| title = 10/27/14 Summary of Meeting in Carlsbad, California to Discuss and Accept Comments Regarding the San Onofre Nuclear Generating Station Post-Shutdown Decommissioning Activities Report (TAC MF4705 and MF4706)
| title = Summary of Meeting in Carlsbad, California to Discuss and Accept Comments Regarding the San Onofre Nuclear Generating Station Post-Shutdown Decommissioning Activities Report
| author name = Wengert T J
| author name = Wengert T
| author affiliation = NRC/NRR/DORL/LPLIV-2
| author affiliation = NRC/NRR/DORL/LPLIV-2
| addressee name = Palmisano T J
| addressee name = Palmisano T
| addressee affiliation = Southern California Edison Co
| addressee affiliation = Southern California Edison Co
| docket = 05000361, 05000362
| docket = 05000361, 05000362
| license number = NPF-010, NPF-015
| license number = NPF-010, NPF-015
| contact person = Wengert T J
| contact person = Wengert T
| case reference number = TAC MF4705, TAC MF4706
| case reference number = TAC MF4705, TAC MF4706
| document type = Meeting Summary
| document type = Meeting Summary
| page count = 4
| page count = 4
| project = TAC:MF4705, TAC:MF4705, TAC:MF4706
| project = TAC:MF4705, TAC:MF4706
| stage = Other
| stage = Meeting
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 U.S. Nuclear Regulatory Commission Public Meeting Summary March 9, 2015 Title: Public Meeting to Discuss the San Onofre Nuclear Generating Station, Units 2 and 3 Post-Shutdown Decommissioning Activities Report (TAC Nos. MF4705 and MF4706) Meeting Identifier: 20141815 Date of Meeting: Monday, October 27, 2014 location: Omni La Costa Hotel, Carlsbad, CA Type of Meeting: Category 3 Purpose of the Meeting: The purpose of this meeting was to discuss and answer questions on the San Onofre Nuclear Generating Station (SONGS), Units 2 and 3 Post-Shutdown Decommissioning Activities Report (PSDAR). The U.S. Nuclear Regulatory Commission (NRC) staff also solicited written comments from the public on those questions that could not be answered during the public meeting. General Details: The meeting was scheduled from 6:00 p.m. -9:00 p.m. Pacific Standard Time and ran approximately 20 minutes longer. Twenty-three NRC staff members were present. The meeting began with an introduction of NRC staff and a review of meeting ground rules, followed by presentations from the NRC staff and Southern California Edison (the licensee). The NRC staff presentations focused on the decommissioning process, the NRC staff's review of the PSDAR, and the ways that members of the public can provide comments on the PSDAR. Following the NRC staff presentations, the licensee made a presentation describing its detailed plans for the decommissioning of SONGS. The majority of the meeting was dedicated to answering questions on the decommissioning process and the NRC staff review process, as well as receiving comments from members of the public. Approximately 250 people participated in the meeting. Ten participants asked questions and 25 participants provided comments. In addition to members of the public, meeting . participants included representatives of the SONGS Community Engagement Panel, labor organizations, public advocacy groups, and the licensee. Summary of Presentations: The NRC staff began the meeting by presenting information about the decommissioning process. The NRC presentation material can be found at Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14303A639. Following the NRC staff's presentation, the licensee made a presentation describing its detailed plans for the decommissioning of SONGS. The licensee's presentation material can be found at ADAMS Accession No. ML 14303A624. *
{{#Wiki_filter:UNITED ST~TES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 U.S. Nuclear Regulatory Commission Public Meeting Summary March 9, 2015
-2 -Following the presentations, the NRG staff then opened the meeting to the general public to ask qu,estions about the decommissioning process and to comment on the licensee's PSDAR. All members of the public who wanted to provide a comment were given the opportunity to speak. The meeting was transcribed so that the NRG staff could consider the public's comments as part of its review of the PSDAR. A copy of the transcript can be found at ADAMS Accession No. ML 14336A252. The NRG staff also created a version that corrects errors in the transcript found during the NRG staff's review of the document. The edited version, which includes the NRG staff's redlines and strikeouts, can be found at ADAMS Accession No. ML 14336A 178. In addition, a video recording of the meeting can be found on the NRG's Webcast Portal at: http://video.nrc.gov/#searcharchivedwebcasts .. The meeting concluded at approximately 9:20 p.m. with the NRG staff leaving the facility at 9:30 p.m. A fact sheet on the decommissioning process can be found at: rril/doc-collections/fact-sheets/decommissioning.html. Public Participation Themes: During the public question and answer session of the meeting, NRG staff addressed questions on the following topics, among others: o On-site spent nuclear fuel storage -NRG considers dry cask storage to be safe; o Decommissioning funding -NRG ascertains whether there is reasonableness that there will be enough funds to decommission the facility and to manage spent fuel until removed by the U.S. Department of Energy; o The seismic rating for the canisters -NRG considers the casks to be robustly designed; and o Long-term nuclear waste storage policy-NRG acknowledged that the United States does not currently have a policy in place that leads to moving the fuel to a permanent national repository. A sample of comments and concerns involving the decommissioning plans made during the public comment portion of the meeting included: o The dry cask storage canisters being considered by the licensee do not provide adequate defense-in-depth; more robust options are available; o Even though the power plant is shutdown, it is still a target for terrorists; o The lack of a national policy for long-term storage of nuclear waste means that the waste will be stored at SONGS indefinitely; and o Look at a longer term containment strategy with the cast iron type casks, something that is more permanent and durable that will last the proposed timeline. A complete accounting of the comments provided can be found in the meeting transcript.
 
