Category:Letter
MONTHYEAR05000269/LER-2022-001-01, Ultrasonic Examination Indication Identifies Degraded Reactor Coolant System Pressure Boundary2024-11-0707 November 2024 Ultrasonic Examination Indication Identifies Degraded Reactor Coolant System Pressure Boundary ML24305A1492024-11-0404 November 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report (O2R31) IR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) ML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency ML24220A1092024-08-0808 August 2024 – Operator Licensing Examination Approval 05000269/2024301, 05000270/2024301, and 05000287/2024301 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24088A3052024-03-25025 March 2024 Fws to NRC, Agreement with Nlaa Determination for Tricolored Bat for Oconee Lr 05000287/LER-2023-002, Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications2024-02-29029 February 2024 Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications 05000270/LER-2023-001, Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee2024-02-29029 February 2024 Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) ML24045A3032024-02-16016 February 2024 Ltr. to John Creel Chief Edisto Natchez-Kusso Tribe of Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2952024-02-16016 February 2024 Ltr. to Chuck Hoskin, Jr, Principal Chief Cherokee Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3072024-02-16016 February 2024 Ltr. to Pete Parr Chief Pee Dee Indian Tribe Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3012024-02-16016 February 2024 Ltr. to Harold Hatcher Chief the Waccamaw Indian People Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3022024-02-16016 February 2024 Ltr. to Joe Bunch United Keetoowah Band of Cherokee Indians in Ok Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A0052024-02-16016 February 2024 Ltr. to Brian Harris, Chief, Catawba Indian Nation; Re., Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2972024-02-16016 February 2024 Ltr. to Dexter Sharp Chief Piedmont American Indian Assoc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2992024-02-16016 February 2024 Ltr. to Eric Pratt Chief the Santee Indian Organization Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2962024-02-16016 February 2024 Ltr. to David Hill Principal Chief Muscogee Creek Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3082024-02-16016 February 2024 Ltr. to Ralph Oxendine Chief Sumter Tribe of Cheraw Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3062024-02-16016 February 2024 Ltr. to Michell Hicks, Principal Chief Eastern Band of Cherokee Re Oconee Nuclear Station Units 1,2, and 3 Section 106 ML24045A3052024-02-16016 February 2024 Ltr. to Louis Chavis Chief Beaver Creek Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2942024-02-16016 February 2024 Ltr. to Carolyn Chavis Bolton Chief Pee Dee Indian Nation of Upper Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3042024-02-16016 February 2024 Ltr. to Lisa M. Collins Chief the Wassamasaw Tribe of Varnertown Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A5212024-02-13013 February 2024 Letter to Elizabeth Johnson, Director, SHPO; Re Oconee Nuclear Stations Units 1, 2, and 3 Section 106 ML24011A1482024-02-13013 February 2024 Letter to Steven M. Snider-Oconee Nuclear Sta, Unites 1,2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML24011A1532024-02-13013 February 2024 Letter to Tracy Watson EPA-Oconee Nuclear Sta, Unites 1, 2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML24019A1442024-02-13013 February 2024 Letter to Reid Nelson, Executive Director, Achp; Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staff’S Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 2024-08-08
[Table view] Category:License-Operator
