Accident Management Guideline Continuous fire watch Fire Watch Power change Overspeed trip Operational leakage |
ML19115A252 | 25 April 2019 | 301 ADAMS2B Final Exam Items | Unanalyzed Condition Boric Acid Grab sample Time to boil Post Accident Monitoring Job Performance Measure Power change Overspeed trip Operational leakage |
ML19115A260 | 25 April 2019 | 301 ADAMS2D Exam Administrative Items | |
ML19115A255 | 25 April 2019 | 301 ADAMS2C Exam Administrative Items | Boric Acid Loop seal |
IR 05000269/2019301 | 21 February 2019 | Operator Licensing Retake Written Examination Approval 05000269/2019301, 05000270/2019301, and 05000287/2019301 | |
ML19018A088 | 17 January 2019 | Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 | Generic Fundamentals Examination |
ML19014A028 | 9 January 2019 | Notification of Licensed Operator Retake Initial Examination 05000269/2019301, 05000270/2019301, and 05000287/2019301 | |
ML18242A693 | 30 August 2018 | Exam Administrative Items ADAMS-2D | Probabilistic Risk Assessment |
ML18155A460 | 1 June 2018 | Operator Licensing Written Examination Approval Letter - 05000269/2018301, 05000270/2018301 and 05000287/2018301 | |
ML18086B044 | 16 February 2018 | Facility Cover Letter - Rii - March 2018 - GFE | |
ONS-2017-061, Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations | 10 August 2017 | Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations | |
ML17193A361 | 12 July 2017 | 302 Final Items 2B - Delay Release 2 Yrs | Unanalyzed Condition Shutdown Margin High Radiation Area Grab sample Arc flash Job Performance Measure Recently irradiated fuel Power change Unidentified leakage Unidentified leak Operational leakage |
ML17193A363 | 12 July 2017 | 302 Admin Items 2C - Delay Release 2 Yrs | Job Performance Measure |
ML17193A359 | 12 July 2017 | 302 Draft Items 2A - Delay Release 2 Yrs | Unanalyzed Condition Shutdown Margin High Radiation Area Grab sample Offsite Dose Calculation Manual Post Accident Monitoring Temporary Modification Arc flash Job Performance Measure Stress corrosion cracking Recently irradiated fuel Power change Unidentified leakage Unidentified leak Operational leakage |
ML17181A219 | 30 June 2017 | 302 Exam Administrative Items for ADAMS 2D | Job Performance Measure |
ML17181A202 | 30 June 2017 | Exam Administrative Items for ADAMS 2C | Operability Determination |
ML17165A558 | 28 June 2017 | 302 Draft SRO Written Exam | Shutdown Margin Arc flash |
ML17179A166 | 28 June 2017 | 302 Exam Administrative Items for ADAMS 2D | Job Performance Measure |
ML17179A506 | 28 June 2017 | 302 Exam Draft Items for ADAMS 2A | Unanalyzed Condition Shutdown Margin Grab sample Arc flash Job Performance Measure Operability Determination Power change Operational leakage |
ML17179A562 | 28 June 2017 | 302 Exam Final Items for ADAMS 2B | Unanalyzed Condition Shutdown Margin Job Performance Measure Power change Unidentified leakage Operational leakage |
ML17165A556 | 28 June 2017 | 302 Draft RO Written Exam | Shutdown Margin Arc flash |
ML17174B291 | 23 June 2017 | 302 Exam Administrative Items for ADAMS 2C - Delay Release 2 Yrs | |
ML17174B289 | 23 June 2017 | 302 Exam Final Items for ADAMS 2B - Delay Release 2 Years | Unanalyzed Condition Shutdown Margin Loop seal High Radiation Area Arc flash Job Performance Measure Power change Overspeed trip Operational leakage |
ML17174B288 | 23 June 2017 | 302 Exam Draft Items for ADAMS 2A - Delay 2 Years Release | Unanalyzed Condition Boric Acid Shutdown Margin Loop seal High Radiation Area Arc flash Fukushima Dai-Ichi Job Performance Measure Severe Accident Management Guideline Power change Downpower Flow Induced Vibration Unidentified leakage Overspeed trip Operational leakage |
ML17032A279 | 27 January 2017 | Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 | Generic Fundamentals Examination |
ML17023A343 | 19 January 2017 | December 2016 - Oconee NRC Generic Fundamentals Examination Results Letter | Generic Fundamentals Examination |
ML17017A498 | 17 January 2017 | 302 Post-Exam Comments - Delay Release 2 Yrs | |
ML17017A493 | 17 January 2017 | 302 Final As-Given SRO Written Exam - Delay Release 2 Yrs | Post Accident Monitoring Arc flash Operational leakage |
ML17017A450 | 17 January 2017 | 302 Final As-Given RO Written Exam - Delay Release 2 Yrs | Arc flash Operational leakage |
ML16336A296 | 30 November 2016 | Operator Licensing Written Examination Approval 05000269/2016302, 05000270/2016302 and 05000287/2016302 | |
IR 05000269/2016301 | 17 August 2016 | NRC Operator License Examination Report Nos. 05000269/2016301, 05000270/2016301 and 05000287/2016301 | |
ML16196A048 | 14 July 2016 | Initial Examination 2016-301 Final SRO Written Exam - Delay Release | Boric Acid Shutdown Margin High Radiation Area Fire Barrier Slow transfer Fire impairment Fire Watch |