DUKE Scott L.
EI\\1ERGY Vice President Oconee Nuclear Station ONS-2014-049 Duke Energy ONOI VP 7800 Rochester Hwy Seneca, SC 29672 April 22, 2015 o
864.873.3274 Mr. Victor McCree, Regional Administrator 1 864.873 4208 U.S. Nuclear Regulatory Commission, Region II ScottBatsonduke-energy corn Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257
Subject:
OCONEE NUCLEAR STATION 1LT47 Operating Exam
- 45 day submittal
Dear Mr. McCree:
In accordance with the provisions of NUREG-1 021, Operator Licensing Examination Standards for Power Reactors, Duke Energy is submitting the operating exam, quality checklists, and other documentation as required for the initial license exam scheduled for the week of June 8, 2015 at the Operator Training Center, Oconee Nuclear Site. Submitted for review are:
One set of Administrative JPMs with handouts; One set of Control Room/In-Plant JPMs with handouts; Form ES-201-2, Examination Outline Quality Checklist; Form ES-201-3, Examination Security Agreement; Form ES-301-1, RO Administrative Topics Outline; Form ES-301-1, SRO Administrative Topics Outline; Form ES-301-2, RO Control Room/In-Plant Systems Outline; Form ES-301-2, SRO (U) Control Room/In-Plant Systems Outline; Form ES-301-2, SRO (I) Control Room/In-Plant Systems Outline; Form ES-301-3, Operating Test Quality Checklist; Form ES-301-4, Simulator Scenario Quality Checklist; Form ES-301-5, Transient and Event Checklist;Form ES-301-6, Competencies Checklist; Form ES-Di for Three Simulator Scenarios; Form ES-D2 for Three Simulator Scenarios.
If you require any additional information, or have any questions, please contact Cliff Witherspoon at (864) 873-4330 or Sam Lark at (864) 873-3642.
Sincerely, Scott L. Batson Vice President Oconee Nuclear Station www.duke-energy.com
U.S. Nuclear Regulatory Commission, Region II April 22, 2015 Page 2 cc:
Gerald J. McCoy, Chief U.S. Nuclear Regulatory Commission, Region It Division of Reactor Safety Operations Branch Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 David Lanyi U.S. Nuclear Regulatory Commission, Region II Division of Reactor Safety Operations Branch Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257
DUKE Scott L.
ENERGY Vice President Oconee Nuclear Station ONS-2014-040 Duke Energy 0N01 VP I 7800 Rochester Hwy Seneca, SC 29672 April 1, 2015 0: 864.873.3274 864.873.4208 Mr. Victor McCree, Regional Administrator Scott.Batsonduke-energy.com U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257
Subject:
Oconee Nuclear Station Written Exam
- 45 day submittal
Dear Mr. McCree:
In accordance with the provisions of NUREG-1 021, Duke Energy is submitting the written exam, quality checklists, and other documentation as required for the initial license written exam scheduled for June 17, 2015 at the Operator Training Center, Oconee Nuclear Station. Submitted for review are:
Form ES-201-3, Examination Security Agreement; Form ES-401-4, Record of Rejected K/As; Form ES-401-6, Written Examination Quality Checklist; RO written exam (with reference package);
RO written exam key; SRO written exam (with reference package);
SRO written exam key; Reference material on a DVD.
If you require any additional information, or have any questions, please contact Cliff Witherspoon at (864) 873-4330.
Sincerely, Scott L. Batson Vice President Oconee Nuclear Station www.duke-energy.com
U.S. Nuclear Regulatory Commission, Region II April 1, 2015 Page 2 cc:
Gerald J. McCoy, Chief U.S. Nuclear Regulatory Commission, Region II Division of Reactor Safety Operations Branch Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 David Lanyi U.S. Nuclear Regulatory Commission, Region II Division of Reactor Safety Operations Branch Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257
DUKE Scott L.
ERGY Vice President Oconee Nuclear Station ONS-2015-078 Duke Energy ONOI VP I 7800 Rochester Hwy Seneca, SC 29672 June 19,2015 0: 864.873.3274 Mr. Victor McCree, Regional Ad mlnistrator Scott.Batson@duk:-energy corn U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257
Subject:
OCONEE NUCLEAR STATION ILT47 Post Exam Submittal
Dear Mr. McCree:
An NRC initial license operating exam was administered the week of June 8, 2015. The associated written exam was administered on June 17, 2015. Oconee has three post exam comments included with this submittal letter as Attachment 1. Enclosed for your review as directed by NUREG 1021 are the following:
A student seating chart, The original student answer sheets, The original signed exam cover sheets, Two clean copies of the student answer sheets, Acopyofthe ROexam, A copy of the SRO exam, An RO exam key, An SRO exam key, A compiled list of student comments and proctor answers.
If you require any additional information, or have any questions, please contact Cliff Witherspoon at (864) 873-4330 or Sam Lark at (864) 873-3642.
Sincerely, Scott L. Batson Vice President Oconee Nuclear Station www.duke-energy.com
U.S. Nuclear Regulatory Commission, Region II June 19, 2015 Page 2 cc:
David Lanyi U.S. Nuclear Regulatory Commission, Region II Division of Reactor Safety Operations Branch Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257