MONTHYEARML24302A0522024-10-28028 October 2024 301 2B File ML24220A1092024-08-0808 August 2024 – Operator Licensing Examination Approval 05000269/2024301, 05000270/2024301, and 05000287/2024301 RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations ML23045A1842023-02-14014 February 2023 Post Examination Comment - Revised Simulator JPM B IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML21218A0952021-08-0606 August 2021 301 ADAMS 2B ML21218A1132021-08-0606 August 2021 301 ADAMS 2A-2 ML21218A1482021-08-0606 August 2021 301 ADAMS 2A-3 IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 ML21174A0432021-06-23023 June 2021 301 Exam Report Items - RO as Given Written Exam ML21174A0452021-06-23023 June 2021 301 Exam Report Items - SRO as Given Written Exam ML21111A3422021-04-16016 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Oconee Nuclear Station ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20302A4322020-10-28028 October 2020 2A-3 Combined Delayed Release Exam Admin Items.Pdf ML20302A2512020-10-26026 October 2020 File 2A-1 Exam Draft Items Delayed Release ML20302A2662020-10-26026 October 2020 File 2A-2 Exam Final Items Delayed Release ML20233A8152020-08-20020 August 2020 1A (2) Oconee 2020301 as Given SRO Written Exam and Key.Pdf ML20233A8092020-08-20020 August 2020 1A (1) Oconee 2020301 as Given RO Written Exam and Key ML20225A0682020-08-11011 August 2020 301 Exam Corporate Notification Letter RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19291G2262019-10-18018 October 2019 Exam Corporate Notification Letter Aka 210-day Letter ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19115A2482019-04-25025 April 2019 301 ADAMS2A Draft Exam Items ML19115A2552019-04-25025 April 2019 301 ADAMS2C Exam Administrative Items ML19115A2602019-04-25025 April 2019 301 ADAMS2D Exam Administrative Items ML19115A2522019-04-25025 April 2019 301 ADAMS2B Final Exam Items IR 05000269/20193012019-02-21021 February 2019 Operator Licensing Retake Written Examination Approval 05000269/2019301, 05000270/2019301, and 05000287/2019301 ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML19014A0282019-01-0909 January 2019 Notification of Licensed Operator Retake Initial Examination 05000269/2019301, 05000270/2019301, and 05000287/2019301 ML18242A6932018-08-30030 August 2018 Exam Administrative Items ADAMS-2D ML18155A4602018-06-0101 June 2018 Operator Licensing Written Examination Approval Letter - 05000269/2018301, 05000270/2018301 and 05000287/2018301 ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ONS-2017-061, Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations2017-08-10010 August 2017 Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations ML17193A3612017-07-12012 July 2017 302 Final Items 2B - Delay Release 2 Yrs ML17193A3632017-07-12012 July 2017 302 Admin Items 2C - Delay Release 2 Yrs ML17193A3592017-07-12012 July 2017 302 Draft Items 2A - Delay Release 2 Yrs ML17181A2192017-06-30030 June 2017 302 Exam Administrative Items for ADAMS 2D ML17181A2022017-06-30030 June 2017 Exam Administrative Items for ADAMS 2C ML17165A5562017-06-28028 June 2017 302 Draft RO Written Exam ML17179A5622017-06-28028 June 2017 302 Exam Final Items for ADAMS 2B ML17179A5062017-06-28028 June 2017 302 Exam Draft Items for ADAMS 2A ML17179A1662017-06-28028 June 2017 302 Exam Administrative Items for ADAMS 2D ML17165A5582017-06-28028 June 2017 302 Draft SRO Written Exam ML17174B2882017-06-23023 June 2017 302 Exam Draft Items for ADAMS 2A - Delay 2 Years Release ML17174B2912017-06-23023 June 2017 302 Exam Administrative Items for ADAMS 2C - Delay Release 2 Yrs ML17174B2892017-06-23023 June 2017 302 Exam Final Items for ADAMS 2B - Delay Release 2 Years ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17023A3432017-01-19019 January 2017 December 2016 - Oconee NRC Generic Fundamentals Examination Results Letter 2024-08-08