-3 -Action Items/Next Steps: o NRG staff will consider the comments provided during this meeting as part of its review of the PSDAR. Attachments: o Meeting agenda -http://meetings.nrc.gov/pmns/mtg?do=details&Gode=20141815 o NRG staff presentation -ML 14303A639 o Licensee's presentation -ML 14303A624 o Meeting transcript -ML 14336A252 (unedited version), ML 14336A 178 (edited version) Please direct any inquiries to me at 301-415-4037 or by e-mail at Thomas.Wengert@nrc.gov. Docket Nos. 50-361 and 50-362 cc: Distribution via Listserv Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
==Title:==
... / -3 -Action Items/Next Steps: o NRC staff will consider the comments provided during this meeting as part of its review of the PSDAR. . Attachments: o Meeting agenda -http://meetings.nrc.gov/pmns/mtg?do=details&Code=20141815 o NRC staff presentation -ML 14303A639 o Licensee's presentation -ML 14303A624 o Meeting transcript-ML 14336A252 (unedited version), ML 14336A178 (edited version) Please direct any inquiries to me at 301-415-4037 or by e-mail at Thomas.Wengert@nrc.gov. Docket Nos. 50-361 and 50-362 cc: Distribution via Listserv DISTRIBUTION: PUBLIC LPL4-2 R/F RidsNrrDorlLPL4-2 Resource RidsNrrPMSanOnofre Resource RKeilar, RIV MDusaniwskyj, NRR VDricks, OPA RIV RidsNmssDuwp Resource KMcConnell, NMSS DWhite, NSIR HBenowitz, OGC LRakovan, OEDO IRA/ Thomas J .. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrLAPBlechman Resource RidsRgn4MailCenter Resource TWertz, NRR JAnderson, NSIR BWatson, NMSS ACsontos, NMSS MVaaler, NMSS RidsOcaMailCenter Resource SChakrabarti, NRO EOlvera, NRR RidsAcrsAcnw_MailCTR Resource RidsNrrLAJBurkhardt Resource GWarnick, RIV DBroaddus, NRR JHickman, NMSS DMclntyre, OPA JCai, NMSS RidsOpaMait Resource BMaier, RIV TSantos, EDO RIV ADAMS Accession No.: PKG ML 14352A063; Meeting Summary ML 14351A396 NRC Slide Presentation ML 14303A639; Licensee's Slide Presentation ML 14303A624; Raw Transcript ML 14336A252; Edited Transcript ML 14336A 178 OFFICE NRR/LPL4-2/PM NRR/LPL4-2/LA NRR/LPL4-2/LA NAME TWenaert PBlechman JBurkhardt DATE 1/6/15 12/18/14 12/19/14 *via email NMSS/DUWP/RDP/BC NRR/LPL4-2/BC BWatson* MKhanna 12/29/14 3/6/15 OFFICIAL RECORD COPY NRR/LPL4-2/PM TWenaert
Public Meeting to Discuss the San Onofre Nuclear Generating Station, Units 2 and 3 Post-Shutdown Decommissioning Activities Report (TAC Nos. MF4705 and MF4706)
* 3/9/15
Meeting Identifier: 20141815 Date of Meeting: Monday, October 27, 2014 location: Omni La Costa Hotel, Carlsbad, CA Type of Meeting: Category 3 Purpose of the Meeting:
}}
The purpose of this meeting was to discuss and answer questions on the San Onofre Nuclear Generating Station (SONGS), Units 2 and 3 Post-Shutdown Decommissioning Activities Report (PSDAR). The U.S. Nuclear Regulatory Commission (NRC) staff also solicited written comments from the public on those questions that could not be answered during the public meeting.
General Details:
The meeting was scheduled from 6:00 p.m. - 9:00 p.m. Pacific Standard Time and ran approximately 20 minutes longer. Twenty-three NRC staff members were present. The meeting began with an introduction of NRC staff and a review of meeting ground rules, followed by presentations from the NRC staff and Southern California Edison (the licensee).
The NRC staff presentations focused on the decommissioning process, the NRC staff's review of the PSDAR, and the ways that members of the public can provide comments on the PSDAR. Following the NRC staff presentations, the licensee made a presentation describing its detailed plans for the decommissioning of SONGS. The majority of the meeting was dedicated to answering questions on the decommissioning process and the NRC staff review process, as well as receiving comments from members of the public.
