| number = ML14321A708
| number = ML14321A708
| issue date = 02/24/2015
| issue date = 02/24/2015
| title = 9/24/2014 Summary of Meeting with Southern California Edison to Discuss Plans to Relocate Current Main Control Room to a Command Center During Decommissioning of San Onofre, Units 2 and 3 (TAC Nos. MF4778 and MF4779)
| title = 9/24/2014 Summary of Meeting with Southern California Edison to Discuss Plans to Relocate Current Main Control Room to a Command Center During Decommissioning of San Onofre, Units 2 and 3
| author name = Wengert T J
| author name = Wengert T
| author affiliation = NRC/NRR/DORL/LPLIV-2
| author affiliation = NRC/NRR/DORL/LPLIV-2
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000361, 05000362
| docket = 05000361, 05000362
| license number = NPF-010, NPF-015
| license number = NPF-010, NPF-015
| contact person = Wengert T J
| contact person = Wengert T
| case reference number = TAC MF4778, TAC MF4779
| case reference number = TAC MF4778, TAC MF4779
| package number = ML14321A707
| package number = ML14321A707
Line 15: Line 15:
| page count = 4
| page count = 4
| project = TAC:MF4778, TAC:MF4779
| project = TAC:MF4778, TAC:MF4779
| stage = Meeting
}}
}}


=Text=
=Text=
{{#Wiki_filter:LICENSEE: Southern California Edison FACILITY: San Onofre Nuclear Generating Station, Units 2 and 3 SUBJECT: SUMMARY OF SEPTEMBER 24, 2014, MEETING WITH SOUTHERN CALIFORNIA EDISON RE: MEETING ON THE CONTROL ROOM/COMMAND CENTER FUNCTION OPTIONS FOR THE SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 (TAC NOS. MF4778 AND MF4779) Background On September 24, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Southern California Edison (SCE, the licensee) at the NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was for SCE to provide an overview of its plans to relocate the current Main Control Room to a new Command Center during decommissioning for the San Onofre Nuclear Generating Station, Units 2 and 3 (SONGS). The meeting notice and agenda, dated September 11, 2014, can be found in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML 14261A398. A list of attendees is provided in the Enclosure. Meeting On September 24, 2014, the NRC staff held a public meeting with SCE to discuss SCE's options for relocating the existing Control Room to a Command Center at SONGS. Portions of the meeting were closed to the public because Safeguards or Security-related information were discussed. The licensee's presentations can be found in ADAMS under Accession Nos. ML 14265A465 and ML 14272A465 for the public and non-public portions, respectively. During the presentation, the licensee provided an overview of the functions that the proposed Command Center would employ, including spent fuel pool indications and alarms, plant radiation monitors, fire panel, and meteorological data. In addition, the licensee identified the Command Center functionality related to the permanently defueled emergency plan (PDEP), which would include the ability to assess plant status, implement emergency actions and mitigation strategies, and provide voice communications with the NRC and local agencies, as needed. The licensee also provided a comparison of the functional design requirements of the operating plant to the proposed decommissioning facility, including the plant control/protection functions, displays, communications, habitability, and structural requirements. The licensee stated that the staffing levels for the Command Center would be consistent with the requirements in Section 5 of the recently-amended technical specifications and the PDEP license amendment request currently under review by the NRC staff.
{{#Wiki_filter:LICENSEE:       Southern California Edison FACILITY:       San Onofre Nuclear Generating Station, Units 2 and 3
-2 -Before concluding the open portion of the meeting, a few members of the public asked questions and made comments. One commenter was concerned that the money for the relocation would not be well spent and suggested that the Command Center should not be a temporary structure, but a facility to be used for the long-term. Another member of the public commented that the licensee was moving too quickly with this relocation and suggested that they slow down and consider other points of view. The NRC responded that the NRC staff will perform a thorough evaluation of any request made by the licensee before a decision is made and that the staff will take as much time to assess as is necessary. Following the public question period, the meeting was closed to the public to discuss security aspects of the Command Center options. No Public Meeting Feedback forms were received. Following the meeting, a member of the public who participated in the meeting submitted an e-mail with comments and observations on the meeting and requested that they be made part of the public record of this meeting. These comments can be found at ADAMS Accession No. ML 15054A352. Please direct any inquiries to me at 301-415-4037 or by email at Thomas.Wengert@nrc.gov. Docket Nos. 50-361 and 50-362 Enclosure: List of Attendees cc w/encl: Distribution via Listserv Thomas J. Weng , Senior ject Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES SEPTEMBER 24, 2014, MEETING WITH SOUTHERN CALIFORNIA EDISON MEETING REGARDING CONTROL ROOM/COMMAND CENTER FUNCTION OPTIONS SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 DOCKET NOS. 50-361 AND 50-362 U.S. Nuclear Regulatory Commission D. Broaddus, NRR/DORL T. Wengert, NRR/DORL M. Keefe, NRR/DRA D. Chung, NRR/DRA S. Wastler, NSIR/DSP D. White, NSIR/DSP M. Cervera, NSIR/DSP J. Rycyna, NSIR/CSD J. Anderson, NSIR/DPR M. Norris, NSIR/DPR Y. Li, NRR/DE A Moreno, OCA Southern California Edison R. Brabec A Sterdis M. Moran J. Madigan A.Do EXTERNAL STAKEHOLDERS California Energy Commission *D. Mills City of Laguna Beach *M. Phillips Crystal River 3 *S. McDaniel Members of the Public *D. Gilmore *M. Magda *R. Lutz
 