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24302A0522024-10-28028 October 2024 301 2B File ML24220A1092024-08-0808 August 2024 – Operator Licensing Examination Approval 05000269/2024301, 05000270/2024301, and 05000287/2024301 RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations ML23045A1842023-02-14014 February 2023 Post Examination Comment - Revised Simulator JPM B IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML21218A1132021-08-0606 August 2021 301 ADAMS 2A-2 ML21218A1482021-08-0606 August 2021 301 ADAMS 2A-3 ML21218A0952021-08-0606 August 2021 301 ADAMS 2B IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 ML21174A0452021-06-23023 June 2021 301 Exam Report Items - SRO as Given Written Exam ML21174A0432021-06-23023 June 2021 301 Exam Report Items - RO as Given Written Exam ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20302A4322020-10-28028 October 2020 2A-3 Combined Delayed Release Exam Admin Items.Pdf ML20302A2662020-10-26026 October 2020 File 2A-2 Exam Final Items Delayed Release ML20302A2512020-10-26026 October 2020 File 2A-1 Exam Draft Items Delayed Release ML20233A8152020-08-20020 August 2020 1A (2) Oconee 2020301 as Given SRO Written Exam and Key.Pdf ML20233A8092020-08-20020 August 2020 1A (1) Oconee 2020301 as Given RO Written Exam and Key ML20225A0682020-08-11011 August 2020 301 Exam Corporate Notification Letter RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19291G2262019-10-18018 October 2019 Exam Corporate Notification Letter Aka 210-day Letter RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19115A2482019-04-25025 April 2019 301 ADAMS2A Draft Exam Items ML19115A2552019-04-25025 April 2019 301 ADAMS2C Exam Administrative Items ML19115A2602019-04-25025 April 2019 301 ADAMS2D Exam Administrative Items ML19115A2522019-04-25025 April 2019 301 ADAMS2B Final Exam Items IR 05000269/20193012019-02-21021 February 2019 Operator Licensing Retake Written Examination Approval 05000269/2019301, 05000270/2019301, and 05000287/2019301 ML19014A0282019-01-0909 January 2019 Notification of Licensed Operator Retake Initial Examination 05000269/2019301, 05000270/2019301, and 05000287/2019301 ML18242A6932018-08-30030 August 2018 Exam Administrative Items ADAMS-2D ML18155A4602018-06-0101 June 2018 Operator Licensing Written Examination Approval Letter - 05000269/2018301, 05000270/2018301 and 05000287/2018301 ONS-2017-061, Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations2017-08-10010 August 2017 Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations ML17193A3612017-07-12012 July 2017 302 Final Items 2B - Delay Release 2 Yrs ML17193A3592017-07-12012 July 2017 302 Draft Items 2A - Delay Release 2 Yrs ML17193A3632017-07-12012 July 2017 302 Admin Items 2C - Delay Release 2 Yrs ML17181A2022017-06-30030 June 2017 Exam Administrative Items for ADAMS 2C ML17181A2192017-06-30030 June 2017 302 Exam Administrative Items for ADAMS 2D ML17165A5562017-06-28028 June 2017 302 Draft RO Written Exam ML17179A5622017-06-28028 June 2017 302 Exam Final Items for ADAMS 2B ML17179A5062017-06-28028 June 2017 302 Exam Draft Items for ADAMS 2A ML17179A1662017-06-28028 June 2017 302 Exam Administrative Items for ADAMS 2D ML17165A5582017-06-28028 June 2017 302 Draft SRO Written Exam ML17174B2912017-06-23023 June 2017 302 Exam Administrative Items for ADAMS 2C - Delay Release 2 Yrs ML17174B2882017-06-23023 June 2017 302 Exam Draft Items for ADAMS 2A - Delay 2 Years Release ML17174B2892017-06-23023 June 2017 302 Exam Final Items for ADAMS 2B - Delay Release 2 Years ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17017A4502017-01-17017 January 2017 302 Final As-Given RO Written Exam - Delay Release 2 Yrs ML17017A4932017-01-17017 January 2017 302 Final As-Given SRO Written Exam - Delay Release 2 Yrs ML17017A4982017-01-17017 January 2017 302 Post-Exam Comments - Delay Release 2 Yrs ML16336A2962016-11-30030 November 2016 Operator Licensing Written Examination Approval 05000269/2016302, 05000270/2016302 and 05000287/2016302 IR 05000269/20163012016-08-17017 August 2016 NRC Operator License Examination Report Nos. 05000269/2016301, 05000270/2016301 and 05000287/2016301 ML16196A0492016-07-14014 July 2016 Initial Examination 2016-301 Final RO Written Exam - Delay Release 2024-08-08
[Table view] |
See also: IR 05000269/2019301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
January 9, 2019
Mr. Ed Burchfield, Jr.