Approximately 250 people participated in the meeting. Ten participants asked questions and 25 participants provided comments. In addition to members of the public, meeting
  . participants included representatives of the SONGS Community Engagement Panel, labor organizations, public advocacy groups, and the licensee.
Summary of Presentations:
The NRC staff began the meeting by presenting information about the decommissioning process. The NRC presentation material can be found at Agencywide Documents Access and Management System (ADAMS) Accession No. ML14303A639. Following the NRC staff's presentation, the licensee made a presentation describing its detailed plans for the decommissioning of SONGS. The licensee's presentation material can be found at ADAMS Accession No. ML14303A624.
* Following the presentations, the NRG staff then opened the meeting to the general public to ask qu,estions about the decommissioning process and to comment on the licensee's PSDAR. All members of the public who wanted to provide a comment were given the opportunity to speak. The meeting was transcribed so that the NRG staff could consider the public's comments as part of its review of the PSDAR. A copy of the transcript can be found at ADAMS Accession No. ML14336A252. The NRG staff also created a version that corrects errors in the transcript found during the NRG staff's review of the document. The edited version, which includes the NRG staff's redlines and strikeouts, can be found at ADAMS Accession No. ML14336A178. In addition, a video recording of the meeting can be found on the NRG's Webcast Portal at: http://video.nrc.gov/#searcharchivedwebcasts ..
The meeting concluded at approximately 9:20 p.m. with the NRG staff leaving the facility at 9:30 p.m.
A fact sheet on the decommissioning process can be found at: http://www.nrc.gov/reading-rril/doc-collections/fact-sheets/decommissioning.html.
Public Participation Themes:
During the public question and answer session of the meeting, NRG staff addressed questions on the following topics, among others:
o   On-site spent nuclear fuel storage - NRG considers dry cask storage to be safe; o   Decommissioning funding - NRG ascertains whether there is reasonableness that there will be enough funds to decommission the facility and to manage spent fuel until removed by the U.S. Department of Energy; o   The seismic rating for the canisters - NRG considers the casks to be robustly designed; and o   Long-term nuclear waste storage policy- NRG acknowledged that the United States does not currently have a policy in place that leads to moving the fuel to a permanent national repository.
A sample of comments and concerns involving the decommissioning plans made during the public comment portion of the meeting included:
o   The dry cask storage canisters being considered by the licensee do not provide adequate defense-in-depth; more robust options are available; o   Even though the power plant is shutdown, it is still a target for terrorists; o   The lack of a national policy for long-term storage of nuclear waste means that the waste will be stored at SONGS indefinitely; and o   Look at a longer term containment strategy with the cast iron type casks, something that is more permanent and durable that will last the proposed timeline.
A complete accounting of the comments provided can be found in the meeting transcript.
 