* Participated via teleconference *D. Mcintyre, OPA *R. Kahler, NSIR/DPR *B. Maier, Region IV *R. Kellar, Region IV *G. Warnick, Region IV *S. Genshaw *J. Donis *H. Williamson Orange County *S. Kaminske Kewaunee Station *J. Gadzale Enclosure OFFICE NAME DATE -2 -Before concluding the open portion of the meeting, a few members of the public asked questions and made comments. One commenter was concerned that the money for the relocation would not be well spent and suggested that the Command Center should not be a temporary structure, but a facility to be used for the long-term. Another member of the public commented that the licensee was moving too quickly with this relocation and suggested that they slow down and consider other points of view. The NRC responded that the NRC staff will perform a thorough evaluation of any request made by the licensee before a decision is made and that the staff will take as much time to assess as is necessary. Following the public question period, the meeting was closed to the public to discuss security aspects of the Command Center options. No Public Meeting Feedback forms were received. Following the meeting, a member of the public who participated in the meeting submitted an e-mail with comments and observations on the meeting and requested that they be made part of the public record of this meeting. These comments can be found at ADAMS Accession No. ML 15054A352. Please direct any inquiries to me at 301-415-4037 or by email at Thomas.Wengert@nrc.gov. Docket Nos. 50-361 and 50-362 Enclosure: List of Attendees IRA/ Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC RidsAcrsAcnw_MailCTR Resource RidsNrrPMSanOnofre Resource GWarnick, RIV RKahler, NSIR DMclntyre, OPA JAnderson, NSIR DChung, NRR MCervera, NSIR LPL4-2 R/F RidsNrrDorlLPL4-2 Resource RidsNrrLAJBurkhardt MKeefe, NRR JRycyna, NSIR RKellar, RIV DBroaddus, NRR AMoreno, OCA ADAMS Package Accession No: ML14321A707 RidsNrrLAPBlechman Resource RidsRgn4MailCenter Resource TWertz, NRR SWastler, NSIR DWhite, NSIR BMaier, RIV MNorris, NSIR Yli,NRR Meeting Summary: ML 14321A708, Meeting Sl"d ML 1 26 A46 ML 1 272A46 1 es: 4 5 5* 4 ' 5 NRR/DORULPL4-2/PM NRR/DORULPL4-2/LA NRR/DORULPL4-2/LA NRR/DORULPL4-2/BC NRR/DORULPL4-2/PM TWenoert PBlechman JBurkhardt DBroaddus( MKhanna for) TWenoert 1/23/15 11/7/14 11/19/14 2/2/15 2/24/15 OFFICIAL RECORD COPY 
==SUBJECT:==
}}
 