Site Vice President
Oconee Nuclear Station
7800 Rochester Highway
Seneca, SC 29672-0752
SUBJECT: OCONEE NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR
RETAKE INITIAL EXAMINATION 05000269/2019301, 05000270/2019301, AND
05000287/2019301
Dear Mr. Burchfield:
During a telephone conversation on December 19, 2018, between Mr. Sam Lark, Lead NRC
Exam Author and Mr. Andreas Goldau, Operations Engineer, arrangements were made for the
administration of a retake licensing examination at the Oconee Nuclear Station. The on-site
preparation and administration of the simulator scenario portion of the operating test are
scheduled for the week of February 24, 2019.
As agreed during the telephone conversation, your staff will prepare the simulator scenario
portion of the operating test based on the guidelines in Revision 11 of NUREG-1021, "Operator
Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examination is administered. Your staff has also agreed to make copies
of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outlines by January 18, 2019. The simulator scenario portion of the operating test and the
supporting reference materials identified in Attachment 3 to ES-201 will be due by February 11,
2019. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outline, examination, and test before they are submitted to the NRC for review and approval. All
materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
E. Burchfield 2
In order to conduct the requested operating test, it will be necessary for your staff to provide
adequate space and accommodations in accordance with ES-402, and to make the simulation
facility available on the dates noted above. In accordance with ES-302, your staff should retain
the original simulator performance data (e.g., system pressures, temperatures, and levels)
generated during the dynamic operating tests until the NRC takes licensing action on all the
applications and any adjudicatory actions on any hearing demands are complete.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator waiver and/or excusal requests (Office of Management and
Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if
possible). Contact Mr. Goldau to determine the method for submission of the waiver or excusal
requests. Preliminary reactor operator and senior reactor operator license applications (OMB
approval number 3150-0090) and medical certifications (OMB approval number 3150-0024)
should be submitted at least 30 days before the first examination date. If the applications are
not received at least 30 days before the examination date, a postponement may be necessary.
Final signed applications certifying that all training has been completed and requesting any
waivers or excusals, as applicable, should be submitted at least 14 days before the first
examination date.
Although the guidelines for receiving waiver or excusal requests call for at least 30 days before
the first examination date (preliminary) and 14 days before the first examination date (final), the
requests should be submitted as early as possible in the process (see the 60-day guideline
above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form
398, Personal Qualifications StatementLicensee, or as directed by Mr. Goldau when
contacting him to determine the method for submission). The NRC will document its final
decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398
submitted for the applicant. The NRC will not provide its decision until the final application is
submitted to the agency.
Paperwork Reduction Act Statement
This letter contains information collection requirements that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved
by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these mandatory information collections is estimated to average
2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination, including the time for reviewing instructions, searching existing
data sources, gathering and maintaining the data needed, and completing and reviewing the
information collections. You may submit comments on any aspect of the information collections,
including suggestions for reducing the burden, to FOIA, Privacy and Information Collections
Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by
electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
E. Burchfield 3
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information, unless the document requesting or requiring the collection displays a currently
valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the agencys Rules of Practice, a copy of this letter and its enclosures will be available
electronically for public inspection through the Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the NRC Website at
http://www.nrc.gov/reading-rm.adams.html.
Thank you for your cooperation in this matter. Mr. Lark has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Goldau at (404) 997-4528, (Internet E-mail:
Andreas.Goldau@nrc.gov), or me at (404) 997-4662, (Internet E-mail:
Eugene.Guthrie@nrc.gov).
Sincerely,
/RA/
Eugene F. Guthrie, Chief
Operations Branch 2
Division of Reactor Safety
Docket Nos.: 50-269, 50-270, 50-287
License Nos.: DPR-38, DPR-47, DPR-55
cc: Distribution via ListServ
ML 19014A028 SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE RII:DRS RII:DRS
SIGNATURE AXG1 GXG
NAME A.GOLDAU E.GURTHRIE
DATE 12/ 20 /2018 1/ 8 /2018
E-MAIL COPY? YES NO YES NO