Action Items/Next Steps:
o NRG staff will consider the comments provided during this meeting as part of its review of the PSDAR.
Attachments:
o Meeting agenda - http://meetings.nrc.gov/pmns/mtg?do=details&Gode=20141815 o NRG staff presentation - ML14303A639 o Licensee's presentation - ML14303A624 o Meeting transcript - ML14336A252 (unedited version), ML14336A178 (edited version)
Please direct any inquiries to me at 301-415-4037 or by e-mail at Thomas.Wengert@nrc.gov.
Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362 cc: Distribution via Listserv
 
PKG ML14352A063; Meeting Summary ML14351A396 NRC Slide Presentation ML14303A639; Licensee's Slide Presentation ML14303A624; Raw Transcript ML14336A252; Edited Transcript ML14336A178                                          *via email OFFICE NRR/LPL4-2/PM     NRR/LPL4-2/LA   NRR/LPL4-2/LA   NMSS/DUWP/RDP/BC  NRR/LPL4-2/BC  NRR/LPL4-2/PM NAME     TWenaert       PBlechman       JBurkhardt       BWatson*          MKhanna        TWenaert
* DATE     1/6/15         12/18/14         12/19/14         12/29/14         3/6/15         3/9/15
... /}}

Latest revision as of 17:27, 19 March 2020

Summary of Meeting in Carlsbad, California to Discuss and Accept Comments Regarding the San Onofre Nuclear Generating Station Post-Shutdown Decommissioning Activities Report
ML14351A396
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/09/2015
From: Thomas Wengert
Plant Licensing Branch IV
To: Thomas J. Palmisano
Southern California Edison Co
Wengert T
References
TAC MF4705, TAC MF4706
Download: ML14351A396 (4)


Text

UNITED ST~TES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 U.S. Nuclear Regulatory Commission Public Meeting Summary March 9, 2015

Title:

Public Meeting to Discuss the San Onofre Nuclear Generating Station, Units 2 and 3 Post-Shutdown Decommissioning Activities Report (TAC Nos. MF4705 and MF4706)

Meeting Identifier: 20141815 Date of Meeting: Monday, October 27, 2014 location: Omni La Costa Hotel, Carlsbad, CA Type of Meeting: Category 3 Purpose of the Meeting:

The purpose of this meeting was to discuss and answer questions on the San Onofre Nuclear Generating Station (SONGS), Units 2 and 3 Post-Shutdown Decommissioning Activities Report (PSDAR). The U.S. Nuclear Regulatory Commission (NRC) staff also solicited written comments from the public on those questions that could not be answered during the public meeting.

General Details:

The meeting was scheduled from 6:00 p.m. - 9:00 p.m. Pacific Standard Time and ran approximately 20 minutes longer. Twenty-three NRC staff members were present. The meeting began with an introduction of NRC staff and a review of meeting ground rules, followed by presentations from the NRC staff and Southern California Edison (the licensee).

The NRC staff presentations focused on the decommissioning process, the NRC staff's review of the PSDAR, and the ways that members of the public can provide comments on the PSDAR. Following the NRC staff presentations, the licensee made a presentation describing its detailed plans for the decommissioning of SONGS. The majority of the meeting was dedicated to answering questions on the decommissioning process and the NRC staff review process, as well as receiving comments from members of the public.