==SUMMARY==
OF SEPTEMBER 24, 2014, MEETING WITH SOUTHERN CALIFORNIA EDISON RE: MEETING ON THE CONTROL ROOM/COMMAND CENTER FUNCTION OPTIONS FOR THE SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 (TAC NOS. MF4778 AND MF4779)
 
===Background===
On September 24, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Southern California Edison (SCE, the licensee) at the NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was for SCE to provide an overview of its plans to relocate the current Main Control Room to a new Command Center during decommissioning for the San Onofre Nuclear Generating Station, Units 2 and 3 (SONGS). The meeting notice and agenda, dated September 11, 2014, can be found in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML14261A398. A list of attendees is provided in the Enclosure.
Meeting On September 24, 2014, the NRC staff held a public meeting with SCE to discuss SCE's options for relocating the existing Control Room to a Command Center at SONGS. Portions of the meeting were closed to the public because Safeguards or Security-related information were discussed. The licensee's presentations can be found in ADAMS under Accession Nos.
ML14265A465 and ML14272A465 for the public and non-public portions, respectively.
During the presentation, the licensee provided an overview of the functions that the proposed Command Center would employ, including spent fuel pool indications and alarms, plant radiation monitors, fire panel, and meteorological data. In addition, the licensee identified the Command Center functionality related to the permanently defueled emergency plan (PDEP),
which would include the ability to assess plant status, implement emergency actions and mitigation strategies, and provide voice communications with the NRC and local agencies, as needed.
The licensee also provided a comparison of the functional design requirements of the operating plant to the proposed decommissioning facility, including the plant control/protection functions, displays, communications, habitability, and structural requirements. The licensee stated that the staffing levels for the Command Center would be consistent with the requirements in Section 5 of the recently-amended technical specifications and the PDEP license amendment request currently under review by the NRC staff.
 
Before concluding the open portion of the meeting, a few members of the public asked questions and made comments. One commenter was concerned that the money for the relocation would not be well spent and suggested that the Command Center should not be a temporary structure, but a facility to be used for the long-term. Another member of the public commented that the licensee was moving too quickly with this relocation and suggested that they slow down and consider other points of view. The NRC responded that the NRC staff will perform a thorough evaluation of any request made by the licensee before a decision is made and that the staff will take as much time to assess as is necessary.
Following the public question period, the meeting was closed to the public to discuss security aspects of the Command Center options.
No Public Meeting Feedback forms were received. Following the meeting, a member of the public who participated in the meeting submitted an e-mail with comments and observations on the meeting and requested that they be made part of the public record of this meeting. These comments can be found at ADAMS Accession No. ML15054A352.
Please direct any inquiries to me at 301-415-4037 or by email at Thomas.Wengert@nrc.gov.
Thomas J. Weng , Senior       ject Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362
 
==Enclosure:==
 
List of Attendees cc w/encl: Distribution via Listserv
 
LIST OF ATTENDEES SEPTEMBER 24, 2014, MEETING WITH SOUTHERN CALIFORNIA EDISON MEETING REGARDING CONTROL ROOM/COMMAND CENTER FUNCTION OPTIONS SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 DOCKET NOS. 50-361 AND 50-362 U.S. Nuclear Regulatory Commission D. Broaddus, NRR/DORL                   *D. Mcintyre, OPA T. Wengert, NRR/DORL                   *R. Kahler, NSIR/DPR M. Keefe, NRR/DRA                       *B. Maier, Region IV D. Chung, NRR/DRA                       *R. Kellar, Region IV S. Wastler, NSIR/DSP                   *G. Warnick, Region IV D. White, NSIR/DSP M. Cervera, NSIR/DSP J. Rycyna, NSIR/CSD J. Anderson, NSIR/DPR M. Norris, NSIR/DPR Y. Li, NRR/DE A Moreno, OCA Southern California Edison R. Brabec                                 *S. Genshaw A Sterdis                                 *J. Donis M. Moran                                 *H. Williamson J. Madigan A.Do EXTERNAL STAKEHOLDERS California Energy Commission             Orange County
*D. Mills                                 *S. Kaminske City of Laguna Beach
*M. Phillips Crystal River 3                           Kewaunee Station
*S. McDaniel                             *J. Gadzale Members of the Public
*D. Gilmore
*M. Magda
*R. Lutz
* Participated via teleconference Enclosure
 
ML15054A352.
Please direct any inquiries to me at 301-415-4037 or by email at Thomas.Wengert@nrc.gov.
IRA/
Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362
 
==Enclosure:==
 
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC                             LPL4-2 R/F                         RidsNrrLAPBlechman Resource RidsAcrsAcnw_MailCTR Resource      RidsNrrDorlLPL4-2 Resource         RidsRgn4MailCenter Resource RidsNrrPMSanOnofre Resource        RidsNrrLAJBurkhardt                 TWertz, NRR GWarnick, RIV                       MKeefe, NRR                         SWastler, NSIR RKahler, NSIR                      JRycyna, NSIR                       DWhite, NSIR DMclntyre, OPA                      RKellar, RIV                        BMaier, RIV JAnderson, NSIR                    DBroaddus, NRR                      MNorris, NSIR DChung, NRR                        AMoreno, OCA                        Yli,NRR MCervera, NSIR ADAMS Package Accession No: ML14321A707 Meeting Summary: ML14321A708, Meeting Sl"d   1 es: ML14265A465* ML14272A465 OFFICE  NRR/DORULPL4-2/PM     NRR/DORULPL4-2/LA   NRR/DORULPL4-2/LA     NRR/DORULPL4-2/BC         NRR/DORULPL4-2/PM NAME    TWenoert             PBlechman           JBurkhardt             DBroaddus( MKhanna for)   TWenoert DATE    1/23/15               11/7/14             11/19/14               2/2/15                   2/24/15}}

Latest revision as of 18:06, 19 March 2020

9/24/2014 Summary of Meeting with Southern California Edison to Discuss Plans to Relocate Current Main Control Room to a Command Center During Decommissioning of San Onofre, Units 2 and 3
ML14321A708
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/24/2015
From: Thomas Wengert
Plant Licensing Branch IV
To:
Southern California Edison Co
Wengert T
Shared Package
ML14321A707 List:
References
TAC MF4778, TAC MF4779
Download: ML14321A708 (4)


Text

LICENSEE: Southern California Edison FACILITY: San Onofre Nuclear Generating Station, Units 2 and 3

SUBJECT:

SUMMARY

OF SEPTEMBER 24, 2014, MEETING WITH SOUTHERN CALIFORNIA EDISON RE: MEETING ON THE CONTROL ROOM/COMMAND CENTER FUNCTION OPTIONS FOR THE SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 (TAC NOS. MF4778 AND MF4779)

Background

On September 24, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Southern California Edison (SCE, the licensee) at the NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was for SCE to provide an overview of its plans to relocate the current Main Control Room to a new Command Center during decommissioning for the San Onofre Nuclear Generating Station, Units 2 and 3 (SONGS). The meeting notice and agenda, dated September 11, 2014, can be found in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML14261A398. A list of attendees is provided in the Enclosure.

Meeting On September 24, 2014, the NRC staff held a public meeting with SCE to discuss SCE's options for relocating the existing Control Room to a Command Center at SONGS. Portions of the meeting were closed to the public because Safeguards or Security-related information were discussed. The licensee's presentations can be found in ADAMS under Accession Nos.

ML14265A465 and ML14272A465 for the public and non-public portions, respectively.

During the presentation, the licensee provided an overview of the functions that the proposed Command Center would employ, including spent fuel pool indications and alarms, plant radiation monitors, fire panel, and meteorological data. In addition, the licensee identified the Command Center functionality related to the permanently defueled emergency plan (PDEP),

which would include the ability to assess plant status, implement emergency actions and mitigation strategies, and provide voice communications with the NRC and local agencies, as needed.