Approximately 250 people participated in the meeting. Ten participants asked questions and 25 participants provided comments. In addition to members of the public, meeting

. participants included representatives of the SONGS Community Engagement Panel, labor organizations, public advocacy groups, and the licensee.

Summary of Presentations:

The NRC staff began the meeting by presenting information about the decommissioning process. The NRC presentation material can be found at Agencywide Documents Access and Management System (ADAMS) Accession No. ML14303A639. Following the NRC staff's presentation, the licensee made a presentation describing its detailed plans for the decommissioning of SONGS. The licensee's presentation material can be found at ADAMS Accession No. ML14303A624.

  • Following the presentations, the NRG staff then opened the meeting to the general public to ask qu,estions about the decommissioning process and to comment on the licensee's PSDAR. All members of the public who wanted to provide a comment were given the opportunity to speak. The meeting was transcribed so that the NRG staff could consider the public's comments as part of its review of the PSDAR. A copy of the transcript can be found at ADAMS Accession No. ML14336A252. The NRG staff also created a version that corrects errors in the transcript found during the NRG staff's review of the document. The edited version, which includes the NRG staff's redlines and strikeouts, can be found at ADAMS Accession No. ML14336A178. In addition, a video recording of the meeting can be found on the NRG's Webcast Portal at: http://video.nrc.gov/#searcharchivedwebcasts ..

The meeting concluded at approximately 9:20 p.m. with the NRG staff leaving the facility at 9:30 p.m.

A fact sheet on the decommissioning process can be found at: http://www.nrc.gov/reading-rril/doc-collections/fact-sheets/decommissioning.html.

Public Participation Themes:

During the public question and answer session of the meeting, NRG staff addressed questions on the following topics, among others:

o On-site spent nuclear fuel storage - NRG considers dry cask storage to be safe; o Decommissioning funding - NRG ascertains whether there is reasonableness that there will be enough funds to decommission the facility and to manage spent fuel until removed by the U.S. Department of Energy; o The seismic rating for the canisters - NRG considers the casks to be robustly designed; and o Long-term nuclear waste storage policy- NRG acknowledged that the United States does not currently have a policy in place that leads to moving the fuel to a permanent national repository.

A sample of comments and concerns involving the decommissioning plans made during the public comment portion of the meeting included:

o The dry cask storage canisters being considered by the licensee do not provide adequate defense-in-depth; more robust options are available; o Even though the power plant is shutdown, it is still a target for terrorists; o The lack of a national policy for long-term storage of nuclear waste means that the waste will be stored at SONGS indefinitely; and o Look at a longer term containment strategy with the cast iron type casks, something that is more permanent and durable that will last the proposed timeline.

A complete accounting of the comments provided can be found in the meeting transcript.

Action Items/Next Steps:

o NRG staff will consider the comments provided during this meeting as part of its review of the PSDAR.

Attachments:

o Meeting agenda - http://meetings.nrc.gov/pmns/mtg?do=details&Gode=20141815 o NRG staff presentation - ML14303A639 o Licensee's presentation - ML14303A624 o Meeting transcript - ML14336A252 (unedited version), ML14336A178 (edited version)

Please direct any inquiries to me at 301-415-4037 or by e-mail at Thomas.Wengert@nrc.gov.

Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362 cc: Distribution via Listserv

PKG ML14352A063; Meeting Summary ML14351A396 NRC Slide Presentation ML14303A639; Licensee's Slide Presentation ML14303A624; Raw Transcript ML14336A252; Edited Transcript ML14336A178 *via email OFFICE NRR/LPL4-2/PM NRR/LPL4-2/LA NRR/LPL4-2/LA NMSS/DUWP/RDP/BC NRR/LPL4-2/BC NRR/LPL4-2/PM NAME TWenaert PBlechman JBurkhardt BWatson* MKhanna TWenaert

  • DATE 1/6/15 12/18/14 12/19/14 12/29/14 3/6/15 3/9/15

... /