The licensee also provided a comparison of the functional design requirements of the operating plant to the proposed decommissioning facility, including the plant control/protection functions, displays, communications, habitability, and structural requirements. The licensee stated that the staffing levels for the Command Center would be consistent with the requirements in Section 5 of the recently-amended technical specifications and the PDEP license amendment request currently under review by the NRC staff.

Before concluding the open portion of the meeting, a few members of the public asked questions and made comments. One commenter was concerned that the money for the relocation would not be well spent and suggested that the Command Center should not be a temporary structure, but a facility to be used for the long-term. Another member of the public commented that the licensee was moving too quickly with this relocation and suggested that they slow down and consider other points of view. The NRC responded that the NRC staff will perform a thorough evaluation of any request made by the licensee before a decision is made and that the staff will take as much time to assess as is necessary.

Following the public question period, the meeting was closed to the public to discuss security aspects of the Command Center options.

No Public Meeting Feedback forms were received. Following the meeting, a member of the public who participated in the meeting submitted an e-mail with comments and observations on the meeting and requested that they be made part of the public record of this meeting. These comments can be found at ADAMS Accession No. ML15054A352.

Please direct any inquiries to me at 301-415-4037 or by email at Thomas.Wengert@nrc.gov.

Thomas J. Weng , Senior ject Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv

LIST OF ATTENDEES SEPTEMBER 24, 2014, MEETING WITH SOUTHERN CALIFORNIA EDISON MEETING REGARDING CONTROL ROOM/COMMAND CENTER FUNCTION OPTIONS SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 DOCKET NOS. 50-361 AND 50-362 U.S. Nuclear Regulatory Commission D. Broaddus, NRR/DORL *D. Mcintyre, OPA T. Wengert, NRR/DORL *R. Kahler, NSIR/DPR M. Keefe, NRR/DRA *B. Maier, Region IV D. Chung, NRR/DRA *R. Kellar, Region IV S. Wastler, NSIR/DSP *G. Warnick, Region IV D. White, NSIR/DSP M. Cervera, NSIR/DSP J. Rycyna, NSIR/CSD J. Anderson, NSIR/DPR M. Norris, NSIR/DPR Y. Li, NRR/DE A Moreno, OCA Southern California Edison R. Brabec *S. Genshaw A Sterdis *J. Donis M. Moran *H. Williamson J. Madigan A.Do EXTERNAL STAKEHOLDERS California Energy Commission Orange County

  • D. Mills *S. Kaminske City of Laguna Beach
  • M. Phillips Crystal River 3 Kewaunee Station
  • S. McDaniel *J. Gadzale Members of the Public
  • D. Gilmore
  • M. Magda
  • R. Lutz
  • Participated via teleconference Enclosure

ML15054A352.

Please direct any inquiries to me at 301-415-4037 or by email at Thomas.Wengert@nrc.gov.

IRA/

Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL4-2 R/F RidsNrrLAPBlechman Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLPL4-2 Resource RidsRgn4MailCenter Resource RidsNrrPMSanOnofre Resource RidsNrrLAJBurkhardt TWertz, NRR GWarnick, RIV MKeefe, NRR SWastler, NSIR RKahler, NSIR JRycyna, NSIR DWhite, NSIR DMclntyre, OPA RKellar, RIV BMaier, RIV JAnderson, NSIR DBroaddus, NRR MNorris, NSIR DChung, NRR AMoreno, OCA Yli,NRR MCervera, NSIR ADAMS Package Accession No: ML14321A707 Meeting Summary: ML14321A708, Meeting Sl"d 1 es: ML14265A465* ML14272A465 OFFICE NRR/DORULPL4-2/PM NRR/DORULPL4-2/LA NRR/DORULPL4-2/LA NRR/DORULPL4-2/BC NRR/DORULPL4-2/PM NAME TWenoert PBlechman JBurkhardt DBroaddus( MKhanna for) TWenoert DATE 1/23/15 11/7/14 11/19/14 2/2/15 2/24/15